- CN113312238A CN113312238A CN202110633096.5A CN202110633096A CN113312238A CN 113312238 A CN113312238 A CN 113312238A CN 202110633096 A CN202110633096 A CN 202110633096A CN 113312238 A CN113312238 A CN 113312238A
- Authority
- CN
- China
- Prior art keywords
- resource pool
- monitoring system
- monitoring
- data
- management unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 192
- 238000000034 method Methods 0.000 title claims abstract description 43
- 238000004458 analytical method Methods 0.000 claims abstract description 52
- 238000012545 processing Methods 0.000 claims abstract description 13
- 238000004590 computer program Methods 0.000 claims description 16
- 238000012512 characterization method Methods 0.000 claims description 12
- 230000036541 health Effects 0.000 claims description 9
- 238000012423 maintenance Methods 0.000 abstract description 8
- 230000009286 beneficial effect Effects 0.000 abstract description 5
- 230000008569 process Effects 0.000 description 8
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000014509 gene expression Effects 0.000 description 1
- 230000003862 health status Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3003—Monitoring arrangements specially adapted to the computing system or computing system component being monitored
- G06F11/302—Monitoring arrangements specially adapted to the computing system or computing system component being monitored where the computing system component is a software system
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3065—Monitoring arrangements determined by the means or processing involved in reporting the monitored data
- G06F11/3086—Monitoring arrangements determined by the means or processing involved in reporting the monitored data where the reporting involves the use of self describing data formats, i.e. metadata, markup languages, human readable formats
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/248—Presentation of query results
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
- G06F16/252—Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Databases & Information Systems (AREA)
- Data Mining & Analysis (AREA)
- Computing Systems (AREA)
- Quality & Reliability (AREA)
- Mathematical Physics (AREA)
- Computational Linguistics (AREA)
- Library & Information Science (AREA)
- Debugging And Monitoring (AREA)
Abstract
The application discloses a resource pool monitoring method and related equipment thereof, wherein the resource pool monitoring system comprises a monitoring management unit and at least one resource pool, and for the resource pool monitoring system, after the monitoring management unit acquires resource pool operation data of each resource pool in the resource pool monitoring system, the monitoring management unit firstly carries out preset analysis processing on the resource pool operation data of each resource pool in the resource pool monitoring system to obtain a resource pool analysis result corresponding to the resource pool monitoring system; and displaying the resource pool analysis result corresponding to the resource pool monitoring system so that a manager can check the running states of all resource pools in an enterprise from the monitoring management unit, thus realizing the overall monitoring of a plurality of resource pools in an enterprise and being beneficial to improving the operation and maintenance efficiency of the resource pools.
Description
Technical Field
The present application relates to the field of data processing technologies, and in particular, to a resource pool monitoring method and a related device.
Background
Currently, an enterprise typically has multiple resource pools (e.g., x86 resource pools). However, each resource pool generally needs to be separately monitored and managed (for example, a manager may log in a vcenter corresponding to one resource pool to monitor and manage the resource pool), so that the monitoring and management process of each resource pool is completely independent of the monitoring and management processes of other resource pools in the enterprise, and thus the monitoring and management effect of the resource pools in the enterprise is not good, and thus the operation and maintenance efficiency of the enterprise is low.
Disclosure of Invention
In order to solve the technical problems in the prior art, the application provides a resource pool monitoring method and related equipment thereof, which can be used for integrally monitoring a plurality of resource pools in an enterprise, and thus, the operation and maintenance efficiency of the resource pools is improved.
In order to achieve the above purpose, the technical solutions provided in the embodiments of the present application are as follows:
the embodiment of the application provides a resource pool monitoring method, which is characterized in that the method is applied to a resource pool monitoring system, and the resource pool monitoring system comprises a monitoring management unit and at least one resource pool; the method comprises the following steps:
the monitoring management unit acquires resource pool operation data of each resource pool in the resource pool monitoring system; the resource pool operation data comprises resource pool performance data, resource pool configuration data, resource pool log data and resource pool event data;
the monitoring management unit performs preset analysis processing on resource pool operation data of each resource pool in the resource pool monitoring system to obtain a resource pool analysis result corresponding to the resource pool monitoring system;
and the monitoring management unit displays a resource pool analysis result corresponding to the resource pool monitoring system.
In a possible implementation manner, if the resource pool monitoring system further includes a system database, the acquiring, by the monitoring management unit, resource pool operation data of each resource pool in the resource pool monitoring system includes:
the monitoring management unit inquires resource pool operation data of each resource pool in the resource pool monitoring system from the system database; the system database is used for storing resource pool operation data of each resource pool in the resource pool monitoring system.
In one possible embodiment, the resource pool operational data includes local operational data and/or remote operational data; the local running data is collected from a host machine corresponding to the resource pool by software monitoring equipment in the host machine; and the remote operation data is acquired from a virtual machine created by the host machine by software monitoring equipment in the host machine corresponding to the resource pool through a preset application program interface.
In one possible embodiment, the resource pool analysis result comprises resource pool capacity characterization data and/or resource pool health characterization data.
In one possible embodiment, the resource pool includes at least one virtual machine.
The embodiment of the application also provides a resource pool monitoring system, which comprises a monitoring management unit and at least one resource pool; the monitoring management unit is used for acquiring resource pool operation data of each resource pool in the resource pool monitoring system; the resource pool operation data comprises resource pool performance data, resource pool configuration data, resource pool log data and resource pool event data; performing preset analysis processing on resource pool operation data of each resource pool in the resource pool monitoring system to obtain a resource pool analysis result corresponding to the resource pool monitoring system; and displaying a resource pool analysis result corresponding to the resource pool monitoring system.
In one possible embodiment, the resource pool monitoring system further comprises a system database; the system database is used for storing resource pool operation data of each resource pool in the resource pool monitoring system;
the monitoring management unit is specifically configured to: and inquiring the resource pool operation data of each resource pool in the resource pool monitoring system from the system database.
In one possible embodiment, the resource pool operational data includes local operational data and/or remote operational data; the local running data is collected from a host machine corresponding to the resource pool by software monitoring equipment in the host machine; and the remote operation data is acquired from a virtual machine created by the host machine by software monitoring equipment in the host machine corresponding to the resource pool through a preset application program interface.
In one possible embodiment, the resource pool analysis result comprises resource pool capacity characterization data and/or resource pool health characterization data.
In one possible embodiment, the resource pool includes at least one virtual machine.
An embodiment of the present application further provides an apparatus, where the apparatus includes a processor and a memory:
the memory is used for storing a computer program;
the processor is used for executing the resource pool monitoring method provided by the embodiment of the application according to the computer program.
The embodiment of the present application further provides a computer-readable storage medium, where the computer-readable storage medium is used for storing a computer program, and the computer program is used for executing the resource pool monitoring method provided in the embodiment of the present application.
The embodiment of the present application further provides a computer program product, and when the computer program product runs on a terminal device, the terminal device is enabled to execute the resource pool monitoring method provided by the embodiment of the present application.
Compared with the prior art, the embodiment of the application has at least the following advantages:
the resource pool monitoring system provided by the embodiment of the application comprises a monitoring management unit and at least one resource pool, and for the resource pool monitoring system, after the monitoring management unit acquires resource pool operation data of each resource pool in the resource pool monitoring system, the monitoring management unit performs preset analysis processing on the resource pool operation data of each resource pool in the resource pool monitoring system to obtain a resource pool analysis result corresponding to the resource pool monitoring system; and displaying the resource pool analysis result corresponding to the resource pool monitoring system so that a manager can check the running states of all resource pools in an enterprise from the monitoring management unit, thus realizing the overall monitoring of a plurality of resource pools in an enterprise and being beneficial to improving the operation and maintenance efficiency of the resource pools.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments described in the present application, and other drawings can be obtained by those skilled in the art without creative efforts.
Fig. 1 is a flowchart of a resource pool monitoring method according to an embodiment of the present application;
fig. 2 is a schematic structural diagram of a resource pool monitoring system according to an embodiment of the present application.
Detailed Description
The inventor finds that if the resource pools in an enterprise are separately monitored and managed, the monitoring results of the resource pools in the enterprise are easily dispersed and isolated, so that the resource pools in the enterprise lack overall linkage, managers cannot accurately master the overall operation conditions of all the resource pools in the enterprise, the monitoring and management effects of the resource pools in the enterprise are poor, and the operation and maintenance efficiency of the enterprise is low.
Based on the above findings, an embodiment of the present application provides a resource pool monitoring system, where the resource pool monitoring system includes a monitoring management unit and at least one resource pool, and for the resource pool monitoring system, after the monitoring management unit obtains resource pool operation data of each resource pool in the resource pool monitoring system, the monitoring management unit performs preset analysis processing on the resource pool operation data of each resource pool in the resource pool monitoring system to obtain a resource pool analysis result corresponding to the resource pool monitoring system; and displaying the resource pool analysis result corresponding to the resource pool monitoring system so that a manager can check the running states of all resource pools in an enterprise from the monitoring management unit, thus realizing the overall monitoring of a plurality of resource pools in an enterprise and being beneficial to improving the operation and maintenance efficiency of the resource pools.
In order to make the technical solutions of the present application better understood, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
Method embodiment
Referring to fig. 1, the figure is a flowchart of a resource pool monitoring method provided in an embodiment of the present application.
The resource pool monitoring method applied to the resource pool monitoring system provided by the embodiment of the application comprises the following steps of S1-S3:
s1: the monitoring management unit acquires resource pool operation data of each resource pool in the resource pool monitoring system.
The monitoring management unit is used for monitoring and displaying the running state of each resource pool in the resource pool monitoring system. In addition, the monitoring management unit is not limited in the embodiments of the present application, and for example, the monitoring management unit may be any terminal device (e.g., a smart phone, a computer, a Personal Digital Assistant (PDA), a tablet computer, or the like).
In addition, the resource pool is not limited in the embodiments of the present application, for example, one resource pool may include at least one virtual machine. In addition, the resource pool may further include at least one physical machine, and all virtual machines in the resource pool are created by the physical machine in the resource pool.
The resource pool operation data is used to describe the operation state of a resource pool. In addition, the resource pool operation data is not limited in the embodiments of the present application, for example, the resource pool operation data may include resource pool performance data, resource pool configuration data, resource pool log data, and resource pool event data.
The resource pool performance data is used for describing the operation performance of one resource pool; in addition, the resource pool performance data is not limited in the embodiment of the present application, for example, the resource pool performance data may include a CPU usage rate, a memory usage rate, and the like.
The resource pool configuration data is used for describing configuration information of one resource pool; in addition, the resource pool configuration data is not limited in the embodiment of the present application, for example, the resource pool configuration data may include the number of physical machines, the number of virtual machines corresponding to each physical machine, and the like.
The resource pool log data is used for describing operation information corresponding to one resource pool; in addition, the resource pool log data is not limited in the embodiment of the present application, for example, the resource pool log data may include an operation type, an operation trigger time, and the like.
The resource pool event data is used for describing event information occurring in one resource pool; and the embodiment of the application does not limit the resource pool event data.
In addition, the embodiment of the present application is not limited to the implementation of S1, for example, in a possible implementation, if the resource pool monitoring system further includes a system database, S1 may specifically include: and the monitoring management unit inquires the resource pool operation data of each resource pool in the resource pool monitoring system from the system database.
The system database is used for storing resource pool operation data of each resource pool in the resource pool monitoring system (especially, the system database can be used for storing the resource pool operation data of each resource pool in the resource pool monitoring system in real time). In addition, the embodiment of the present application does not limit the system database (for example, the system database may be an ElasticSearch database)
In addition, the embodiment of the present application does not limit the storage process of the resource pool operation data, for example, in a possible implementation manner, if the resource pool monitoring system includes N resource pools, and the resource pool operation data includes local operation data and/or remote operation data, the storage process of the resource pool operation data may include step 11 and/or step 12:
step 11: after the software monitoring device in the host machine corresponding to the nth resource pool acquires the local running data of the nth resource pool from the host machine, the software monitoring device in the host machine corresponding to the nth resource pool stores the local running data of the nth resource pool to the system database. Wherein N is a positive integer, N is less than or equal to N, and N is a positive integer.
The host machine corresponding to the nth resource pool is used for creating all the virtual machines in the nth resource pool; in addition, the number of hosts corresponding to the nth resource pool is not limited in the embodiment of the present application, for example, the number of hosts corresponding to the nth resource pool is Mn. Wherein M isnIs a positive integer.
The software monitoring equipment is equipment which is installed in a host machine and is used for monitoring software; moreover, the embodiment of the present application does not limit the software monitoring device (for example, the software monitoring device may be an existing appmon agent unit).
In addition, the embodiment of the present application does not limit the collection process of the local operation data of the nth resource pool (hereinafter referred to as local collection), for example, the local collection may be applicable to Power, HP, and X86 database resource pools, and the local collection may respectively obtain configuration data, performance data, operating system log data, and the like from a pre-configured collection script and a control agent, so that the collected data may be subsequently stored in the system database by the local appmon agent (that is, the software monitoring device in the host corresponding to the nth resource pool).
The local running data of the nth resource pool is acquired from the host machine (in real time) by software monitoring equipment in the host machine corresponding to the nth resource pool; and the local running data of the nth resource pool is used for representing the running data of the resource pool recorded in the host corresponding to the nth resource pool.
Based on the related content in the step 11, for the nth resource pool in the resource pool monitoring system, the software monitoring device in the host corresponding to the nth resource pool may first collect the local running data of the nth resource pool from the host (in real time), and then the software monitoring device in the host corresponding to the nth resource pool may store the local running data of the nth resource pool in the system database, so that the local running data of the nth resource pool may be stored in the system database. Wherein N is a positive integer, N is less than or equal to N, and N is a positive integer.
Step 12: after the software monitoring equipment in the host machine corresponding to the nth resource pool acquires remote operation data from the virtual machine created by the host machine through a preset application program interface, the software monitoring equipment in the host machine corresponding to the nth resource pool stores the remote operation data of the nth resource pool to a system database. Wherein N is a positive integer, N is less than or equal to N, and N is a positive integer.
The preset application program interface refers to a preset interface for collecting data from the virtual machine. In addition, the preset Application program Interface is not limited in the embodiment of the present Application, for example, the preset Application program Interface may be a native Application Program Interface (API) used for connecting a vcenter in the VMware virtualization platform.
The remote operation data of the nth resource pool is acquired from a virtual machine created by a host machine by software monitoring equipment in the host machine corresponding to the nth resource pool through a preset application program interface; and the remote operation data of the nth resource pool is used for representing the resource pool operation data recorded in the virtual machine created by the host machine. That is, if the host corresponding to the nth resource pool is used to create the HnThe remote operation data of the nth resource pool can include the HnAnd running data of the resource pool recorded in each virtual machine.
Based on the related contents of the above steps 11 to 12, the resource pool operation data of one resource pool may be determined comprehensively according to the resource pool operation data recorded in the host corresponding to the resource pool and the resource pool operation data recorded in the virtual machine created by the host, so that the resource pool operation data of the resource pool can accurately represent the resource operation state of the resource pool.
Based on the relevant content of S1, for the resource pool monitoring system, the monitoring management unit in the resource pool monitoring system may obtain the resource pool operation data of each resource pool in the resource pool monitoring system in real time, so that all resource pools in the resource pool monitoring system can be monitored and managed integrally based on the resource pool operation data of each resource pool in the resource pool monitoring system in the following.
S2: and the monitoring management unit performs preset analysis processing on the resource pool operation data of each resource pool in the resource pool monitoring system to obtain a resource pool analysis result corresponding to the resource pool monitoring system.
Wherein the preset analysis process can be preset; moreover, the preset analysis process is not limited in the embodiments of the present application, for example, the preset analysis process may include a resource pool capacity analysis and/or a resource pool health analysis.
It should be noted that, the embodiment of the present application is not limited to the implementation of resource pool capacity analysis, and may be implemented by any existing method for analyzing resource pool capacity appearing in the future; in addition, the embodiment of the present application does not limit the implementation of the resource pool health analysis, and can be implemented by any existing method for analyzing the resource pool health in the future.
And the resource pool analysis result corresponding to the resource pool monitoring system is used for describing the running states of all the resource pools in the resource pool monitoring system. In addition, the resource pool analysis result is not limited in the embodiments of the present application, for example, the resource pool analysis result may include resource pool capacity characterization data and/or resource pool health characterization data. Wherein the resource pool capacity characterization data is used for characterizing the capacity state of the resource pool. The resource pool health characterization data is used to characterize the health status of the resource pool.
Based on the relevant content of S2, for the resource pool monitoring system, after the monitoring management unit in the resource pool monitoring system obtains the resource pool operation data of each resource pool in the resource pool monitoring system, the monitoring management unit may perform preset analysis processing on the resource pool operation data of each resource pool, and obtain and output a resource pool analysis result corresponding to the resource pool monitoring system, so that the resource pool analysis result can accurately describe the operation states of all resource pools in the resource pool monitoring system.
S3: and the monitoring management unit displays the resource pool analysis result corresponding to the resource pool monitoring system.
In this embodiment, for the resource pool monitoring system, after the monitoring management unit in the resource pool monitoring system obtains the resource pool analysis result corresponding to the resource pool monitoring system, the monitoring management unit may display the resource pool analysis result corresponding to the resource pool monitoring system according to a preset display manner (e.g., a chart or the like), so that a manager can view the operation states of all resource pools in an enterprise from the monitoring management unit.
Based on the related contents of S1 to S3, for the resource pool monitoring system including the monitoring management unit and at least one resource pool, after the monitoring management unit obtains the resource pool operation data of each resource pool in the resource pool monitoring system, the monitoring management unit performs preset analysis processing on the resource pool operation data of each resource pool in the resource pool monitoring system to obtain a resource pool analysis result corresponding to the resource pool monitoring system; and displaying the resource pool analysis result corresponding to the resource pool monitoring system so that a manager can check the running states of all resource pools in an enterprise from the monitoring management unit, thus realizing the overall monitoring of a plurality of resource pools in an enterprise and being beneficial to improving the operation and maintenance efficiency of the resource pools.
Based on the resource pool monitoring method provided by the above method embodiment, the embodiment of the present application further provides a resource pool monitoring system, which is explained and explained below with reference to the accompanying drawings.
System embodiment
Please refer to the above method embodiment for technical details of the resource pool monitoring system provided by the system embodiment.
Referring to fig. 2, the figure is a schematic structural diagram of a resource pool monitoring system according to an embodiment of the present application.
The resource pool monitoring system 200 provided in the embodiment of the present application includes: a monitoring management unit 201 and at least one resource pool 202; the monitoring management unit 201 is configured to obtain resource pool operation data of each resource pool 202 in the resource pool monitoring system 200; the resource pool operation data comprises resource pool performance data, resource pool configuration data, resource pool log data and resource pool event data; performing preset analysis processing on resource pool operation data of each resource pool 202 in the resource pool monitoring system 200 to obtain a resource pool analysis result corresponding to the resource pool monitoring system 200; and displaying a resource pool analysis result corresponding to the resource pool monitoring system 200.
It should be noted that, in the embodiment of the present application, a connection manner between the monitoring management unit 201 and the resource pool 202 is not limited, for example, the monitoring management unit 201 and the resource pool 202 may be connected through a network.
In one possible embodiment, the resource pool monitoring system 200 further includes a system database; the system database is used for storing resource pool operation data of each resource pool in the resource pool monitoring system;
the monitoring management unit 201 is specifically configured to: and inquiring the resource pool operation data of each resource pool in the resource pool monitoring system from the system database.
In one possible embodiment, the resource pool operational data includes local operational data and/or remote operational data; the local running data is collected from a host machine corresponding to the resource pool by software monitoring equipment in the host machine; and the remote operation data is acquired from a virtual machine created by the host machine by software monitoring equipment in the host machine corresponding to the resource pool through a preset application program interface.
In one possible embodiment, the resource pool analysis result comprises resource pool capacity characterization data and/or resource pool health characterization data.
In one possible embodiment, the resource pool includes at least one virtual machine.
Based on the related content of the resource pool monitoring system 200, for the resource pool monitoring system 200 including the monitoring management unit 201 and at least one resource pool 202, after the monitoring management unit 201 obtains the resource pool operation data of each resource pool 202 in the resource pool monitoring system 200, the monitoring management unit 201 performs preset analysis processing on the resource pool operation data of each resource pool 202 in the resource pool monitoring system 200 to obtain a resource pool analysis result corresponding to the resource pool monitoring system 200; and then, displaying the resource pool analysis result corresponding to the resource pool monitoring system 200, so that the manager can view the operating states of all resource pools in an enterprise from the monitoring management unit 201, thereby realizing the overall monitoring of a plurality of resource pools in an enterprise, and being beneficial to improving the operation and maintenance efficiency of the resource pools.
Further, an embodiment of the present application further provides an apparatus, where the apparatus includes a processor and a memory:
the memory is used for storing a computer program;
the processor is configured to execute any implementation manner of the resource pool monitoring method provided by the embodiment of the application according to the computer program.
Further, an embodiment of the present application also provides a computer-readable storage medium, where the computer-readable storage medium is used to store a computer program, where the computer program is used to execute any implementation manner of the resource pool monitoring method provided in the embodiment of the present application.
Further, an embodiment of the present application also provides a computer program product, which when running on a terminal device, causes the terminal device to execute any implementation of the resource pool monitoring method provided in the embodiment of the present application.
It should be understood that in the present application, "at least one" means one or more, "a plurality" means two or more. "and/or" for describing an association relationship of associated objects, indicating that there may be three relationships, e.g., "a and/or B" may indicate: only A, only B and both A and B are present, wherein A and B may be singular or plural. The character "/" generally indicates that the former and latter associated objects are in an "or" relationship. "at least one of the following" or similar expressions refer to any combination of these items, including any combination of single item(s) or plural items. For example, at least one (one) of a, b, or c, may represent: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", wherein a, b, c may be single or plural.
The foregoing is merely a preferred embodiment of the invention and is not intended to limit the invention in any manner. Although the present invention has been described with reference to the preferred embodiments, it is not intended to be limited thereto. Those skilled in the art can make numerous possible variations and modifications to the present teachings, or modify equivalent embodiments to equivalent variations, without departing from the scope of the present teachings, using the methods and techniques disclosed above. Therefore, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention are still within the scope of the protection of the technical solution of the present invention, unless the contents of the technical solution of the present invention are departed.
Claims (10)
1. A resource pool monitoring method is characterized in that the method is applied to a resource pool monitoring system, and the resource pool monitoring system comprises a monitoring management unit and at least one resource pool; the method comprises the following steps:
the monitoring management unit acquires resource pool operation data of each resource pool in the resource pool monitoring system; the resource pool operation data comprises resource pool performance data, resource pool configuration data, resource pool log data and resource pool event data;
the monitoring management unit performs preset analysis processing on resource pool operation data of each resource pool in the resource pool monitoring system to obtain a resource pool analysis result corresponding to the resource pool monitoring system;
and the monitoring management unit displays a resource pool analysis result corresponding to the resource pool monitoring system.
2. The method according to claim 1, wherein if the resource pool monitoring system further includes a system database, the acquiring, by the monitoring management unit, resource pool operation data of each resource pool in the resource pool monitoring system includes:
the monitoring management unit inquires resource pool operation data of each resource pool in the resource pool monitoring system from the system database; the system database is used for storing resource pool operation data of each resource pool in the resource pool monitoring system.
3. The method according to claim 1 or 2, wherein the resource pool operational data comprises local operational data and/or remote operational data; the local running data is collected from a host machine corresponding to the resource pool by software monitoring equipment in the host machine; and the remote operation data is acquired from a virtual machine created by the host machine by software monitoring equipment in the host machine corresponding to the resource pool through a preset application program interface.
4. The method of claim 1, wherein the resource pool analysis results comprise resource pool capacity characterization data and/or resource pool health characterization data.
5. The method of claim 1, wherein the resource pool comprises at least one virtual machine.
6. A resource pool monitoring system is characterized in that the resource pool monitoring system comprises a monitoring management unit and at least one resource pool; the monitoring management unit is used for acquiring resource pool operation data of each resource pool in the resource pool monitoring system; the resource pool operation data comprises resource pool performance data, resource pool configuration data, resource pool log data and resource pool event data; performing preset analysis processing on resource pool operation data of each resource pool in the resource pool monitoring system to obtain a resource pool analysis result corresponding to the resource pool monitoring system; and displaying a resource pool analysis result corresponding to the resource pool monitoring system.
7. The system of claim 6, wherein the resource pool monitoring system further comprises a system database; the system database is used for storing resource pool operation data of each resource pool in the resource pool monitoring system;
the monitoring management unit is specifically configured to: and inquiring the resource pool operation data of each resource pool in the resource pool monitoring system from the system database.
8. An apparatus, comprising a processor and a memory:
the memory is used for storing a computer program;
the processor is configured to perform the method of any of claims 1-5 in accordance with the computer program.
9. A computer-readable storage medium, characterized in that the computer-readable storage medium is used to store a computer program for performing the method of any of claims 1-5.
10. A computer program product, characterized in that the computer program product, when run on a terminal device, causes the terminal device to perform the method of any of claims 1-5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110633096.5A CN113312238A (en) | 2021-06-07 | 2021-06-07 | Resource pool monitoring method and related equipment thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110633096.5A CN113312238A (en) | 2021-06-07 | 2021-06-07 | Resource pool monitoring method and related equipment thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113312238A true CN113312238A (en) | 2021-08-27 |
Family
ID=77377849
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110633096.5A Pending CN113312238A (en) | 2021-06-07 | 2021-06-07 | Resource pool monitoring method and related equipment thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113312238A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115269058A (en) * | 2022-09-29 | 2022-11-01 | 广州市保伦电子有限公司 | WPF resource loading method and device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160308783A1 (en) * | 2015-04-20 | 2016-10-20 | Peter G. Bookman | Systems and Methods for Allocating Online Resources |
CN109271256A (en) * | 2018-09-27 | 2019-01-25 | 浪潮软件股份有限公司 | A kind of cloud resource management and monitoring system and method based on distributed deployment |
US10423459B1 (en) * | 2016-09-23 | 2019-09-24 | Amazon Technologies, Inc. | Resource manager |
CN111144830A (en) * | 2019-11-20 | 2020-05-12 | 上海泛云信息科技有限公司 | Enterprise-level computing resource management method, system and computer equipment |
CN112596864A (en) * | 2020-12-29 | 2021-04-02 | 航天开元科技有限公司 | Operation cloud platform cloud resource management system based on virtualization and policy automation |
-
2021
- 2021-06-07 CN CN202110633096.5A patent/CN113312238A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160308783A1 (en) * | 2015-04-20 | 2016-10-20 | Peter G. Bookman | Systems and Methods for Allocating Online Resources |
US10423459B1 (en) * | 2016-09-23 | 2019-09-24 | Amazon Technologies, Inc. | Resource manager |
CN109271256A (en) * | 2018-09-27 | 2019-01-25 | 浪潮软件股份有限公司 | A kind of cloud resource management and monitoring system and method based on distributed deployment |
CN111144830A (en) * | 2019-11-20 | 2020-05-12 | 上海泛云信息科技有限公司 | Enterprise-level computing resource management method, system and computer equipment |
CN112596864A (en) * | 2020-12-29 | 2021-04-02 | 航天开元科技有限公司 | Operation cloud platform cloud resource management system based on virtualization and policy automation |
Non-Patent Citations (1)
Title |
---|
杨代才 等: "异构资源池的统一监控研究及应用", 数字技术与应用, no. 07, pages 1 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115269058A (en) * | 2022-09-29 | 2022-11-01 | 广州市保伦电子有限公司 | WPF resource loading method and device |
CN115269058B (en) * | 2022-09-29 | 2023-01-24 | 广州市保伦电子有限公司 | WPF resource loading method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107248927B (en) | Generation method of fault positioning model, and fault positioning method and device | |
JP7325584B2 (en) | ALARM LOG COMPRESSION METHOD, APPARATUS AND SYSTEM, AND STORAGE MEDIUM | |
CN105357038B (en) | Monitor the method and system of cluster virtual machine | |
CN106371975B (en) | A kind of O&M automation method for early warning and system | |
CN110704277B (en) | Method for monitoring application performance, related equipment and storage medium | |
CN110377590B (en) | Data acquisition system and method based on Internet of things and computer readable storage medium | |
US20160224400A1 (en) | Automatic root cause analysis for distributed business transaction | |
CN106776226B (en) | Monitoring method and device of self-service terminal | |
CN113360918A (en) | Vulnerability rapid scanning method, device, equipment and storage medium | |
CN110807050B (en) | Performance analysis method, device, computer equipment and storage medium | |
CN114546590B (en) | Java virtual machine heap memory set object monitoring method and memory overflow analysis method | |
CN113312238A (en) | Resource pool monitoring method and related equipment thereof | |
CN110569157B (en) | Storage testing method, device, server and storage medium | |
CN110764985A (en) | Method, system, equipment and readable storage medium for recording command line | |
CN115687406A (en) | Sampling method, device and equipment of call chain data and storage medium | |
CN115422601A (en) | RPA robot process automation implementation method and system | |
CN110994796B (en) | Power dispatching operation panoramic visualization device and method | |
CN114363704A (en) | Video playing method, device, equipment and storage medium | |
CN113627534A (en) | Method and device for identifying type of dynamic image and electronic equipment | |
CN113656391A (en) | Data detection method and device, storage medium and electronic equipment | |
CN113141407A (en) | Page resource loading method and device and electronic equipment | |
CN115061886A (en) | Performance data processing method, device, equipment and storage medium | |
CN114648298A (en) | Work order management method, device, equipment and storage medium | |
CN115113976A (en) | Nanotube edge virtualization clustering method and device | |
CN115858324A (en) | IT equipment fault processing method, device, equipment and medium based on AI |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |