Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202110317931.4A
Other languages
Chinese (zh)
Other versions
CN113235360A (en
Inventor
贾双源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Academy Of Building Research Co ltd
Fujian Longjian Construction Development Co ltd
Fujian Zhonghe Development Architectural Design Institute Co ltd
Original Assignee
Fujian Longjian Construction Development Co ltd
Fujian Zhonghe Development Architectural Design Institute Co ltd
Fujian Academy Of Building Research Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Longjian Construction Development Co ltd, Fujian Zhonghe Development Architectural Design Institute Co ltd, Fujian Academy Of Building Research Co ltd filed Critical Fujian Longjian Construction Development Co ltd
Priority to CN202110317931.4A priority Critical patent/CN113235360B/en
Publication of CN113235360A publication Critical patent/CN113235360A/en
Application granted granted Critical
Publication of CN113235360B publication Critical patent/CN113235360B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1013Plant characterised by the mode of operation or the construction of the mixing apparatus; Mixing apparatus
    • E01C19/104Mixing by means of movable members in a non-rotating mixing enclosure, e.g. stirrers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mixers Of The Rotary Stirring Type (AREA)
  • Road Paving Machines (AREA)

Abstract

The invention relates to a stirring device, in particular to a movable efficient asphalt stirring device for road and bridge construction. The technical problem to be solved is to provide a small-size road bridge construction that stirs efficiently, conveniently removes is with mobilizable high-efficient agitated vessel of pitch. The technical scheme of the invention is as follows: the utility model provides a road bridge construction is with mobilizable high-efficient agitated vessel of pitch, including sweep, wheel, first baffle and first backup pad etc. two sets of wheels rotate respectively through two axletrees and connect in the sweep bottom, two first baffle fixed mounting in the both sides of sweep, first baffle is connected with the wheel rotation, three first backup pad fixed mounting on the sweep. Adopt the motor to drive the rotation of two bull sticks and first branch in the device, stir the pitch and replaced the stirring of current axle in the drum that has the blade, made things convenient for the stirring to pitch of both sides.

Description

Movable efficient asphalt stirring equipment for road and bridge construction
Technical Field
The invention relates to a stirring device, in particular to a movable efficient asphalt stirring device for road and bridge construction.
Background
Asphalt is a black-brown complex mixture composed of hydrocarbons with different molecular weights and non-metallic derivatives thereof, and in the production process of asphalt, the asphalt is often required to be stirred, and a stirrer is a machine which rotates a shaft with blades in a cylinder or a tank and stirs and mixes a plurality of raw materials to form a mixture or a proper consistency.
Present pitch agitating unit's stirring inefficiency, agitating unit stirring speed is slow when the stirring, and the mixing velocity between the pitch is slower when making the stirring, all is the main equipment at current mixer moreover, and is inconvenient to remove, if the pitch that needs is less, adopts large-scale equipment, can cause the waste of resource.
Therefore, a movable asphalt high-efficiency stirring device which is high in stirring efficiency and convenient to move and used for small road and bridge construction is particularly needed to solve the problems in the prior art.
Disclosure of Invention
In order to overcome the stirring inefficiency of present pitch agitating unit, agitating unit stirs speed in the stirring slow, and the mixing velocity between the pitch is slower when making the stirring, all is the main equipment at current mixer moreover, and is inconvenient to remove, if the pitch that needs is less, adopts large-scale equipment, can cause the shortcoming of the waste of resource, and the technical problem that solves provides a stirring efficiency height, the convenient movable high-efficient agitated vessel of mobilizable pitch for construction of small-size road bridge that removes.
The technical scheme of the invention is as follows:
a movable asphalt high-efficiency stirring device for road and bridge construction comprises a vehicle plate, wheels, a first baffle plate and a first supporting plate, discharge frame, the carriage, first heater strip and dead lever, two sets of wheels rotate through two axletrees respectively and connect in the sweep bottom, two first baffle fixed mounting are in the both sides of sweep, three first backup pad fixed mounting is on the sweep, the other end of the three first backup pad of one side fixed connection of discharge frame, the opposite side and the sweep fixed connection of discharge frame, the carriage sets up the outside at discharge frame, first heater strip distributes between discharge frame and carriage, four dead levers set up the both sides at the carriage, still including, rabbling mechanism, take out material mechanism and spraying mechanism, rabbling mechanism fixed mounting is in one side of discharge frame, take out one side that material mechanism fixed mounting kept away from discharge frame on the sweep, spraying mechanism sets up in the carriage top.
Further, the rabbling mechanism is including the support, including a motor, an end cap, a controller, and a cover plate, first spur gear, the bull stick, the second spur gear, first branch, the extension board, switch and fender material subassembly, support fixed mounting is in one side of carriage, motor fixed mounting is on the support, first spur gear fixed mounting is on the output shaft of motor, two bull sticks rotate respectively and install the inboard at carriage and ejection of compact frame, the one end and the first spur gear axle fixed connection of one of them bull stick, second spur gear fixed mounting is in the one end that is close to first spur gear of another bull stick, second spur gear and first spur gear meshing, the first branch of a plurality of groups distributes on two bull sticks, extension board fixed mounting is in the first spur gear one side that is close to of carriage, the switch sets up in one side of extension board, keep off one side sliding connection of material subassembly and carriage and ejection of compact frame.
Further, keep off the material subassembly including second baffle, first fixed plate and handle, the second baffle with the carriage with go out the one side sliding connection who keeps away from the support of material frame, first fixed plate fixed mounting is provided with the handle in one side of second baffle on the first fixed plate.
Furthermore, the material pumping mechanism comprises second supporting plates, second supporting rods, a water pump, a pipeline connector, a storage box, right-angle folding rods, a material passing pipeline, a first connecting rod, a water spraying box, a water sprayer and a heating assembly, wherein the two second supporting plates are fixedly arranged on one side, far away from the material outlet frame, of the vehicle plate, the two second supporting rods are fixedly arranged on one side, close to the second supporting plates, of the vehicle plate, the water pump is fixedly arranged on the two second supporting rods, the storage box is fixedly arranged on the two second supporting plates, two sides of the pipeline connector are respectively connected with the storage box and the water pump, the right-angle folding rods are fixedly connected with the supporting frame, one ends of the right-angle folding rods are fixedly connected with the vehicle plate, the material passing pipeline is fixedly connected with the right-angle folding rods, one ends of the material passing pipeline are connected with the pipeline connector, the other ends of the material passing pipeline penetrate through one side of the right-angle folding rods, the two first connecting rods are respectively and fixedly arranged on one side, far away from the vehicle plate, of the right-angle folding rods, the upper end of the water spraying box is communicated with one end of the material passing pipeline, the two rows of water sprayers are arranged at the bottom of the water spraying box, and the heating component is arranged in the storage box.
Further, heating element is including apron, inner box, second heater strip and intake antrum, and the apron sets up the upside at the bin, and the inner box setting is inboard at the bin, and the second heater strip sets up between bin and inner box, and the intake antrum sets up the side on the apron.
Furthermore, the spraying mechanism comprises a sliding column, a spring, a second fixed plate and a sliding frame, the slider, first even post, third branch, link the piece and spray the subassembly, second fixed plate fixed mounting is in the one side of keeping away from the motor of carriage, two travelers and second fixed plate sliding connection, the one end of two travelers of traveller fixed connection, the traveller contacts with the second fixed plate, two springs overlap respectively on two travelers, the one end fixed connection one side of second fixed plate of two springs, the other end of two travelers of other end difference fixed connection of two springs, slider and traveller sliding contact, first even post fixed connection slider, first even post and traveller sliding contact, the opposite side of third branch link block, two link fixed mounting are on the upper portion of carriage, third branch and two link sliding connection, the other end and the switch contact of third branch.
Further, spray the subassembly and link the post including linking the frame, keeping off the dish and the second, a plurality of even fixed settings of frame are on third branch, keep off the dish and link the post through the second and link frame rotary type sliding connection, keep off the dish and rotate with the sprinkler and be connected.
Further, the feeding assembly comprises air cylinders, feeding frames and second connecting rods, the two air cylinders are fixedly connected with the inner sides of the two first baffle plates respectively, the two feeding frames are fixedly mounted on telescopic rods of the two air cylinders respectively, the lower sides of the feeding frames are in sliding contact with the supporting frames, the two second connecting rods are fixedly connected with the lower ends of the two feeding frames respectively, the second connecting rods are in sliding contact with the supporting frames and the fixing rods, and the other ends of the second connecting rods are in sliding contact with the sliding frames.
The invention has the advantages that:
1. adopt the motor to drive the rotation of two bull sticks and first branch in the device, stir the pitch and replaced the stirring of current axle with the blade in the drum, made things convenient for the stirring to both sides pitch for the stirring of pitch is more even, and the efficiency of stirring is better.
2. The device adopts a vehicle body form, and the whole device is movable, so that the asphalt can be conveniently paved anywhere.
3. The whole volume of this device is less, is applicable to the laying of the pitch of carrying out narrow and small highway section, compares in current large-scale equipment, and convenient the removal more.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a first partial schematic view of a three-dimensional structure according to the present invention.
Fig. 3 is a second partial schematic view of the three-dimensional structure of the present invention.
Fig. 4 is a third partial schematic view of the three-dimensional structure of the present invention.
Fig. 5 is a schematic structural diagram of the stirring mechanism of the present invention.
Fig. 6 is a partial structure schematic diagram of the stirring mechanism of the present invention.
Fig. 7 is a schematic structural view of the material pumping mechanism of the present invention.
Fig. 8 is a schematic structural view of a heating assembly of the present invention.
Fig. 9 is a schematic structural view of the spraying mechanism of the present invention.
Fig. 10 is a partial structure diagram of the spraying mechanism of the present invention.
FIG. 11 is a schematic view of the spraying assembly of the present invention.
FIG. 12 is a partial schematic view of a spray assembly of the present invention.
Fig. 13 is a schematic structural view of a feeding assembly of the present invention.
Reference numerals: 1: vehicle panel, 101: wheel, 102: first baffle, 103: first support plate, 104: discharge frame, 105: support frame, 1051: first heating wire, 106: fixed link, 2: a support, 201: motor, 202: first straight gear, 203: turning rod, 204: second spur gear, 205: first strut, 206: support plate, 207: switch, 208: second baffle, 209: first fixing plate, 210: handle, 3: second support plate, 301: second strut, 302: water pump, 303: pipe connector, 304: storage box, 3041: cover plate, 3042: inner box, 3043: second heating wire, 3044: water inlet tank, 305: right angle folding bar, 306: through-flow pipe, 307: first link, 308: spray tank, 3081: water sprayer, 4: strut, 401: spring, 402: second fixing plate, 4021: slide frame, 403: slider, 404: first connecting column, 405: third strut, 4051: frame connection, 4052: block, 406: catch plate, 407: second column, 5: cylinder, 501: feed block, 502: a second link.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings in conjunction with the following detailed description. It should be understood that the description is intended to be exemplary only, and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
Example 1
A movable efficient asphalt stirring device for road and bridge construction is shown in figures 1-4 and comprises a sweeping board 1, wheels 101, first baffle plates 102, first supporting plates 103, a discharging frame 104, supporting frames 105, first heating wires 1051 and fixing rods 106, wherein two groups of wheels 101 are respectively connected to the front side and the rear side of the bottom of the sweeping board 1 in a rotating mode through two axles, the two first baffle plates 102 are fixedly installed on the left side and the right side of the sweeping board 1, the three first supporting plates 103 are fixedly installed on the rear side of the upper portion of the sweeping board 1, the front side of the lower portion of the discharging frame 104 is fixedly connected with the upper ends of the three first supporting plates 103, the rear side of the lower portion of the discharging frame 104 is fixedly connected with the front side of the upper portion of the sweeping board 1, the supporting frames 105 are arranged on the outer side of the discharging frame 104, the first heating wires 1051 are distributed between the discharging frame 104 and the supporting frames 105, the four fixing rods 106 are uniformly arranged on the left side and the right side of the supporting frame 105, and the stirring mechanism, The stirring mechanism is fixedly arranged at the rear side of the discharging frame 104, the material pumping mechanism is fixedly arranged at the rear side of the upper part of the vehicle plate 1, and the spraying mechanism is arranged above the supporting frame 105.
The artifical material blocking component of putting into braced frame 105 and ejection of compact frame 104, block the downside opening of ejection of compact frame 104, the artifical stone and the pitch that will carry out the stirring are poured into and are gone into in ejection of compact frame 104, start the rabbling mechanism and stir, first heater strip 1051 heats ejection of compact frame 104 simultaneously, prevent the solidification of pitch, start and take out the material mechanism, send the adhesive that will pour into in the spraying mechanism, spout the even ejection of compact frame 104 of adhesive through spraying mechanism in, during the even thoughtlessly advances pitch of rabbling mechanism adhesive, when preparing to use pitch at last, the artifical material blocking component outwards pulls out, pitch flows through the export of ejection of compact frame 104 downside, use.
Example 2
On the basis of the embodiment 1, as shown in fig. 5-12, the stirring mechanism comprises a bracket 2, a motor 201, a first straight gear 202 and a rotating rod 203, the support 2 is fixedly installed on the left side of the rear portion of the support frame 105, the motor 201 is fixedly installed on the support 2, the first straight gear 202 is fixedly installed on an output shaft of the motor 201, the two rotary rods 203 are respectively rotatably installed on the inner sides of the support frame 105 and the discharge frame 104, the rear end of the rotary rod 203 on the left side is fixedly connected with a shaft of the first straight gear 202, the second straight gear 204 is fixedly installed on the rear end of the rotary rod 203 on the right side, the second straight gear 204 is meshed with the first straight gear 202, ten groups of first rotary rods 205 are distributed on the two rotary rods 203, the support plate 206 is fixedly installed on the rear side of the upper portion of the support frame 105, the switch 207 is arranged on the front side of the support plate 206, and the material blocking assembly is slidably connected with the lower sides of the front portions of the support frame 105 and the discharge frame 104.
The manual work is with keeping off in the material subassembly pushes away in the material frame 104, the raw materials that will carry out the stirring are put in the material frame 104 back, starting motor 201, fixed mounting rotates at the epaxial first spur gear 202 of motor 201 output, the meshing of second spur gear 204 and first spur gear 202, drive the rotation of two bull sticks 203 of being connected with it simultaneously, the rotation of the raw materials such as stone of adding is stirred along with the rotation of bull stick 203 to a plurality of first bull stick 205, starting switch 207, the switch 207 is taken out the material mechanism through the sprinkler body control and is spouted the adhesive, through the intensive mixing of raw materials such as rabbling mechanism with adhesive and stone, at last manual work pulls out sprinkler body, the pitch that stirs is sent out through the downside export of material frame 104 and is used.
The material blocking assembly comprises a second baffle plate 208, a first fixing plate 209 and a handle 210, the second baffle plate 208 is in sliding connection with the lower sides of the front parts of the supporting frame 105 and the discharging frame 104, the first fixing plate 209 is fixedly installed on the front side of the second baffle plate 208, and the handle 210 is arranged on the first fixing plate 209.
When feeding is performed manually in the discharging frame 104, the first fixing plate 209 and the second baffle plate 208 are pushed by the handle 210, so that the second baffle plate 208 slides inwards along the supporting frame 105 and the discharging frame 104, the lower opening of the discharging frame 104 is temporarily sealed, and subsequent feeding and stirring mixing are facilitated.
The material pumping mechanism comprises second supporting plates 3, second supporting rods 301, a water pump 302, a pipeline connector 303, a storage tank 304, right-angle folding rods 305, a material passing pipeline 306, a first connecting rod 307, a water spraying tank 308, a water sprayer 3081 and a heating assembly, wherein the two second supporting plates 3 are fixedly arranged on the right rear side of the upper part of the vehicle plate 1, the two second supporting rods 301 are fixedly arranged on the left rear side of the upper part of the vehicle plate 1, the water pump 302 is fixedly arranged on the two second supporting rods 301, the storage tank 304 is fixedly arranged on the two second supporting plates 3, the left side and the right side of the pipeline connector 303 are respectively connected with the storage tank 304 and the water pump 302, the right-angle folding rods 305 are fixedly connected with the supporting frame 105, the lower end of the right-angle folding rods 305 is fixedly connected with the vehicle plate 1, the material passing pipeline 306 is fixedly connected with the outer sides of the right-angle folding rods 305, the lower end of the material passing pipeline 306 is connected with the pipeline connector 303, the upper end of the material passing pipeline 306 penetrates through the upper side of the right-angle folding rods 305, the two first connecting rods 307 are respectively fixedly arranged on the lower side of the horizontal plate of the right-angle folding rod 305, the upper end of the water spraying tank 308 is communicated with the upper end of the communicating pipeline 306, the two rows of water sprayers 3081 are arranged at the bottom of the water spraying tank 308, and the heating assembly is arranged in the storage tank 304.
After the raw materials are manually placed in the discharging frame 104, the stirring mechanism is started to stir the raw materials, the heating assembly heats the adhesive in the storage box 304, the water pump 302 is started, the water pump 302 sends the adhesive in the storage box 304 to the water spraying box 308 along the pipeline connector 303 and the material passing pipeline 306, and the water sprayer 3081 sprays the adhesive into the discharging frame 104 to be fully mixed with the raw materials such as stones.
The heating assembly includes a cover 3041, an inner case 3042, a second heater wire 3043 and a water inlet 3044, the cover 3041 is disposed on the upper side of the storage case 304, the inner case 3042 is disposed inside the storage case 304, the second heater wire 3043 is disposed between the storage case 304 and the inner case 3042, and the water inlet 3044 is disposed on the left side of the upper portion of the cover 3041.
When the asphalt is stirred, the adhesive to be used is manually poured into the inner tank 3042 through the water inlet 3044, and the second heating wire 3043 between the material storage tank and the inner tank 3042 heats the adhesive to prevent the adhesive from solidifying.
The spraying mechanism comprises sliding columns 4, springs 401, a second fixing plate 402, a sliding frame 4021, a sliding block 403, a first connecting column 404, a third supporting rod 405, connecting blocks 4052 and spraying components, wherein the second fixing plate 402 is fixedly arranged on the upper side of the front part of the supporting frame 105, the two sliding columns 4 are in sliding connection with the second fixing plate 402, the sliding frame 4021 is fixedly connected with the upper ends of the two sliding columns 4, the lower side of the sliding frame 4021 is in contact with the upper side of the second fixing plate 402, the two springs 401 are respectively sleeved on the two sliding columns 4, the upper ends of the two springs 401 are fixedly connected with the lower side of the second fixing plate 402, the lower ends of the two springs 401 are respectively and fixedly connected with the lower ends of the two sliding columns 4, the sliding blocks are in sliding contact with the sliding frame 4021, the first connecting column 404 is fixedly connected with the sliding block 403, the first connecting column 404 is in sliding contact with the sliding frame 4021, the third supporting rod 405 is connected with the rear side of the sliding block 403, the two connecting blocks 4052 are respectively and fixedly arranged on the front and rear sides of the upper part of the supporting frame 105, the third bar 405 is slidably connected to the two links 4052, and the rear end of the third bar 405 contacts the switch 207.
When the material pumping mechanism is ready to be started, the sliding block 403 is manually lifted up with the sliding column 4, the spring 401 is compressed, meanwhile, the sliding block 403 moves backwards and downwards along the sliding frame 4021, the rear end of the third supporting rod 405 touches the switch 207, the water pump 302 is started, the spraying assembly is started simultaneously, the adhesive is sprayed into the discharging frame 104 through the water sprayer 3081 through the movement of the spraying assembly, and all raw materials are fully mixed through the stirring mechanism.
The spraying component comprises a connecting frame 4051, a blocking disk 406 and a second connecting column 407, six connecting frames 4051 are fixedly arranged on the third supporting rod 405, the inner side of the blocking disk 406 is rotatably and slidably connected with the connecting frame 4051 through the second connecting column 407, and the blocking disk 406 is rotatably connected with the inner side of the water sprayer 3081.
When the third supporting rod 405 moves backward, the blocking disk 406 is rotatably connected to the sprinkler 3081, the blocking disk 406 is no longer in contact with the lower side of the sprinkler 3081, and the second connecting column 407 fixedly connected to the inner end of the blocking disk 406 slides in the connecting frame 4051 to prevent the blocking disk 406 from falling off.
Example 3
On the basis of embodiment 2, as shown in fig. 13, the feeding device further includes a feeding assembly, the feeding assembly includes air cylinders 5, feeding frames 501 and second connecting rods 502, the two air cylinders 5 are respectively and fixedly connected with the middle positions of the inner sides of the two first baffle plates 102, the two feeding frames 501 are respectively and fixedly installed on the telescopic rods of the two air cylinders 5, the lower sides of the feeding frames 501 are in sliding contact with the supporting frames 105, the two second connecting rods 502 are respectively and fixedly connected with the lower ends of the two feeding frames 501, the second connecting rods 502 are in sliding contact with the supporting frames 105 and the fixing rods 103, and the front ends of the second connecting rods 502 are in sliding contact with the sliding frames 4021.
The stone and the asphalt are put into the two feeding frames 501, the two air cylinders 5 are started simultaneously, the feeding frames 501 move upwards along the supporting frames 105, the second connecting rods 502 fixed on the lower sides of the feeding frames 501 move upwards along with the feeding frames, when the second connecting rods 502 contact the sliding frames 4021 and carry the sliding columns 4 to move upwards to the uppermost ends, the lower sides of the feeding frames 501 just stop on the upper sides of the supporting frames 105, and the raw materials such as the stone and the like in the feeding frames 501 are poured into the discharging frames 104 and are stirred by the stirring mechanism.
The above-mentioned embodiments are merely preferred embodiments of the present invention, which are not intended to limit the scope of the present invention, and therefore, all equivalent changes made by the contents of the claims of the present invention should be included in the claims of the present invention.

Claims (1)

1. A movable efficient asphalt stirring device for road and bridge construction is characterized by comprising a turning plate, wheels, first baffle plates, first supporting plates, a discharging frame, supporting frames, first heating wires and fixing rods, wherein two groups of wheels are respectively connected to the bottom of the turning plate in a rotating manner through two axles, the two first baffle plates are fixedly arranged on two sides of the turning plate, the three first supporting plates are fixedly arranged on the turning plate, one side of the discharging frame is fixedly connected with the other ends of the three first supporting plates, the other side of the discharging frame is fixedly connected with the turning plate, the supporting frames are arranged on the outer side of the discharging frame, the first heating wires are distributed between the discharging frame and the supporting frames, the four fixing rods are arranged on two sides of the supporting frames, the movable efficient asphalt stirring device also comprises a stirring mechanism, a material pumping mechanism and a spraying mechanism, the stirring mechanism is fixedly arranged on one side of the discharging frame, the material pumping mechanism is fixedly arranged on one side of the turning plate far away from the discharging frame, the spraying mechanism is arranged above the supporting frame;
the stirring mechanism comprises a support, a motor, a first straight gear, rotating rods, a second straight gear, a first supporting rod, supporting plates, a switch and a material blocking assembly, wherein the support is fixedly arranged on one side of a supporting frame;
the material blocking assembly comprises a second baffle, a first fixing plate and a handle, the second baffle is connected with one sides of the supporting frame and the discharging frame far away from the bracket in a sliding mode, the first fixing plate is fixedly installed on one side of the second baffle, and the handle is arranged on the first fixing plate;
the material pumping mechanism comprises second supporting plates, second supporting rods, a water pump, a pipeline connector, a storage box, right-angle folding rods, a material passing pipeline, a first connecting rod, a water spraying box, a water sprayer and a heating assembly, wherein the two second supporting plates are fixedly arranged on one side, far away from the discharging frame, of the vehicle plate, the two second supporting rods are fixedly arranged on one side, close to the second supporting plates, of the vehicle plate, the water pump is fixedly arranged on the two second supporting rods, the storage box is fixedly arranged on the two second supporting plates, the two sides of the pipeline connector are respectively connected with the storage box and the water pump, the right-angle folding rods are fixedly connected with the supporting frames, one ends of the right-angle folding rods are fixedly connected with the vehicle plate, the material passing pipeline is fixedly connected with the right-angle folding rods, one ends of the material passing pipeline are connected with the pipeline connector, the other ends of the material passing pipeline penetrate through one side of the right-angle folding rods, the two first connecting rods are respectively and fixedly arranged on one side, far away from the vehicle plate, of the right-angle folding rods, the upper end of the water spraying box is communicated with one end of the material passing pipeline, the two rows of water sprayers are arranged at the bottom of the water spraying box, and the heating assembly is arranged in the storage box;
the heating assembly comprises a cover plate, an inner box, a second heating wire and a water inlet groove, the cover plate is arranged on the upper side of the storage box, the inner box is arranged on the inner side of the storage box, the second heating wire is arranged between the storage box and the inner box, and the water inlet groove is arranged on the upper side of the cover plate;
the spraying mechanism comprises sliding columns, springs, a second fixing plate, a sliding frame, a sliding block, a first connecting column, a third supporting rod, a connecting block and a spraying assembly, wherein the second fixing plate is fixedly arranged on one side, far away from the motor, of the supporting frame;
the spraying assembly comprises connecting frames, a baffle disc and a second connecting column, the connecting frames are fixedly arranged on the third supporting rod, the baffle disc is rotatably and slidably connected with the connecting frames through the second connecting column, and the baffle disc is rotatably connected with the water sprayer;
the feeding assembly comprises cylinders, feeding frames and second connecting rods, the two cylinders are fixedly connected with the inner sides of the two first baffle plates respectively, the two feeding frames are fixedly mounted on telescopic rods of the two cylinders respectively, the lower sides of the feeding frames are in sliding contact with the supporting frames, the two second connecting rods are fixedly connected with the lower ends of the two feeding frames respectively, the second connecting rods are in sliding contact with the supporting frames and the fixing rods, and the other ends of the second connecting rods are in sliding contact with the sliding frames.
CN202110317931.4A 2021-03-25 2021-03-25 Movable efficient asphalt stirring equipment for road and bridge construction Expired - Fee Related CN113235360B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110317931.4A CN113235360B (en) 2021-03-25 2021-03-25 Movable efficient asphalt stirring equipment for road and bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110317931.4A CN113235360B (en) 2021-03-25 2021-03-25 Movable efficient asphalt stirring equipment for road and bridge construction

Publications (2)

Publication Number Publication Date
CN113235360A CN113235360A (en) 2021-08-10
CN113235360B true CN113235360B (en) 2022-09-06

Family

ID=77130470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110317931.4A Expired - Fee Related CN113235360B (en) 2021-03-25 2021-03-25 Movable efficient asphalt stirring equipment for road and bridge construction

Country Status (1)

Country Link
CN (1) CN113235360B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197277B (en) * 2021-12-23 2023-07-14 中建四局华南建设有限公司 Asphalt pouring device for building construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080259714A1 (en) * 2007-04-17 2008-10-23 Astec, Inc. Method and apparatus for making asphalt concrete using foamed asphalt cement
CN204224956U (en) * 2014-11-10 2015-03-25 山东东岳专用汽车制造有限公司 A kind of lifting appliance stirring material
CN207031974U (en) * 2017-07-04 2018-02-23 滁州高仁建设工程有限公司 Asphalt macadam mixer
CN208685408U (en) * 2018-04-28 2019-04-02 江苏瓦楷新材料科技有限公司 A kind of bituminous concrete mixing device
CN110700049A (en) * 2019-10-19 2020-01-17 杨雨 Road construction device and method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212688654U (en) * 2020-07-06 2021-03-12 杭州大江东城市设施管养有限公司 Bituminous paving fog seals structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080259714A1 (en) * 2007-04-17 2008-10-23 Astec, Inc. Method and apparatus for making asphalt concrete using foamed asphalt cement
CN204224956U (en) * 2014-11-10 2015-03-25 山东东岳专用汽车制造有限公司 A kind of lifting appliance stirring material
CN207031974U (en) * 2017-07-04 2018-02-23 滁州高仁建设工程有限公司 Asphalt macadam mixer
CN208685408U (en) * 2018-04-28 2019-04-02 江苏瓦楷新材料科技有限公司 A kind of bituminous concrete mixing device
CN110700049A (en) * 2019-10-19 2020-01-17 杨雨 Road construction device and method

Also Published As

Publication number Publication date
CN113235360A (en) 2021-08-10

Similar Documents

Publication Publication Date Title
CN111300646B (en) Preparation method of asphalt concrete
CN110712295B (en) Preparation device and preparation method of concrete
CN113235360B (en) Movable efficient asphalt stirring equipment for road and bridge construction
CN107972171A (en) A kind of concrete preparation system
CN110388059A (en) A kind of construction concrete robotic watering unit
CN115155396A (en) Preparation process of asphalt mixture
CN211772592U (en) Asphalt environment-friendly stirring device for highway construction
CN115572105B (en) Foam warm mix asphalt using reclaimed materials and preparation method thereof
CN113119278A (en) Aerated concrete block pouring device capable of achieving composite pouring
CN113145006A (en) Production is decorated thick liquids agitating unit for body paper
CN114602963A (en) Comprehensive soil remediation ecological restoration device
CN206436369U (en) A kind of engineering multifunction cement processing unit
CN116497663A (en) Concrete mixer of environment-friendly highway construction
CN216726796U (en) Agitated vessel is used in lithium ion battery material production and processing
CN215612980U (en) Screening plant is used in production of fine grain asphalt concrete
CN215472121U (en) Glass fiber concrete stirring device for prefabricated cabin
CN114797647A (en) Waterproof coating stirring and mixing preparation system and preparation process
CN213493509U (en) Compound fertilizer production agitating unit
CN210827059U (en) Marking device for road bridge engineering
CN113171708A (en) Preparation process of ultraviolet curing ink
CN219849110U (en) Mixing equipment for preparation
CN112809924A (en) Agitating unit is used in road bridge construction
CN219849322U (en) Medium trace element chelate apparatus for producing in soil remediation agent
CN206034867U (en) Novel all -in -one of plastering is stirred in remote control
CN217855581U (en) Air cushion film raw materials for production mixing arrangement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220817

Address after: 19th Floor, Building 3, Wanfu Center, No. 8 Chuangye Road, High-tech Zone, Fuzhou City, Fujian Province, 350100

Applicant after: FUJIAN ACADEMY OF BUILDING RESEARCH Co.,Ltd.

Applicant after: Fujian Longjian Construction Development Co.,Ltd.

Applicant after: Fujian Zhonghe development Architectural Design Institute Co.,Ltd.

Address before: 113000 12-1, Longfeng street, Dongzhou District, Fushun City, Liaoning Province

Applicant before: Jia Shuangyuan

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220906