CN113307124A - Rack and pinion formula construction elevator for well - Google Patents
Rack and pinion formula construction elevator for well Download PDFInfo
- Publication number
- CN113307124A CN113307124A CN202110352567.5A CN202110352567A CN113307124A CN 113307124 A CN113307124 A CN 113307124A CN 202110352567 A CN202110352567 A CN 202110352567A CN 113307124 A CN113307124 A CN 113307124A
- Authority
- CN
- China
- Prior art keywords
- base
- cage
- rack
- standard
- construction elevator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
- B66B9/02—Kinds or types of lifts in, or associated with, buildings or other structures actuated mechanically otherwise than by rope or cable
- B66B9/022—Kinds or types of lifts in, or associated with, buildings or other structures actuated mechanically otherwise than by rope or cable by rack and pinion drives
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/02—Cages, i.e. cars
- B66B11/0226—Constructional features, e.g. walls assembly, decorative panels, comfort equipment, thermal or sound insulation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/04—Driving gear ; Details thereof, e.g. seals
- B66B11/043—Driving gear ; Details thereof, e.g. seals actuated by rotating motor; Details, e.g. ventilation
- B66B11/0461—Driving gear ; Details thereof, e.g. seals actuated by rotating motor; Details, e.g. ventilation with rack and pinion gear
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Automation & Control Theory (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The invention discloses a rack and pinion type construction elevator for a well, which comprises a foundation surface, wherein a base is fixedly arranged at the top of the foundation surface, standard knots are equidistantly arranged at the top of the base, wall attaching frames are equidistantly arranged on the back surface of the standard knots, a suspension cage is movably arranged on the surface of the standard knots, a transmission assembly is fixedly arranged at the top of the suspension cage, and a suspension rod is fixedly arranged on the surface of the top of the suspension cage. According to the invention, the standard knots installed at the top of the base at equal intervals and the wall attaching frames installed at the back of the standard knots at equal intervals are used, the base is installed on the foundation surface, the corresponding number of standard knots are equipped according to the project progress, the first standard knot is installed on the base, one wall attaching frame is installed after a certain number of standard knots are installed, the standard knots are connected with the building through the wall attaching frame, and the construction elevator can be installed inside the hoistway by utilizing the base, the standard knots and the wall attaching frames, so that the external wall decoration is prevented from being influenced, and the external wall damage is avoided.
Description
Technical Field
The invention relates to the technical field of upgrading machines, in particular to a rack and pinion type construction elevator for a hoistway.
Background
Along with the development of urbanization, large-scale buildings and high-rise buildings are in a large number at present, the required construction rhythm is faster and faster, the transportation capacity of the construction elevator is higher, the transportation quantity in unit working hour can be ensured by improving the carrying weight, the running speed and the installation quantity of the elevator, and in the using process of the construction elevator, the existing construction upgrading machine has a plurality of problems or defects:
traditional construction upgrading machine is in the in-service use, and the installation construction lift influences the outer wall fitment easily, causes the outer wall to damage, and inconvenient staff installs the maintenance to construction upgrading machine moreover, has increased use cost.
Disclosure of Invention
The present invention is directed to a rack and pinion type construction hoist for a hoistway, which solves the problems of the related art.
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides a rack and pinion formula construction elevator for well, includes the basal plane, the top fixed mounting of basal plane has the base, the standard festival is installed to the top equidistance of base, the back equidistance of standard festival is installed and is attached the wall frame, the surface movable mounting of standard festival has the cage, the top fixed mounting of cage has transmission assembly, the fixed surface at cage top has the jib.
Preferably, the inside fixed mounting of standard festival has the fixing base, and the surperficial equidistance of fixing base is provided with mounting fixture, and mounting fixture's inside cup joints and installs the stand, and the fixed orifices that is provided with in both sides on fixing base surface, the fixed surface of standard festival installs the butt rack, and the surperficial equidistance of butt rack is provided with the connecting hole, the stiffener is installed to the back equidistance of standard festival.
