CN113154650B - Air conditioner, method of controlling the same, and computer-readable storage medium - Google Patents

Air conditioner, method of controlling the same, and computer-readable storage medium Download PDF

Info

Publication number
CN113154650B
CN113154650B CN202110359972.XA CN202110359972A CN113154650B CN 113154650 B CN113154650 B CN 113154650B CN 202110359972 A CN202110359972 A CN 202110359972A CN 113154650 B CN113154650 B CN 113154650B
Authority
CN
China
Prior art keywords
air conditioner
compensation value
target
target operation
operation time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110359972.XA
Other languages
Chinese (zh)
Other versions
CN113154650A (en
Inventor
梁文潮
郑伟锐
段晓华
陈志斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
GD Midea Air Conditioning Equipment Co Ltd
Original Assignee
Midea Group Co Ltd
GD Midea Air Conditioning Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, GD Midea Air Conditioning Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN202110359972.XA priority Critical patent/CN113154650B/en
Publication of CN113154650A publication Critical patent/CN113154650A/en
Application granted granted Critical
Publication of CN113154650B publication Critical patent/CN113154650B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/61Control or safety arrangements characterised by user interfaces or communication using timers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/74Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity
    • F24F11/77Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity by controlling the speed of ventilators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/84Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/86Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling compressors within refrigeration or heat pump circuits
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Signal Processing (AREA)
  • Thermal Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Human Computer Interaction (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a control method of an air conditioner, which comprises the following steps: acquiring target operation parameters of the air conditioner; determining the ambient temperature of the air conditioner starting comfortable function corresponding to the same historical operation time length, wherein the historical operation time length is the operation time length of the air conditioner corresponding to the indoor environment reaching the comfortable state before the air conditioner operates at this time; determining a difference between the maximum ambient temperature and the minimum ambient temperature; determining a target compensation value according to the difference value; correcting the target operation parameters according to the target compensation values; and controlling the air conditioner to operate according to the corrected target operation parameters. The invention also discloses an air conditioner and a computer readable storage medium. The invention ensures the refrigeration effect or heating effect of the air conditioner.

Description

Air conditioner, method of controlling the same, and computer-readable storage medium
The application is a divisional application with the application number of 201910588636.5, and the application date of a parent application is as follows: 2019, 28 months 06; the invention name of the mother case is: an air conditioner, a method of controlling the same, and a computer-readable storage medium.
Technical Field
The present invention relates to the field of air conditioners, and in particular, to an air conditioner, a control method thereof, and a computer-readable storage medium.
Background
With the improvement of life of people, the air conditioner has become an essential household appliance for every family.
After the air conditioner is used for a period of time, the performance of the air conditioner is reduced due to the fact that refrigerant leaks. The parameter setting of the air conditioner is obtained based on the test when the air conditioner is in normal performance. When the performance of the air conditioner is reduced, the set parameters can cause the air conditioner to create a comfortable environment for a user for too long time, and the refrigerating effect or the heating effect of the air conditioner is poor.
Disclosure of Invention
The invention mainly aims to provide an air conditioner, a control method thereof and a computer readable storage medium, and aims to solve the problem that the air conditioner is poor in refrigerating effect or heating effect.
In order to achieve the above object, the present invention provides a method for controlling an air conditioner, comprising:
acquiring target operation parameters of the air conditioner; and the number of the first and second groups,
determining the ambient temperature of the air conditioner starting comfort function corresponding to the same historical operation time length, wherein the historical operation time length is the operation time length of the air conditioner corresponding to the indoor environment reaching the comfort state before the air conditioner operates at this time;
determining a difference between the maximum ambient temperature and the minimum ambient temperature;
determining a target compensation value according to the difference value;
correcting the target operation parameters according to the target compensation values;
and controlling the air conditioner to operate according to the corrected target operation parameters.
In one embodiment, the control method of the air conditioner further includes: and when the air conditioner is started, executing the steps of obtaining the target operation parameters of the air conditioner and determining the compensation value.
In one embodiment, the step of obtaining the target operation parameter of the air conditioner is preceded by:
presetting a mapping relation between the difference value of the environmental temperature and the compensation value;
the step of determining a target compensation value according to the difference value comprises:
and acquiring a compensation value corresponding to the difference value according to the preset mapping relation, and taking the compensation value as the target compensation value.
In one embodiment, the step of obtaining the target operation parameter of the air conditioner is preceded by:
when the air conditioner starts a comfort function, recording the current ambient temperature;
when the air conditioner operates to enable the indoor environment to reach a comfortable state, the operation time of the air conditioner is recorded, and the recorded environment temperature and the operation time are correspondingly stored.
In an embodiment, the ambient temperature includes at least one of an indoor temperature and an outdoor temperature.
In one embodiment, the target compensation value includes: the air conditioner comprises one or more of a set temperature compensation value for refrigerating or heating, a rotating speed compensation value of an indoor fan, an operation frequency compensation value of a compressor and an opening compensation value of a throttling component.
In one embodiment, the step of obtaining the target operation parameter of the air conditioner includes:
determining a cold and hot feeling value of a user in an air conditioner acting space;
and acquiring target operation parameters of the air conditioner according to the cold and hot feeling values.
In an embodiment, the target operation parameter includes at least one of a set temperature corresponding to cooling or heating of an air conditioner, a rotation speed of an indoor fan, an operation frequency of a compressor, and an opening degree of a throttling assembly, and the step of correcting the target operation parameter according to the target compensation value includes:
the air conditioner operates in a refrigeration mode, the set temperature is reduced, the rotating speed of an indoor fan is increased, the operating frequency of a compressor is increased, and/or the opening degree of a throttling component is increased;
the air conditioner runs in a heating mode, the set temperature is increased, the rotating speed of an indoor fan is increased, the running frequency of a compressor is increased, and/or the opening degree of a throttling component is increased.
In order to achieve the above object, the present invention further provides an air conditioner, which includes a memory, a processor, and a control program of the air conditioner stored in the memory and operable on the processor, wherein the control program of the air conditioner, when executed by the processor, implements the steps of the control method of the air conditioner as described above.
To achieve the above object, the present invention also provides a computer-readable storage medium storing a control program of an air conditioner, which when executed by a processor, implements the steps of the control method of the air conditioner as described above.
The air conditioner, the control method thereof and the computer readable storage medium provided by the invention have the advantages that the target operation parameters of the air conditioner and the compensation values obtained by the historical operation durations are obtained, and the target operation parameters are corrected according to the compensation values, so that the air conditioner is controlled to operate according to the corrected target operation parameters; the air conditioner can determine whether the performance of the air conditioner is reduced or not according to the historical running time, and then determines the compensation value when the performance of the air conditioner is reduced, so that the current running parameters of the air conditioner are compensated, and the refrigerating effect or the heating effect of the air conditioner is ensured.
Drawings
FIG. 1 is a schematic diagram of a hardware architecture of an air conditioner according to an embodiment of the present invention;
FIG. 2 is a flowchart illustrating an embodiment of a method for controlling an air conditioner according to the present invention;
fig. 3 is a detailed flowchart illustrating the process of acquiring the target compensation value of the air conditioner in step S10 in fig. 2;
fig. 4 is a detailed flowchart illustrating the process of acquiring the target operation parameter of the air conditioner in step S10 in fig. 2.
The implementation, functional features and advantages of the objects of the present invention will be further explained with reference to the accompanying drawings.
Detailed Description
It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The main solution of the embodiment of the invention is as follows: acquiring target operation parameters and compensation values of an air conditioner, wherein the compensation values are determined according to historical operation time of the air conditioner, and the historical operation time is the operation time of the air conditioner corresponding to the indoor environment reaching a comfortable state before the air conditioner operates at this time; correcting the target operation parameters according to the compensation values; and controlling the air conditioner to operate according to the corrected target operation parameters.
The air conditioner can determine whether the performance of the air conditioner is reduced or not according to the historical running time, and then determines the compensation value when the performance of the air conditioner is reduced, so that the current running parameters of the air conditioner are compensated, and the refrigerating effect or the heating effect of the air conditioner is ensured.
As one implementation, the air conditioner may be as shown in fig. 1.
The embodiment of the invention relates to an air conditioner, which comprises: a processor 101, e.g. a CPU, a memory 102, a communication bus 103. Wherein a communication bus 103 is used for enabling the connection communication between these components.
The memory 102 may be a high-speed RAM memory or a non-volatile memory (e.g., a disk memory). As shown in fig. 1, a control program of an air conditioner may be included in the memory 103 as a kind of computer storage medium; and the processor 101 may be configured to call a control program of the air conditioner stored in the memory 102 and perform the following operations:
acquiring target operation parameters and target compensation values of an air conditioner, wherein the target compensation values are determined according to historical operation time of the air conditioner, and the historical operation time is the operation time of the air conditioner corresponding to the indoor environment reaching a comfortable state before the air conditioner operates at this time;
correcting the target operation parameters according to the target compensation values;
and controlling the air conditioner to operate according to the corrected target operation parameters.
In one embodiment, the processor 101 may be configured to call a control program of an air conditioner stored in the memory 102 and perform the following operations:
determining a target operation time length in each historical operation time length, wherein the environment temperature of the starting comfort function of the air conditioner corresponding to each target operation time length is the same as the environment temperature of the current starting comfort function of the air conditioner;
determining the maximum target operation time length and the minimum target operation time length in each target operation time length;
determining a first difference between the maximum target operation time length and the minimum target operation time length;
and determining the target compensation value according to the first difference value.
In one embodiment, the processor 101 may be configured to call a control program of an air conditioner stored in the memory 102 and perform the following operations:
the operation time period of the air conditioner corresponding to the maximum target operation time period is within the target time period, and the step of determining a first difference value between the maximum target operation time period and the minimum target operation time period is executed, wherein the interval time period between the ending time point of the target time period and the current time point is less than a preset interval time period;
and determining a compensation value according to a second difference between the minimum target operation time length and the maximum target operation time length in the target time length.
In one embodiment, the processor 101 may be configured to call a control program of an air conditioner stored in the memory 102 and perform the following operations:
determining the same ambient temperature of the starting comfort function of the air conditioner corresponding to each historical running time;
determining a third difference between the maximum ambient temperature and the minimum ambient temperature;
and determining a target compensation value according to the third difference value.
In one embodiment, the processor 101 may be configured to call a control program of an air conditioner stored in the memory 102 and perform the following operations:
determining the actual operation time length of the air conditioner corresponding to the comfortable state of the last indoor environment of the air conditioner;
the actual operation time length is not matched with a preset operation time length, and a pre-stored compensation value is updated according to the actual operation time length and each historical operation time length to determine a target compensation value, wherein the preset operation time length is determined according to the pre-stored compensation value; and matching the actual running time with the preset running time, and taking the pre-stored compensation value as a target compensation value.
In one embodiment, the processor 101 may be configured to call a control program of an air conditioner stored in the memory 102 and perform the following operations:
determining a cold and hot feeling value of a user in an air conditioner acting space;
and acquiring target operation parameters of the air conditioner according to the cold and hot feeling values.
In one embodiment, the processor 101 may be configured to call a control program of an air conditioner stored in the memory 102 and perform the following operations:
the air conditioner operates in a refrigeration mode, the set temperature is reduced, the rotating speed of an indoor fan is increased, the operating frequency of a compressor is increased, and/or the opening degree of a throttling component is increased;
the air conditioner runs in a heating mode, the set temperature is increased, the rotating speed of an indoor fan is increased, the running frequency of a compressor is increased, and/or the opening degree of a throttling component is increased.
According to the scheme, the target operation parameters of the air conditioner and the compensation values obtained by the historical operation durations are obtained, and the target operation parameters are corrected according to the compensation values, so that the air conditioner is controlled to operate according to the corrected target operation parameters; the air conditioner can determine whether the performance of the air conditioner is reduced or not according to the historical running time, and then determines the compensation value when the performance of the air conditioner is reduced, so that the current running parameters of the air conditioner are compensated, and the refrigerating effect or the heating effect of the air conditioner is ensured.
Based on the hardware architecture of the air conditioner, the embodiment of the control method of the air conditioner is provided.
Referring to fig. 2, fig. 2 is a first embodiment of a control method of an air conditioner according to the present invention, the control method of the air conditioner including the steps of:
step S10, obtaining a target operation parameter and a target compensation value of the air conditioner, wherein the target compensation value is determined according to the historical operation time length of the air conditioner, and the historical operation time length is the operation time length of the air conditioner corresponding to the condition that the indoor environment before the air conditioner operates at this time reaches a comfortable state;
in this embodiment, a compensation value is set in the air conditioner, and the compensation value is used for compensating the current operating parameter of the air conditioner. For example, when the air conditioner is used for cooling, the air conditioner reduces the set cooling temperature, increases the rotating speed of an indoor fan, increases the operating frequency of a compressor and/or increases the opening degree of a throttling component through a compensation value; when the air conditioner heats, the air conditioner increases the set heating temperature, increases the rotating speed of the indoor fan, increases the operating frequency of the compressor and/or increases the opening of the throttling component through the compensation value. It is understood that the compensation value includes one or more of a set temperature compensation value for cooling or heating of the air conditioner, a rotation speed compensation value of the indoor fan, an operation frequency compensation value of the compressor, and an opening degree compensation value of the throttling assembly. The air conditioner can judge whether the performance of the air conditioner is reduced or not through each historical operation time length, wherein the historical operation time length refers to the operation time length of the air conditioner when the indoor temperature reaches a comfortable state before the air conditioner operates at this time. For example, the last historical operating time of the air conditioner is 10min, and the last historical operating time is 8min, at this time, it may be determined that the performance of the air conditioner is degraded, the air conditioner may determine the compensation value according to the difference between the two historical operating times, and the larger the difference between the historical operating times is, the larger the absolute value of the compensation value is. The compensation value stored in the air conditioner may be the target compensation value.
The air conditioner stores the operation duration corresponding to the comfortable environment of the indoor environment when the air conditioner operates every time, and the operation duration is the historical operation duration. The indoor environment reaching the comfortable state can be determined by detecting the cool and heat feeling value M of the user, and when M is in a preset interval, it can be determined that the indoor environment reaches the comfortable state, and the preset interval can be any number of intervals, for example, the preset interval is [ -1, 1 ].
The air conditioner is provided with an array infrared pile sensor, and the air conditioner acquires an environment background temperature image through the array infrared pile sensor. The air conditioner can obtain the cold and hot feeling value of the user according to the environment background temperature image. Specifically, according to the first law of thermodynamics, the heat dissipation amount generated by the human body is substantially equal to the heat consumed by the human body, so that the heat dissipation amount of the human body can be obtained by measuring the heat consumed by the human body, and the heat consumed by the human body can be calculated by the following formula: h ═ Φ (Tcl-Ra), where H is the heat dissipation capacity of the human body, Tcl is the temperature value of the human body surface (the temperature value of the human body surface can be determined from the ambient background temperature image), Ta is the radiation temperature value, Φ is the additional calculation coefficients, these calculation coefficients are some common calculation coefficients in the field of human body thermal comfort research, for example, considering the effective radiation area coefficient f _ eff of the ambient environment, the human body area coefficient f _ cl of the garment, Φ ═ f _ eff _ cl, at this time H ═ f _ cl (Tcl-Ta), the heat dissipation capacity H of the human body is obtained by calculating the difference between the temperature value Tcl of the human body surface and the radiation temperature Ta and combining the calculation coefficients Φ.
Of course, the values of the temperature value Tcl and the temperature value Ta may also be taken in advance according to the mapping relationship between the temperature value Tcl and the radiation temperature value Ta on the surface of the human body and the heat dissipation capacity of the human body, and the heat dissipation capacity of the human body corresponding to the temperature value Tcl and the temperature value Ta is set to form a mapping table. When the temperature value Tcl and the radiation temperature value Ta of the human body surface are obtained, the corresponding human body heat dissipation capacity can be obtained by looking up the table.
Because the value of the human body's cold and heat feeling is related to the heat consumed by the human body, and the heat consumed by the human body is equal to the heat dissipated by the human body, the state of the human body's cold and heat feeling is reflected by the magnitude of the heat dissipated by the human body, the experience test is performed on the cold and heat feelings of different users in the earlier-stage air conditioner development process, and the relational expression between the value of the human body's cold and heat feeling and the value of the heat dissipated by the different users can be obtained by the fitting formula, for example, the relational expression between the value of the cold and heat feeling state M and the value of the heat dissipated by the heat dissipated H can be expressed as follows:
M=a0+a1H+a2H2+a3H3+…+anHn
wherein, a0, a1, a2, a3 and an are different calculation coefficient values obtained according to experiments, N is a positive value, and the value of N is determined according to a forming fitting formula between specific H and M data groups, and if N can be 4. Through the relational expression between the human body cold and heat feeling value M and the heat dissipation capacity H in the formula, after the heat dissipation capacity H of the human body is obtained through calculation, the human body cold and heat feeling value M is obtained by substituting the formula.
Of course, whether the indoor temperature reaches the comfortable temperature may be detected to determine if the indoor environment reaches the comfortable state.
And after the air conditioner operates, acquiring target operation parameters and compensation values. The target operation parameter includes at least one or more of a set temperature corresponding to cooling or heating of the air conditioner, an operation frequency of the compressor, a rotation speed of the indoor fan, and an opening degree of the throttle assembly.
Step S20, correcting the target operation parameter according to the target compensation value;
and step S30, controlling the air conditioner to operate according to the corrected target operation parameters.
After the target compensation value and the target operation parameter are determined, the air conditioner carries out compensation correction on the target operation parameter according to the compensation value, so that the air conditioner operates according to the corrected target operation parameter.
It should be noted that, when the air conditioner is turned on, the target compensation value and the target operation parameter can be determined, so that the indoor environment can reach a comfortable state as early as possible.
In the technical scheme provided by the embodiment, the target operation parameters of the air conditioner and the compensation values obtained by the historical operation durations are obtained, and the target operation parameters are corrected according to the compensation values, so that the air conditioner is controlled to operate according to the corrected target operation parameters; the air conditioner can determine whether the performance of the air conditioner is reduced or not according to the historical running time, and then determines the compensation value when the performance of the air conditioner is reduced, so that the current running parameters of the air conditioner are compensated, and the refrigerating effect or the heating effect of the air conditioner is ensured.
In an embodiment, the air conditioner may determine a plurality of compensation values in advance, may determine a target compensation value in each compensation value, and the compensation value is determined according to each historical operation time length, and stores the determined compensation value, so that the air conditioner directly corrects the operation parameter to be operated by using the stored compensation value in the subsequent operation, so as to ensure the cooling effect or the heating effect of the air conditioner. The method for determining the compensation value in advance according to each historical operating time specifically comprises the following steps:
1. determining target operation time length in each historical operation time length, wherein the environment temperature of the starting comfort function of the air conditioner corresponding to each target operation time length is the same;
the comfort function refers to a function of the air conditioner to adjust the current indoor environment to a comfortable state. The air conditioner can record the current ambient temperature when starting the comfortable function, the ambient temperature is at least one of indoor temperature and outdoor temperature, the air conditioner can start the comfortable function automatically when starting, and the opening of the comfortable function can also be set by the user. When the air conditioner operates to enable the indoor environment temperature to reach a comfortable state, the operation time of the air conditioner is recorded, and the recorded environment temperature and the operation time are correspondingly stored. The air conditioner classifies all the environment temperatures, and all the historical operation time lengths with the same environment temperature when the air conditioner is started are used as target operation time lengths.
2. Determining the maximum target operation time length and the minimum target operation time length in each target operation time length;
3. determining a first difference between the maximum target operation time length and the minimum target operation time length;
4. and determining a compensation value according to the first difference value.
After the target operation time length is determined, the air conditioner determines the maximum target operation time length and the minimum target operation time length, and then calculates a first difference value between the maximum target operation time length and the minimum target operation time length, and the difference value and the compensation value have a mapping relation, so that the compensation value can be determined according to the difference value. In addition, the mapping relationship between the difference and the compensation value is different at different environmental temperatures, and therefore, when determining the compensation value, the compensation value needs to be determined according to the environmental temperature and the difference.
The air conditioner can obtain a plurality of compensation values according to corresponding target operation time lengths under different environmental temperatures. When the air conditioner operates the comfort function currently, the ambient temperature corresponding to the currently started comfort function can be acquired, and the compensation value which is the same as the current ambient temperature is used as the target compensation value.
Of course, the air conditioner may also determine the target compensation value in real time, and when determining the target compensation value in real time, the maximum target operation time and the minimum target operation time are determined in each target operation time having the same ambient temperature corresponding to the currently opened comfort function, and other steps are consistent with the step of determining the compensation value in advance, and are not described in detail herein.
In this embodiment, the air conditioner determines the target compensation value according to each historical operating duration, so that the air conditioner compensates the operating parameter by using the target compensation value matched with the current environment, and the air conditioner compensates the operating parameter accurately.
In one embodiment, as the air conditioner is continuously used, the performance of the air conditioner is gradually decreased, and thus, the target operation time period is gradually increased, that is, it may be determined that the minimum target operation time period is a period in which the performance of the air conditioner is the best. The difference between the historical operation time length corresponding to the current operation time length of the air conditioner and the historical operation time length corresponding to the previous operation time lengths is not large, so that the current operation parameter of the air conditioner can be accurately adjusted by obtaining a compensation value according to the difference between the maximum target operation time length and the minimum target operation time length in the near term. For this, after the air conditioner determines the maximum target operation duration, it is determined whether the operation time period of the air conditioner corresponding to the maximum target operation duration is in the target time period, and an interval duration between an end time point of the target time period and a current time point is less than a preset interval duration, that is, the target time period represents a recent time period, for example, three days or a week.
And when the maximum target operation time length is determined to be in the target time period, the compensation value obtained by the maximum target operation time length and the minimum operation time length is considered to be accurate to compensate the current operation parameter. At this time, the air conditioner determines a compensation value according to a first difference between the maximum target operation time period and the minimum target operation time period.
And when the maximum target operation time length is determined not to be in the target time period, determining that the compensation value obtained by the maximum target operation time length and the minimum operation time length is inaccurate for compensating the current operation parameter. In this regard, the air conditioner selects a maximum target operation duration within the target time period, and determines a compensation value according to a second difference between the maximum operation duration and the minimum target operation duration within the target time period, thereby correcting the current operation parameter of the air conditioner according to the compensation value.
In the technical scheme provided by this embodiment, after determining the maximum target operation duration and the minimum target operation duration, the air conditioner determines whether the maximum target operation duration is within the recent time period, so as to determine a compensation value accurately according to the determination result, so that the compensated parameter of the air conditioner is relatively accurate.
In an embodiment, the air conditioner may determine the target compensation value according to the same ambient temperature corresponding to each historical operating time, where the ambient temperature is the ambient temperature corresponding to the starting comfort function of the air conditioner. Specifically, after obtaining a plurality of historical operating durations, the air conditioner determines the same historical operating durations, for example, the historical operating durations of 10min are divided into one category. The air conditioner determines the same ambient temperature corresponding to each historical operating time, selects the maximum ambient temperature and the minimum ambient temperature, and calculates a third difference value between the maximum ambient temperature and the minimum ambient temperature. The air conditioner can determine the target compensation value according to the preset mapping relation between the third difference value and the compensation value and the third difference value. It should be noted that the ambient temperature includes an indoor temperature or an outdoor temperature, and the target compensation value corresponding to the indoor temperature is different from the target compensation value corresponding to the outdoor temperature under the same third difference.
In the technical scheme provided by this embodiment, the air conditioner determines the ambient temperature of the air conditioner at the start-up corresponding to each of the same historical operating durations, so as to determine the target compensation value according to the difference between the maximum ambient temperature and the minimum ambient temperature, and enable the air conditioner to compensate the operating parameters according to the target compensation value, thereby ensuring the cooling effect or the heating effect of the air conditioner.
Referring to fig. 3, fig. 3 is a detailed flowchart illustrating the step 10 of fig. 2 for obtaining the target compensation value of the air conditioner, where the step S10 includes:
step S11, determining the actual operation time length of the air conditioner corresponding to the comfortable state of the last indoor environment of the air conditioner;
step S12, the actual operation duration is not matched with a preset operation duration, and a prestored compensation value is updated according to the actual operation duration and each historical operation duration to determine a target compensation value, wherein the preset operation duration is determined according to the prestored compensation value;
and step S13, matching the actual operation time length with a preset operation time length, and taking a pre-stored compensation value as a target compensation value.
In this embodiment, the compensation value is pre-stored in the air conditioner, and the current performance of the air conditioner may be different from the performance of the air conditioner when the pre-stored compensation value is determined. After the air conditioner acquires the pre-stored compensation value, the preset operation time length can be determined according to the pre-stored compensation value, namely the maximum historical operation time length corresponding to the pre-stored compensation value determined by the air conditioner is used as the preset operation time length.
The air conditioner can obtain the actual operation time corresponding to the long indoor environment reaching the comfortable state in the last operation.
The air conditioner judges whether the actual operation time length is matched with the preset operation time length, and when the difference value between the actual operation time length and the preset operation time length is large, the fact that the actual operation time length is not matched with the preset operation time length can be judged. When the actual operation duration does not match the preset operation duration, the air conditioner needs to update the pre-stored compensation value, specifically, the compensation value is re-determined for the actual operation duration and each historical operation duration to update the pre-stored compensation value, and the re-determination of the compensation value is not repeated here. And after the pre-stored compensation value is updated, the updated compensation value is saved and is used as the target compensation value.
Of course, when the actual operation duration matches the preset operation duration, the pre-stored compensation value does not need to be updated, and at this time, the pre-stored compensation value is used as the target compensation value.
Further, the air conditioner can adopt the judgment that the estimated operation time of the operation comfort function is matched with the preset operation time at the moment, and the estimated preset time can be determined according to the current indoor temperature variation of the air conditioner.
In the technical scheme provided by this embodiment, the air conditioner acquires the actual operation time length corresponding to the comfortable state of the indoor environment when the air conditioner operates last time, so as to judge whether the pre-stored compensation value needs to be updated according to the actual operation time length, thereby accurately compensating the current operation parameters of the air conditioner.
Referring to fig. 4, fig. 4 is a detailed flowchart illustrating the step S10 of fig. 2 for obtaining the target operation parameter of the air conditioner, where the step S10 includes:
step S14, determining the cold and hot feeling value of the user in the air conditioner acting space;
and step S15, acquiring target operation parameters of the air conditioner according to the cold and hot feeling values.
In this embodiment, a thermal sensation model is provided in the air conditioner, and the air conditioner determines a target operation parameter corresponding to a current thermal sensation value of a user through the thermal sensation model. The determination of the cold and hot feeling values and the target operation parameters is described above, and will not be described in detail herein.
The thermal sensation model is obtained by training when the performance of the air conditioner is normal, so that after the performance of the air conditioner is reduced, if the air conditioner still runs according to the target running parameters obtained by the thermal sensation model, the time for the indoor environment to reach a comfortable state is increased, namely after the performance of the air conditioner is reduced, the setting and determination of the parameters in the thermal sensation model do not accord with the actual performance of the air conditioner, and for this reason, the air conditioner needs to compensate the target running parameters obtained by the thermal sensation model so as to ensure the refrigerating effect or the heating effect of the air conditioner.
The invention also provides an air conditioner, which comprises a memory, a processor and a control program of the air conditioner, wherein the control program of the air conditioner is stored in the memory and can be operated on the processor, and when the control program of the air conditioner is executed by the processor, the steps of the control method of the air conditioner are realized.
The present invention also provides a computer-readable storage medium storing a control program of an air conditioner, which when executed by a processor, implements the steps of the control method of the air conditioner as described in the above embodiments.
The above-mentioned serial numbers of the embodiments of the present invention are merely for description and do not represent the merits of the embodiments.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
Through the above description of the embodiments, those skilled in the art will clearly understand that the method of the above embodiments can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware, but in many cases, the former is a better implementation manner. Based on such understanding, the technical solution of the present invention may be embodied in the form of a software product, which is stored in a storage medium (e.g., ROM/RAM, magnetic disk, optical disk) as described above and includes instructions for enabling a terminal device (e.g., a mobile phone, a computer, a server, an air conditioner, or a network device) to execute the method according to the embodiments of the present invention.
The above description is only a preferred embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (10)

1. A control method of an air conditioner is characterized by comprising the following steps:
acquiring target operation parameters of the air conditioner; and the number of the first and second groups,
determining the ambient temperature of the air conditioner starting comfort function corresponding to the same historical operation time length, wherein the historical operation time length is the operation time length of the air conditioner corresponding to the indoor environment reaching the comfort state before the air conditioner operates at this time;
determining a difference between the maximum ambient temperature and the minimum ambient temperature;
determining a target compensation value according to the difference value;
correcting the target operation parameters according to the target compensation values;
and controlling the air conditioner to operate according to the corrected target operation parameters.
2. The control method of an air conditioner according to claim 1, further comprising: and when the air conditioner is started, executing the steps of obtaining the target operation parameters of the air conditioner and determining the compensation value.
3. The method of controlling an air conditioner according to claim 1, wherein the step of obtaining the target operation parameter of the air conditioner is preceded by:
presetting a mapping relation between the difference value of the environmental temperature and the compensation value;
the step of determining a target compensation value according to the difference value comprises:
and acquiring a compensation value corresponding to the difference value according to the preset mapping relation, and taking the compensation value as the target compensation value.
4. The method of controlling an air conditioner according to claim 1, wherein the step of obtaining the target operation parameter of the air conditioner is preceded by:
when the air conditioner starts a comfort function, recording the current ambient temperature;
when the air conditioner operates to enable the indoor environment to reach a comfortable state, the operation duration of the air conditioner is recorded, and the recorded environment temperature and the operation duration are correspondingly stored.
5. The control method of an air conditioner according to claim 3, wherein the ambient temperature includes at least one of an indoor temperature and an outdoor temperature.
6. The control method of an air conditioner according to claim 1, wherein the target compensation value includes: the air conditioner comprises one or more of a set temperature compensation value for refrigerating or heating, a rotating speed compensation value of an indoor fan, an operation frequency compensation value of a compressor and an opening compensation value of a throttling component.
7. The control method of an air conditioner according to claim 1, wherein the step of acquiring the target operation parameter of the air conditioner comprises:
determining a cold and hot feeling value of a user in an air conditioner acting space;
and acquiring target operation parameters of the air conditioner according to the cold and hot feeling values.
8. The control method of an air conditioner according to any one of claims 1 to 7, wherein the target operation parameter includes at least one of a set temperature corresponding to cooling or heating of the air conditioner, a rotational speed of an indoor fan, an operation frequency of a compressor, and an opening degree of a throttle assembly, and the step of correcting the target operation parameter according to the target compensation value includes:
the air conditioner operates in a refrigeration mode, the set temperature is reduced, the rotating speed of an indoor fan is increased, the operating frequency of a compressor is increased, and/or the opening degree of a throttling component is increased;
the air conditioner runs in a heating mode, the set temperature is increased, the rotating speed of an indoor fan is increased, the running frequency of a compressor is increased, and/or the opening degree of a throttling component is increased.
9. An air conditioner, characterized in that the air conditioner comprises a memory, a processor, and a control program of the air conditioner stored in the memory and executable on the processor, the control program of the air conditioner realizing the steps of the control method of the air conditioner according to any one of claims 1 to 8 when executed by the processor.
10. A computer-readable storage medium, characterized in that the computer-readable storage medium stores a control program of an air conditioner, which when executed by a processor, implements the steps of the control method of the air conditioner according to any one of claims 1 to 8.
CN202110359972.XA 2019-06-28 2019-06-28 Air conditioner, method of controlling the same, and computer-readable storage medium Active CN113154650B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110359972.XA CN113154650B (en) 2019-06-28 2019-06-28 Air conditioner, method of controlling the same, and computer-readable storage medium

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910588636.5A CN110285542B (en) 2019-06-28 2019-06-28 Air conditioner, method of controlling the same, and computer-readable storage medium
CN202110359972.XA CN113154650B (en) 2019-06-28 2019-06-28 Air conditioner, method of controlling the same, and computer-readable storage medium

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201910588636.5A Division CN110285542B (en) 2019-06-28 2019-06-28 Air conditioner, method of controlling the same, and computer-readable storage medium

Publications (2)

Publication Number Publication Date
CN113154650A CN113154650A (en) 2021-07-23
CN113154650B true CN113154650B (en) 2022-05-13

Family

ID=68021664

Family Applications (3)

Application Number Title Priority Date Filing Date
CN202110359288.1A Active CN113108434B (en) 2019-06-28 2019-06-28 Air conditioner, method of controlling the same, and computer-readable storage medium
CN202110359972.XA Active CN113154650B (en) 2019-06-28 2019-06-28 Air conditioner, method of controlling the same, and computer-readable storage medium
CN201910588636.5A Active CN110285542B (en) 2019-06-28 2019-06-28 Air conditioner, method of controlling the same, and computer-readable storage medium

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202110359288.1A Active CN113108434B (en) 2019-06-28 2019-06-28 Air conditioner, method of controlling the same, and computer-readable storage medium

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201910588636.5A Active CN110285542B (en) 2019-06-28 2019-06-28 Air conditioner, method of controlling the same, and computer-readable storage medium

Country Status (1)

Country Link
CN (3) CN113108434B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112682921B (en) * 2019-10-17 2022-11-11 广东美的制冷设备有限公司 Control method and device of air conditioner and air conditioner
CN113739364B (en) * 2020-05-29 2023-12-26 广东美的制冷设备有限公司 Energy consumption estimating method, air conditioner and storage medium
CN112032914B (en) * 2020-08-24 2022-09-02 广东Tcl智能暖通设备有限公司 Control method of air conditioner and air conditioning equipment
CN114963497B (en) * 2021-07-12 2023-12-12 青岛经济技术开发区海尔热水器有限公司 Water temperature correction control method and device for water heater, electronic equipment and storage medium
CN113551374B (en) * 2021-07-20 2022-11-11 珠海格力电器股份有限公司 Control method, device and equipment of air conditioner outdoor unit and storage medium
CN113566375B (en) * 2021-07-26 2022-06-03 海信(广东)空调有限公司 Air conditioner control method and control device and air conditioner
CN113757952B (en) * 2021-08-18 2023-10-13 清华大学 Air conditioner control method and device and air conditioner
CN114396715B (en) * 2022-01-13 2023-08-08 北京小米移动软件有限公司 Equipment control method, device, electronic equipment and storage medium
CN114623565B (en) * 2022-03-29 2024-02-20 青岛海尔空调电子有限公司 Multi-split air conditioning system and control method and control device thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04363532A (en) * 1991-03-15 1992-12-16 Toshiba Corp Air-conditioner
JP2000018671A (en) * 1998-07-03 2000-01-18 Daikin Ind Ltd Heat pump type heating apparatus
JP2001304648A (en) * 2000-04-25 2001-10-31 Funai Electric Co Ltd Consumption energy-reducing device of air conditioner
CN101995069A (en) * 2009-08-10 2011-03-30 海尔集团公司 Air conditioner and method for controlling same to operate in energy-saving manner
JP2015190669A (en) * 2014-03-28 2015-11-02 三機工業株式会社 Variable air volume type air conditioning system
CN106440224A (en) * 2016-10-13 2017-02-22 珠海格力电器股份有限公司 Control method and control device for air conditioner
CN106594960A (en) * 2016-11-02 2017-04-26 珠海格力电器股份有限公司 Air conditioner control method and device and air conditioner
EP3182027A1 (en) * 2015-12-18 2017-06-21 Panasonic Intellectual Property Management Co., Ltd. Control method for air conditioner, terminal device, and operation control system
CN108204657A (en) * 2017-12-29 2018-06-26 广东美的制冷设备有限公司 Progress control method, device, air conditioner and computer readable storage medium

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100275557B1 (en) * 1998-03-13 2000-12-15 윤종용 Compressor controller and method for air conditioner
CN101893309B (en) * 2010-07-19 2012-12-05 宁波奥克斯电气有限公司 Method for controlling energy-saving operation of frequency converting air conditioner
JP5633335B2 (en) * 2010-11-26 2014-12-03 アイシン精機株式会社 Air conditioner
CN105042810B (en) * 2014-04-29 2019-05-14 松下电器(美国)知识产权公司 The control method of the terminal installation in the air-conditioner control system of time and expense selection operating mode can be used
JP6280456B2 (en) * 2014-06-25 2018-02-14 アズビル株式会社 Air conditioning system and air conditioning control method
JP6135638B2 (en) * 2014-10-29 2017-05-31 ダイキン工業株式会社 Air conditioner
CN104501351B (en) * 2014-11-24 2017-06-06 广东美的制冷设备有限公司 The temperature correction of air-conditioner and air-conditioner
CN104566798B (en) * 2014-12-18 2017-06-30 珠海格力电器股份有限公司 The control method and device of air-conditioner radiating
CN104566814B (en) * 2014-12-25 2017-06-27 广东美的制冷设备有限公司 Air-conditioner panel display control method and system, air-conditioner
CN108006906B (en) * 2017-11-03 2020-11-06 特灵空调系统(中国)有限公司 Air conditioner temperature control method, temperature control device and air conditioner
CN107975919B (en) * 2017-11-21 2020-11-13 广东美的暖通设备有限公司 Air conditioning system, and control method and device of air conditioning system
CN109539511B (en) * 2018-10-22 2020-03-27 珠海格力电器股份有限公司 Compressor, frequency control method thereof, air conditioner, computer device, and storage medium
CN111006367B (en) * 2018-11-07 2021-04-16 珠海格力电器股份有限公司 Air conditioner and control method and device thereof
CN109751740A (en) * 2018-12-12 2019-05-14 广东美的暖通设备有限公司 For the control method of multi-gang air-conditioner, device, outdoor unit and multi-gang air-conditioner
CN109724220A (en) * 2018-12-25 2019-05-07 广东美的制冷设备有限公司 Control method, device and the apparatus of air conditioning of the apparatus of air conditioning
CN109668267B (en) * 2018-12-25 2021-02-26 广东美的制冷设备有限公司 Control method and device of air conditioning equipment and air conditioning equipment

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04363532A (en) * 1991-03-15 1992-12-16 Toshiba Corp Air-conditioner
JP2000018671A (en) * 1998-07-03 2000-01-18 Daikin Ind Ltd Heat pump type heating apparatus
JP2001304648A (en) * 2000-04-25 2001-10-31 Funai Electric Co Ltd Consumption energy-reducing device of air conditioner
CN101995069A (en) * 2009-08-10 2011-03-30 海尔集团公司 Air conditioner and method for controlling same to operate in energy-saving manner
JP2015190669A (en) * 2014-03-28 2015-11-02 三機工業株式会社 Variable air volume type air conditioning system
EP3182027A1 (en) * 2015-12-18 2017-06-21 Panasonic Intellectual Property Management Co., Ltd. Control method for air conditioner, terminal device, and operation control system
CN106440224A (en) * 2016-10-13 2017-02-22 珠海格力电器股份有限公司 Control method and control device for air conditioner
CN106594960A (en) * 2016-11-02 2017-04-26 珠海格力电器股份有限公司 Air conditioner control method and device and air conditioner
CN108204657A (en) * 2017-12-29 2018-06-26 广东美的制冷设备有限公司 Progress control method, device, air conditioner and computer readable storage medium

Also Published As

Publication number Publication date
CN110285542B (en) 2021-04-27
CN110285542A (en) 2019-09-27
CN113108434A (en) 2021-07-13
CN113154650A (en) 2021-07-23
CN113108434B (en) 2022-04-22

Similar Documents

Publication Publication Date Title
CN113154650B (en) Air conditioner, method of controlling the same, and computer-readable storage medium
CN109297153B (en) Air conditioner, control method and device thereof and readable storage medium
CN108954706B (en) Control method of air conditioner, air conditioner and storage medium
CN110285539B (en) Air conditioner, method of controlling the same, and computer-readable storage medium
CN109405214B (en) Control device of air conditioner, control method of air conditioner and readable storage medium
CN106839284B (en) Air pipe machine air conditioning system and control method and device of indoor fan of air pipe machine air conditioning system
CN110715421B (en) Air conditioner and control method and device thereof
CN105546761B (en) Air-conditioning system Learning Control Method
CN109114759B (en) Control terminal, control method and device for multi-split air conditioner and storage medium
CN108489036B (en) Air conditioner, control method thereof, and computer-readable storage medium
CN108195032B (en) Air conditioner control method, device and computer readable storage medium
CN111141013B (en) Air conditioner control method and air conditioning unit control system
CN109373536B (en) Control device of air conditioner, control method of air conditioner and readable storage medium
CN107062525B (en) Control method and device of air conditioner and air conditioner
CN105202711A (en) Method and device for controlling air conditioner
CN112432345B (en) Air conditioner, control method of starting mode of air conditioner and storage medium
CN110553347A (en) control method and system for delaying frosting, storage medium and air conditioner
CN111256325A (en) Temperature control method, air conditioning apparatus, control apparatus, and storage medium
CN110864402B (en) Air conditioner, air conditioner control method based on cold and heat feeling detection and storage medium
CN115540247A (en) Air conditioner cooling control method, air conditioner and computer readable storage medium
CN110925937B (en) Control method of air conditioner, terminal equipment and system
CN107975917B (en) Temperature adjustment time prediction method and temperature adjustment device
CN114110998B (en) Air conditioner operation frequency control method, air conditioner and storage medium
CN111256312A (en) Control method and device of air conditioner, air conditioner and server
WO2023005012A1 (en) Air conditioner and control method therefor, and computer-readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant