CN113379290A - Method, device and equipment for generating part division route and storage medium - Google Patents

Method, device and equipment for generating part division route and storage medium Download PDF

Info

Publication number
CN113379290A
CN113379290A CN202110715522.XA CN202110715522A CN113379290A CN 113379290 A CN113379290 A CN 113379290A CN 202110715522 A CN202110715522 A CN 202110715522A CN 113379290 A CN113379290 A CN 113379290A
Authority
CN
China
Prior art keywords
division
route
function number
division route
dictionary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110715522.XA
Other languages
Chinese (zh)
Other versions
CN113379290B (en
Inventor
黄大昌
马琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongfeng Liuzhou Motor Co Ltd
Original Assignee
Dongfeng Liuzhou Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongfeng Liuzhou Motor Co Ltd filed Critical Dongfeng Liuzhou Motor Co Ltd
Priority to CN202110715522.XA priority Critical patent/CN113379290B/en
Publication of CN113379290A publication Critical patent/CN113379290A/en
Application granted granted Critical
Publication of CN113379290B publication Critical patent/CN113379290B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention relates to the technical field of part division, and discloses a method, a device, equipment and a storage medium for generating a part division route, wherein a part function number is obtained according to a part drawing number by obtaining the part drawing number; importing the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number; writing the division route attribute and the part drawing number into a division route table to obtain a corresponding part division route, obtaining a corresponding part function number after obtaining the part drawing number, leading the part function number into a part division dictionary, obtaining a division route attribute corresponding to the part function number through the part division dictionary, and finally generating a corresponding part division route according to the division route attribute and the part function number and writing the part division route attribute into the division route table, thereby solving the technical problem that the division route of the part cannot be efficiently distributed in the prior art.

Description

Method, device and equipment for generating part division route and storage medium
Technical Field
The invention relates to the technical field of part division, in particular to a method, a device, equipment and a storage medium for generating a part division route.
Background
In the production and manufacturing process, the warehousing of the parts and the distribution of the division routes are usually performed in a manual operation mode, which makes it difficult to avoid the error of the attribute calibration of the parts and the error of the division routes corresponding to the parts. In the prior art, manufacturers usually adopt a computer allocation method when solving such problems, however, computer operations are also performed by corresponding technicians, and problems such as long operation time, naming errors, irrevocability and the like are involved when corresponding interface operations are performed, so how to efficiently allocate work routes of parts becomes an urgent problem to be solved.
The above is only for the purpose of assisting understanding of the technical aspects of the present invention, and does not represent an admission that the above is prior art.
Disclosure of Invention
The invention mainly aims to provide a method, a device, equipment and a storage medium for generating a part division route, and aims to solve the technical problem that the part division route cannot be efficiently distributed in the prior art.
In order to achieve the above object, the present invention provides a method for generating a part division route, comprising the following steps:
acquiring a part drawing number, and acquiring a part function number according to the part drawing number;
importing the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number;
and writing the work division route attributes and the part drawing numbers into a work division route table to obtain corresponding part work division routes.
Optionally, the step of obtaining a part drawing number and obtaining a part function number according to the part drawing number includes:
acquiring a part drawing number in a manual input mode, a system import mode or a PLM import mode;
and obtaining a part function number according to the part drawing number.
Optionally, the part function number comprises: group number, packet number, and serial number;
the step of obtaining the part function number according to the part drawing number comprises the following steps:
when a part drawing number is received, acquiring a part information table;
and analyzing the part drawing number according to the part information table to obtain a group number, a grouping number and a serial number corresponding to the part drawing number.
Optionally, the step of importing the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number includes:
importing the part function number into a part division dictionary;
judging whether the part function number is divided for the first time;
if the part function number does not belong to division of labor for the first time, acquiring a corresponding part division history record in the part division dictionary;
and determining the division route attribute corresponding to the part function number according to the part division history.
Optionally, the step of judging whether the part function number is the first time division work, includes:
traversing and inquiring the part function number in the part division dictionary;
and judging whether the part function number is the first time of division of labor according to the traversal query result.
Optionally, after the step of determining whether the part function number is first time division, the method further includes:
if the part function number is the first time of division, searching in the division route dictionary according to the inclusion relation;
and when the corresponding retrieval result exists in the division route dictionary, generating corresponding division route attributes.
Optionally, the step of writing the division route attribute and the part drawing number into a division route table to obtain a corresponding part division route includes:
and migrating the work division route table from the supply chain system to a production material list system so as to enable the production material list system to read the information in the work division route table.
In addition, in order to achieve the above object, the present invention further provides a device for generating a part division route, the device comprising:
the drawing number acquisition module is used for acquiring a part drawing number and acquiring a part function number according to the part drawing number;
the attribute acquisition module is used for leading the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number;
and the route determining module is used for writing the work division route attribute and the part drawing number into a work division route table to obtain a corresponding part work division route.
In addition, in order to achieve the above object, the present invention further provides a device for generating a part division route, the device comprising: the system comprises a memory, a processor and a part division route generation program stored on the memory and capable of running on the processor, wherein the part division route generation program is configured to realize the steps of the part division route generation method.
In addition, in order to achieve the above object, the present invention further provides a storage medium having a program for generating a part distribution route stored thereon, wherein the program for generating a part distribution route realizes the steps of the method for generating a part distribution route as described above when executed by a processor.
The method comprises the steps of obtaining a part drawing number and obtaining a part function number according to the part drawing number; importing the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number; writing the division route attribute and the part drawing number into a division route table to obtain a corresponding part division route, obtaining a corresponding part function number after obtaining the part drawing number, leading the part function number into a part division dictionary, obtaining a division route attribute corresponding to the part function number through the part division dictionary, and finally generating a corresponding part division route according to the division route attribute and the part function number and writing the part division route attribute into the division route table, thereby solving the technical problem that the division route of the part cannot be efficiently distributed in the prior art.
Drawings
FIG. 1 is a schematic structural diagram of a device for generating a part division route of a hardware operating environment according to an embodiment of the present invention;
FIG. 2 is a schematic flow chart of a first embodiment of a method for generating a part division route according to the present invention;
FIG. 3 is a schematic flow chart of a second embodiment of the method for generating a part division route according to the present invention;
fig. 4 is a block diagram of a first embodiment of the apparatus for generating a part division route according to the present invention.
The implementation, functional features and advantages of the objects of the present invention will be further explained with reference to the accompanying drawings.
Detailed Description
It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1, fig. 1 is a schematic structural diagram of a generating device of a part division route of a hardware operating environment according to an embodiment of the present invention.
As shown in fig. 1, the generating device of the part division route may include: a processor 1001, such as a Central Processing Unit (CPU), a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005. Wherein a communication bus 1002 is used to enable connective communication between these components. The user interface 1003 may include a Display screen (Display), an input unit such as a Keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface, a wireless interface. The network interface 1004 may optionally include a standard wired interface, a Wireless interface (e.g., a Wireless-Fidelity (WI-FI) interface). The Memory 1005 may be a Random Access Memory (RAM) Memory, or may be a Non-Volatile Memory (NVM), such as a disk Memory. The memory 1005 may alternatively be a storage device separate from the processor 1001.
Those skilled in the art will appreciate that the configuration shown in fig. 1 does not constitute a definition of the means for generating the part division line, and may include more or fewer components than those shown, or some components in combination, or a different arrangement of components.
As shown in fig. 1, the memory 1005, which is a storage medium, may include therein an operating system, a data storage module, a network communication module, a user interface module, and a generation program of a part division path.
In the generation apparatus of the part division route shown in fig. 1, the network interface 1004 is mainly used for data communication with a network server; the user interface 1003 is mainly used for data interaction with a user; the processor 1001 and the memory 1005 in the device for generating a part division route according to the present invention may be provided in the device for generating a part division route, and the device for generating a part division route calls the program for generating a part division route stored in the memory 1005 through the processor 1001, and executes the method for generating a part division route according to the embodiment of the present invention.
An embodiment of the present invention provides a method for generating a part division route, and referring to fig. 2, fig. 2 is a schematic flow diagram of a first embodiment of the method for generating a part division route according to the present invention.
In this embodiment, the method for generating the part division route includes the following steps:
step S10: and acquiring a part drawing number and acquiring a part function number according to the part drawing number.
It should be noted that the part drawing number is an identifier for defining attributes of a part in a production process, and identifies target attributes of the part by adopting a specific naming mode, for example: part numbers a3-1109010, for parts names of air cleaner assemblies, manufactured by the manufacturer (finished product), assembly shop, production case, mass production, parts category, assembly designation 1102.
It can be understood that the part function numbers are classified according to groups, groups and serial numbers, the serial numbers are composed of seven digits and are assembled at the same position in principle, the part function numbers with the same function and shape are unique, and the parts with the same function numbers can be determined according to the part coding rule and have the same function and shape. If the attributes defined by the part division routes with the same function number are basically the same as determined from the service, the function codes can be used as classification codes to identify the part types.
In specific implementation, acquiring a part drawing number, acquiring a part function number according to the part drawing number, and after acquiring the part drawing number, inquiring the corresponding part drawing number by using a part information table in a PLM system to determine the corresponding part function number.
Further, in order to obtain more part drawing numbers in the generation of the part division route, the step of obtaining the part drawing numbers and obtaining the part function numbers according to the part drawing numbers comprises the following steps: acquiring a part drawing number in a manual input mode, a system import mode or a PLM import mode; and obtaining a part function number according to the part drawing number.
It should be noted that the part function numbers include: group number, packet number, and sequence number.
It is understood that the step of obtaining a part function number according to the part drawing number includes: when a part drawing number is received, acquiring a part information table; and analyzing the part drawing number according to the part information table to obtain a group number, a grouping number and a serial number corresponding to the part drawing number.
Step S20: and importing the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number.
The part division dictionary is a search engine for the division attribute corresponding to the part function number, and the part division dictionary learns the historical part route to grasp the division route history record corresponding to the part function number.
It can be understood that the division route attribute refers to a target address of a production process, corresponding to the part function number, and parts of the same type can be released into an engine production workshop or a maintenance workshop at the same time, for example: the product part name corresponding to a part function number 3754015 is a water-cut solenoid valve bracket, the corresponding flow code and change code are A012S0, the corresponding branch work route attribute is a CV general assembly workshop, and similarly 3754015 when the corresponding flow code and change code are A011S0, the corresponding branch work route attribute becomes a CV trial production workshop.
In a specific implementation, the step of importing the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number is to search a division history record of the part function number corresponding to the part division dictionary in the part division dictionary by using the part division dictionary, and when the corresponding history record is searched, the division route attribute of the part function number is correspondingly generated by taking the part division attribute corresponding to the history record as a feedback result.
In specific implementation, when a new part figure number is identified, whether the suffix of the corresponding part figure number is a new version code or not is judged, if yes, the corresponding version code is removed, and the inclusion relation is searched in the division route dictionary according to the part function number after the version is removed so as to obtain the corresponding part division attribute. And if not, uploading to a system background, switching manual assignment, and sending the assignment result to the division route dictionary to enable the division route dictionary to learn.
Step S30: and writing the work division route attributes and the part drawing numbers into a work division route table to obtain corresponding part work division routes.
It should be noted that the work division route table is a table used for querying a part work division route corresponding to a part drawing number, and the work division route table is originally located in a supply chain system, which results in that a worker of another system cannot call and read information in the work division route table, and can only query and write the corresponding work division route table by means of the supply chain system, which undoubtedly increases a workload of the supply chain system.
It is understood that the part division route includes: when the life cycle of the part changes, only the corresponding part change code needs to be modified, so that the part division route is ensured to be unchanged, for example: 3407010A012S0 is the division route of a part, wherein 3407010 shows the function number of the part, A012 is the corresponding serial number, S0 and the corresponding change code, when the part is changed in version, the corresponding division route map of the part is 3407010A012S1, when the next version is met, it is 3407010A012A1, and finally the division route of the part is 3407010A012B1, it can be known that no matter how the version of the part is changed, the corresponding division attribute is not changed, only the change code in the division route is changed correspondingly.
In a specific implementation, writing the division route attribute and the part drawing number into a division route table to obtain a corresponding part division route is to add a code number represented by the division route attribute to the back of a part function number in the part drawing number, and then add the part division route after the division route attribute according to a corresponding part version of the part drawing number, and the generated part division route includes: part function numbers (including group, and serial numbers), serial partition numbers, and change codes, such as: 3407010A012S0, wherein 34 denotes a group number corresponding to the part function number, 07 denotes a group number corresponding to the part function number, 010 denotes a serial number corresponding to the part function number, A012 denotes a serial number corresponding to the part, and S0 denotes a change code corresponding to the part.
Further, in order to enable other systems to read the result of part division, the step of writing the division route attribute and the part drawing number into a division route table to obtain a corresponding part division route includes: and migrating the work division route table from the supply chain system to a production material list system so as to enable the production material list system to read the information in the work division route table.
In the embodiment, a part function number is obtained according to a part drawing number obtained; importing the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number; writing the division route attribute and the part drawing number into a division route table to obtain a corresponding part division route, obtaining a corresponding part function number after obtaining the part drawing number, leading the part function number into a part division dictionary, obtaining a division route attribute corresponding to the part function number through the part division dictionary, and finally generating a corresponding part division route according to the division route attribute and the part function number and writing the part division route attribute into the division route table, thereby solving the technical problem that the division route of the part cannot be efficiently distributed in the prior art.
Referring to fig. 3, fig. 3 is a schematic flow chart of a second embodiment of the method for generating a part division route according to the present invention.
Based on the first embodiment described above, in the present embodiment, the step S20 includes:
step S201: and importing the part function number into a part division dictionary.
In specific implementation, the step of importing the part function number into the part division dictionary is to send the part function number analyzed from the part information table to the part division dictionary.
Step S202: and judging whether the part function number is the first time for division of labor.
In specific implementation, when the part function number is sent to the part division dictionary, the part division dictionary can inquire according to the part function number in the corresponding part division history record, and when the division item of the corresponding part function number is matched, whether the part is divided for the first time is fed back. For example: when a part function number 3401010 is queried through the part division dictionary, the system judges that a corresponding history entry exists, and at the moment, the part division dictionary feeds back that the part function number 3401010 does not belong to division for the first time.
Further, in order to reduce resource calling in the system labor division process, the step of judging whether the part function number is the first time labor division includes: traversing and inquiring the part function number in the part division dictionary; and judging whether the part function number is the first time of division of labor according to the traversal query result.
In specific implementation, the part function number is subjected to traversal query in the part division dictionary; and judging whether the part function number is subjected to division for the first time according to the traversal query result, namely traversing a division log in the part division dictionary, searching whether the part function number with the part function number is subjected to division for the first time, specifically, performing traversal query on the division log, if a corresponding division record exists in the division log, determining that the part function number does not belong to the first division, and if the corresponding division record does not exist in the division log, determining that the part function number belongs to the first division.
Further, in order to reduce the frequency of manual intervention for part division, after the step of judging whether the part function number is divided for the first time, the method further includes: if the part function number is the first time of division, searching in the division route dictionary according to the inclusion relation; and when the corresponding retrieval result exists in the division route dictionary, generating corresponding division route attributes.
It should be noted that the inclusion relation refers to an operation of removing a suffix from a part function number, and in order to prevent that the part division dictionary cannot be identified and finally cannot produce a corresponding division route attribute due to a change code carried in a step of analyzing a part drawing number into a part function number.
In a specific implementation, if the part function number is divided for the first time, searching is carried out in the division route dictionary according to an inclusion relation; when the corresponding retrieval result exists in the work division route dictionary, the generation of the corresponding work division route attribute means that if the part is subjected to work division for the first time, because all the part function numbers are Arabic numerals, only the corresponding part function numbers need to be searched for whether information in other formats appears, if the information exists, the part function numbers with irrelevant formats and reserved with 7-bit numbers are removed, then the part function numbers are retrieved, if no corresponding part work division history records exist after the retrieval, a manual assignment interface is switched, and a feedback result of the manual assignment interface is sent to the part work division dictionary to increase record items in the part work division history records.
Step S203: and if the part function number does not belong to division of labor for the first time, acquiring a corresponding part division history record in the part division dictionary.
In specific implementation, if the part function number does not belong to division of labor for the first time, the historical division of labor records corresponding to the part function number are obtained from the part division dictionary, and when the division of labor records corresponding to the part function number exist in the part division dictionary, feedback of the part division of labor historical records corresponding to the part division of labor records is received.
Step S204: and determining the division route attribute corresponding to the part function number according to the part division history.
The labor division route attribute is a running water identification number, and the target part can be identified to the target workshop by defining the labor division route attribute, for example, when the corresponding labor division route attribute of CV production specified by the system is a010, an entry exists in the work division history record, and the part with the part function number of 1010101 is divided into a010, when the part division dictionary receives a request for acquiring the labor division attribute of 1010101, it is known that 1010101 is divided into a010 by searching the entry corresponding to the specific history record, and then the a010 is fed back as the labor division route attribute of 1010101.
In a specific implementation, the step of determining the work division route attribute corresponding to the part function number according to the part work division history record means that when the corresponding work division route in the part work division history record is unique, the assembly line division number represented by the corresponding unique work division route attribute is fed back. When the division route is not unique, the principle of analyzing the specific gravity can be adopted, the feedback is performed by using the commonly used division attributes, or the judgment mechanism of the system is used for inquiring whether the target division attributes defined manually exist under the item, such as: when two division route attributes A010 and A011 corresponding to the same part function code exist in the part division history record, the historical division times of the two division route attributes are judged to be the same, the system preference is inquired, and when A010 conflicts with A011, the A010 is preferentially adopted, and the division route attribute corresponding to the part function code is identified as the A010 to be fed back.
In the embodiment, the part function number is imported into a part division dictionary; judging whether the part function number is divided for the first time; if the part function number does not belong to division of labor for the first time, acquiring a corresponding part division history record in the part division dictionary; determining the division route attribute corresponding to the part function number according to the part division history, leading the part function number into a part division dictionary, judging whether the part function number is divided for the first time in the part division dictionary, if the part function number does not belong to the division for the first time, determining the division route attribute corresponding to the part function number according to the part division history in the part division dictionary, and rapidly determining the corresponding division route attribute for the part function number according to the history of the part division dictionary, thereby further solving the high efficiency of generating the part division route.
Furthermore, an embodiment of the present invention further provides a storage medium, where a program for generating a part division route is stored, and the program for generating a part division route realizes the steps of the method for generating a part division route as described above when executed by a processor.
Referring to fig. 4, fig. 4 is a block diagram of a first embodiment of the device for generating a part division route according to the present invention.
As shown in fig. 4, a device for generating a part division route according to an embodiment of the present invention includes:
the drawing number obtaining module 401 is configured to obtain a part drawing number and obtain a part function number according to the part drawing number;
an attribute obtaining module 402, configured to import the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number;
a route determining module 403, configured to write the work division route attribute and the part drawing number into a work division route table to obtain a corresponding part work division route.
In the embodiment, a part function number is obtained according to a part drawing number obtained; importing the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number; writing the division route attribute and the part drawing number into a division route table to obtain a corresponding part division route, obtaining a corresponding part function number after obtaining the part drawing number, leading the part function number into a part division dictionary, obtaining a division route attribute corresponding to the part function number through the part division dictionary, and finally generating a corresponding part division route according to the division route attribute and the part function number and writing the part division route attribute into the division route table, thereby solving the technical problem that the division route of the part cannot be efficiently distributed in the prior art.
In an embodiment, the drawing number obtaining module 401 is further configured to obtain a part drawing number through manual entry, system import, or PLM import; and obtaining a part function number according to the part drawing number.
In an embodiment, the drawing number obtaining module 401 is further configured to obtain a part information table when the part drawing number is received; analyzing the part drawing number according to the part information table to obtain a group number, a grouping number and a serial number corresponding to the part drawing number, wherein the part function number comprises: group number, packet number, and sequence number.
In an embodiment, the attribute obtaining module 402 is further configured to import the part function number into a part division dictionary; judging whether the part function number is divided for the first time; if the part function number does not belong to division of labor for the first time, acquiring a corresponding part division history record in the part division dictionary; and determining the division route attribute corresponding to the part function number according to the part division history.
In an embodiment, the attribute obtaining module 402 is further configured to perform traversal query on the part function number in the part division dictionary; and judging whether the part function number is the first time of division of labor according to the traversal query result.
In an embodiment, the attribute obtaining module 402 is further configured to, if the part function number is for division of labor for the first time, search in the division route dictionary according to an inclusion relationship; and when the corresponding retrieval result exists in the division route dictionary, generating corresponding division route attributes.
In an embodiment, the route determining module 403 is further configured to migrate the work distribution route table from the supply chain system to the production materials list system, so as to enable the production materials list system to read information in the work distribution route table.
Other embodiments or specific implementation manners of the device for generating the part division path of the present invention may refer to the above method embodiments, and are not described herein again.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or system that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or system. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, method, article, or system that comprises the element.
The above-mentioned serial numbers of the embodiments of the present invention are merely for description and do not represent the merits of the embodiments.
Through the above description of the embodiments, those skilled in the art will clearly understand that the method of the above embodiments can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware, but in many cases, the former is a better implementation manner. Based on such understanding, the technical solutions of the present invention may be embodied in the form of a software product, which is stored in a storage medium (e.g., a rom/ram, a magnetic disk, an optical disk) and includes instructions for enabling a terminal device (e.g., a mobile phone, a computer, a server, an air conditioner, or a network device) to execute the method according to the embodiments of the present invention.
The above description is only a preferred embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (10)

1. A method for generating a part division route, comprising the steps of:
acquiring a part drawing number, and acquiring a part function number according to the part drawing number;
importing the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number;
and writing the work division route attributes and the part drawing numbers into a work division route table to obtain corresponding part work division routes.
2. The method of claim 1, wherein the step of obtaining a part drawing number and obtaining a part function number based on the part drawing number comprises:
acquiring a part drawing number in a manual input mode, a system import mode or a PLM import mode;
and obtaining a part function number according to the part drawing number.
3. The method of claim 2, wherein the part function number comprises: group number, packet number, and serial number;
the step of obtaining the part function number according to the part drawing number comprises the following steps:
when a part drawing number is received, acquiring a part information table;
and analyzing the part drawing number according to the part information table to obtain a group number, a grouping number and a serial number corresponding to the part drawing number.
4. The method of claim 1, wherein the step of importing the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number comprises:
importing the part function number into a part division dictionary;
judging whether the part function number is divided for the first time;
if not, acquiring a corresponding part division history record in the part division dictionary;
and determining the division route attribute corresponding to the part function number according to the part division history.
5. The method of claim 4, wherein said step of determining whether said part function number is a first division of labor comprises:
traversing and inquiring the part function number in the part division dictionary;
and judging whether the part function number is the first time of division of labor according to the traversal query result.
6. The method of claim 4, wherein after the step of determining whether the part function number is a first division, further comprising:
if the part function number is the first time of division, searching in the division route dictionary according to the inclusion relation;
and when the corresponding retrieval result exists in the division route dictionary, generating corresponding division route attributes.
7. The method of any of claims 1 to 6, wherein said step of writing said division route attributes and said part drawing number into a division route table to obtain a corresponding part division route comprises:
and migrating the work division route table from the supply chain system to a production material list system so as to enable the production material list system to read the information in the work division route table.
8. An apparatus for generating a part distribution route, the apparatus comprising:
the drawing number acquisition module is used for acquiring a part drawing number and acquiring a part function number according to the part drawing number;
the attribute acquisition module is used for leading the part function number into a part division dictionary to obtain a division route attribute corresponding to the part function number;
and the route determining module is used for writing the work division route attribute and the part drawing number into a work division route table to obtain a corresponding part work division route.
9. An apparatus for generating a part division route, the apparatus comprising: a memory, a processor and a program for generating a part division route stored on the memory and executable on the processor, the program for generating a part division route being configured to implement the steps of the method for generating a part division route according to any one of claims 1 to 7.
10. A storage medium, characterized in that a program for generating a part division route is stored on the storage medium, and the program for generating a part division route realizes the steps of the method for generating a part division route according to any one of claims 1 to 7 when executed by a processor.
CN202110715522.XA 2021-06-24 2021-06-24 Method, device and equipment for generating part division route and storage medium Active CN113379290B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110715522.XA CN113379290B (en) 2021-06-24 2021-06-24 Method, device and equipment for generating part division route and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110715522.XA CN113379290B (en) 2021-06-24 2021-06-24 Method, device and equipment for generating part division route and storage medium

Publications (2)

Publication Number Publication Date
CN113379290A true CN113379290A (en) 2021-09-10
CN113379290B CN113379290B (en) 2022-12-13

Family

ID=77579337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110715522.XA Active CN113379290B (en) 2021-06-24 2021-06-24 Method, device and equipment for generating part division route and storage medium

Country Status (1)

Country Link
CN (1) CN113379290B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007141821A (en) * 2005-10-17 2007-06-07 Semiconductor Energy Lab Co Ltd Semiconductor device and method of manufacturing same
CN105224953A (en) * 2015-10-09 2016-01-06 天津大学 In a kind of machine part technology, knowledge is extracted and the method developed
CN105468849A (en) * 2015-11-26 2016-04-06 中国航空工业集团公司沈阳飞机设计研究所 Aircraft weight control method
CN106228458A (en) * 2016-07-11 2016-12-14 武汉法利莱切焊系统工程有限公司 A kind of method and apparatus using Excel form to import the processing of data genaration part
CN107515953A (en) * 2017-09-27 2017-12-26 武汉龙谷科尔技术有限公司 One kind welding overall process quality tracing and analysis system
CN109522527A (en) * 2018-11-30 2019-03-26 常州伟泰科技股份有限公司 A method of site construction technology establishment is carried out using software systems
CN109918746A (en) * 2019-02-19 2019-06-21 西门子电站自动化有限公司 The method and apparatus for generating bill of materials based on CAD drawing file
CN110598279A (en) * 2019-08-28 2019-12-20 武汉理工大学 Method and device for planning part machining process route
CN110659866A (en) * 2019-04-15 2020-01-07 南京依维柯汽车有限公司 Method for releasing BOM from PDM system to ERP system
CN110780625A (en) * 2019-10-28 2020-02-11 安徽江淮汽车集团股份有限公司 Automatic control method, device and equipment for pre-assembly line and storage medium
CN111062196A (en) * 2019-11-25 2020-04-24 大明重工有限公司 Batch process flow card generation method based on CAD and Excel
CN112465605A (en) * 2020-12-21 2021-03-09 一汽解放汽车有限公司 Part generation method, device, equipment and storage medium

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007141821A (en) * 2005-10-17 2007-06-07 Semiconductor Energy Lab Co Ltd Semiconductor device and method of manufacturing same
CN105224953A (en) * 2015-10-09 2016-01-06 天津大学 In a kind of machine part technology, knowledge is extracted and the method developed
CN105468849A (en) * 2015-11-26 2016-04-06 中国航空工业集团公司沈阳飞机设计研究所 Aircraft weight control method
CN106228458A (en) * 2016-07-11 2016-12-14 武汉法利莱切焊系统工程有限公司 A kind of method and apparatus using Excel form to import the processing of data genaration part
CN107515953A (en) * 2017-09-27 2017-12-26 武汉龙谷科尔技术有限公司 One kind welding overall process quality tracing and analysis system
CN109522527A (en) * 2018-11-30 2019-03-26 常州伟泰科技股份有限公司 A method of site construction technology establishment is carried out using software systems
CN109918746A (en) * 2019-02-19 2019-06-21 西门子电站自动化有限公司 The method and apparatus for generating bill of materials based on CAD drawing file
CN110659866A (en) * 2019-04-15 2020-01-07 南京依维柯汽车有限公司 Method for releasing BOM from PDM system to ERP system
CN110598279A (en) * 2019-08-28 2019-12-20 武汉理工大学 Method and device for planning part machining process route
CN110780625A (en) * 2019-10-28 2020-02-11 安徽江淮汽车集团股份有限公司 Automatic control method, device and equipment for pre-assembly line and storage medium
CN111062196A (en) * 2019-11-25 2020-04-24 大明重工有限公司 Batch process flow card generation method based on CAD and Excel
CN112465605A (en) * 2020-12-21 2021-03-09 一汽解放汽车有限公司 Part generation method, device, equipment and storage medium

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
潘青姑: "" 基于PLM平台的汽车典型零件加工工艺规划方法研究与应用"", 《中国优秀硕士学位论文全文数据库 (工程科技Ⅱ辑)》 *
赵静 等: ""航修企业制造车间管理系统的设计与实现"", 《内燃机与配件》 *
邱福生 等: ""型号研制过程的工艺分工规划建模技术研究"", 《计算机集成制造系统》 *

Also Published As

Publication number Publication date
CN113379290B (en) 2022-12-13

Similar Documents

Publication Publication Date Title
CN1755684B (en) Query forced indexing
US8577937B1 (en) Repository including exclusion list
CN111459985A (en) Identification information processing method and device
CN110737674A (en) Visual chart query method, device and equipment and computer storage medium
CN107391092B (en) Method and system for automatically deploying associated software
CN112667697A (en) Method and device for acquiring real estate information by combining RPA and AI
CN108629052B (en) Kettle task scheduling method, system, computer equipment and storage medium
CN113568925B (en) Message data conversion method and device, electronic equipment and storage medium
CN112860948B (en) Metadata management method and system based on multi-tenant SaaS architecture and electronic equipment
CN113379290B (en) Method, device and equipment for generating part division route and storage medium
US20230297077A1 (en) Automatic Configuration of Replaced Field Devices in an Industrial Plant
CN106095511A (en) A kind of server updating method and apparatus
CN108763127B (en) Method for realizing Modbus adapter capable of realizing interconversion of source data and target data
CN116341007A (en) Data query method, system, equipment and storage medium
CN113253685B (en) Industrial data acquisition method, device, equipment and medium
CN113535730A (en) Index updating method and system for search engine, electronic equipment and storage medium
CN110333883B (en) Method and device for updating persistent data
CN112199294A (en) Automatic software testing method and device
CN114564621A (en) Method, device and equipment for associating data and readable storage medium
CN109522014B (en) Algorithm processing method based on new product development, electronic device and readable storage medium
CN112579129A (en) Software updating method, device, equipment and storage medium based on server
CN113283742A (en) Task allocation method and device
CN112947991A (en) Method and device for acquiring version difference code file, computer equipment and medium
CN107742195B (en) System data integration method, device and storage medium
CN112559444A (en) SQL (structured query language) file migration method and device, storage medium and equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant