CN113187210A - Construction platform for building construction and use method thereof - Google Patents

Construction platform for building construction and use method thereof Download PDF

Info

Publication number
CN113187210A
CN113187210A CN202110451844.8A CN202110451844A CN113187210A CN 113187210 A CN113187210 A CN 113187210A CN 202110451844 A CN202110451844 A CN 202110451844A CN 113187210 A CN113187210 A CN 113187210A
Authority
CN
China
Prior art keywords
construction
construction platform
lifting
fixed connection
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110451844.8A
Other languages
Chinese (zh)
Inventor
汪顺益
李海宁
陈毕海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Shuangfeng Steel Structure Engineering Co ltd
Original Assignee
Anhui Shuangfeng Steel Structure Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Shuangfeng Steel Structure Engineering Co ltd filed Critical Anhui Shuangfeng Steel Structure Engineering Co ltd
Priority to CN202110451844.8A priority Critical patent/CN113187210A/en
Publication of CN113187210A publication Critical patent/CN113187210A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/20Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F13/00Common constructional features or accessories
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/12Canopies
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G2005/008Hoisting devices specially adapted as part of a scaffold system
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/12Canopies
    • E04G2005/125Roof for scaffolds, e.g. extending to the adjacent building

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The invention discloses a construction platform for building construction and a using method thereof, relates to the technical field of building construction, and aims to solve the problem that construction tools are inconvenient to take for a construction platform for common building construction in the prior art. The utility model discloses a lifting device, including roof, lifting device, axle bed and lifting box, fastening screw fixed connection, first pivot and second pivot are all installed to the below of roof, lifting device's below is provided with the lifting box, first pivot and second pivot are installed respectively to lifting device's inside, and first pivot and second pivot all pass through axle bed and lifting device fixed connection, first belt pulley is all installed at the both ends of first pivot, and first belt pulley and first pivot fixed connection, first lifting belt is installed to the inboard of first belt pulley, first belt pulley and lifting box all with first lifting belt fixed connection, the second belt pulley is all installed at the both ends of second pivot, and second belt pulley and second pivot fixed connection.

Description

Construction platform for building construction and use method thereof
Technical Field
The invention relates to the technical field of building construction, in particular to a construction platform for building construction and a using method thereof.
Background
The building construction refers to production activities in the engineering construction implementation stage, is a construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place, and comprises basic engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, wherein the construction operation place is called a building construction site or a construction site, and is also called a construction site.
In the process of building construction, a construction platform is often used for carrying out auxiliary construction work, constructors stand on the construction platform and can carry out construction at different heights of the periphery of a house, but the constructors need to carry a large number of construction tools during construction, sometimes the situation that tools are forgotten or too many tools cannot be carried on the body at one time occurs, at the moment, the constructors can only lift the work to the hands of the constructors through the cooperation of ropes and ground personnel, the constructors are very dangerous in the process of high-altitude construction work, and no device capable of assisting the constructors to take the construction tools exists in the current market; therefore, the market urgently needs to develop a construction platform for house building construction and a using method thereof to help people to solve the existing problems.
Disclosure of Invention
The invention aims to provide a construction platform for building construction and a using method thereof, and aims to solve the problem that construction tools are inconvenient to take for a common construction platform for building construction in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a construction platform for building construction comprises a base and a top plate, wherein a lifting device is arranged below the top plate, the lifting device is fixedly connected with the top plate through fastening screws, a lifting box is arranged below the lifting device, a first rotating shaft and a second rotating shaft are respectively arranged in the lifting device, the first rotating shaft and the second rotating shaft are fixedly connected with the lifting device through shaft seats, both ends of the first rotating shaft are provided with first belt pulleys, and the first belt pulley is fixedly connected with the first rotating shaft, the inner side of the first belt pulley is provided with a first lifting belt, the first belt pulley and the lifting box are both fixedly connected with a first lifting belt, the two ends of the second rotating shaft are both provided with a second belt pulley, and the second belt pulley is fixedly connected with the second rotating shaft, a second lifting belt is installed on the inner side of the second belt pulley, and the second belt pulley and the lifting box are fixedly connected with the second lifting belt.
Preferably, carry the inside of hoist device and install first motor and first reduction gear respectively, and first motor and first reduction gear all with carry hoist device fixed connection, carry hoist device's inside and be provided with first worm, first worm passes through shaft coupling fixed connection with first reduction gear, carry hoist device's inside and be provided with the drive shaft, and the drive shaft passes through axle bed fixed connection with carrying hoist device, drive gear is installed in the outside of drive shaft, and drive gear and drive shaft fixed connection, drive gear is connected with first worm interlock.
Preferably, first drive gear and second drive gear are installed respectively to the both ends of drive shaft, and first drive gear and second drive gear all with drive shaft fixed connection, first driven gear is installed in the outside of first pivot, and first driven gear and first pivot fixed connection, first driven gear is connected with first drive gear interlock, second driven gear is installed in the outside of second pivot, and second driven gear and second pivot fixed connection, second driven gear is connected with second drive gear interlock.
Preferably, the pillar is installed to the top of base, base and roof all pass through bolt and pillar fixed connection, the top of base is provided with construction platform, construction platform and pillar sliding connection, install the guard gate on construction platform's the preceding terminal surface, and the guard gate passes through the hinge rotation with construction platform and is connected, the below of base is provided with the regulation base.
Preferably, hoisting device is installed to the top of base, base and roof all pass through bolt and hoisting device fixed connection, the connecting seat is installed to one side of construction platform, and the connecting seat passes through bolt fixed connection with the construction platform, connecting seat and hoisting device sliding connection, hoisting device's internally mounted has the screw thread post, and the screw thread post passes through the bearing rotation with hoisting device and is connected, screw thread post and connecting seat threaded connection.
Preferably, second motor and second reduction gear are installed respectively to hoisting device's inside, and second motor and second reduction gear all with hoisting device fixed connection, the second worm is installed to one side of second reduction gear, and the second worm passes through shaft coupling fixed connection with the second reduction gear, hoisting device's internally mounted has first fixed bridge, and first fixed bridge and hoisting device fixed connection, hoisting device's inside is provided with the connecting axle, the connecting axle passes through the bearing rotation with first fixed bridge and is connected.
Preferably, the inside of hoisting device is provided with steel wire wheel and gear respectively, steel wire wheel and gear all with connecting axle fixed connection, hoisting device's internally mounted has the second fixed bridge, and second fixed bridge and hoisting device fixed connection, hoisting device's inside is provided with the fixed pulley, and the fixed pulley passes through the bearing rotation with the second fixed bridge and is connected, hoisting device's inside is provided with connecting wire rope, connecting wire rope's one end and steel wire wheel fixed connection, connecting wire rope's other end connecting seat fixed connection, hoisting device's inside is installed third motor and third reduction gear respectively, and third motor and third reduction gear all with hoisting device fixed connection, the screw thread post passes through shaft coupling fixed connection with the third reduction gear.
A use method of a construction platform for house building construction comprises the following steps:
s1: a constructor stands inside the construction platform, and the height of the construction platform is lifted through a lifting device;
s2: lifting the construction platform to a construction height, and standing the construction platform by constructors for construction operation;
s3: when the construction tools need to be supplemented, the lifting box is lowered to the ground through the lifting device, and the ground personnel place the construction tools into the lifting box;
s4: the lifting box is lifted to the height corresponding to the construction platform through the lifting device, so that a constructor on the construction platform can conveniently take tools in the lifting box;
s5: construction work is completed, the construction platform is lowered to the ground through the lifting device, and constructors walk out of the interior of the construction platform.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the construction platform, the lifting device and the lifting box are arranged, the lifting device is arranged below the top plate, the height of the lifting box can be lifted through the lifting device, when the construction platform rises to a high position, the lifting box can be lowered to the ground through the lifting device, then a ground worker puts tools into the lifting box, then the lifting box is lifted to a height corresponding to the construction platform, the construction worker only needs to take the tools from the interior of the lifting box, the operation is simple and safer, on one hand, the construction platform does not need to be lifted repeatedly, on the other hand, a rope hanging tool does not need to be used, and therefore the tools for the construction worker to take the ground from the construction platform are more convenient.
2. According to the construction platform, the threaded column is in threaded connection with the connecting seat through the arrangement of the threaded column and rotates along with the rising and falling of the construction platform, the main lifting mechanism of the construction platform is provided by the connecting steel wire rope, the shaking of the construction platform during rising and falling can be relieved through the threaded column, and on the other hand, when the connecting steel wire rope breaks down, the construction platform can be prevented from falling down to the ground from a high place, so that the use safety of the construction platform is improved.
Drawings
FIG. 1 is a front view of a construction platform for building construction according to the present invention;
FIG. 2 is an enlarged schematic view at A of the present invention;
FIG. 3 is a schematic view of the internal structure of the lifting device of the present invention;
FIG. 4 is a schematic view of the internal structure of the lifting device of the present invention;
FIG. 5 is an enlarged schematic view at B of the present invention;
fig. 6 is an enlarged schematic view at C in the drawing of the present invention.
In the figure: 1. a base; 2. adjusting the base; 3. a construction platform; 4. a protective door; 5. a pillar; 6. a lifting device; 7. a top plate; 8. lifting the device; 9. lifting the box; 10. a first lifting belt; 11. a second lifting belt; 12. a first motor; 13. a first decelerator; 14. a first worm; 15. a drive shaft; 16. a drive gear; 17. a first drive gear; 18. a second transmission gear; 19. a first driven gear; 20. a first rotating shaft; 21. a second driven gear; 22. a second rotating shaft; 23. a second motor; 24. a second decelerator; 25. a second worm; 26. a first fixed bridge; 27. a wire wheel; 28. a connecting shaft; 29. a gear; 30. Connecting a steel wire rope; 31. a connecting seat; 32. a threaded post; 33. a fixed pulley; 34. a third motor; 35. a third speed reducer; 36. a first pulley; 37. a second pulley; 38. a second fixed bridge.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-6, an embodiment of the present invention is shown: a construction platform for building construction comprises a base 1 and a top plate 7, wherein a lifting device 8 is arranged below the top plate 7, the lifting device 8 is fixedly connected with the top plate 7 through fastening screws, a lifting box 9 is arranged below the lifting device 8, a first rotating shaft 20 and a second rotating shaft 22 are respectively arranged in the lifting device 8, the first rotating shaft 20 and the second rotating shaft 22 are fixedly connected with the lifting device 8 through shaft seats, first belt pulleys 36 are respectively arranged at two ends of the first rotating shaft 20, the first belt pulleys 36 are fixedly connected with the first rotating shaft 20, a first lifting belt 10 is arranged on the inner side of the first belt pulleys 36, the first belt pulleys 36 and the lifting box 9 are fixedly connected with the first lifting belt 10, second belt pulleys 37 are respectively arranged at two ends of the second rotating shaft 22, the second belt pulleys 37 are fixedly connected with the second rotating shaft 22, and a second lifting belt 11 is arranged on the inner side of the second belt pulleys 37, the second belt pulley 37 and the lifting box 9 are both fixedly connected with the second lifting belt 11.
Further, a first motor 12 and a first speed reducer 13 are respectively installed inside the lifting device 8, the first motor 12 and the first speed reducer 13 are both fixedly connected with the lifting device 8, a first worm 14 is arranged inside the lifting device 8, the first worm 14 is fixedly connected with the first speed reducer 13 through a coupler, a driving shaft 15 is arranged inside the lifting device 8, the driving shaft 15 is fixedly connected with the lifting device 8 through a shaft seat, a driving gear 16 is installed on the outer side of the driving shaft 15, the driving gear 16 is fixedly connected with the driving shaft 15, the driving gear 16 is connected with the first worm 14 in an engaged manner, and the first motor 12 is fixedly connected with the first speed reducer 13 through a coupler.
Further, a first transmission gear 17 and a second transmission gear 18 are respectively installed at two ends of the driving shaft 15, the first transmission gear 17 and the second transmission gear 18 are both fixedly connected with the driving shaft 15, a first driven gear 19 is installed on the outer side of the first rotating shaft 20, the first driven gear 19 is fixedly connected with the first rotating shaft 20, the first driven gear 19 is in meshed connection with the first transmission gear 17, a second driven gear 21 is installed on the outer side of the second rotating shaft 22, the second driven gear 21 is fixedly connected with the second rotating shaft 22, the second driven gear 21 is in meshed connection with the second transmission gear 18, and the first transmission gear 17, the second transmission gear 18, the first driven gear 19 and the second driven gear 21 are universal gears.
Further, pillar 5 is installed to base 1's top, base 1 and roof 7 all pass through bolt and pillar 5 fixed connection, base 1's top is provided with construction platform 3, construction platform 3 and pillar 5 sliding connection, install guard gate 4 on construction platform 3's the preceding terminal surface, guard gate 4 passes through the hinge rotation with construction platform 3 and is connected, base 1's below is provided with adjusts base 2, pillar 5 is provided with four, adjust the rotation of base 2 accessible bolt, adjust and the angle between the base 1, make base 1 can be on a parallel with horizontal line all the time.
Further, hoisting device 6 is installed to base 1's top, base 1 and roof 7 all pass through bolt and hoisting device 6 fixed connection, connecting seat 31 is installed to one side of construction platform 3, connecting seat 31 passes through bolt fixed connection with construction platform 3, connecting seat 31 and hoisting device 6 sliding connection, hoisting device 6's internally mounted has screw thread post 32, screw thread post 32 passes through the bearing rotation with hoisting device 6 and is connected, screw thread post 32 and connecting seat 31 threaded connection, hoisting device 6 and connecting seat 31 all are provided with two.
Further, a second motor 23 and a second speed reducer 24 are respectively installed inside the lifting device 6, the second motor 23 and the second speed reducer 24 are both fixedly connected with the lifting device 6, a second worm 25 is installed on one side of the second speed reducer 24, the second worm 25 and the second speed reducer 24 are fixedly connected through a coupler, a first fixing bridge 26 is installed inside the lifting device 6, the first fixing bridge 26 is fixedly connected with the lifting device 6, a connecting shaft 28 is arranged inside the lifting device 6, the connecting shaft 28 is rotatably connected with the first fixing bridge 26 through a bearing, and the second motor 23 and the second speed reducer 24 are fixedly connected through a coupler.
Further, a steel wire wheel 27 and a gear 29 are respectively arranged inside the lifting device 6, the steel wire wheel 27 and the gear 29 are both fixedly connected with a connecting shaft 28, a second fixed bridge 38 is arranged inside the lifting device 6, the second fixed bridge 38 is fixedly connected with the lifting device 6, a fixed pulley 33 is arranged inside the lifting device 6, the fixed pulley 33 and the second fixed bridge 38 are rotatably connected through a bearing, a connecting steel wire rope 30 is arranged inside the lifting device 6, one end of the connecting steel wire rope 30 is fixedly connected with the steel wire wheel 27, the other end of the connecting steel wire rope 30 is fixedly connected with a connecting seat 31, a third motor 34 and a third speed reducer 35 are respectively arranged inside the lifting device 6, the third motor 34 and the third speed reducer 35 are both fixedly connected with the lifting device 6, a threaded column 32 is fixedly connected with the third speed reducer 35 through a coupler, the third motor 34 is fixedly connected with the third speed reducer 35 through a coupler, the connecting wire rope 30 is wound around the fixed sheave 33 and is connected to the fixed sheave 33 in a rolling manner.
A use method of a construction platform for house building construction comprises the following steps:
s1: a constructor stands inside the construction platform 3 and lifts the height of the construction platform 3 through a lifting device 6;
s2: lifting the construction platform 3 to a construction height, and standing the construction platform 3 by a constructor for construction operation;
s3: when the construction tools need to be supplemented, the lifting box 9 is lowered to the ground through the lifting device 8, and the ground personnel place the construction tools into the lifting box 9;
s4: the lifting box 9 is lifted to the height corresponding to the construction platform 3 through the lifting device 8, so that a constructor on the construction platform 3 can conveniently take tools in the lifting box 9;
s5: construction work is completed, the construction platform 3 is lowered to the ground through the lifting device 6, and constructors walk out of the interior of the construction platform 3.
The working principle is as follows: when the construction platform is used, firstly, the base 1 is adjusted to be in a horizontal state by adjusting the base 2, then a constructor opens the protective door 4 to enter the interior of the construction platform 3, the second motor 23 is started, the second motor 23 drives the second worm 25 to rotate after being decelerated by the second decelerator 24, the second worm 25 drives the connecting shaft 28 to rotate through the gear 29, the connecting shaft 28 drives the wire wheel 27 to rotate, the wire wheel 27 recovers the connecting wire rope 30 to pass over the fixed pulley 33 and pulls the connecting seat 31 to move upwards, meanwhile, the third motor 34 is started, the third motor 34 drives the threaded column 32 to rotate after being decelerated by the third decelerator 35, so that the connecting seat 31 can move upwards, when the construction platform 3 rises to a specified height, the second motor 23 and the third motor 34 are closed, and the construction platform 3 is fixed under the locking of the second worm 25 and the threaded column 32, the tool can not sink, when the construction tool is lacked, the first motor 12 can be started, the first motor 12 can drive the first worm 14 to rotate after being decelerated by the first decelerator 13, the first worm 14 drives the driving shaft 15 to rotate by the driving gear 16, the driving shaft 15 drives the first rotating shaft 20 and the first belt pulley 36 to rotate by the first transmission gear 17 and the first driven gear 19, meanwhile, the driving shaft 15 drives the second rotating shaft 22 and the second belt pulley 37 to rotate by the second transmission gear 18 and the second driven gear 21, the first lifting belt 10 is released by the rotation of the first belt pulley 36, the second lifting belt 11 is released by the rotation of the second belt pulley 37, so that the lifting box 9 is lowered to the ground, then a ground worker puts the tool into the lifting box 9, starts the first motor 12 again, the lifting box 9 is raised by the reverse rotation, so that the height of the lifting box corresponds to the height of the construction platform 3, the constructor on the construction platform 3 can take the tool in the lifting box 9 conveniently.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (8)

1. The utility model provides a construction platform is used in housing construction, includes base (1) and roof (7), its characterized in that: a lifting device (8) is arranged below the top plate (7), the lifting device (8) is fixedly connected with the top plate (7) through fastening screws, a lifting box (9) is arranged below the lifting device (8), a first rotating shaft (20) and a second rotating shaft (22) are respectively arranged inside the lifting device (8), the first rotating shaft (20) and the second rotating shaft (22) are fixedly connected with the lifting device (8) through shaft seats, first belt pulleys (36) are respectively arranged at two ends of the first rotating shaft (20), the first belt pulleys (36) are fixedly connected with the first rotating shaft (20), first lifting belts (10) are arranged on the inner sides of the first belt pulleys (36), the first belt pulleys (36) and the lifting box (9) are fixedly connected with the first lifting belts (10), second belt pulleys (37) are respectively arranged at two ends of the second rotating shaft (22), and second belt pulley (37) and second pivot (22) fixed connection, second lift and hang belt (11) is installed to the inboard of second belt pulley (37), second belt pulley (37) and lift and hang case (9) all with second lift and hang belt (11) fixed connection.
2. The construction platform for house building construction according to claim 1, characterized in that: carry the inside of hoist device (8) and install first motor (12) and first reduction gear (13) respectively, and first motor (12) and first reduction gear (13) all with carry hoist device (8) fixed connection, the inside of carrying hoist device (8) is provided with first worm (14), first worm (14) pass through shaft coupling fixed connection with first reduction gear (13), the inside of carrying hoist device (8) is provided with drive shaft (15), and drive shaft (15) and carry hoist device (8) through axle bed fixed connection, drive gear (16) are installed in the outside of drive shaft (15), and drive gear (16) and drive shaft (15) fixed connection, drive gear (16) are connected with first worm (14) interlock.
3. The construction platform for house building construction according to claim 2, characterized in that: first drive gear (17) and second drive gear (18) are installed respectively to the both ends of drive shaft (15), and first drive gear (17) and second drive gear (18) all with drive shaft (15) fixed connection, first driven gear (19) are installed in the outside of first pivot (20), and first driven gear (19) and first pivot (20) fixed connection, first driven gear (19) are connected with first drive gear (17) interlock, second driven gear (21) are installed in the outside of second pivot (22), and second driven gear (21) and second pivot (22) fixed connection, second driven gear (21) are connected with second drive gear (18) interlock.
4. The construction platform for house building construction according to claim 1, characterized in that: pillar (5) are installed to the top of base (1), base (1) and roof (7) all are through bolt and pillar (5) fixed connection, the top of base (1) is provided with construction platform (3), construction platform (3) and pillar (5) sliding connection, install guard gate (4) on the preceding terminal surface of construction platform (3), and guard gate (4) are connected through the hinge rotation with construction platform (3), the below of base (1) is provided with adjusts base (2).
5. The construction platform for house building construction according to claim 4, characterized in that: hoisting device (6) are installed to the top of base (1), base (1) and roof (7) all pass through bolt and hoisting device (6) fixed connection, connecting seat (31) are installed to one side of construction platform (3), and connecting seat (31) pass through bolt fixed connection with construction platform (3), connecting seat (31) and hoisting device (6) sliding connection, the internally mounted of hoisting device (6) has screw thread post (32), and screw thread post (32) and hoisting device (6) pass through the bearing and rotate and be connected, screw thread post (32) and connecting seat (31) threaded connection.
6. The construction platform for house building construction according to claim 5, characterized in that: second motor (23) and second reduction gear (24) are installed respectively to the inside of hoisting device (6), and second motor (23) and second reduction gear (24) all with hoisting device (6) fixed connection, second worm (25) are installed to one side of second reduction gear (24), and second worm (25) pass through shaft coupling fixed connection with second reduction gear (24), the internally mounted of hoisting device (6) has first fixed bridge (26), and first fixed bridge (26) and hoisting device (6) fixed connection, the inside of hoisting device (6) is provided with connecting axle (28), connecting axle (28) are connected through bearing rotation with first fixed bridge (26).
7. The construction platform for house building construction according to claim 6, characterized in that: a steel wire wheel (27) and a gear (29) are respectively arranged inside the lifting device (6), the steel wire wheel (27) and the gear (29) are both fixedly connected with a connecting shaft (28), a second fixed bridge (38) is arranged inside the lifting device (6), the second fixed bridge (38) is fixedly connected with the lifting device (6), a fixed pulley (33) is arranged inside the lifting device (6), the fixed pulley (33) is rotatably connected with the second fixed bridge (38) through a bearing, a connecting steel wire rope (30) is arranged inside the lifting device (6), one end of the connecting steel wire rope (30) is fixedly connected with the steel wire wheel (27), the other end connecting seat (31) of the connecting steel wire rope (30) is fixedly connected, a third motor (34) and a third speed reducer (35) are respectively arranged inside the lifting device (6), and the third motor (34) and the third speed reducer (35) are both fixedly connected with the lifting device (6), and the threaded column (32) is fixedly connected with the third speed reducer (35) through a coupler.
8. A method of using a construction platform for building construction, based on any one of claims 1 to 7, comprising the steps of:
s1: a constructor stands inside the construction platform (3) and lifts the height of the construction platform (3) through a lifting device (6);
s2: lifting the construction platform (3) to a construction height, and standing the construction platform (3) by constructors for construction operation;
s3: when the construction tools need to be supplemented, the lifting box (9) is lowered to the ground through the lifting device (8), and ground personnel place the construction tools into the lifting box (9);
s4: the lifting box (9) is lifted to the height corresponding to the construction platform (3) through the lifting device (8), so that a constructor on the construction platform (3) can conveniently take tools in the lifting box (9);
s5: construction work is completed, the construction platform (3) is lowered to the ground through the lifting device (6), and constructors walk out of the interior of the construction platform (3).
CN202110451844.8A 2021-04-26 2021-04-26 Construction platform for building construction and use method thereof Pending CN113187210A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110451844.8A CN113187210A (en) 2021-04-26 2021-04-26 Construction platform for building construction and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110451844.8A CN113187210A (en) 2021-04-26 2021-04-26 Construction platform for building construction and use method thereof

Publications (1)

Publication Number Publication Date
CN113187210A true CN113187210A (en) 2021-07-30

Family

ID=76979027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110451844.8A Pending CN113187210A (en) 2021-04-26 2021-04-26 Construction platform for building construction and use method thereof

Country Status (1)

Country Link
CN (1) CN113187210A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100045324A (en) * 2008-10-23 2010-05-03 삼성중공업 주식회사 Elevating work platform
CN110080512A (en) * 2019-04-24 2019-08-02 凌霄 A kind of safety-type construction platform convenient for feeding
CN111017834A (en) * 2019-12-18 2020-04-17 刘雁峰 High-safety lifting platform for building construction
CN210508315U (en) * 2019-08-23 2020-05-12 陕西国防工业职业技术学院 Multifunctional lifting platform for house building construction
CN211817835U (en) * 2020-02-19 2020-10-30 王常冬 Building external climbing type building construction operation platform
CN212101853U (en) * 2020-03-05 2020-12-08 张思才 Elevating gear for construction
CN112211385A (en) * 2020-11-10 2021-01-12 广州博今科技有限公司 Bearing frame with protection structure for building construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100045324A (en) * 2008-10-23 2010-05-03 삼성중공업 주식회사 Elevating work platform
CN110080512A (en) * 2019-04-24 2019-08-02 凌霄 A kind of safety-type construction platform convenient for feeding
CN210508315U (en) * 2019-08-23 2020-05-12 陕西国防工业职业技术学院 Multifunctional lifting platform for house building construction
CN111017834A (en) * 2019-12-18 2020-04-17 刘雁峰 High-safety lifting platform for building construction
CN211817835U (en) * 2020-02-19 2020-10-30 王常冬 Building external climbing type building construction operation platform
CN212101853U (en) * 2020-03-05 2020-12-08 张思才 Elevating gear for construction
CN112211385A (en) * 2020-11-10 2021-01-12 广州博今科技有限公司 Bearing frame with protection structure for building construction

Similar Documents

Publication Publication Date Title
CN105977864B (en) A kind of multifunction power high-altitude operation worktable used for transmission line
CN210828276U (en) Hanging basket with high-rise sliding protection for building construction
WO1990014300A1 (en) Rotary lifting hook apparatus
CN111252674B (en) Hoisting device in automobile assembling
CN215558710U (en) Adjustable track traction erection device for bridge construction
CN113187210A (en) Construction platform for building construction and use method thereof
CN113605240A (en) Assembled bridge construction is with scaffold that has protective structure
CN116374827B (en) Crane boom guide mechanism for building construction
CN215519858U (en) Safe and reliable's construction is with preventing hanging flower basket that inclines
CN217128896U (en) Civil engineering construction support
CN216512711U (en) Cable device of automatic lifting device capable of assisting operating personnel to go up and down tower
CN213679578U (en) Electric power overhauls instrument lifting means
CN212893801U (en) Lifting platform for electric power installation
CN209129340U (en) A kind of Multifunctional decoration scaffold
CN209493201U (en) It is a kind of for blower fan tower barrel exempt from climb lifting device
CN217897244U (en) Spider people safety device is used in curtain cleaning maintenance
CN209780202U (en) Rotary telescopic hanging basket
CN213738292U (en) Steel construction section bar lifting device
CN219950303U (en) Prefabricated component hangs and gets device
CN219771577U (en) Hoisting equipment for building construction
CN215291324U (en) High altitude construction is with slowly falling equipment
CN219175810U (en) Safety construction frame convenient to construct
CN213894966U (en) Hoisting accessory is used in building engineering construction
CN216549372U (en) Load monitoring and protecting device for mine hoister
CN216474565U (en) Simple bridge guardrail template mounting trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210730