CN113356375A - Assembled building outer wall drainage structure and construction method thereof - Google Patents

Assembled building outer wall drainage structure and construction method thereof Download PDF

Info

Publication number
CN113356375A
CN113356375A CN202110781029.8A CN202110781029A CN113356375A CN 113356375 A CN113356375 A CN 113356375A CN 202110781029 A CN202110781029 A CN 202110781029A CN 113356375 A CN113356375 A CN 113356375A
Authority
CN
China
Prior art keywords
pipe
wall
drainage pipe
main drainage
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110781029.8A
Other languages
Chinese (zh)
Inventor
徐俊
马逢春
王波
陈�峰
周海超
朱矿
桂涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Third Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Third Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Third Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN202110781029.8A priority Critical patent/CN113356375A/en
Publication of CN113356375A publication Critical patent/CN113356375A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/70Drying or keeping dry, e.g. by air vents
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

Assembled building outer wall drainage structure, including vertical main drain pipe, main drain pipe rear side is equipped with a plurality of first through-holes, is equipped with a plurality of horizontal branch pipes on the main drain pipe, and the branch pipe rear side is equipped with a plurality of second through-holes, and main drain pipe and branch pipe are the polyethylene hose. The construction method comprises the following steps: the main drainage pipe is positioned in a longitudinal joint of an outer wall of the fabricated building, a branch pipe is arranged in a transverse joint communicated with the longitudinal joint on the outer wall, the branch pipe is communicated with the main drainage pipe, a sewer pipe near the outer wall of the building is led into the lower side of the main drainage pipe, and finally building weather-resistant glue is filled in the longitudinal joint and the transverse joint. This structure can be smoothly with the clearance water discharge in the assembly type structure gap, prevents the outer wall infiltration. The construction method has simple steps, convenient construction and good drainage effect.

Description

Assembled building outer wall drainage structure and construction method thereof
Technical Field
The invention relates to an external wall drainage structure of an assembly type building and a construction method thereof.
Background
The assembly type building outer wall is mostly "sandwich" structure, and the prefabricated outer wall of sandwich insulation board is all adopted to standard layer outer wall, and precast concrete is excessive with cast-in-place concrete joint, and in the assembly type high-rise building sandwich insulation board outer wall construction process, it is many because of the board seam is reserved to the outer wall, generally adopts polyethylene foam stick inside lining to add building resistant weather to glue to handle in follow-up work progress, has a large amount of infiltration hidden dangers. The main disadvantages are: firstly, the polyethylene foam rod is easy to absorb water and store water, cannot effectively drain water and only plays a lining effect; and once the outer wall has a water seepage point, the seepage water cannot be discharged from the heat insulation layer, and the seepage water pressure can be formed in the heat insulation layer after the seepage water is accumulated for a long time, so that the seepage water easily penetrates into the room from concrete gaps and inner hole holes blocked by cement mortar.
Disclosure of Invention
The first technical problem to be solved by the invention is to provide an outer wall drainage structure of a fabricated building, which can smoothly drain gap water in a gap of the fabricated building and prevent water seepage of the outer wall.
The second technical problem to be solved by the invention is to provide the construction method of the assembled building outer wall drainage structure, which has the advantages of simple steps, convenient construction and good drainage effect.
In order to solve the first technical problem, the invention provides an assembled building outer wall drainage structure which comprises a main drainage pipe vertically arranged, wherein a plurality of first through holes penetrating through the main drainage pipe in the front-back direction are formed in the rear side of the main drainage pipe, a plurality of branch pipes horizontally arranged are arranged on the main drainage pipe and communicated with the main drainage pipe, a plurality of second through holes penetrating through the main drainage pipe in the front-back direction are also formed in the rear side of each branch pipe, and the main drainage pipe and the branch pipes are hoses made of polyethylene materials.
Preferably, the pitch of the first through holes on the main drainage pipe is 50cm, and the pitch of the second through holes on the branch pipe is 50 cm.
For the sake of simplicity of explanation, the drainage structure for the exterior wall of the prefabricated building according to the present invention is hereinafter referred to simply as the present structure.
The advantage of this structure: this structure can be smoothly with the clearance water discharge in the assembly type structure gap, prevents the outer wall infiltration.
In order to solve the second technical problem, the invention provides a construction method of an outer wall drainage structure of an assembly type building, which comprises the following steps:
(1) positioning the main drainage pipe in a longitudinal joint of an outer wall of the fabricated building, and ensuring that the first through hole is arranged towards the inner side of the longitudinal joint;
(2) arranging branch pipes in transverse seams communicated with the longitudinal seams on the outer wall, and ensuring that the second through holes are arranged towards the inner sides of the transverse seams;
(3) and communicating the branch pipes with the main drainage pipe, guiding the lower side of the main drainage pipe into a sewer pipe near the outer wall of the building, and finally filling the building weather-resistant glue into the longitudinal joints and the transverse joints.
For the sake of simplicity of explanation, the construction method of the drainage structure of the exterior wall of the prefabricated building according to the present invention is simply referred to as the present method.
The method has the advantages that: the method has simple steps, convenient construction and good drainage effect.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Fig. 2 is a sectional view a-a of fig. 1.
Fig. 3 is a sectional view B-B of fig. 1.
Detailed Description
Referring to fig. 1-3, the assembled building outer wall drainage structure comprises a main drainage pipe 1 which is vertically arranged, a plurality of first through holes 11 which penetrate through the main drainage pipe 1 along the front-back direction are formed in the rear side of the main drainage pipe 1, a plurality of branch pipes 2 which are horizontally arranged are arranged on the main drainage pipe 1, the branch pipes 2 are communicated with the main drainage pipe 1, a plurality of second through holes 21 which penetrate through the main drainage pipe 1 along the front-back direction are also formed in the rear side of the branch pipes 2, and the main drainage pipe 1 and the branch pipes 2 are hoses made of polyethylene materials.
The pitch of the first through holes 11 on the main drainage pipe 1 is 50cm, and the pitch of the second through holes 21 on the branch pipe 2 is 50 cm.
The advantage of this structure: this structure can be smoothly with the clearance water discharge in the assembly type structure gap, prevents the outer wall infiltration.
The construction method of the outer wall drainage structure of the fabricated building comprises the following steps:
(1) positioning the main drainage pipe 1 in a longitudinal joint of an outer wall of the fabricated building, and ensuring that the first through hole 11 is arranged towards the inner side of the longitudinal joint;
(2) arranging a branch pipe 2 in a transverse seam communicated with the longitudinal seam on the outer wall, and ensuring that the second through hole 21 is arranged towards the inner side of the transverse seam;
(3) and (3) communicating the branch pipes 2 with the main drainage pipe 1, guiding the lower side of the main drainage pipe 1 into a sewer pipe near the outer wall of the building, and finally filling building weather-resistant glue into the longitudinal joints and the transverse joints.
The method has the advantages that: the method has simple steps, convenient construction and good drainage effect.

Claims (3)

1. Assembled building outer wall drainage structure, its characterized in that: the water pipe comprises a vertically arranged main drainage pipe, wherein a plurality of first through holes penetrating through the main drainage pipe in the front-back direction are formed in the rear side of the main drainage pipe, a plurality of branch pipes arranged horizontally are arranged on the main drainage pipe and communicated with the main drainage pipe, a plurality of second through holes penetrating through the main drainage pipe in the front-back direction are also formed in the rear side of each branch pipe, and the main drainage pipe and the branch pipes are hoses made of polyethylene materials.
2. The exterior wall drainage structure of a fabricated building according to claim 1, wherein: the pitch of the first through holes on the main drainage pipe is 50cm, and the pitch of the second through holes on the branch pipe is 50 cm.
3. The construction method of an exterior wall drainage structure of a fabricated building according to claim 1, comprising the steps of:
(1) positioning the main drainage pipe in a longitudinal joint of an outer wall of the fabricated building, and ensuring that the first through hole is arranged towards the inner side of the longitudinal joint;
(2) arranging branch pipes in transverse seams communicated with the longitudinal seams on the outer wall, and ensuring that the second through holes are arranged towards the inner sides of the transverse seams;
(3) and communicating the branch pipes with the main drainage pipe, guiding the lower side of the main drainage pipe into a sewer pipe near the outer wall of the building, and finally filling the building weather-resistant glue into the longitudinal joints and the transverse joints.
CN202110781029.8A 2021-07-10 2021-07-10 Assembled building outer wall drainage structure and construction method thereof Pending CN113356375A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110781029.8A CN113356375A (en) 2021-07-10 2021-07-10 Assembled building outer wall drainage structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110781029.8A CN113356375A (en) 2021-07-10 2021-07-10 Assembled building outer wall drainage structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN113356375A true CN113356375A (en) 2021-09-07

Family

ID=77538979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110781029.8A Pending CN113356375A (en) 2021-07-10 2021-07-10 Assembled building outer wall drainage structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN113356375A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023039745A1 (en) * 2021-09-15 2023-03-23 中铁上海工程局集团第三工程有限公司 Drainage and anti-seepage device and method for assembled prefabricated sandwich thermal-insulation external wallboard

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023039745A1 (en) * 2021-09-15 2023-03-23 中铁上海工程局集团第三工程有限公司 Drainage and anti-seepage device and method for assembled prefabricated sandwich thermal-insulation external wallboard

Similar Documents

Publication Publication Date Title
CN101929340B (en) Coal mine underground flat inclined tunnel pipe shed pre-grouting advance support construction process
CN110939468A (en) Assembly type supporting steel pipe piece of open type TBM (tunnel boring machine) and combined supporting method of assembly type supporting steel pipe piece and spray anchor
CN104790394A (en) Pressure anchor cable structure with prefabricated anchor head and construction method of pressure anchor cable structure
CN101575859B (en) Anti-seepage joint of underground continuous walls and construction method thereof
CN113356375A (en) Assembled building outer wall drainage structure and construction method thereof
CN112012761B (en) Construction method of anti-disturbance double-arch tunnel structure
CN207017444U (en) A kind of connecting structure of steel column and retaining wall
CN215106164U (en) Assembled building outer wall drainage structures
CN107035027A (en) A kind of assembled steel reinforced concrete structure light wt compound external wall panel
CN210797910U (en) Prefabricated plate prefabricated with waterproof structure
CN1932242B (en) Well wall with steel plate aquifuge and construction method thereof
CN206655716U (en) A kind of tunnel drainage structure
CN213175669U (en) Disturbance-resistant double-arch tunnel structure
CN115807561A (en) Connection reinforcing structure of ultra-high shale clear water brick hollowed decorative wall and construction method thereof
CN206360137U (en) Administration structure in one kind construction exterior wall mending-leakage reinforcement
CN104746902A (en) Integral bathroom
CN104712152A (en) Unit bathroom
CN212104215U (en) Post-cast strip for bottom plate of underground chamber
CN107762006A (en) Composite expanded perlite light partition wall board construction method
CN209430248U (en) A kind of buried Central drain discharge structure of novel tunnel
CN218667561U (en) Pile-wall combined supporting structure
CN213448977U (en) Vertical connected node of prefabricated outer wall
CN216713619U (en) A waterproof structure of baffle for interior gutter
CN204510912U (en) A kind of integral bathroom
CN204510898U (en) A kind of integral bathroom

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination