CN217128896U - Civil engineering construction support - Google Patents
Civil engineering construction support Download PDFInfo
- Publication number
- CN217128896U CN217128896U CN202220585877.1U CN202220585877U CN217128896U CN 217128896 U CN217128896 U CN 217128896U CN 202220585877 U CN202220585877 U CN 202220585877U CN 217128896 U CN217128896 U CN 217128896U
- Authority
- CN
- China
- Prior art keywords
- base
- civil engineering
- construction support
- engineering construction
- pinion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 230000001681 protective effect Effects 0.000 claims description 6
- 239000000463 material Substances 0.000 abstract description 4
- 230000001276 controlling effect Effects 0.000 description 3
- 238000010862 gear shaping Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 2
- 239000004035 construction material Substances 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Abstract
The utility model discloses a civil engineering construction support, the on-line screen storage device comprises a base, up end one side of base is provided with the shear force lift, the top of shear force lift is provided with the operation panel, up end one side of operation panel is rotated and is provided with the gallows, the lower part of gallows is provided with the pinion, be provided with on the operation panel and place the frame, one side of operation panel is provided with the motor, the rotor shaft of motor is connected with the master gear, master gear meshing pinion, the top of gallows is provided with electric block, be provided with wire rope on the electric block, wire rope's the end that stretches out is connected with the gallows, be equipped with the standing groove on the base, the toolbox has been placed in the standing groove. The lifting frame is fixedly connected with the tool box manually, then the electric hoist is controlled to lift the tool box, then the motor is controlled to drive the main gear to be meshed with the pinion, the lifting frame is driven to rotate, and the electric hoist is controlled to place the tool box into the placement frame, so that a worker can conveniently take tools or materials.
Description
Technical Field
The utility model belongs to civil engineering building construction field, concretely relates to civil engineering building construction support.
Background
Civil engineering building when the construction, can use the construction support to carry out the operation usually, the construction support is all built up layer upon layer through a plurality of steel pipe usually and forms, has increased intensity of labour, has reduced work efficiency, and in the use, the position of height and angle is limited, and the regulating effect is poor, and on the staff need hoist material and instrument to the scaffold of eminence in some construction, the staff of current traditional support is not convenient for takes of instrument and construction material.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a civil engineering construction support to there is the problem of taking of staff to instrument and construction material not convenient for in solving prior art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a civil engineering construction support, includes the base, up end one side of base is provided with the shear force lift, the top of shear force lift is provided with the operation panel, up end one side of operation panel is rotated and is provided with the gallows, the lower part of gallows is provided with the pinion, be provided with on the operation panel and place the frame, one side of operation panel is provided with the motor, the rotor shaft of motor is connected with the master gear, master gear meshing pinion, the top of gallows is provided with electric block, the last wire rope that is provided with of electric block, wire rope's the end that stretches out is connected with the gallows, be equipped with the standing groove on the base, the toolbox has been placed in the standing groove.
Preferably, a guard rail is arranged on the other side of the upper end face of the operating platform, and a control switch group is arranged on one side of the guard rail.
Preferably, one side of the base is provided with an electric hydraulic push rod, and the telescopic end of the electric hydraulic push rod is connected with a fixed toothed bar.
Preferably, the two sides of the bottom end of the base are provided with rollers.
Preferably, the other side of the base is provided with a traction ring.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model firstly controls the electric hydraulic push rod to push the gear shaping of the fixed gear shaping plate to be inserted into the ground through the control switch group, after the position of the construction support is fixed, the worker enters the protective guard, then the shear force lifter is controlled by the control switch group to lift the operation platform to the construction height, the electric hoist is controlled by the control switch group to loosen the steel wire rope for one section, the lifting hook on the lifting frame is manually hooked with the lifting rings on the two sides of the tool box, then controlling the electric hoist to roll up the steel wire rope, hoisting the tool box to a height higher than the operating platform, then controlling the motor to drive the main gear to be meshed with the pinion gear to drive the hanger to rotate, controlling the electric hoist to place the tool box into the placing frame after the tool box is rotated above the placing frame, therefore, workers can conveniently take tools or materials in the tool box in the protective guard, and the construction efficiency is improved.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
fig. 2 is a front sectional view of fig. 1.
In the figure: 1. a base; 2. a shear lift; 3. an operation table; 301. placing the frame; 4. a hanger; 5. a pinion gear; 6. a motor; 7. a main gear; 8. an electric hoist; 9. a wire rope; 10. lifting the hanger; 11. a placement groove; 12. a tool box; 13. protecting the fence; 14. a control switch group; 15. an electro-hydraulic push rod; 16. a fixed toothed plate; 17. a roller; 18. a traction ring.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in fig. 1 and fig. 2, an embodiment of the present invention provides a civil engineering construction support, including a base 1, a shear force elevator 2 is fixedly installed on the right side of the upper end face of the base 1 through bolts, the model of the shear force elevator 2 is SJG, the input end of the shear force elevator 2 is connected with the control end of a control switch group 14 through an electric wire, the top end of the shear force elevator 2 is fixedly installed with an operation console 3 through bolts, the left side of the operation console 3 is provided with a stepped groove, a bearing is inserted in the stepped groove in an interference manner, a hanger 4 is inserted in the inner ring of the bearing in an interference manner, the lower part of the hanger 4 is sleeved with an auxiliary gear 5 in an interference manner, a placing frame 301 is fixedly installed on the operation console 3 through bolts, the inner diameter of the placing frame 301 is larger than the outer diameter of a tool box 12, the left side of the operation console 3 is fixedly installed with a motor 6 through bolts, the model of the motor 6 is TRC28-60, the input end of the motor 6 is connected with the control switch group 14 through an electric wire, the rotor shaft key of motor 6 is connected with master gear 7, master gear 7 meshes pinion 5, there is electric block 8 on the top of gallows 4 through bolt fixed mounting, electric block 8's model is HET0.5-01, electric block 8's input passes through the control end of wire connection control switch group 14, there is wire rope 9 through buckle fixed mounting on the electric block 8, wire rope 9's the end that stretches out is connected with out gallows 10 through the cable loop, it is connected with the lifting hook to play the rotation of the lower terminal surface both sides of gallows 10, be equipped with standing groove 11 on the base 1, toolbox 12 has been placed in the standing groove 11, the welding of toolbox 12's both sides has rings, there is rail guard 13 on the up end right side of operation panel 3 through bolt fixed mounting, there is control switch group 14 on the right side of rail guard 13 through bolt fixed mounting, the input of control switch group 14 passes through the connection of electric lines power.
As shown in fig. 1 and 2, there is electronic hydraulic rod 15 on the right side of base 1 through bolt fixed mounting, the model of electronic hydraulic rod 15 is QDA60, the control end of electric wire connection control switch group 14 is passed through to electronic hydraulic rod 15's input end, electronic hydraulic rod 15's flexible end has fixed pinion rack 16 of inserting through bolt fixed mounting, there is gyro wheel 17 all through bolt fixed mounting base 1 bottom left and right sides, there is towing ring 18 on the left side of base 1 through bolt fixed mounting, towing ring 18 is connected with the tractor through the bolt, be convenient for carry out transition and removal to the construction support.
The working principle of the embodiment is as follows: firstly, an electric hydraulic push rod 15 is controlled by a control switch group 14 to push the gear shaping of a fixed toothed plate 16 to be inserted into the ground, after the position of a construction support is fixed, a worker enters a protective guard 13, then a shear lifter 2 is controlled by the control switch group 14 to lift an operating platform 3 to the construction height, an electric hoist 8 is controlled by the control switch group 14 to loosen a section of a steel wire rope 9, a hook on a lifting frame 10 is manually hooked with lifting rings on two sides of a tool box 12, then the electric hoist 8 is controlled to roll up the steel wire rope 9, the tool box 12 is lifted to the height higher than the operating platform 3, then a control motor 6 drives a main gear 7 to be meshed with a secondary gear 5 to drive the lifting frame 4 to rotate, after the tool box 12 is rotated to the upper part of a placing frame 301, the electric hoist 8 is controlled to place the tool box 12 into the placing frame 301, so that the worker can conveniently take tools or materials in the tool box 12 in the protective guard 13, is beneficial to improving the construction efficiency.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention.
Claims (5)
1. The utility model provides a civil engineering construction support which characterized in that: comprises a base (1), a shear lifter (2) is arranged on one side of the upper end face of the base (1), an operating table (3) is arranged on the top end of the shear lifter (2), a hanging bracket (4) is rotatably arranged on one side of the upper end face of the operating table (3), a pinion (5) is arranged on the lower portion of the hanging bracket (4), a placing frame (301) is arranged on the operating table (3), a motor (6) is arranged on one side of the operating table (3), a rotor shaft of the motor (6) is connected with a main gear (7), the main gear (7) is meshed with the pinion (5), an electric hoist (8) is arranged on the top end of the hanging bracket (4), a steel wire rope (9) is arranged on the electric hoist (8), an extending end of the steel wire rope (9) is connected with the hanging bracket (10), and a placing groove (11) is arranged on the base (1), a tool box (12) is placed in the placing groove (11).
2. The civil engineering construction support of claim 1, wherein: a protective guard (13) is arranged on the other side of the upper end face of the operating platform (3), and a control switch group (14) is arranged on one side of the protective guard (13).
3. The civil engineering construction support of claim 1, wherein: one side of base (1) is provided with electronic hydraulic push rod (15), the flexible end of electronic hydraulic push rod (15) is connected with fixed pinion rack (16).
4. A civil engineering construction support according to claim 3, wherein: both sides of the bottom end of the base (1) are provided with rollers (17).
5. The civil engineering construction support of claim 4, wherein: the other side of the base (1) is provided with a traction ring (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220585877.1U CN217128896U (en) | 2022-03-17 | 2022-03-17 | Civil engineering construction support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220585877.1U CN217128896U (en) | 2022-03-17 | 2022-03-17 | Civil engineering construction support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217128896U true CN217128896U (en) | 2022-08-05 |
Family
ID=82645451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220585877.1U Expired - Fee Related CN217128896U (en) | 2022-03-17 | 2022-03-17 | Civil engineering construction support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217128896U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117468684A (en) * | 2023-12-27 | 2024-01-30 | 山西二建集团有限公司 | Operation platform for building construction |
-
2022
- 2022-03-17 CN CN202220585877.1U patent/CN217128896U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117468684A (en) * | 2023-12-27 | 2024-01-30 | 山西二建集团有限公司 | Operation platform for building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107043060A (en) | A kind of installation method of inverse formula installation lift | |
CN217128896U (en) | Civil engineering construction support | |
CN107298388A (en) | Bridge crane with suspender maintenance rig | |
CN214656426U (en) | Bridge construction platform | |
CN210598182U (en) | Semi-automatic electric hydraulic partition plate mounting machine | |
CN111636916A (en) | Hoisting apparatus for tunnel construction | |
CN206955487U (en) | It is exclusively used in lifting steel pipes and the crane device of welding | |
CN114105058B (en) | Cable trench cover board opening tool | |
CN206956559U (en) | Quick peace for guardrail template in Bridge guardrail concrete pouring construction tears equipment open | |
CN215055468U (en) | ALC wallboard installation hoisting device for building finishing engineering | |
CN210341634U (en) | Viaduct outer wall painting crane | |
CN204324662U (en) | A kind of route-variable elevator | |
CN219792150U (en) | Hoisting mechanism and split type hoisting system | |
CN219409024U (en) | Lifting type overhauling and hoisting platform car | |
CN112482710B (en) | ALC (autoclaved lightweight concrete) wallboard installation and lifting device for building decoration engineering and application method thereof | |
CN220487501U (en) | Rock abrupt slope support stock drilling safety base device | |
CN212476048U (en) | Special elevating gear of superelevation pier stud construction | |
CN211198525U (en) | Building engineering machinery maintenance work frame | |
CN220565224U (en) | Intelligent pile driver chassis | |
CN218809971U (en) | Fixed large crane | |
CN102304920A (en) | All-electric suspended wheel type remote control piling machine | |
CN212654256U (en) | Tower transportation installation device | |
CN220245491U (en) | Functional foot rest | |
CN218708754U (en) | Small landing hanger | |
CN214653216U (en) | 360-degree steering crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220805 |