CN113403998A - Method for quickly repairing flood control dam - Google Patents

Method for quickly repairing flood control dam Download PDF

Info

Publication number
CN113403998A
CN113403998A CN202110727760.2A CN202110727760A CN113403998A CN 113403998 A CN113403998 A CN 113403998A CN 202110727760 A CN202110727760 A CN 202110727760A CN 113403998 A CN113403998 A CN 113403998A
Authority
CN
China
Prior art keywords
flood
module
flood control
dam
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110727760.2A
Other languages
Chinese (zh)
Inventor
孙震
薛冬梅
顾时雨
穆张
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China India Hengsheng Beijing Trading Co ltd
Original Assignee
China India Hengsheng Beijing Trading Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China India Hengsheng Beijing Trading Co ltd filed Critical China India Hengsheng Beijing Trading Co ltd
Priority to CN202110727760.2A priority Critical patent/CN113403998A/en
Publication of CN113403998A publication Critical patent/CN113403998A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/106Temporary dykes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/041Structures or apparatus for, or methods of, protecting banks, coasts, or harbours using active mechanical means, e.g. fluidizing or pumping

Abstract

The invention discloses a method for quickly repairing a flood control dam, and relates to a method for pre-protecting and reinforcing a main flood control dam before a flood disaster comes, which can effectively deal with the risk of dam breach. The method adopts a novel fast-assembling flood control module to quickly place the module wall behind the dam in a hoisting mode when the dam is subjected to flood damage early warning, so that the module wall can become a permanent guard wall for protecting the dam body.

Description

Method for quickly repairing flood control dam
Technical Field
The invention discloses a method for quickly repairing a flood control dam, which adopts a novel quick-mounting flood control module to quickly place a module wall behind the dam in a hoisting mode when the dam is subjected to flood damage early warning, so that the module wall can become a permanent guard wall for protecting the dam body.
Background
Water resources in China are not uniformly distributed, total reserve of hydraulic resources is small, precipitation in southern areas is abundant, flood disasters are serious, and the development of people's life and agricultural production is seriously influenced. Novel hydraulic engineering can effectively save the river course flood, alleviates flood disasters and influences, protects current dykes and dams basis.
Disclosure of Invention
According to the method for protecting the original river channel dam, the flood control quick installation module completes construction of the module wall on the bank side, and the flood control module wall which is stably connected through vacuum adsorption is hung to a designated flood control area through a crane on the bank side, so that the flood control wall which blocks flood can be formed on the other side of the original river channel flood control dam.
Drawings
Fig. 1 is a sectional view of a flood control quick-install module of a method for quickly repairing an embankment.
Fig. 2 is a path diagram of a method for rapidly repairing an embankment.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, an embodiment of the invention is shown in fig. 1, which is a cross-sectional view of a flood control quick-assembly module for a rapid dam repairing method, comprising a detachable movable plate (1), a vacuum adsorption groove (2), a vacuum suction pump (3), a hollow water storage space (4), a power water pump (5), a water inlet pipeline (6), a water discharge pipeline (7), a water amount monitoring device (8), a main circuit board (9), a fixing bolt (10), a one-way valve (11), and a wiring pipeline (12)
Fig. 2 is a path diagram of a method for rapidly repairing a dam.

Claims (7)

1. A method for rapidly repairing a flood control dam is disclosed, wherein fig. 1 is a sectional view of a flood control quick-assembly module for realizing the method, and the flood control quick-assembly module comprises a detachable movable plate surface (1), a vacuum adsorption groove (2), a vacuum suction pump (3), a hollow water storage space (4), a power water pump (5), a water inlet pipeline (6), a drainage pipeline (7), a water quantity monitoring device (8), a main circuit board (9), a fixing bolt (10), a one-way valve (11), a wiring pipeline (12) and the like; fig. 2 is a path diagram of a method for rapidly repairing a dam, wherein a flood control fast-assembly module is used for completing construction of a module wall on a bank, and a flood control module wall which is stably connected by vacuum adsorption is hung to a designated flood control area through a crane on the bank to form another flood control wall for blocking flood outside the original river flood control dam.
2. A method for rapidly repairing a flood protection dam according to claim 1, wherein: the flood control quick-assembly module is a hexahedral square module device with a detachable single plate surface, building materials of the module comprise a high-density foamed ceramic material, a synthetic rubber material and a tooling steel plate material, and the tooling steel plate is positioned in the inner layer of the module and is convenient for installation of an internal pipeline; wherein, the pipeline layer of the module is wrapped by a 100mm rubber layer, thereby effectively preventing water erosion.
3. A method for rapidly repairing a flood protection dam according to claim 1, wherein: the detachable movable plate surface (1) is a back plate of the flood control module, is provided with a movable shaft and a detachable handle, and is convenient for a maintainer to detach the material plate at any time to overhaul or replace internal equipment; this flood control module internally mounted has power water pump (5), as the power original paper that drives the module and carry out water storage and drainage work.
4. A method for rapidly repairing a flood protection dam according to claim 1, wherein: the hollow water storage space (4) is used for sucking the flood rising outside the flood control wall body into the module through the water suction port, so that the pressure of the flood flow on two types of dams can be effectively reduced, the weight of the module is increased, and the gravity of the flood control wall is improved after the module splicing is completed.
5. A method for rapidly repairing a flood protection dam according to claim 1, wherein: the flood control modules are connected in a vacuum adsorption mode, the implementation method is that a vacuum suction pump (3) in the modules is communicated with a 600x600mm circular groove, namely a vacuum adsorption groove (2), on the surface of each module, the vacuum adsorption grooves (2) of adjacent modules are mutually spliced and butted to form a spherical vacuum area, all air in the vacuum adsorption area is completely extracted by using the vacuum suction pump (3), and the two flood control modules are firmly connected together under the action of air pressure.
6. A method for rapidly repairing a flood protection dam according to claim 1, wherein: the flood control module is internally provided with four groups of pipelines which are respectively two groups of water through pipelines and two groups of circuit pipelines, wherein the water pipe layers are a water inlet pipeline (6) and a water discharge pipeline (7) which are shown in the figure, the circuit layers are transversely arranged double-row pipelines, and the pipeline layers are all wrapped by the waterproof rubber layer, so that waterproof protection is well realized.
7. A method for rapidly repairing a flood protection dam according to claim 1, wherein: in case of flood disasters, an emergency plan can be made in advance by splicing the flood control quick-assembly modules when flood early warning is carried out, workers and mechanical equipment are arranged on two sides of a river bank to carry out installation of the modules, and flood control walls can be arranged according to specific conditions of a river channel to build specifications.
CN202110727760.2A 2021-06-29 2021-06-29 Method for quickly repairing flood control dam Pending CN113403998A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110727760.2A CN113403998A (en) 2021-06-29 2021-06-29 Method for quickly repairing flood control dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110727760.2A CN113403998A (en) 2021-06-29 2021-06-29 Method for quickly repairing flood control dam

Publications (1)

Publication Number Publication Date
CN113403998A true CN113403998A (en) 2021-09-17

Family

ID=77680203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110727760.2A Pending CN113403998A (en) 2021-06-29 2021-06-29 Method for quickly repairing flood control dam

Country Status (1)

Country Link
CN (1) CN113403998A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020024859A (en) * 2000-09-27 2002-04-03 염병대 Temporary levee protector for repairing underwater structure and installation method for the levee
CN2928945Y (en) * 2006-08-11 2007-08-01 林熹 Anti-flood wall block
CN201405409Y (en) * 2009-04-24 2010-02-17 上海舒平精工机械有限公司 Vacuum adsorption working bench
KR20100042725A (en) * 2008-10-17 2010-04-27 이성산업 (주) Vaccum suction typic forming apparatus for manufacturing a panel shaped core having honeycomb structure and method for manufacturing the panle shaped core using the forming apparatus
US20110033242A1 (en) * 2009-08-06 2011-02-10 Steele Flood Stop System Llc Modular-unit floodwall system
CN102995604A (en) * 2012-11-16 2013-03-27 尤柄澄 Water plugging bag for flood control
CN205975492U (en) * 2016-08-22 2017-02-22 曾彬 Dykes and dams flood control device
CN106436638A (en) * 2016-10-31 2017-02-22 顾新华 Superposition type city anti-flood wall capable of being built fast and method
CN107938597A (en) * 2017-12-21 2018-04-20 南京工业大学 Portable L-type automatic water storage type composite material flood control harden structure
CN207944425U (en) * 2018-01-17 2018-10-09 华川建设集团有限公司 Municipal works flood protection device
CN209285343U (en) * 2018-08-08 2019-08-23 宁波史河机器人科技有限公司 Clean robot
CN213268456U (en) * 2020-09-01 2021-05-25 深圳五联建设工程有限公司 Light fitment wall

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020024859A (en) * 2000-09-27 2002-04-03 염병대 Temporary levee protector for repairing underwater structure and installation method for the levee
CN2928945Y (en) * 2006-08-11 2007-08-01 林熹 Anti-flood wall block
KR20100042725A (en) * 2008-10-17 2010-04-27 이성산업 (주) Vaccum suction typic forming apparatus for manufacturing a panel shaped core having honeycomb structure and method for manufacturing the panle shaped core using the forming apparatus
CN201405409Y (en) * 2009-04-24 2010-02-17 上海舒平精工机械有限公司 Vacuum adsorption working bench
US20110033242A1 (en) * 2009-08-06 2011-02-10 Steele Flood Stop System Llc Modular-unit floodwall system
CN102995604A (en) * 2012-11-16 2013-03-27 尤柄澄 Water plugging bag for flood control
CN205975492U (en) * 2016-08-22 2017-02-22 曾彬 Dykes and dams flood control device
CN106436638A (en) * 2016-10-31 2017-02-22 顾新华 Superposition type city anti-flood wall capable of being built fast and method
CN107938597A (en) * 2017-12-21 2018-04-20 南京工业大学 Portable L-type automatic water storage type composite material flood control harden structure
CN207944425U (en) * 2018-01-17 2018-10-09 华川建设集团有限公司 Municipal works flood protection device
CN209285343U (en) * 2018-08-08 2019-08-23 宁波史河机器人科技有限公司 Clean robot
CN213268456U (en) * 2020-09-01 2021-05-25 深圳五联建设工程有限公司 Light fitment wall

Similar Documents

Publication Publication Date Title
CN106193074B (en) Steel cofferdam for channel reparation
CN205742235U (en) The steel cofferdam repaired for channel
CN113250138A (en) Flood control module device capable of being spliced quickly
CN102086634A (en) Marine underwater assembled water intake and construction method thereof
CN113882322B (en) Intelligent water stopping method for repairing underwater concrete damaged dry chamber
CN113403998A (en) Method for quickly repairing flood control dam
CN107130620B (en) Channel steel cofferdam method for arranging with the flow-compensated function of section
CN110820693A (en) Floating rubber dam
CN210797844U (en) Device that steel cofferdam and pump station combine to arrange
CN215977119U (en) Damaged dry chamber cabin of concrete under water restores intelligent stagnant water and equips
CN113235519A (en) Method for rapidly coping through type breach of dam
CN204662476U (en) A kind of box-type suction foundation water intaking brake structure
CN214738637U (en) Water outlet structure of power plant
CN106120656B (en) A kind of application method of the underwater constructing device for changing waterstop
CN213142939U (en) Flood control dam for hydraulic engineering
CN113529649A (en) Splicing type building process of novel retaining dam
CN210459142U (en) High arch dam protection energy dissipation system adopting water-permeable bottom plate
CN2326637Y (en) Assembling-type concrete slope-protection plate piece
CN107326876B (en) Non-closed non-pumping drainage plunge pool structure
CN211142988U (en) Floating rubber dam
CN113990053B (en) Online evaluation system for hydraulic working gate of pumped storage power station
CN201172809Y (en) Flood-combating intelligent combination water proof wall
CN216108936U (en) Drainage structure for intercepting newly-built water intake beside existing sewage well
KR200232752Y1 (en) Synthetic resins mould mending a underwater construction of bridge
CN211607679U (en) Hydraulic pipeline for hydraulic engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination