CN113403533B - Method for producing HRB500E twisted steel bar by high-speed bar and HRB500E twisted steel bar produced by high-speed bar - Google Patents

Method for producing HRB500E twisted steel bar by high-speed bar and HRB500E twisted steel bar produced by high-speed bar Download PDF

Info

Publication number
CN113403533B
CN113403533B CN202110592869.XA CN202110592869A CN113403533B CN 113403533 B CN113403533 B CN 113403533B CN 202110592869 A CN202110592869 A CN 202110592869A CN 113403533 B CN113403533 B CN 113403533B
Authority
CN
China
Prior art keywords
rolling
hrb500e
speed
double
twisted steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110592869.XA
Other languages
Chinese (zh)
Other versions
CN113403533A (en
Inventor
钱学海
蒙曰睿
肖娟
吴海林
陈学良
李西德
何维
周从锐
李显
潘刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Liuzhou Iron and Steel Group Co Ltd
Guangxi Liugang Huachuang Technology R&D Co Ltd
Original Assignee
Guangxi Liuzhou Iron and Steel Group Co Ltd
Guangxi Liugang Huachuang Technology R&D Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Liuzhou Iron and Steel Group Co Ltd, Guangxi Liugang Huachuang Technology R&D Co Ltd filed Critical Guangxi Liuzhou Iron and Steel Group Co Ltd
Priority to CN202210304834.6A priority Critical patent/CN114807746B/en
Priority to CN202110592869.XA priority patent/CN113403533B/en
Publication of CN113403533A publication Critical patent/CN113403533A/en
Application granted granted Critical
Publication of CN113403533B publication Critical patent/CN113403533B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/16Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling wire rods, bars, merchant bars, rounds wire or material of like small cross-section
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/46Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
    • B21B1/463Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a continuous process, i.e. the cast not being cut before rolling
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/06Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of rods or wires
    • C21D8/08Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of rods or wires for concrete reinforcement
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/24Ferrous alloys, e.g. steel alloys containing chromium with vanadium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/26Ferrous alloys, e.g. steel alloys containing chromium with niobium or tantalum
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/32Ferrous alloys, e.g. steel alloys containing chromium with boron
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Abstract

The invention provides a method for producing HRB500E twisted steel bars by using high-speed bars and HRB500E twisted steel bars produced by using the high-speed bars, wherein the method for producing the HRB500E twisted steel bars by using the high-speed bars comprises the following steps: the method comprises the following steps of smelting blast furnace molten iron, desulfurizing and pretreating the molten iron, smelting converter molten steel, blowing argon, LF refining, continuous casting of square billets, heating by a heating furnace, rough rolling, intermediate rolling, pre-finish rolling, controlled cooling and recovery, finish rolling, controlled cooling and recovery after rolling; the components of the HRB500E twisted steel produced by the high-speed bar are as follows: c: 0.21-0.25 Wt%, Si: 0.65-0.80 Wt%, Mn: 1.2-1.35 Wt%, P: less than or equal to 0.04 Wt%, S: less than or equal to 0.035 Wt%, V: 0.03-0.06 Wt%, Nb: 0.008-0.02 Wt%, N: 0.007-0.017 Wt%, B: 0.001-0.003 Wt%, Cr: 0.1-0.2 Wt%. High production efficiency and good surface quality. Reasonable yield strength and higher tensile strength are obtained.

Description

Method for producing HRB500E twisted steel bar by high-speed bar and HRB500E twisted steel bar produced by high-speed bar
Technical Field
The invention relates to the field of metallurgy, in particular to a method for producing HRB500E threaded steel bars by high-speed bars and HRB500E threaded steel bars produced by the high-speed bars.
Background
The steel bar produced by the high-speed bar has good control on the overall dimension, the finish rolling speed can reach 45 m/s or above, and the steel bar has the advantages of high yield, high quality and low cost, and is the development trend of the production of the current medium and small-sized twisted steel bars. Because the high-speed bar has high deformation speed and can use the controlled rolling and controlled cooling process, the HRB400E steel bar with fine grains is produced. However, when HRB500E steel bar with higher strength is produced, the contribution of fine grain strengthening to yield strength is large, the contribution to tensile strength is weak, and the yield ratio R DEG of HRB500E earthquake-resistant steel bar is difficult to satisfym/R°eL1.25 or more.
In summary, the following problems exist in the prior art: the HRB600E twisted steel bar produced by the existing high-speed bar is difficult to satisfy the yield ratio R DEGm/R°eL1.25 or more.
Disclosure of Invention
The technical problem solved by the embodiment of the invention is that the HRB600E twisted steel bar produced by the existing high-speed bar is difficult to meet the yield ratio R DEGm/R°eLA requirement of 1.25 or more.
To this end, in one aspect, the embodiments of the present invention provide a method for producing HRB500E twisted steel from high-speed bars, where the method for producing HRB500E twisted steel from high-speed bars includes:
the method comprises the following steps of smelting blast furnace molten iron, desulfurizing and pretreating the molten iron, smelting converter molten steel, blowing argon, LF refining, continuous casting of square billets, heating by a heating furnace, rough rolling, intermediate rolling, pre-finish rolling, controlled cooling and recovery, finish rolling, controlled cooling and recovery after rolling;
the components of the HRB500E twisted steel produced by the high-speed bar are as follows: c: 0.21-0.25 Wt%, Si: 0.65-0.80 Wt%, Mn: 1.2-1.35 Wt%, P: less than or equal to 0.04 Wt%, S: less than or equal to 0.035 Wt%, V: 0.03-0.06 Wt%, Nb: 0.008-0.02 Wt%, N: 0.007-0.017 Wt%, B: 0.001-0.003 Wt%, Cr: 0.1-0.2 Wt%.
Specifically, for HRB500E twisted steel with the specification of 10-16 mm, the components are as follows: c: 0.21-0.25 Wt%, Si: 0.65-0.80 Wt%, Mn: 1.2-1.35 Wt%, P: less than or equal to 0.04 Wt%, S: less than or equal to 0.035 Wt%, V: 0.03-0.045 Wt%, Nb: 0.008-0.02 Wt%, N: 0.007-0.015 Wt%, B: 0.001-0.002 Wt%, Cr: 0.1-0.2 Wt%.
Specifically, for HRB500E twisted steel with the specification of 18-25 mm, the components are as follows: c: 0.21-0.25 Wt%, Si: 0.65-0.80 Wt%, Mn: 1.2-1.35 Wt%, P: less than or equal to 0.04 Wt%, S: less than or equal to 0.035 Wt%, V: 0.045-0.06 Wt%, Nb: 0.008-0.02 Wt%, N: 0.009-0.017 Wt%, B: 0.002-0.003 Wt%, Cr: 0.1-0.2 Wt%.
Specifically, the method for producing the high-speed bar steel bar by the single line comprises the following steps: blast furnace molten iron smelting, molten iron desulphurization pretreatment, converter molten steel smelting, argon blowing, LF refining, square billet continuous casting, heating furnace heating, rough rolling, medium rolling (6 frames), pre-finish rolling (6 frames), single line, pre-finish rolling, controlled cooling and recovery section, finish rolling (4 frames), finish rolling (2 frames of reducing diameter), controlled cooling and recovery section after rolling, pinch rolls, disc double-length shear, braking device, hub device, cooling bed cooling and fixed-length shear.
Specifically, the method for producing the high-speed bar steel bars in a double-line mode comprises the following steps: the method comprises the following steps of smelting in a blast furnace molten iron, desulfurizing and pretreating the molten iron, smelting in a converter molten steel, blowing argon, LF refining, continuous casting of square billets, heating in a heating furnace, rough rolling, intermediate rolling, pre-finish rolling and splitting into double lines, pre-finish rolling and controlled cooling and recovery sections of the double lines, finish rolling of the double lines, double-line diameter reduction of 2 frames, controlled cooling and recovery sections after double rolling, double-line pinch rolls, double-line disc double-length shear, double-line braking devices, double-line hub devices, cooling bed cooling and fixed-length shearing.
Specifically, the reducing unit adopts 2 frames of 45-degree top-cross cantilever reducing machines, and realizes rolling below the recrystallization temperature or in a dual-phase region through independent transmission.
Specifically, the finishing mill group is divided into two lines and adopts 4 frames of 45-degree top cross cantilever V-shaped non-twist ultra-heavy-load Morgan rolling mills.
Specifically, the deformation of the last two machine frame passes is more than 15%.
Specifically, for HRB500E steel bars with the specification of 10-16 mm, the finish rolling speed is not less than 25 m/S.
On the other hand, the embodiment of the invention also provides a high-speed bar material for producing HRB500E twisted steel, and the HRB500E twisted steel produced by the high-speed bar material comprises the following components: c: 0.21-0.25 Wt%, Si: 0.65-0.80 Wt%, Mn: 1.2-1.35 Wt%, P: less than or equal to 0.04 Wt%, S: less than or equal to 0.035 Wt%, V: 0.03-0.06 Wt%, Nb: 0.008-0.02 Wt%, N: 0.007-0.017 Wt%, B: 0.001-0.003 Wt%, Cr: 0.1-0.2 Wt%, and is prepared by adopting a method for producing HRB500E twisted steel bars by using high-speed bars.
Compared with the HRB500E steel bar of the conventional production line, the method for producing the HRB500E twisted steel bar by the high-speed bar has the advantages that the alloy addition is reduced, and the production cost is reduced. The qualified HRB500E steel bars can be successfully produced by a high-speed bar production line, and the production efficiency and the surface quality are high. The elements with large contribution to the tensile strength are controlled according to the upper limit, elements which can enable the CCT curve to move to the right, such as V, N, B, Cr, Nb and the like are added, and finally a small amount of bainite structures are formed in the core metallographic structure of the high-speed bar HRB500E anti-seismic steel bar, so that reasonable yield strength and high tensile strength are obtained.
Detailed Description
The present invention will now be described in order to more clearly understand the technical features, objects, and effects of the present invention.
The invention provides a method for producing HRB500E twisted steel bars by high-speed bars, which comprises the following steps:
the production process of the single-wire high-speed bar steel bar comprises the following steps: blast furnace molten iron smelting, molten iron desulphurization pretreatment, converter molten steel smelting, argon blowing, LF refining, square billet continuous casting, heating furnace heating, rough rolling (6 frames), medium rolling (6 frames), pre-finish rolling (6 frames), single line, controlled cooling and recovery section, finish rolling (4 frames), finish rolling (diameter shearing 2 frames), controlled cooling and recovery section after rolling, pinch rolls, disc double-length shear, braking device, hub device, cooling bed cooling, fixed-length shear, inspection, packaging and warehousing. Is beneficial to refining crystal grains and reducing the cost. The reinforcing steel bars are stored on each tooth of the stepping cooling bed, so that heat dissipation is accelerated, and large-size reinforcing steel bars are cooled by air on the cooling bed.
The production process of the double-line high-speed bar steel bar comprises the following steps: blast furnace molten iron smelting, molten iron desulphurization pretreatment, converter molten steel smelting, argon blowing, LF refining, square billet continuous casting, heating by a heating furnace, rough rolling (6 frames), intermediate rolling (6 frames), pre-finish rolling (6 frames) and cutting into double lines, a controlled cooling and recovery section multiplied by 2, finish rolling (4 frames) multiplied by 2, a shearing diameter 2 frames multiplied by 2, a controlled cooling and recovery section multiplied by 2 after rolling, a pinch roll multiplied by 2, a disc double-length shear multiplied by 2, a braking device multiplied by 2, a hub device multiplied by 2, cooling bed cooling, fixed-length shearing, inspecting, packaging and warehousing. Is beneficial to refining crystal grains and reducing the cost. The reinforcing steel bars are stored on each tooth of the stepping cooling bed, so that heat dissipation is accelerated, and large-size reinforcing steel bars are cooled by air on the cooling bed.
The rolling speed is kept high for different specifications.
Wherein, the process characteristics of each stage are as follows:
1. the components:
(1) c, Si: the solid solution strengthening effect is achieved, the contribution to the tensile strength is large, the contribution to the yield strength is small, and the upper limit is controlled.
(2) Mn: the solid solution strengthening effect is achieved, the contribution to the yield strength is slightly high, the cost can be reduced by controlling Mn at a moderate level, and the lost strength is compensated by fine crystalline strengthening at a lower temperature.
(3) Adding Nb to raise austenite recrystallization temperature, realizing non-recrystallization rolling at higher temperature and having precipitation strengthening effect, raising strength and increasing iron scale thickness. The trace amount of niobium dissolved in austenite delays the precipitation of pro-eutectoid ferrite and increases the time for the austenite to start decomposing and precipitating pearlite, but it hardly affects the transformation of bainite, and increases the transformation temperature of bainite, which is an advantageous element for forming bainite, so that Nb is added to control the bainite structure, and forms carbonitride to increase the strength.
(4) V, N, B content. The V element and trace B in the steel compete for N in the steel, and the combination of V and N for producing VN improves the strength of the steel and makes B difficult to combine with N to form BN. B exists on the austenite grain boundary, thereby reducing the austenite grain boundary energy and improving the stability of austenite in the temperature range above martensite, therefore, trace B can obviously improve the hardenability of steel. The elements with large contribution to the tensile strength are controlled according to the upper limit, elements which can enable the CCT curve to move to the right, such as V, N, B, Cr, Nb and the like are added, and finally a small amount of bainite structures are formed in the core metallographic structure of the high-speed bar HRB500E anti-seismic steel bar, so that reasonable yield strength and high tensile strength are obtained.
(5) Cr element. Cr has the solid solution strengthening effect, the diffusion speed of Cr in austenite is relatively low, and the diffusion of carbon can be hindered, so that the stability of austenite can be improved, the CCT curve can be shifted to the right, the critical cooling speed is reduced, the hardenability is improved, and bainite can be formed.
TABLE 1 HRB500E ingredients (wt%)
Figure BDA0003090228200000041
2. Arranging a rolling line:
6 rough rolling frames, 6 middle rolling frames, 6 pre-finish rolling frames, a controlled cooling device, a recovery section, 4 finishing mill sets, a controlled cooling device, a recovery section and 2 reducing mills.
6 stands of short stress line rolling mill of roughing mill group, 6 stands of short stress line rolling mill of medium rolling and 6 stands of short stress line rolling mill of pre-finish rolling (all stands are connected by loop, the bar is cut twice from the 4 th stand and enters two channels at the outlet of pre-finish rolling respectively)
The finishing mill group is two lines and adopts 4 top-crossed cantilevers (V-shaped) of 45 degrees to have no torsion and overload type Morgan rolling mills, 2 groups of modules are totally adopted, and each group of modules is driven by a motor alone, compares the collective transmission, has following advantages: each group of rollers can be independently regulated, the speed regulation range is wide, and the speed regulation flexibility is high; each motor has small power and small size; is convenient for maintenance and repair.
The reducing unit adopts 2 frames of 45-degree top-cross cantilever reducing machines for independent transmission. The addition of the reducing unit can realize rolling below the recrystallization temperature or in a dual-phase region (namely, heat engine rolling), and the aims of refining grains and improving the performance of steel are fulfilled by designing a deformation system of the last two passes to crush the grains and inducing ferrite phase change through deformation. In addition, the production rate of the rolling mill can be improved, the dimensional tolerance and the surface quality of products can be improved, the variety and the specification can be increased, the metallurgical performance of the products can be improved, and the like.
The reducing unit adopts 2 frames of 45-degree top-cross cantilever reducing machines, and realizes rolling below the recrystallization temperature or in a double-phase region through independent transmission.
The finishing mill group is a two-line V-shaped non-twist overload Morgan rolling mill with 4 frames of top cross cantilevers of 45 degrees.
And the deformation of the last two machine frame passes is more than 15%.
For HRB500E steel bar with the specification of 10-16 mm, the finish rolling speed is not less than 25 m/S.
3. The rolling process comprises the following steps:
(1) the heating time of the steel billet is 60-90 minutes, and the initial rolling temperature is as follows: 1030 +/-30 ℃.
(2) Double-line and single-line rolling with the specification of phi 10-phi 16 mm: the temperature of finish rolling and the temperature of the reducing mill are controlled, the austenite recrystallization temperature is increased by Nb, the non-recrystallization rolling of austenite can be realized at higher temperature, cooling control equipment cannot be installed behind the reducing mill, the formation of the scale is facilitated, and the temperature of the reducing mill can be slightly higher due to large deformation during single-line rolling, so that the generation of the scale is more facilitated.
(3) Double-line and single-line rolling with phi 18-phi 25 specifications: the finish rolling unit is not put into use, the water tank after pre-finish rolling and finish rolling is used by utilizing the concept of graded cooling control, the water tank is kept in a long-open state, the phenomenon that the intensity of primary cooling is overlarge and is not beneficial to the control of organization and iron scale is avoided, and the temperature of the reducer can be slightly higher due to the large deformation during single-line rolling, so that the generation of the iron scale is more beneficial. After the reducing mill is arranged to the front of the upper cooling bed, no cooling control equipment is arranged and used, so that the steel bar is in a natural cooling state, and the surface of the steel bar obtains higher temperature of the upper cooling bed.
(4) The deformation of the last two frames (K1, K2) is more than 15%.
TABLE 2 Rolling Key temperature (wt%)
Figure BDA0003090228200000051
Figure BDA0003090228200000061
4. Final rolling speed: the rolling speed is kept higher for different specifications, which is beneficial to grain refinement (see table 3).
TABLE 3 Final Rolling speed
Figure BDA0003090228200000062
5. Cooling by a cooling bed: the reinforcing steel bars are stored on each tooth of the stepping cooling bed, so that heat dissipation is accelerated, and large-size reinforcing steel bars are cooled by air on the cooling bed.
The measures can control the bainite content at the edge part of the cross section of the HRB500E steel bar structure to be 0%, the bainite content at 1/4 part to be 0% and the bainite content at the center part of the cross section to be 1-10%. And successfully producing qualified HRB500E steel bars by using a high-speed bar production line.
The invention also provides a high-speed bar for producing HRB500E twisted steel, and the HRB500E twisted steel produced by the high-speed bar comprises the following components: c: 0.21-0.25 Wt%, Si: 0.65-0.80 Wt%, Mn: 1.2-1.35 Wt%, P: less than or equal to 0.04 Wt%, S: less than or equal to 0.035 Wt%, V: 0.03-0.06 Wt%, Nb: 0.008-0.02 Wt%, N: 0.007-0.017 Wt%, B: 0.001-0.003 Wt%, Cr: 0.1-0.2 Wt% and produced by the method for producing HRB500E twisted steel bar by using the high-speed bar material as claimed in any one of claims 1-9.
Specifically, for HRB500E twisted steel with the specification of 10-16 mm, the components are as follows: c: 0.21-0.25 Wt%, Si: 0.65-0.80 Wt%, Mn: 1.2-1.35 Wt%, P: less than or equal to 0.04 Wt%, S: less than or equal to 0.035 Wt%, V: 0.03-0.045 Wt%, Nb: 0.008-0.02 Wt%, N: 0.007-0.015 Wt%, B: 0.001-0.002 Wt%, Cr: 0.1-0.2 Wt%.
Specifically, for HRB500E twisted steel with the specification of 18-25 mm, the components are as follows: c: 0.21-0.25 Wt%, Si: 0.65-0.80 Wt%, Mn: 1.2-1.35 Wt%, P: less than or equal to 0.04 Wt%, S: less than or equal to 0.035 Wt%, V: 0.045-0.06 Wt%, Nb: 0.008-0.02 Wt%, N: 0.009-0.017 Wt%, B: 0.002-0.003 Wt%, Cr: 0.1-0.2 Wt%.
Compared with the HRB500E steel bar of the conventional production line, the method for producing the HRB500E twisted steel bar by the high-speed bar has the advantages that the alloy addition is reduced, and the production cost is reduced. The qualified HRB500E steel bars can be successfully produced by a high-speed bar production line, and the production efficiency and the surface quality are high. The elements with large contribution to the tensile strength are controlled according to the upper limit, elements which can enable the CCT curve to move to the right, such as V, N, B, Cr, Nb and the like are added, and finally a small amount of bainite structures are formed in the core metallographic structure of the high-speed bar HRB500E anti-seismic steel bar, so that reasonable yield strength and high tensile strength are obtained.
Example (b):
1. the technology for producing phi 10-25 mm straight twisted steel bars by using double-line high-speed bars comprises the following steps: blast furnace molten iron smelting, molten iron desulphurization pretreatment, converter molten steel smelting, argon blowing, LF refining, square billet continuous casting, heating by a heating furnace, rough rolling (6 frames), intermediate rolling (6 frames), pre-finish rolling (6 frames) and cutting into double lines, a controlled cooling and recovery section multiplied by 2, finish rolling (4 frames) multiplied by 2, a shearing diameter 2 frames multiplied by 2, a controlled cooling and recovery section multiplied by 2 after rolling, a pinch roll multiplied by 2, a disc double-length shear multiplied by 2, a braking device multiplied by 2, a hub device multiplied by 2, cooling bed cooling, fixed-length shearing, inspecting, packaging and warehousing.
2. The heating time of the billet is 60-90 minutes, and the initial rolling temperature is 1010-1050 ℃.
3. The following components are mixed and prepared in a specific process. Wherein, Table 4 shows the compositions (in weight%) of the steels of the respective examples. Table 5 shows the production specifications, process parameters, mechanical properties, scale thickness corresponding to the example steels described in table 4.
Table 4: chemical composition (wt%) of product
Examples of the invention C Si Mn P S V Nb N B Cr
Example 1 0.23 0.70 1.25 0.035 0.027 0.035 0.012 0.0126 0.0015 0.14
Example 2 0.24 0.75 1.22 0.029 0.025 0.041 0.015 0.0121 0.0017 0.16
Example 3 0.22 0.72 1.26 0.031 0.033 0.037 0.016 0.0135 0.0014 0.15
Example 4 0.24 0.69 1.28 0.026 0.032 0.055 0.014 0.0159 0.0026 0.12
Example 5 0.25 0.71 1.23 0.033 0.029 0.052 0.013 0.0142 0.0023 0.18
Table 5: specific process parameters and mechanical properties of the examples
Figure BDA0003090228200000071
The above description is only an exemplary embodiment of the present invention, and is not intended to limit the scope of the present invention. In order that the components of the present invention may be combined without conflict, it is intended that all equivalent changes and modifications made by those skilled in the art without departing from the spirit and principles of the present invention shall fall within the protection scope of the present invention.

Claims (6)

1. A method for producing HRB500E twisted steel bars by using high-speed bars is characterized in that the method for producing the HRB500E twisted steel bars by using the high-speed bars comprises the following steps:
the method comprises the following steps of smelting blast furnace molten iron, desulfurizing and pretreating the molten iron, smelting converter molten steel, blowing argon, LF refining, continuous casting of square billets, heating by a heating furnace, rough rolling, intermediate rolling, pre-finish rolling, controlled cooling and recovery, finish rolling, controlled cooling and recovery after rolling;
the components of the HRB500E twisted steel produced by the high-speed bar are as follows: c: 0.21-0.25 Wt%, Si: 0.65-0.80 Wt%, Mn: 1.2-1.35 Wt%, P: less than or equal to 0.04 Wt%, S: less than or equal to 0.035 Wt%, V: 0.03-0.06 Wt%, Nb: 0.008-0.02 Wt%, N: 0.007-0.017 Wt%, B: 0.001-0.003 Wt%, Cr: 0.1-0.2 Wt%;
the method for producing the high-speed bar steel bars in a double-line mode comprises the following steps: the method comprises the following steps of smelting in a blast furnace molten iron, desulfurizing and pretreating the molten iron, smelting in a converter molten iron, blowing argon, LF refining, continuously casting a square billet, heating in a heating furnace, rough rolling, intermediate rolling, pre-finish rolling and splitting into double lines, pre-finish rolling, cooling control and recovery sections of the double lines, finish rolling of the double lines, double-line diameter reduction of 2 frames, post-double-line rolling, cooling control and recovery sections of the double lines, double-line pinch rolls, double-line disc double-length shear, a double-line braking device, a double-line hub device, cooling bed cooling and fixed-length shear;
the reducing machine set adopts 2 frames of 45-degree top-cross cantilever reducing machines, and realizes rolling below the recrystallization temperature or in a double-phase region through independent transmission;
for HRB500E thread steel bars with the specification of 10-16 mm, the finish rolling speed is not less than 25 m/S;
the heating time of the steel billet is 60-90 minutes, and the initial rolling temperature is as follows: 1030 +/-30 ℃;
the finish rolling temperature is: 900 +/-20, and the temperature of the reducing mill is: 880 + -20.
2. The method for producing HRB500E twisted steel bars with high speed bars as claimed in claim 1, wherein the HRB500E twisted steel bars with the specification of 10 to 16mm has the following composition: c: 0.21-0.25 Wt%, Si: 0.65-0.80 Wt%, Mn: 1.2-1.35 Wt%, P: less than or equal to 0.04 Wt%, S: less than or equal to 0.035 Wt%, V: 0.03-0.045 Wt%, Nb: 0.008-0.02 Wt%, N: 0.007-0.015 Wt%, B: 0.001-0.002 Wt%, Cr: 0.1-0.2 Wt%.
3. The method for producing HRB500E twisted steel bars with high speed bars as claimed in claim 1, wherein the HRB500E twisted steel bars with the specification of 18 to 25mm has the following composition: c: 0.21-0.25 Wt%, Si: 0.65-0.80 Wt%, Mn: 1.2-1.35 Wt%, P: less than or equal to 0.04 Wt%, S: less than or equal to 0.035 Wt%, V: 0.045-0.06 Wt%, Nb: 0.008-0.02 Wt%, N: 0.009-0.017 Wt%, B: 0.002-0.003 Wt%, Cr: 0.1-0.2 Wt%.
4. The method for producing HRB500E twisted steel bars with high-speed bars as claimed in claim 1, wherein the method for producing the high-speed bar steel bars with single line is as follows: the method comprises the following steps of smelting in a blast furnace molten iron, desulfurizing and pretreating the molten iron, smelting in a converter molten iron, blowing argon, LF refining, continuous casting of square billets, heating in a heating furnace, rough rolling, intermediate rolling, pre-finish rolling, single line, pre-finish rolling, controlled cooling and recovery section, finish rolling, controlled cooling and recovery section after rolling, pinch rolls, disc double-length shear, a braking device, a hub device, cooling bed cooling and fixed-length shearing.
5. The method for producing HRB500E twisted steel bars with high speed bars as claimed in claim 1, wherein the finishing mill group is two-line using 4-stand 45 ° top cross cantilever V type non-twist super heavy duty Morgan rolling mill.
6. The method of claim 1 for producing HRB500E twisted steel from high speed rods wherein the final two frame passes are deformed by more than 15%.
CN202110592869.XA 2021-05-28 2021-05-28 Method for producing HRB500E twisted steel bar by high-speed bar and HRB500E twisted steel bar produced by high-speed bar Active CN113403533B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202210304834.6A CN114807746B (en) 2021-05-28 2021-05-28 HRB500E twisted steel bar produced by high-speed bar
CN202110592869.XA CN113403533B (en) 2021-05-28 2021-05-28 Method for producing HRB500E twisted steel bar by high-speed bar and HRB500E twisted steel bar produced by high-speed bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110592869.XA CN113403533B (en) 2021-05-28 2021-05-28 Method for producing HRB500E twisted steel bar by high-speed bar and HRB500E twisted steel bar produced by high-speed bar

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202210304834.6A Division CN114807746B (en) 2021-05-28 2021-05-28 HRB500E twisted steel bar produced by high-speed bar

Publications (2)

Publication Number Publication Date
CN113403533A CN113403533A (en) 2021-09-17
CN113403533B true CN113403533B (en) 2022-04-12

Family

ID=77675084

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202210304834.6A Active CN114807746B (en) 2021-05-28 2021-05-28 HRB500E twisted steel bar produced by high-speed bar
CN202110592869.XA Active CN113403533B (en) 2021-05-28 2021-05-28 Method for producing HRB500E twisted steel bar by high-speed bar and HRB500E twisted steel bar produced by high-speed bar

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202210304834.6A Active CN114807746B (en) 2021-05-28 2021-05-28 HRB500E twisted steel bar produced by high-speed bar

Country Status (1)

Country Link
CN (2) CN114807746B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115161536B (en) * 2021-09-18 2023-07-14 广西柳州钢铁集团有限公司 Hot rolled wire rod reinforcing steel bar
CN114799095B (en) * 2022-04-28 2023-12-29 广西柳州钢铁集团有限公司 Reinforcement bar heating-free direct rolling method and reinforcement bar rolled by heating-free direct rolling method
CN114875205B (en) * 2022-05-27 2024-03-26 广西柳州钢铁集团有限公司 Non-microalloy HRB400E hot rolled ribbed bar and production method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1990431A1 (en) * 2007-05-11 2008-11-12 ArcelorMittal France Method of manufacturing annealed, very high-resistance, cold-laminated steel sheets, and sheets produced thereby
CN103924165A (en) * 2014-03-26 2014-07-16 首钢水城钢铁(集团)有限责任公司 Production method of HRB500 screw bar having yield point jog
CN106399855A (en) * 2016-09-19 2017-02-15 石横特钢集团有限公司 HRB500E ribbed reinforcing steel bar and production process thereof
CN107815603A (en) * 2017-11-30 2018-03-20 攀钢集团攀枝花钢铁研究院有限公司 Steel Bar and its LF stove production methods are built containing V, Nb, Cr microalloy
CN109161812A (en) * 2018-11-23 2019-01-08 攀钢集团攀枝花钢铁研究院有限公司 500MPa grades contain V, Nb microalloy high yield ratio anti-seismic steel bar wire rod and its production method
CN109355560A (en) * 2018-11-07 2019-02-19 钢铁研究总院 The complex intensifying cooling technique of hot-rolled microalloy reinforcing bar HRB500E
CN111945079A (en) * 2020-07-31 2020-11-17 阳春新钢铁有限责任公司 Ultra-high pulling speed niobium-containing HRB500E deformed steel bar and production process thereof

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2131318C3 (en) * 1971-06-24 1973-12-06 Fried. Krupp Huettenwerke Ag, 4630 Bochum Process for the production of a reinforcement steel bar for prestressed concrete
JP5419820B2 (en) * 2010-07-20 2014-02-19 新日鐵住金株式会社 Rolled steel bar or wire rod for hot forging
CN102383039B (en) * 2011-11-10 2013-07-17 长沙东鑫环保材料有限责任公司 Microalloy HRB500E steel bar containing chrome and nitrogen and production method thereof
CN103451516B (en) * 2013-08-30 2016-01-20 武汉钢铁(集团)公司 HRB500 reinforcing bar and preparation method thereof
CN103898403B (en) * 2014-04-09 2016-06-29 武汉钢铁(集团)公司 The hot-rolled ribbed anti-seismic steel bar of HRB500 level
CN107955913A (en) * 2017-11-30 2018-04-24 攀钢集团攀枝花钢铁研究院有限公司 Steel wire rod and its LF stove production methods are built containing V, Nb, Cr microalloy
CN109252106A (en) * 2018-11-23 2019-01-22 攀钢集团攀枝花钢铁研究院有限公司 500MPa grades contain V, Nb microalloy high yield ratio anti-seismic steel bar bar and its production method
CN111360066B (en) * 2020-02-21 2022-08-12 中冶赛迪工程技术股份有限公司 Low-cost, less-red-rust, high-strength and anti-seismic deformed steel bar production method and system
CN111893371A (en) * 2020-07-18 2020-11-06 钢铁研究总院 Method for improving yield ratio qualification rate of high-strength hot-rolled ribbed steel bar

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1990431A1 (en) * 2007-05-11 2008-11-12 ArcelorMittal France Method of manufacturing annealed, very high-resistance, cold-laminated steel sheets, and sheets produced thereby
CN103924165A (en) * 2014-03-26 2014-07-16 首钢水城钢铁(集团)有限责任公司 Production method of HRB500 screw bar having yield point jog
CN106399855A (en) * 2016-09-19 2017-02-15 石横特钢集团有限公司 HRB500E ribbed reinforcing steel bar and production process thereof
CN107815603A (en) * 2017-11-30 2018-03-20 攀钢集团攀枝花钢铁研究院有限公司 Steel Bar and its LF stove production methods are built containing V, Nb, Cr microalloy
CN109355560A (en) * 2018-11-07 2019-02-19 钢铁研究总院 The complex intensifying cooling technique of hot-rolled microalloy reinforcing bar HRB500E
CN109161812A (en) * 2018-11-23 2019-01-08 攀钢集团攀枝花钢铁研究院有限公司 500MPa grades contain V, Nb microalloy high yield ratio anti-seismic steel bar wire rod and its production method
CN111945079A (en) * 2020-07-31 2020-11-17 阳春新钢铁有限责任公司 Ultra-high pulling speed niobium-containing HRB500E deformed steel bar and production process thereof

Also Published As

Publication number Publication date
CN113403533A (en) 2021-09-17
CN114807746A (en) 2022-07-29
CN114807746B (en) 2022-12-30

Similar Documents

Publication Publication Date Title
CN113403533B (en) Method for producing HRB500E twisted steel bar by high-speed bar and HRB500E twisted steel bar produced by high-speed bar
DE112013001434B4 (en) Manufacturing method for strip casting of an atmosphere-corrosion-resistant steel having a quality of 700 MPa
DE112013000841B4 (en) A method of producing a weather-resistant continuous strip steel having a high strength of 700 MPa
CN102787280B (en) Boron-containing weather-proof thin strip steel and manufacturing method thereof
CN106521320B (en) Special thickness Q460GJC/D controlled rolling state high-strength structure steel plates
CN103572025B (en) Production method of low-cost X52 pipeline steel and pipeline steel
CN101130847A (en) Diphasic steel plate by continuous casting and rolling middle bar strip and manufacturing method thereof
CN102021495A (en) 420 MPa weatherproof bridge steel with high ductility and method for manufacturing hot rolled coil of 420 MPa weatherproof bridge steel with high ductility
CN106756618A (en) 100mm thickness Q420GJCD controlled rolling state high-strength structure steel plates
CN102686750A (en) Ultra-high-strength steel wire having excellent resistance to delayed fracture and manufacturing method thereof
CN1273635C (en) Manufacturing method of cold forming high intensity steel for welded structure
CN103484768A (en) High-strength engineering steel plate with length of larger than or equal to 30 m and production method
CN114411061B (en) High-strength anti-seismic steel bar and preparation method thereof
CN113388781B (en) Method for producing HRB600E threaded steel bar by high-speed bar and HRB600E threaded steel bar produced by high-speed bar
CN113373377B (en) Low-cost high-speed bar deformed steel bar with surface oxidized iron sheet thickness of more than 10 mu m and production method thereof
CN114643278A (en) Production method of low-alloy grain-refined HRB400E steel bar
KR20090132796A (en) Method for manufacturing high-strength deformed bar with low yield ratio
CN1586750A (en) Rolling method for low carbon twisted steel bar
CN111334719A (en) high-N composite reinforced 500 MPa-grade and 600 MPa-grade steel bar, smelting method and production method
CN100488649C (en) Technology method for using thin slab for continuous casting and rolling to produce low-carbon high-niobium high-strength toughness steel belt
CN105543680B (en) Micro- boron processing tensile strength 700MPa levels Wide and Thick Slab and manufacture method
CN114875205A (en) Non-microalloy HRB400E hot-rolled ribbed steel bar ordinary-speed bar and production method thereof
CN111575583A (en) High-strength hot-rolled section and temperature and cooling control process thereof
CN112522626A (en) Method for producing low-yield-ratio high-strength steel by controlling phase change process
CN102127704B (en) 900MPa-level high-strength high-plasticity medium-carbon hot rolled steel and manufacturing method thereof

Legal Events

Date Code Title Description