Preferably, attach the surface equidistance of wall frame and install the mounting panel, the surface of mounting panel cup joints and installs mounting bolt, attaches the both sides fixed mounting on wall frame surface and has connect anchor clamps, and connect anchor clamps's surface cup joints and installs connecting bolt.
Preferably, the horizontal pole is installed to the inside equidistance of base, the fixed plate is installed to the inside equidistance of base, and the top fixed mounting of fixed plate has the spring holder, and the top fixed mounting of spring holder has buffer spring.
Preferably, the transmission assembly comprises a driving motor, a transmission shaft is fixedly arranged at the output end of the driving motor, the abutting gear is installed at one end of the transmission shaft in a sleeved mode, and a control rod is fixedly arranged on one side of the bottom of the driving motor.
Preferably, the top fixed mounting of cage has the rail guard, the fixed surface at cage top is provided with the opening, the fixed surface of cage installs the door frame, and the inside movable mounting of door frame has the cage door, and the top fixed mounting of cage door one side has the pulley, and the runner is installed in the meshing of one side of pulley bottom, the stiffener is installed to the bottom equidistance of cage.
Preferably, the standard knot is composed of a plurality of knots, the first standard knot is fixed on the base, each standard knot installed backwards is next to the previous standard knot, and a wall-attached frame is installed between the standard knot and the hoistway after the standard knots are installed.
Preferably, the base is a frame structure, the base is connected with foundation bolts on the foundation surface, and the first section of standard knot is also connected with the base.
Preferably, the cage belongs to slice concatenation formula, also can assemble and dismantle in the narrow and small space of well.
Compared with the prior art, the invention has the beneficial effects that:
this rack and pinion formula construction elevator for well, through the standard festival of the top equidistance installation at the base and the wall frame that attaches of the back equidistance installation of standard festival, the pedestal mounting is on the basal plane, be equipped with corresponding quantity's standard festival according to the project progress, first festival standard festival is installed on the base, every time the standard frame of certain quantity has been installed, just install one and attach the wall frame, attach the wall frame and couple together standard festival and building, utilize the base, the standard festival can install the construction elevator in the inside of well with attaching the wall frame, avoid influencing the exterior wall fitment, avoid causing the outer wall to damage.
This rack and pinion formula construction elevator for well, cage through white Europe and America movable mounting at the standard festival and the transmission assembly of the top fixed mounting of cage, driving motor passes through the round pin axle and is connected with the cage, driving motor produces power, it rotates to drive the transmission shaft, the butt gear of installation and the butt rack toothing installation of the fixed surface installation of standard festival are cup jointed to the one end of transmission shaft, the butt gear drives the cage along standard festival up-and-down motion, realize the function of transportation personnel and material, direct mount is in the building well, the basis of well is directly utilized, need not set up special installation basis, expenditure such as temporary passageway has still been saved, help practicing thrift the cost, the transmission structure of butt gear and butt rack toothing installation, the mechanism commonly used that belongs to building engineering machinery, it is firm durable, make things convenient for the staff to install, use and maintenance.
This rack and pinion formula construction elevator for well, jib through the fixed surface installation at the cage top, the cage belongs to slice concatenation formula, also can assemble and dismantle in the narrow and small space of well, guarantees also can tear into the slice after the building structure capping and transports out, and firm well can also regard as cage protection all around, guarantees that the cage can not take place to tumble, guarantees safe in utilizationly, and the jib can make things convenient for the staff to carry the material of loading.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a partial structural view of a standard section according to the present invention;
FIG. 3 is a schematic view of a partial structure of the wall attachment frame of the present invention;
FIG. 4 is a partial structural view of a base according to the present invention;
FIG. 5 is a schematic top view of a portion of the transmission assembly of the present invention;
fig. 6 is a partial structural schematic view of the suspension cage of the present invention.
In the figure: 1. a standard section; 101. a fixed seat; 102. a column; 103. fixing the clamp; 104. a fixing hole; 105. abutting against the rack; 106. connecting holes; 107. a reinforcing bar; 2. a wall-attached frame; 201. mounting a plate; 202. connecting a clamp; 203. installing a bolt; 204. a connecting bolt; 3. a base; 301. a spring seat; 302. a buffer spring; 303. a fixing plate; 304. a cross bar; 4. a boom; 5. a transmission assembly; 501. an abutment gear; 502. a drive shaft; 503. a drive motor; 504. a control lever; 6. a suspension cage; 601. protecting the fence; 602. an opening; 603. a pulley; 604. a rotating wheel; 605. a door frame; 606. a cage door; 607. a reinforcing bar; 7. a basal plane.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-6, an embodiment of the present invention is shown: a rack and pinion construction elevator for a well comprises a foundation surface 7, wherein a base 3 is fixedly installed at the top of the foundation surface 7, cross rods 304 are installed in the base 3 at equal intervals, fixing plates 303 are installed in the base 3 at equal intervals, spring seats 301 are fixedly installed at the tops of the fixing plates 303, buffer springs 302 are fixedly installed at the tops of the spring seats 301, the base 3 is of a frame structure, the base 3 is connected with anchor bolts on the foundation surface 7, a first section of standard knot 1 is also connected with the base 3, a standard knot 1 is installed at the top of the base 3 at equal intervals, a fixing seat 101 is fixedly installed in the standard knot 1, fixing clamps 103 are arranged on the surface of the fixing seat 101 at equal intervals, a stand column 102 is installed in the fixing clamp 103 in a sleeved mode, fixing holes 104 are fixedly arranged on two sides of the surface of the fixing seat 101, an abutting rack 105 is fixedly installed on the surface of the standard knot 1, and connecting holes 106 are arranged on the surface of the abutting rack 105 at equal intervals, the back of the standard knot 1 is equidistantly provided with reinforcing rods 107, the back of the standard knot 1 is equidistantly provided with wall attaching frames 2, the surface of the wall attaching frame 2 is equidistantly provided with mounting plates 201, the surface of the mounting plate 201 is sleeved with mounting bolts 203, two sides of the surface of the wall attaching frame 2 are fixedly provided with connecting clamps 202, the surface of the connecting clamps 202 is sleeved with connecting bolts 204, the standard knot 1 is composed of a plurality of knots, the first standard knot 1 is fixed on a base 3, each standard knot 1 which is installed backwards is closely connected with the previous standard knot 1, after the standard knots 1 are installed, one wall attaching frame 2 is installed between the standard knot 1 and a well, the wall attaching frame 2 is installed on the back of the standard knot 1 at the top of the base 3 at an equal distance, the base 3 is installed on a foundation surface 7 through foundation bolts, the standard knot 1 is composed of a plurality of knots, and a corresponding number of standard knots 1 are equipped according to project schedule, first section standard festival 1 is installed on base 3, each section of standard festival 1 all installs on preceding section of standard festival 1 backward, every standard frame 1 of having installed a certain amount, just install one and attach wall frame 2, attach wall frame 2 and couple together standard festival 1 and building, guarantee the stability of standard festival frame, attach wall frame 2 and install between standard festival 1 and well inner wall, utilize base 3, standard festival 1 can install the inside at the well with attaching wall frame 2 with the construction elevator, avoid influencing the exterior wall fitment, avoid causing the outer wall damage.
A suspension cage 6 is movably arranged on the surface of the standard joint 1, a protective guard 601 is fixedly arranged on the top of the suspension cage 6, an opening 602 is fixedly arranged on the surface of the top of the suspension cage 6, a door frame 605 is fixedly arranged on the surface of the suspension cage 6, a cage door 606 is movably arranged in the door frame 605, a pulley 603 is fixedly arranged at the top end of one side of the cage door 606, a rotating wheel 604 is meshed with one side of the bottom of the pulley 603, reinforcing bars 607 are equidistantly arranged at the bottom of the suspension cage 6, the suspension cage 6 belongs to a sheet splicing type and can be spliced and disassembled in a narrow space of a well, a transmission assembly 5 is fixedly arranged on the top of the suspension cage 6, the transmission assembly 5 comprises a driving motor 503, a transmission shaft 502 is fixedly arranged at the output end of the driving motor 503, an abutting gear 501 is sleeved at one end of the transmission shaft 502, a control rod 504 is fixedly arranged on one side of the bottom of the driving motor 503, and the transmission assembly 5 is fixedly arranged on the top of the suspension cage 6 and the suspension cage 6 which is movably arranged in the Baioumei of the standard joint 1, the driving motor 503 is connected with the suspension cage 6 through a pin shaft, the driving motor 503 generates power to drive the transmission shaft 502 to rotate, the abutting gear 501 which is sleeved and installed at one end of the transmission shaft 502 is meshed and installed with the abutting rack 105 which is fixedly installed on the surface of the standard section 1, the abutting gear 501 drives the suspension cage 6 to move up and down along the standard section 1 to realize the functions of transportation personnel and materials, the suspension cage is directly installed in a building well, the foundation of the well is directly utilized, a special installation foundation is not needed to be arranged, expenditure such as a temporary channel is saved, cost is saved, the transmission structure which is meshed and installed by the abutting gear 501 and the abutting rack 105 belongs to a common mechanism of building engineering machinery, the suspension cage is stable and durable, and is convenient for installation, use and maintenance of workers, the suspension rod 4 is fixedly installed on the surface of the top of the suspension cage 6, the standard section 1, the wall-attached frame 2 and the suspension rod 4, and the structure and the function of the suspension rod are well-known parts in the industry, through jib 4 at the fixed surface installation at cage 6 top, cage 6 belongs to slice concatenation formula, also can assemble and dismantle in the narrow and small space of well, guarantees also can tear into the slice after the building structure capping and transports out, and 6 protection all around of cage can also be regarded as to firm well, guarantees that cage 6 can not take place to tumble, guarantees safe in utilizationly, and jib 4 can make things convenient for the staff to carry the material of loading.
The working principle is as follows: when in use, firstly, the standard knots 1 which are equidistantly arranged on the top of the base 3 and the wall attaching frame 2 which is equidistantly arranged on the back of the standard knots 1 are arranged, the base 3 is arranged on a foundation surface 7 through foundation bolts, the standard knots 1 consist of a plurality of knots, a corresponding number of standard knots 1 are prepared according to project schedule, the first standard knot 1 is arranged on the base 3, each standard knot 1 is arranged on the previous standard knot 1 afterwards, one wall attaching frame 2 is arranged after a certain number of standard knots 1 are arranged, the standard knots 1 are connected with a building through the wall attaching frame 2, the stability of the standard knot frame is ensured, the wall attaching frame 2 is arranged between the standard knots 1 and the inner wall of a well, a construction elevator can be arranged inside the well by utilizing the base 3, the standard knots 1 and the wall attaching frame 2, the exterior wall decoration is prevented from being influenced, the damage of the exterior wall is avoided, secondly, a suspension cage 6 which is movably arranged on the white Europe and America of the standard knot 1 and a transmission component 5 which is fixedly arranged on the top of the suspension cage 6, the driving motor 503 is connected with the suspension cage 6 through a pin shaft, the driving motor 503 generates power to drive the transmission shaft 502 to rotate, the abutting gear 501 which is sleeved and installed at one end of the transmission shaft 502 is meshed and installed with the abutting rack 105 which is fixedly installed on the surface of the standard section 1, the abutting gear 501 drives the suspension cage 6 to move up and down along the standard section 1 to realize the functions of transportation personnel and materials, the suspension cage is directly installed in a building well, the foundation of the well is directly utilized, a special installation foundation is not needed to be arranged, expenditure such as a temporary channel is saved, and cost is saved, the suspension cage 6 belongs to a transmission structure which is meshed and installed with the abutting rack 105, the suspension cage belongs to a common mechanism of building engineering machinery, is stable and durable, is convenient for installation, use and maintenance of workers, and finally, the suspension cage 6 belongs to a sheet splicing type through the suspension rod 4 which is fixedly installed on the top of the suspension cage 6, and can be spliced and disassembled in a narrow space of the well, guarantee also can tear into the slice after building structure seals the top and transport out, firm well can also regard as cage 6 protection all around, guarantees that cage 6 can not take place to tumble, guarantees safe in utilizationly, and jib 4 can make things convenient for the staff to carry the material of loading.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.
Claims (9)
1. The utility model provides a well is with rack and pinion formula construction elevator, includes basal plane (7), its characterized in that: the top fixed mounting of basal plane (7) has base (3), standard festival (1) is installed to the top equidistance of base (3), the back equidistance of standard festival (1) is installed and is attached wall frame (2), the surface activity of standard festival (1) installs cage (6), the top fixed mounting of cage (6) has drive assembly (5), the fixed surface at cage (6) top installs jib (4).
2. The rack and pinion construction elevator for the shaft according to claim 1, wherein: the inside fixed mounting of standard festival (1) has fixing base (101), and the surperficial equidistance of fixing base (101) is provided with mounting fixture (103), and the inside of mounting fixture (103) is cup jointed and is installed stand (102), and the fixed orifices (104) that are provided with in both sides on fixing base (101) surface, the fixed surface of standard festival (1) installs butt rack (105), and the surperficial equidistance of butt rack (105) is provided with connecting hole (106), stiffener (107) are installed to the back equidistance of standard festival (1).
3. The rack and pinion construction elevator for the shaft according to claim 1, wherein: attach the surface equidistance of wall frame (2) and install mounting panel (201), the surface of mounting panel (201) is cup jointed and is installed mounting bolt (203), attaches the both sides fixed mounting on wall frame (2) surface and has connect anchor clamps (202), and the surface of connect anchor clamps (202) is cup jointed and is installed connecting bolt (204).
4. The rack and pinion construction elevator for the shaft according to claim 1, wherein: horizontal pole (304) are installed to the inside equidistance of base (3), fixed plate (303) are installed to the inside equidistance of base (3), and the top fixed mounting of fixed plate (303) has spring holder (301), and the top fixed mounting of spring holder (301) has buffer spring (302).
5. The rack and pinion construction elevator for the shaft according to claim 1, wherein: the transmission assembly (5) comprises a driving motor (503), a transmission shaft (502) is fixedly arranged at the output end of the driving motor (503), one end of the transmission shaft (502) is sleeved with an abutting gear (501), and a control rod (504) is fixedly arranged on one side of the bottom of the driving motor (503).
6. The rack and pinion construction elevator for the shaft according to claim 1, wherein: the top fixed mounting of cage (6) has rail guard (601), the fixed surface at cage (6) top is provided with opening (602), the fixed surface of cage (6) installs door frame (605), and the inside movable mounting of door frame (605) has cage door (606), and the top fixed mounting of cage door (606) one side has pulley (603), and runner (604) are installed in the meshing of one side of pulley (603) bottom, stiffener (607) are installed to the bottom equidistance of cage (6).
7. The rack and pinion construction elevator for the shaft according to claim 1, wherein: standard festival (1) comprises a plurality of sections, and first section standard festival (1) is fixed on base 3, and each section standard festival (1) of past installation is immediately on preceding section standard festival (1), and every time a plurality of sections standard festival (1) of having installed, one attaches wall frame (2) between standard festival (1) and well installation.
8. The rack and pinion construction elevator for the shaft according to claim 1, wherein: the base (3) is of a frame structure, the base (3) is connected with foundation bolts on a foundation surface (7), and the first section of standard section (1) is also connected with the base (3).
9. The rack and pinion construction elevator for the shaft according to claim 1, wherein: the suspension cage (6) belongs to a sheet splicing type combined structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110352567.5A CN113307124A (en) | 2021-03-31 | 2021-03-31 | Rack and pinion formula construction elevator for well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110352567.5A CN113307124A (en) | 2021-03-31 | 2021-03-31 | Rack and pinion formula construction elevator for well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113307124A true CN113307124A (en) | 2021-08-27 |
Family
ID=77371899
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110352567.5A Pending CN113307124A (en) | 2021-03-31 | 2021-03-31 | Rack and pinion formula construction elevator for well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113307124A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113816238A (en) * | 2021-09-03 | 2021-12-21 | 广西宏涛建筑机械制造有限公司 | Well type concave sheet type construction elevator |
CN114212647A (en) * | 2021-11-16 | 2022-03-22 | 中国建筑第八工程局有限公司 | Construction elevator |
CN114852819A (en) * | 2022-05-30 | 2022-08-05 | 湖北众利工程机械有限公司 | Sheet-mounted hoistway construction elevator |
CN118375053A (en) * | 2024-06-24 | 2024-07-23 | 厦门康柏机械集团有限公司 | Lifting system for be used for pier to draw node to detect |
-
2021
- 2021-03-31 CN CN202110352567.5A patent/CN113307124A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113816238A (en) * | 2021-09-03 | 2021-12-21 | 广西宏涛建筑机械制造有限公司 | Well type concave sheet type construction elevator |
CN114212647A (en) * | 2021-11-16 | 2022-03-22 | 中国建筑第八工程局有限公司 | Construction elevator |
CN114852819A (en) * | 2022-05-30 | 2022-08-05 | 湖北众利工程机械有限公司 | Sheet-mounted hoistway construction elevator |
CN114852819B (en) * | 2022-05-30 | 2023-07-21 | 湖北众利工程机械有限公司 | Sheet-mounted hoistway construction lifter |
CN118375053A (en) * | 2024-06-24 | 2024-07-23 | 厦门康柏机械集团有限公司 | Lifting system for be used for pier to draw node to detect |
CN118375053B (en) * | 2024-06-24 | 2024-09-17 | 厦门康柏机械集团有限公司 | Lifting system for be used for pier to draw node to detect |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113307124A (en) | Rack and pinion formula construction elevator for well | |
CN110510525A (en) | A kind of single-beam gantry crane with hook | |
CN210393475U (en) | Screw-in anchoring device for crane | |
CN215101355U (en) | Rack and pinion formula construction elevator for well | |
CN208329569U (en) | Attachment type raise scaffold | |
CN102923582A (en) | Gantry crane | |
CN216235731U (en) | Large-scale steel construction vestibule hoist and mount hoisting frame | |
CN214495621U (en) | Hanging basket for tower crane driver | |
CN211871096U (en) | Well construction elevator | |
CN115030524A (en) | Wallboard auxiliary device for assembly type structure | |
CN208980118U (en) | A kind of machine-roomless lift rope head fixing device | |
CN210342629U (en) | Protection frame and lifting structure thereof | |
CN213387572U (en) | Hoist engine for road and bridge engineering | |
CN210342628U (en) | Protective frame | |
CN212507314U (en) | Fixing structure for construction hanging basket | |
CN219447160U (en) | Road machinery cab skeleton texture | |
CN217420440U (en) | Improved generation hanging flower basket support frame | |
CN216921262U (en) | External climbing platform for building construction | |
CN216041723U (en) | Stable form braced truss for three-layer steel structure room | |
CN220998851U (en) | Elevator steel structure integrated assembly type elevator shaft section additionally installed | |
CN221277249U (en) | Stay cord type concrete blocking device | |
CN212715920U (en) | Supporting frame of assembled building board of encorbelmenting | |
CN211776312U (en) | Easy-to-maintain communication iron tower and mast structure | |
CN220133476U (en) | Attached scaffold anti-falling structure | |
CN217924788U (en) | High overhead position climbing frame climbing fixing auxiliary device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |