CN113322740A - Reinforced asphalt concrete road and construction method thereof - Google Patents

Reinforced asphalt concrete road and construction method thereof Download PDF

Info

Publication number
CN113322740A
CN113322740A CN202110714951.5A CN202110714951A CN113322740A CN 113322740 A CN113322740 A CN 113322740A CN 202110714951 A CN202110714951 A CN 202110714951A CN 113322740 A CN113322740 A CN 113322740A
Authority
CN
China
Prior art keywords
road
layer
asphalt concrete
cushion layer
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110714951.5A
Other languages
Chinese (zh)
Other versions
CN113322740B (en
Inventor
王正波
徐振刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Guangwu Landscape Construction Co ltd
Original Assignee
Jiangsu Guangwu Landscape Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Guangwu Landscape Construction Co ltd filed Critical Jiangsu Guangwu Landscape Construction Co ltd
Priority to CN202110714951.5A priority Critical patent/CN113322740B/en
Publication of CN113322740A publication Critical patent/CN113322740A/en
Application granted granted Critical
Publication of CN113322740B publication Critical patent/CN113322740B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/16Reinforcements
    • E01C11/165Reinforcements particularly for bituminous or rubber- or plastic-bound pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The application relates to the field of reinforced asphalt concrete roads, in particular to a reinforced asphalt concrete road and a construction method thereof, which comprises a cushion layer, a base layer and a surface layer which are sequentially arranged, wherein a reinforcing piece is embedded in the base layer, the reinforcing piece comprises a plurality of layers of reinforcing mesh, connecting steel bars are welded at nodes between two adjacent layers of reinforcing mesh in a one-to-one correspondence manner, and a plurality of positioning rods used for inserting into the cushion layer are arranged on the reinforcing mesh. This application has the effect that reduces the road fracture, improves road life.

Description

Reinforced asphalt concrete road and construction method thereof
Technical Field
The application relates to the field of reinforced asphalt concrete roads, in particular to a reinforced asphalt concrete road and a construction method thereof.
Background
Currently, reinforced asphalt concrete roads include a road bed, a base layer made of asphalt concrete is laid on the road bed, and then a surface layer made of asphalt concrete is laid on the base layer to ensure the flatness of the whole road.
The old concrete pavement can be directly used as a cushion layer of the asphalt concrete pavement to add a base layer and a surface layer on the old cement concrete base layer to complete the white-black transformation, so that a complete road is formed.
The inventor finds that after a long time, the impact load caused by vehicle running on the road surface is transferred to the base layer to cause the base layer to crack, and further causes the defect that the road surface is easy to crack.
Disclosure of Invention
In order to improve the bearing capacity of road, reduce the road fracture, improve road life, this application provides a muscle asphalt concrete road.
The application provides a reinforced asphalt concrete road adopts following technical scheme:
the utility model provides a muscle asphalt concrete road, is including bed course, basic unit and the surface course that sets gradually, inlay in the basic unit and be equipped with the reinforcement, the reinforcement includes a plurality of layers of reinforcing bar net, and the node one-to-one welding between the adjacent two-layer reinforcing bar net has connecting reinforcement, the reinforcing bar is provided with a plurality of locating levers that are arranged in inserting the bed course on the net.
By adopting the technical scheme, after the positioning rod is inserted into the cushion layer, the base layer is poured on the cushion layer, so that the reinforcing mesh and the connecting steel bars are embedded in the base layer and integrally formed with the base layer, the reinforcing mesh and the connecting steel bars play a role in reinforcing the base layer, the cracking of the base layer is reduced, and the service life of a road is prolonged; meanwhile, the positioning rods are inserted into the cushion layer, so that the connection tightness of the reinforcing mesh layer and the cushion layer is further improved, and the occurrence of the mutual separation condition of the cushion layer and the base layer is reduced.
Optionally, a limiting piece is arranged on the positioning rod, and a conical guide part is arranged at the bottom end of the positioning rod.
Through adopting above-mentioned technical scheme, the setting of guide part is convenient for insert the locating lever in the bed course, then makes spacing piece butt on the bed course surface to guarantee the degree of depth that the locating lever inserted in the bed course, in order to guarantee the position of reinforcing bar net, thereby guaranteed the reinforcing effect of reinforcing bar net to the basic unit.
Optionally, a plurality of ground grabbing holes are formed in the cushion layer, limiting piles embedded in the ground grabbing holes are arranged in the base layer, and the adjacent two ground grabbing holes are arranged in a mode that the inclination angles are opposite
Through adopting above-mentioned technical scheme, the vehicle is at the in-process of traveling, has all the time to play the supporting role with vehicle direction of travel opposite's spacing stake to the basic unit to reduce because the vehicle removes and to form the emergence of impact load and lead to the road surface condition of ftractureing to the road surface.
Optionally, the base layer is provided with a plurality of hollow steel pipes at equal intervals, one end of each hollow steel pipe extends into the cushion layer, the other end of each hollow steel pipe extends into the cushion layer, and the surface layer is provided with a hooking part filled in the hollow steel pipes.
By adopting the technical scheme, the hooking part penetrates through the base layer along with the hollow steel pipe and extends into the cushion layer, so that the connection stability among the cushion layer, the base layer and the surface layer is ensured; meanwhile, the hollow steel pipe per se also plays a certain supporting role on the road, so that the stability of the road is ensured.
Optionally, the part of the hollow steel pipe in the base layer is provided with an L-shaped hanging rod, and the reinforcing mesh is hung on the hanging rod.
By adopting the technical scheme, the reinforcing mesh is embedded on the hanging rod, so that the reinforcing mesh and the hollow steel pipe are connected together to improve the stability of the reinforcing mesh and the hollow steel pipe, and further the overall stability of the road is improved.
Optionally, the road sleeper stone comprises road sleeper stones embedded in the roadbeds on two sides of the width direction of the road sleeper stone, and abutting portions perpendicular to the road sleeper stone are arranged on the side walls of the side, away from the cushion layer, of the road sleeper stone.
By adopting the technical scheme, the arrangement of the road sleeper stones can reduce the occurrence of edge breakage of the cushion layer, the base layer and the surface layer in the width direction; meanwhile, the stability of the road sleeper stone is ensured by the arrangement of the abutting part.
Optionally, the abutting portion is provided with a drainage pipeline, and a drainage cover is laid on the road sleeper stone and the drainage pipeline.
Through adopting above-mentioned technical scheme for rivers on the road surface can be followed drainage pipe and discharged, reduce because of the rainwater gathering back, the vehicle rolls repeatedly and leads to ponding department to produce the pot hole.
Optionally, a water blocking plate is arranged on one side, close to the cushion layer, of the road sleeper stone, the water blocking plate is inclined downwards in the direction close to the road sleeper stone, and a water through hole communicated with a drainage pipeline is formed in the road sleeper stone above the water blocking plate.
Through adopting above-mentioned technical scheme, rivers between sleeper stone and the road are discharged in can getting into drainage pipe from the limbers after water blocking plate intercepts, reduce the rainwater and lead to the road bed sediment in the road bed of clearance department flow direction below between sleeper stone and the bed course to arouse the appearance of road cracking condition.
On the other hand, the application also provides a construction method of the reinforced asphalt concrete road, 1, comprising the following steps;
s1, compacting the roadbed, cleaning the roadbed surface, paving a cushion layer or planing the upper surface of cement concrete on the original road for 5-6cm, compacting the planed particles in situ by a grinding machine, and forming the cushion layer together with the un-planed concrete on the bottom layer;
s2, arranging a plurality of ground grabbing holes at equal intervals on the cushion layer, embedding hollow steel pipes in the cushion layer, then placing reinforcing members on the cushion layer, inserting positioning rods into the cushion layer, enabling the limiting pieces to abut against the upper surface of the cushion layer, and hanging a reinforcing mesh on hanging rods;
s3, pouring asphalt mixture and territory on the cushion layer to form a base layer;
and S4, after the base layer is solidified and formed, pouring asphalt concrete doped with plastic particles on the base layer, and rolling the asphalt concrete by a rolling machine back and forth for 2 to 5 times to form a surface layer.
By adopting the technical scheme, the asphalt mixture collar soil is poured on the cushion layer to form the base layer, so that the asphalt concrete of the base layer is condensed with the reinforcing piece and the hollow steel pipe, the structural strength of the base layer is improved, and the occurrence of the tired condition of the base layer is reduced; pouring asphalt concrete doped with plastic particles on the base layer, and rolling back and forth for 2-5 times by using a rolling machine to form a surface layer so as to ensure the smoothness of the surface layer; meanwhile, the surface layer has certain elasticity due to the addition of the plastic particles, and the effect of absorbing and damping can be achieved, so that the cracking of the surface layer is reduced.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the arrangement of the reinforcing member increases the bearing capacity of the base layer, thereby reducing the occurrence of road cracking and prolonging the service life of the road;
2. the plastic particles are added into the surface layer in the road construction process, so that the elasticity of the surface layer can be increased, the surface layer can absorb certain impact load, and the service life of the road is prolonged.
Drawings
Fig. 1 is a schematic overall structure diagram of a reinforced asphalt concrete road according to an embodiment of the present application.
Fig. 2 is a cross-sectional view of a reinforced asphalt concrete road according to an embodiment of the present application.
Fig. 3 is a schematic structural diagram of a reinforcing member in a reinforced asphalt concrete road according to an embodiment of the present application.
Fig. 4 is an exploded view of a reinforced asphalt concrete road according to an embodiment of the present invention.
Description of reference numerals: 1. a cushion layer; 2. a base layer; 21. limiting piles; 3. a reinforcement; 31. a reinforcing mesh; 32. connecting reinforcing steel bars; 33. positioning a rod; 34. a limiting sheet; 35. a guide portion; 36. a limiting rod; 4. a surface layer; 41. a hooking part; 5. a hollow steel pipe; 51. a grab bar; 52. a hanging rod; 6. a road sleeper stone; 61. an abutting portion; 62. a water-stop plate; 63. a water discharge pipeline; 64. a drainage cover; 65. a water hole.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses reinforced asphalt concrete road. Referring to fig. 1 and 2, the reinforced asphalt concrete road includes a mat layer 1 laid on a roadbed, and the mat layer 1 may be formed by sand-rolling or concrete road on the original road. A plurality of inclined downward ground grabbing holes are formed in the cushion layer 1 at equal intervals, the ground grabbing holes are arranged obliquely along the length direction of the cushion layer 1, and the inclination directions of two adjacent ground grabbing holes are opposite. A base layer 2 made of asphalt concrete is laid on the cushion layer 1, and the asphalt concrete flows into the ground grabbing holes in the laying process, is solidified and molded to form limiting piles 21 embedded in the ground grabbing holes, so that the connection stability of the base layer 2 and the cushion layer 1 is ensured; simultaneously because grab the ground hole and set up each other crisscross, consequently every inclination who grabs the spacing stake 21 that the ground hole corresponds is also the same for the vehicle is at the in-process of traveling, has the spacing stake 21 opposite with vehicle advancing direction all the time to play the supporting role to basic unit 2, thereby reduces because the vehicle removes and leads to the appearance of road surface fracture condition to the road surface formation impact load.
Referring to fig. 2 and 3, a reinforcing member 3 for reinforcing the base layer 2 is also embedded in the base layer 2. The reinforcement 3 comprises two-layer mesh reinforcement 31, and the equal one-to-one in node of two-layer mesh reinforcement 31 is provided with the connecting reinforcement 32 that is used for connecting two mesh reinforcement 31, connects two-layer mesh reinforcement 31 through connecting reinforcement 32 promptly and fixes into three-dimensional steel reinforcement cage to make mesh reinforcement 31 play reinforced effect to basic unit 2, reduced the appearance of the 2 circumstances of ftracture of basic unit. Meanwhile, in order to ensure that the mesh reinforcement 31 is positioned at the center of the base layer 2, the reinforcing effect of the mesh reinforcement 31 in the base layer 2 on the base layer 2 cannot be uneven due to the deviation of the reinforcing piece 3, a vertical downward positioning rod 33 is fixed at a node of a steel reinforcement cage close to one side of the cushion layer 1, a limiting sheet 34 is arranged on the positioning rod 33, a conical guide part 35 is arranged at one end, away from the bracket, of the positioning rod 33, the positioning rod 33 is inserted into the cushion layer 1 through the guide part 35, then the limiting sheet 34 is abutted to the surface of the cushion layer 1, so that the depth of the positioning rod 33 inserted into the cushion layer 1 is ensured, and the position of the mesh reinforcement 31 is ensured. Meanwhile, the arrangement of the positioning rods 33 further increases the connection tightness of the reinforcing mesh 31 layer and the cushion layer 1, so that the occurrence of the condition that the cushion layer 1 and the base layer 2 are separated from each other is reduced. The vertical position-limiting rods 36 are arranged on the layer of reinforcing steel bars far away from the cushion layer 1, and the length of the position-limiting rods 36 is half of that of the connecting reinforcing steel bars 32, so that the separation of the part without the reinforcing mesh 31 and the part with the reinforcing mesh 31 on the upper part of the base layer 2 is reduced.
Referring to fig. 2 and 3, a surface layer 4 is arranged above the cushion layer 1, and the surface layer 4 is made of asphalt concrete added with plastic particles, so that the stability of the road is ensured, and the buffer and shock absorption effects are achieved, so that the cracking of the road is reduced. In order to ensure the connection stability of the surface layer 4, the base layer 2 and the cushion layer 1, a plurality of hollow steel pipes 5 are arranged in the cushion layer 1, and each hollow steel pipe 5 penetrates through the base layer 2 and extends into the cushion layer 1. When the foreshadowing is pour to surface course 4, the asphalt concrete can be filled up hollow copper steel pipe and solidify the shaping and form and collude even portion 41, collude even portion 41 and follow hollow steel pipe 5 and run through basic unit 2 together and stretch into in the bed course 1 to guarantee the stability of being connected between bed course 1, basic unit 2 and the surface course 4 three. Meanwhile, a limiting rod 36 perpendicular to the axial direction of the hollow steel tube 5 is arranged on the part, extending into the cushion layer 1, of the hollow steel tube 5, so that the stability of the hollow steel tube 5 is ensured. The hollow steel pipes 5 are provided with L-shaped hanging rods 52 at the parts thereof in the base layer 2, so that the mesh reinforcement 31 can be embedded in the hanging rods 52, and the mesh reinforcement 31 and the hollow steel pipes 5 are connected together to improve the stability of the two.
Referring to fig. 1 and 4, in order to reduce the occurrence of edge breakage in the width direction of the cushion layer 1, the base layer 2 and the surface layer 4, the two sides of the cushion layer 1 in the width direction are provided with the road sleeper stones 6, and the road sleeper stones 6 are embedded in the roadbed at an embedding depth of 50-60cm so as to ensure the stability of the road sleeper stones 6. The side wall of the side of the road sleeper stone 6 far away from the cushion layer 1 is provided with an abutting part 61 vertical to the road sleeper stone 6, and the abutting part is embedded in the roadbed so as to reduce the inclination and the toppling of the road sleeper stone 6. The abutting part 61 is provided with a drainage pipeline 63, the road sleeper stone 6 and the drainage pipeline 63 are paved with a drainage cover 64, and the drainage cover 64 is flush with the surface layer 4 or about 2cm lower so as to ensure the normal drainage of water flow. In order to reduce the phenomenon that rainwater flows to a roadbed below from a gap between the road sleeper stone 6 and the cushion layer 1 to cause roadbed precipitation, so that the road cracks, a water baffle plate 62 embedded in the base layer 2 is arranged on one side, close to the cushion layer 1, of the road sleeper stone 6, the water baffle plate 62 is obliquely and downwards arranged towards the direction close to the road sleeper stone 6, and a water through hole 65 communicated with a drainage pipe 63 is formed in the road sleeper stone 6 above the water baffle plate 62, so that water between the road sleeper stone 6 and the road can enter the drainage pipe 63 from the water through hole 65 and be drained after being intercepted by the water baffle plate 62.
On the other hand, the application also provides a construction method of the reinforced asphalt concrete road, which comprises the following specific steps:
s1, compacting the roadbed, cleaning the roadbed surface, paving a cushion layer 1 or planing the upper surface of cement concrete on the original road by 5-6cm, compacting the planed particles in situ by a grinding machine, and forming the cushion layer 1 together with un-planed concrete on the bottom layer;
s2, burying road sleepers 6 in the roadbed on two sides of the cushion layer 1 in the width direction;
s3, arranging a plurality of ground grabbing holes at equal intervals on the cushion layer 1, embedding the hollow steel pipes 5 in the cushion layer 1, then placing the reinforcing members 3 on the cushion layer 1, inserting the positioning rods 33 into the cushion layer 1, enabling the limiting pieces 34 to abut against the upper surface of the cushion layer 1, and hanging the reinforcing mesh 31 on the hanging rods 52;
s4, pouring asphalt mixture collar soil on the cushion layer 1 to form the base layer 2, so that the asphalt concrete of the base layer 2 is condensed with the reinforcing piece 3 and the hollow steel pipe 5, the structural strength of the base layer 2 is improved, and the occurrence of the base layer 2 is reduced.
S5, after the base layer 2 is solidified and formed, pouring asphalt concrete doped with plastic particles on the base layer 2, and rolling the mixture for 2 to 5 times by using a rolling machine to form a surface layer 4; in order to guarantee the planarization of surface course 4, the doping of plastic granules makes surface course 4 have certain elasticity simultaneously, can play the effect that absorbs the shock attenuation to reduce surface course 4 fracture.
S6, the drainage pipe 63 is installed on the abutting part 61, and the drainage cover 64 is laid above the drainage pipe 63, thereby completing the construction of the whole road.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. A reinforced asphalt concrete road is characterized in that: including bed course (1), basic unit (2) and surface course (4) that set gradually, inlay in basic unit (2) and be equipped with reinforcement (3), reinforcement (3) include a plurality of layers of reinforcing bar net (31), and node one-to-one welding between adjacent two-layer reinforcing bar net (31) has connecting reinforcement (32), be provided with a plurality of locating levers (33) that are arranged in inserting bed course (1) on reinforcing bar net (31).
2. A reinforced asphalt concrete road according to claim 1, wherein: the positioning rod (33) is provided with a limiting piece (34), and the bottom end of the positioning rod (33) is provided with a conical guide part (35).
3. A reinforced asphalt concrete road according to claim 1, wherein: set up the hole of grabbing ground that a plurality of slopes set up on bed course (1), be provided with in basic unit (2) and inlay and put spacing stake (21) in grabbing ground hole, adjacent two grab the inclination in ground hole sets up oppositely.
4. A reinforced asphalt concrete road according to claim 1, wherein: the base layer (2) is provided with a plurality of hollow steel pipes (5) at equal intervals, one end of each hollow steel pipe (5) stretches into the corresponding cushion layer (1), the other end of each hollow steel pipe stretches into the corresponding cushion layer (1), and the surface layer (4) is provided with a hook connecting part (41) filled in the hollow steel pipes (5).
5. A reinforced asphalt concrete road according to claim 4, wherein: the part of the hollow steel pipe (5) in the base layer (2) is provided with an L-shaped hanging rod (52), and the reinforcing mesh (31) is hung on the hanging rod (52).
6. A reinforced asphalt concrete road according to claim 1, wherein: the road sleeper stone (6) embedded in the roadbeds on two sides of the width direction of the road sleeper stone (6) is further included, and an abutting portion (61) perpendicular to the road sleeper stone (6) is arranged on the side wall of one side, far away from the cushion layer (1), of the road sleeper stone (6).
7. A reinforced asphalt concrete road according to claim 6, wherein: a drainage pipeline (63) is arranged on the abutting part (61), and a drainage cover (64) is paved on the road sleeper stone (6) and the drainage pipeline (63).
8. A reinforced asphalt concrete road according to claim 7, wherein: road sleeper stone (6) are close to bed course (1) one side and are provided with water blocking plate (62), water blocking plate (62) are to being close to road sleeper stone (6) direction slope and set up downwards, set up limbers (65) in drainage pipe (63) intercommunication on road sleeper stone (6) of water blocking plate (62) top.
9. A construction method of a reinforced asphalt concrete road to which the reinforced asphalt concrete road of claim 8 is applied, characterized in that: the method comprises the following steps:
s1, compacting the roadbed, cleaning the roadbed surface, paving a cushion layer (1) or planing the upper surface of cement concrete on the original road by 5-6cm, compacting the planed particles in situ by a grinding machine, and forming the cushion layer (1) together with un-planed concrete on the bottom layer;
s2, arranging a plurality of ground grabbing holes at equal intervals on the cushion layer (1), embedding hollow steel pipes (5) in the cushion layer (1), then placing reinforcing pieces (3) on the cushion layer (1), inserting positioning rods (33) into the cushion layer (1), enabling the limiting pieces (34) to abut against the upper surface of the cushion layer (1), and hanging reinforcing mesh (31) on hanging rods (52);
s3, pouring asphalt mixture and territory on the cushion layer (1) to form a base layer (2);
and S4, after the base layer (2) is solidified and formed, pouring asphalt concrete doped with plastic particles on the base layer (2), and rolling the mixture for 2 to 5 times by using a rolling machine to form the surface layer (4).
CN202110714951.5A 2021-06-25 2021-06-25 Reinforced asphalt concrete road and construction method thereof Active CN113322740B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110714951.5A CN113322740B (en) 2021-06-25 2021-06-25 Reinforced asphalt concrete road and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110714951.5A CN113322740B (en) 2021-06-25 2021-06-25 Reinforced asphalt concrete road and construction method thereof

Publications (2)

Publication Number Publication Date
CN113322740A true CN113322740A (en) 2021-08-31
CN113322740B CN113322740B (en) 2022-07-26

Family

ID=77424891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110714951.5A Active CN113322740B (en) 2021-06-25 2021-06-25 Reinforced asphalt concrete road and construction method thereof

Country Status (1)

Country Link
CN (1) CN113322740B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113981760A (en) * 2021-11-05 2022-01-28 河北建筑工程学院 Anti-seismic roadbed and construction method thereof
CN114232407A (en) * 2021-12-15 2022-03-25 深圳市东深工程有限公司 Pavement structure with water-stable base layer and construction process thereof
CN114737436A (en) * 2022-04-02 2022-07-12 中能建路桥工程有限公司 Treatment method for cement concrete pavement cracks

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001026974A (en) * 1999-07-14 2001-01-30 Nishikawa Toshizou Drainage structure of road surface
CN1326032A (en) * 2000-05-25 2001-12-12 关伟伯 Pavement structure
JP2013221330A (en) * 2012-04-17 2013-10-28 Nippo Corp Construction method of paved road and reinforcing structure of paved road
CN209082285U (en) * 2018-09-25 2019-07-09 江苏省科佳工程设计有限公司 A kind of pavement structure having fiber mixture
CN110409244A (en) * 2019-08-23 2019-11-05 中国建筑第七工程局有限公司 A kind of prefabricated road deck of composite bearing and prefabricated pavement construction method
CN213328491U (en) * 2020-06-16 2021-06-01 中交第三公路工程局有限公司 Roadbed widening structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001026974A (en) * 1999-07-14 2001-01-30 Nishikawa Toshizou Drainage structure of road surface
CN1326032A (en) * 2000-05-25 2001-12-12 关伟伯 Pavement structure
JP2013221330A (en) * 2012-04-17 2013-10-28 Nippo Corp Construction method of paved road and reinforcing structure of paved road
CN209082285U (en) * 2018-09-25 2019-07-09 江苏省科佳工程设计有限公司 A kind of pavement structure having fiber mixture
CN110409244A (en) * 2019-08-23 2019-11-05 中国建筑第七工程局有限公司 A kind of prefabricated road deck of composite bearing and prefabricated pavement construction method
CN213328491U (en) * 2020-06-16 2021-06-01 中交第三公路工程局有限公司 Roadbed widening structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113981760A (en) * 2021-11-05 2022-01-28 河北建筑工程学院 Anti-seismic roadbed and construction method thereof
CN114232407A (en) * 2021-12-15 2022-03-25 深圳市东深工程有限公司 Pavement structure with water-stable base layer and construction process thereof
CN114232407B (en) * 2021-12-15 2023-04-14 深圳市东深工程有限公司 Pavement structure with water-stable base layer and construction process thereof
CN114737436A (en) * 2022-04-02 2022-07-12 中能建路桥工程有限公司 Treatment method for cement concrete pavement cracks

Also Published As

Publication number Publication date
CN113322740B (en) 2022-07-26

Similar Documents

Publication Publication Date Title
CN113322740B (en) Reinforced asphalt concrete road and construction method thereof
CN103510441B (en) Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof
CN107386047B (en) Water permeable brick pavement structure and construction method thereof
CN110904823B (en) Bridge head bump treatment construction structure and construction method in high soft soil filling area
CN203498721U (en) Three-dimensional drainage roadbed structure preventing damage by water of road in cold region
CN207714057U (en) A kind of anti-settling road structure
CN111764219B (en) Water permeable pavement structure and water permeable pavement method
CN205329446U (en) Upper and lower staggered floor precast reinforced concrete basic unit of permeating water
CN109853624B (en) Extension construction method for existing highway rectangular culvert
KR101043285B1 (en) Settlement of the road surface to prevent the construction of drainage facilities, and he used to drain
CN111809470A (en) Structure and method for preventing cracks of road base layer and road subbase layer
CN211256522U (en) Highway subgrade structure capable of preventing subgrade from softening
CN210458818U (en) Subgrade structure that bridge head prevented subsiding
CN111501459B (en) Roadbed structure of mountain road and construction method thereof
CN211395743U (en) Water accumulation preventing and draining structure of retaining wall of mountain road
CN212223507U (en) Urban road assembled permeable pavement structure
CN212335677U (en) Farmland operation way with drainage function
CN210104468U (en) Water-permeable prefabricated assembled concrete road
CN112411288A (en) Geotextile-containing light soil widened embankment anti-floating structure and construction method thereof
CN112095394A (en) Composite pavement with excellent drainage function and construction method thereof
CN219079982U (en) Solid waste modified foam lightweight concrete roadbed structure
CN210238175U (en) Road bed for municipal road engineering design
CN217869799U (en) Low-maintenance urban landscape ecological ground
CN217078279U (en) A drainage kerb structure for town road
CN112900485B (en) Improved cantilever type retaining wall structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant