CN113359649A - Multi-mode energy scheduling method and system for power generation side - Google Patents

Multi-mode energy scheduling method and system for power generation side Download PDF

Info

Publication number
CN113359649A
CN113359649A CN202110746274.5A CN202110746274A CN113359649A CN 113359649 A CN113359649 A CN 113359649A CN 202110746274 A CN202110746274 A CN 202110746274A CN 113359649 A CN113359649 A CN 113359649A
Authority
CN
China
Prior art keywords
power generation
power
generation side
control unit
control center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110746274.5A
Other languages
Chinese (zh)
Other versions
CN113359649B (en
Inventor
王锐
张涛
黄生俊
雷洪涛
刘亚杰
史志超
董南江
杨旭
李凯文
李文桦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National University of Defense Technology
Original Assignee
National University of Defense Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National University of Defense Technology filed Critical National University of Defense Technology
Priority to CN202110746274.5A priority Critical patent/CN113359649B/en
Publication of CN113359649A publication Critical patent/CN113359649A/en
Application granted granted Critical
Publication of CN113359649B publication Critical patent/CN113359649B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a multi-mode energy scheduling method of a power generation side.A control unit of the power generation side detects a link state with an internal control center of power scheduling, the control unit of the power generation side sends a heartbeat packet to the internal control center according to a fixed frequency, if the heartbeat packet is lost and when the interval between the time of a last received scheduling scheme and the current time is greater than a first preset value, the control unit of the power generation side works according to the scheduling scheme of historical time; and the power generation side control unit tries to establish new connection in the state of losing connection with the power dispatching internal control center, the power dispatching internal control center compares the scheme made by the power generation side control unit with the dispatching scheme made by the control center at the current moment after reconnection, if the expected result is less than a second preset value, the current working state of the power generation side is kept, and if the expected result is greater than the second preset value, the working state of each power generation unit is adjusted.

Description

Multi-mode energy scheduling method and system for power generation side
Technical Field
The invention relates to the technical field of energy planning, in particular to a multi-mode energy scheduling method and system for a power generation side.
Background
The comprehensive energy station integrates the construction of various energy infrastructures such as electric power, heat supply, cold supply and the like in one station space, and the conventional comprehensive energy utilization scheme predicts the planning level annual energy utilization requirement by acquiring the historical energy utilization data of regional comprehensive energy and respectively controls and schedules various energy sources in a plurality of systems; meanwhile, in the traditional information energy system, the parameters and the operation information of the capacity side, the network side and the load side are all transmitted to a cloud server or an internal control center, and are uniformly processed and then transmitted for processing.
In order to relieve the energy pressure, on one hand, the proportion of green clean energy is increased, and on the other hand, the primary energy utilization efficiency is improved in the production and scheduling process, so that unnecessary energy waste is reduced. Therefore, the existing mode of independent planning, independent design and independent operation of each original energy supply system is broken through, integrated planning design and operation optimization of the social energy system are carried out, and finally, a unified social comprehensive energy supply and utilization system is constructed, so that the gradual utilization of primary energy and the unified planning and scheduling of secondary energy such as electric energy, heat energy and the like are realized.
As disclosed in chinese patent ZL 202011468472.1, a multi-station fusion type multi-energy coupling scheduling system for distributed energy stations includes: the scheme making module is used for making an energy utilization requirement scheme based on the user requirement and the constraint condition; the information acquisition module is used for acquiring the operation measurement information of the energy equipment and the operation measurement information of the environment sensing equipment; the data service module is used for storing and calculating the obtained performance coefficient; the operation evaluation module is used for carrying out comprehensive energy supply scheduling on the energy station based on the operation of the energy equipment and the operation measurement information of the environment sensing equipment by combining historical data and a historical scheduling scheme in the database; and the result output module is used for outputting the scheduling scheme and the scheme condition evaluation result.
Obviously, the output scheduling scheme is based on evaluation, which cannot spontaneously perform power regulation on the power generation side, but needs a control center to perform uniform calculation and control, so that the energy scheduling on the power generation side inevitably has hysteresis after the control center is out of line or unexpectedly goes off line. Because, in practical situations, it usually takes a considerable time to establish a connection. When the server or the control center pushes the command, the connection is always kept in a plurality of responses, so that the server can send more data at any time.
Disclosure of Invention
The present invention is directed to solving at least one of the problems of the prior art. Therefore, the invention discloses a multi-mode energy scheduling method for a power generation side, which comprises the following steps:
step 1, a power generation side control unit detects a link state with a power dispatching internal control center, the power generation side control unit sends a heartbeat packet to the internal control center according to a fixed frequency, and if reply information of the internal control center is not received in a first specified time period, the power generation side control unit records the time of the last received dispatching scheme;
step 2, when the interval between the time of the scheduling scheme received last time and the current time is greater than a first preset value, the power generation side control unit works according to the scheduling scheme at the historical moment;
and 3, the power generation side control unit tries to establish new connection in a state of losing connection with the power dispatching internal control center, the power dispatching internal control center compares the scheme made by the power generation side control unit with the dispatching scheme made by the control center at the current moment after reconnection, if the expected result is smaller than a second preset value, the current working state of the power generation side is kept, and if the expected result is larger than the second preset value, the working state of each power generation unit is adjusted.
Further, when the multiple power generation units need to be adjusted, the adjustment is performed according to the priority preset in the power generation units, the power generation side control unit obtains the adjustment parameters matched with the respective priorities to be adjusted according to the demand of the power utilization side at the historical time.
Still further, the step 1 further comprises: the power dispatching internal control center comprises a main control server and a standby server, a hot backup mechanism is adopted between the main control server and the standby server, when a reply message of the main control server is not received in a first specified time period, connection with the standby server controlled by power is tried, the control unit at the power generation side does not change the current power generation mode in the process of new connection, and after a reply message of the standby server is not received in a second specified time period, the step 2 is carried out.
Still further, the step 3 further comprises: after connection is recovered, the control center evaluates loss of a working mode of a power generation side, generates scheduling modes aiming at a plurality of loss connection states and sets different priorities, and the power generation side control unit receives the generated scheduling modes of the loss connection states and selects a new working mode according to the priorities in the next loss connection state.
Furthermore, when the power generation side control unit is in the loss of connection state, the power generation side control unit firstly predicts the necessity of changing the power generation mode at present according to the scheduling mode before loss of connection and the average power utilization side demand state at the same time in history, and then changes the power generation mode after determining that the power generation mode needs to be changed and enters the step 3.
The invention also discloses a system for multi-mode energy scheduling of a power generation side, which comprises a power generation side control unit and a power scheduling internal control center, wherein the power generation side control unit detects the link state with the power scheduling internal control center, the power generation side control unit sends a heartbeat packet to the internal control center according to a fixed frequency, and if no reply information of the internal control center is received in a first specified time period, the power generation side control unit records the time of the scheduling scheme received at the last time; when the interval between the time of the scheduling scheme received last time and the current time is larger than a first preset value, the power generation side control unit works according to the scheduling scheme at the historical moment; and the power generation side control unit tries to establish new connection under the state of loss of connection with the power dispatching internal control center, the power dispatching internal control center compares the scheme made by the power generation side control unit with the dispatching scheme made by the control center at the current moment after reconnection, if the expected result is less than a second preset value, the current working state of the power generation side is kept, and if the expected result is greater than the second preset value, the working state of each power generation unit is adjusted.
Preferably, when the multiple power generation units need to be adjusted, the adjustment is performed according to priorities preset in the power generation units, the power generation side control unit obtains adjustment parameters matched with the priorities of the multiple power generation units according to the power consumption demand at the historical time, and the adjustment is performed.
Preferably, the power dispatching internal control center includes a main control server and a backup server, and a hot backup mechanism is adopted between the main control server and the backup server, when a reply message of the main control server is not received in a first specified time period, connection with the power-controlled backup server is attempted, the power generation side control unit does not change a current power generation mode in a process of performing new connection, and after a reply message of the backup server is not received in a second specified time period, whether self-regulation of the power generation side is required is determined.
Preferably, after the connection is recovered, the control center evaluates the loss of the working mode of the power generation side, generates scheduling modes for a plurality of loss connection states, and sets different priorities, and the power generation side control unit receives the generated scheduling modes for the loss connection states and selects a new working mode according to the priorities in the next loss connection state.
Preferably, when the power generation side control unit is in the loss of connection state, the power generation side control unit first predicts the necessity of changing the power generation mode at present according to the scheduling method before loss of connection and the power consumption side demand state averaged at the same time in history, and changes the power generation mode after determining that the power generation mode needs to be changed.
Drawings
The invention will be further understood from the following description in conjunction with the accompanying drawings. The components in the figures are not necessarily to scale, emphasis instead being placed upon illustrating the principles of the embodiments. In the drawings, like reference numerals designate corresponding parts throughout the different views.
FIG. 1 is a logic flow diagram of an embodiment of the present invention.
Detailed Description
Example one
The method for multi-mode energy scheduling of the power generation side shown in fig. 1 comprises the following steps:
step 1, a power generation side control unit detects a link state with a power dispatching internal control center, the power generation side control unit sends a heartbeat packet to the internal control center according to a fixed frequency, and if reply information of the internal control center is not received in a first specified time period, the power generation side control unit records the time of the last received dispatching scheme;
step 2, when the interval between the time of the scheduling scheme received last time and the current time is greater than a first preset value, the power generation side control unit works according to the scheduling scheme at the historical moment;
and 3, the power generation side control unit tries to establish new connection in a state of losing connection with the power dispatching internal control center, the power dispatching internal control center compares the scheme made by the power generation side control unit with the dispatching scheme made by the control center at the current moment after reconnection, if the expected result is smaller than a second preset value, the current working state of the power generation side is kept, and if the expected result is larger than the second preset value, the working state of each power generation unit is adjusted.
Further, when the multiple power generation units need to be adjusted, the adjustment is performed according to the priority preset in the power generation units, the power generation side control unit obtains the adjustment parameters matched with the respective priorities to be adjusted according to the demand of the power utilization side at the historical time.
Still further, the step 1 further comprises: the power dispatching internal control center comprises a main control server and a standby server, a hot backup mechanism is adopted between the main control server and the standby server, when a reply message of the main control server is not received in a first specified time period, connection with the standby server controlled by power is tried, the control unit at the power generation side does not change the current power generation mode in the process of new connection, and after a reply message of the standby server is not received in a second specified time period, the step 2 is carried out.
Still further, the step 3 further comprises: after connection is recovered, the control center evaluates loss of a working mode of a power generation side, generates scheduling modes aiming at a plurality of loss connection states and sets different priorities, and the power generation side control unit receives the generated scheduling modes of the loss connection states and selects a new working mode according to the priorities in the next loss connection state.
Furthermore, when the power generation side control unit is in the loss of connection state, the power generation side control unit firstly predicts the necessity of changing the power generation mode at present according to the scheduling mode before loss of connection and the average power utilization side demand state at the same time in history, and then changes the power generation mode after determining that the power generation mode needs to be changed and enters the step 3.
Example two
The embodiment describes the inventive concept of the invention from the perspective of hardware, and provides a system for multi-mode energy scheduling on a power generation side, which comprises a power generation side control unit and a power scheduling internal control center, wherein the power generation side control unit detects the link state with the power scheduling internal control center, sends a heartbeat packet to the internal control center according to a fixed frequency, and records the time of a scheduling scheme received last time if no reply information of the internal control center is received in a first specified time period; when the interval between the time of the scheduling scheme received last time and the current time is larger than a first preset value, the power generation side control unit works according to the scheduling scheme at the historical moment; and the power generation side control unit tries to establish new connection under the state of loss of connection with the power dispatching internal control center, the power dispatching internal control center compares the scheme made by the power generation side control unit with the dispatching scheme made by the control center at the current moment after reconnection, if the expected result is less than a second preset value, the current working state of the power generation side is kept, and if the expected result is greater than the second preset value, the working state of each power generation unit is adjusted.
Preferably, when the multiple power generation units need to be adjusted, the adjustment is performed according to priorities preset in the power generation units, the power generation side control unit obtains adjustment parameters matched with the priorities of the multiple power generation units according to the power consumption demand at the historical time, and the adjustment is performed.
Preferably, the power dispatching internal control center includes a main control server and a backup server, and a hot backup mechanism is adopted between the main control server and the backup server, when a reply message of the main control server is not received in a first specified time period, connection with the power-controlled backup server is attempted, the power generation side control unit does not change a current power generation mode in a process of performing new connection, and after a reply message of the backup server is not received in a second specified time period, whether self-regulation of the power generation side is required is determined.
Preferably, after the connection is recovered, the control center evaluates the loss of the working mode of the power generation side, generates scheduling modes for a plurality of loss connection states, and sets different priorities, and the power generation side control unit receives the generated scheduling modes for the loss connection states and selects a new working mode according to the priorities in the next loss connection state.
Preferably, when the power generation side control unit is in the loss of connection state, the power generation side control unit first predicts the necessity of changing the power generation mode at present according to the scheduling method before loss of connection and the power consumption side demand state averaged at the same time in history, and changes the power generation mode after determining that the power generation mode needs to be changed.
It should also be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
Although the invention has been described above with reference to various embodiments, it should be understood that many changes and modifications may be made without departing from the scope of the invention. It is therefore intended that the foregoing detailed description be regarded as illustrative rather than limiting, and that it be understood that it is the following claims, including all equivalents, that are intended to define the spirit and scope of this invention. The above examples are to be construed as merely illustrative and not limitative of the remainder of the disclosure. After reading the description of the invention, the skilled person can make various changes or modifications to the invention, and these equivalent changes and modifications also fall into the scope of the invention defined by the claims.

Claims (10)

1. A method for multi-mode energy scheduling of a power generation side is characterized by comprising the following steps:
step 1, a power generation side control unit detects a link state with a power dispatching internal control center, the power generation side control unit sends a heartbeat packet to the internal control center according to a fixed frequency, and if reply information of the internal control center is not received in a first specified time period, the power generation side control unit records the time of the last received dispatching scheme;
step 2, when the interval between the time of the scheduling scheme received last time and the current time is greater than a first preset value, the power generation side control unit works according to the scheduling scheme at the historical moment;
and 3, the power generation side control unit tries to establish new connection in a state of losing connection with the power dispatching internal control center, the power dispatching internal control center compares the scheme made by the power generation side control unit with the dispatching scheme made by the control center at the current moment after reconnection, if the expected result is smaller than a second preset value, the current working state of the power generation side is kept, and if the expected result is larger than the second preset value, the working state of each power generation unit is adjusted.
2. The method according to claim 1, wherein when the multiple power generating units need to be adjusted, the adjustment is performed according to priorities preset in the power generating units, the power generating side control unit obtains adjustment parameters matched with the priorities of the multiple power generating units according to the power demand of the power utilization side at historical time, and the adjustment is performed.
3. The method for multi-mode energy scheduling at the power generation side according to claim 2, wherein the step 1 further comprises: the power dispatching internal control center comprises a main control server and a standby server, a hot backup mechanism is adopted between the main control server and the standby server, when a reply message of the main control server is not received in a first specified time period, connection with the standby server controlled by power is tried, the control unit at the power generation side does not change the current power generation mode in the process of new connection, and after a reply message of the standby server is not received in a second specified time period, the step 2 is carried out.
4. A method of multi-mode energy scheduling at a power generation side according to claim 3, wherein the step 3 further comprises: after connection is recovered, the control center evaluates loss of a working mode of a power generation side, generates scheduling modes aiming at a plurality of loss connection states and sets different priorities, and the power generation side control unit receives the generated scheduling modes of the loss connection states and selects a new working mode according to the priorities in the next loss connection state.
5. The method as claimed in claim 5, wherein when the power generation side control unit is in the loss of connection state, it first predicts the necessity of changing the power generation mode according to the scheduling mode before loss of connection and the average power consumption demand state at the same time in history, and when it is determined that the power generation mode needs to be changed, changes the power generation mode and then enters step 3.
6. The system for multi-mode energy scheduling on the power generation side is characterized by comprising a power generation side control unit and a power scheduling internal control center, wherein the power generation side control unit detects the link state with the power scheduling internal control center, the power generation side control unit sends a heartbeat packet to the internal control center according to a fixed frequency, and if reply information of the internal control center is not received in a first specified time period, the power generation side control unit records the time of the scheduling scheme received last time; when the interval between the time of the scheduling scheme received last time and the current time is larger than a first preset value, the power generation side control unit works according to the scheduling scheme at the historical moment; and the power generation side control unit tries to establish new connection under the state of loss of connection with the power dispatching internal control center, the power dispatching internal control center compares the scheme made by the power generation side control unit with the dispatching scheme made by the control center at the current moment after reconnection, if the expected result is less than a second preset value, the current working state of the power generation side is kept, and if the expected result is greater than the second preset value, the working state of each power generation unit is adjusted.
7. The system according to claim 6, wherein when the multiple power generating units need to be adjusted, the multiple power generating units are adjusted according to priorities preset in the power generating units, the power generating side control unit obtains adjustment parameters matched with the priorities of the multiple power generating units according to the power demand of the power utilization side at the historical time, and the multiple power generating units are adjusted.
8. The system according to claim 6, wherein the power dispatching internal control center comprises a main control server and a backup server, and a hot backup mechanism is used between the main control server and the backup server, when a reply message from the main control server is not received within a first specified time period, the power dispatching internal control center tries to connect to the backup server for power dispatching, the power dispatching control unit does not change the current power dispatching mode during the new connection process, and when a reply message from the backup server is not received within a second specified time period, the power dispatching internal control center determines whether self-regulation of the power dispatching side is needed.
9. The system of claim 6, wherein after connection is restored, the control center evaluates the loss of the operating mode of the power generation side and generates the scheduling modes for a plurality of loss connection states and sets different priorities, and the power generation side control unit receives the generated scheduling modes for the loss connection states and selects a new operating mode according to the priorities at the next loss connection state.
10. The system of claim 6, wherein the power generation side control unit predicts the necessity of changing the power generation mode according to the scheduling method before loss of connection and the average power consumption demand state at the same time in history when loss of connection occurs, and changes the power generation mode after determining that the power generation mode needs to be changed.
CN202110746274.5A 2021-07-01 2021-07-01 Multi-mode energy scheduling method and system for power generation side Active CN113359649B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110746274.5A CN113359649B (en) 2021-07-01 2021-07-01 Multi-mode energy scheduling method and system for power generation side

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110746274.5A CN113359649B (en) 2021-07-01 2021-07-01 Multi-mode energy scheduling method and system for power generation side

Publications (2)

Publication Number Publication Date
CN113359649A true CN113359649A (en) 2021-09-07
CN113359649B CN113359649B (en) 2022-07-26

Family

ID=77537976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110746274.5A Active CN113359649B (en) 2021-07-01 2021-07-01 Multi-mode energy scheduling method and system for power generation side

Country Status (1)

Country Link
CN (1) CN113359649B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101710738A (en) * 2009-12-09 2010-05-19 中国电力科学研究院 Automatic voltage control system of power plant substation
CN101752873A (en) * 2010-01-25 2010-06-23 株洲变流技术国家工程研究中心有限公司 Protection method of DC electricity transmission high-voltage convertor station
CN101834469A (en) * 2010-04-16 2010-09-15 清华大学 Transformer substation-dispatching center two-stage distribution type restoration control method
CN102208834A (en) * 2011-05-24 2011-10-05 中国科学院深圳先进技术研究院 Scheduling system and method of intelligent power grid
CN102222906A (en) * 2010-04-14 2011-10-19 河南省电力公司 Laminated and partitioned automatic current control method applicable to multi-target power grid
WO2015024691A1 (en) * 2013-08-22 2015-02-26 Fujitsu Technology Solutions Intellectual Property Gmbh Power distribution unit, computer arrangement and method for capturing port information
CN104578431A (en) * 2015-02-06 2015-04-29 云南电网有限责任公司红河供电局 Emergency dispatching automation system based on EMS system
CN105141029A (en) * 2015-06-19 2015-12-09 国电南瑞科技股份有限公司 Power system security and stability adaptive emergency control system and method
CN106203745A (en) * 2016-08-19 2016-12-07 国电南瑞科技股份有限公司 Distributed photovoltaic control system based on the many spaces of Multiple Time Scales and control method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101710738A (en) * 2009-12-09 2010-05-19 中国电力科学研究院 Automatic voltage control system of power plant substation
CN101752873A (en) * 2010-01-25 2010-06-23 株洲变流技术国家工程研究中心有限公司 Protection method of DC electricity transmission high-voltage convertor station
CN102222906A (en) * 2010-04-14 2011-10-19 河南省电力公司 Laminated and partitioned automatic current control method applicable to multi-target power grid
CN101834469A (en) * 2010-04-16 2010-09-15 清华大学 Transformer substation-dispatching center two-stage distribution type restoration control method
CN102208834A (en) * 2011-05-24 2011-10-05 中国科学院深圳先进技术研究院 Scheduling system and method of intelligent power grid
WO2015024691A1 (en) * 2013-08-22 2015-02-26 Fujitsu Technology Solutions Intellectual Property Gmbh Power distribution unit, computer arrangement and method for capturing port information
CN104578431A (en) * 2015-02-06 2015-04-29 云南电网有限责任公司红河供电局 Emergency dispatching automation system based on EMS system
CN105141029A (en) * 2015-06-19 2015-12-09 国电南瑞科技股份有限公司 Power system security and stability adaptive emergency control system and method
CN106203745A (en) * 2016-08-19 2016-12-07 国电南瑞科技股份有限公司 Distributed photovoltaic control system based on the many spaces of Multiple Time Scales and control method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙润稼: "大停电后机组恢复在线智能决策优化研究", 《中国优秀博硕士学位论文全文数据库(博士) 工程科技II辑》 *

Also Published As

Publication number Publication date
CN113359649B (en) 2022-07-26

Similar Documents

Publication Publication Date Title
KR101872557B1 (en) Energy consumption management
JP6631665B2 (en) Power receiving device
Koutsopoulos et al. Challenges in demand load control for the smart grid
US8140194B2 (en) Supply-and-demand control system of distributed and coordinated type, for use in power systems
EP2678750B1 (en) Queuing access to a shared power supply
EP2488883B1 (en) Controlled restart of electrical service within a utility service area
CN102025150B (en) Method and system for demand response in a distribution network
WO2014092195A1 (en) Distributed power generation system, control station, and control method therefor
WO2007030471A2 (en) Method and system for local load control
EP3316374A1 (en) Fuel cell system, external management device, fuel cell device, and control method for fuel cell device
KR20150117085A (en) Virtual Power Plant Platform System and Method for Energy Management
US11334135B1 (en) Power supply optimization using backup battery power supplementation
CN104053162A (en) Renewable-energy base station and coverage adjustment method thereof, and wireless cellular system
CN110866646A (en) Electric power system safety check method and safety check device
JP5955581B2 (en) Electric power supply and demand control device and electric power supply and demand control method
CN103576633A (en) Method and system for conducting power supply control on intelligent home systems in community micro grid
CN116544953A (en) Flexible resource robust scheduling method for large-scale data center micro-grid group
JP6894538B2 (en) Methods and assemblies for load management of electrical equipment
CN113359649B (en) Multi-mode energy scheduling method and system for power generation side
CN113078727B (en) Intelligent power conversion cabinet and power supply method, power supply system and computer storage medium thereof
Jia et al. Social-aware learning-based online energy scheduling for 5G integrated smart distribution power grid
JP7409835B2 (en) Power control method, power control system, and program
CN116415801B (en) Commercial energy load intelligent distribution method and system based on big data
CN117114292A (en) Multi-energy flow regulation and control method based on comprehensive energy system
JP2005333701A (en) Operation scheduling method, system and program of distributed energy community system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant