CN113153432B - 多变量矿山废石混入率动态测算方法 - Google Patents
多变量矿山废石混入率动态测算方法 Download PDFInfo
- Publication number
- CN113153432B CN113153432B CN202110394283.2A CN202110394283A CN113153432B CN 113153432 B CN113153432 B CN 113153432B CN 202110394283 A CN202110394283 A CN 202110394283A CN 113153432 B CN113153432 B CN 113153432B
- Authority
- CN
- China
- Prior art keywords
- calculating
- ore
- rock
- mixing rate
- pixel point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011435 rock Substances 0.000 title claims abstract description 38
- 238000000034 method Methods 0.000 title claims abstract description 16
- 239000002699 waste material Substances 0.000 title claims description 9
- 239000010878 waste rock Substances 0.000 claims abstract description 13
- 238000004519 manufacturing process Methods 0.000 claims abstract description 5
- 238000004364 calculation method Methods 0.000 abstract description 6
- 238000010586 diagram Methods 0.000 abstract description 5
- 238000005065 mining Methods 0.000 abstract description 3
- 238000010790 dilution Methods 0.000 abstract description 2
- 239000012895 dilution Substances 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 abstract description 2
- 239000003086 colorant Substances 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007429 general method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/18—Special adaptations of signalling or alarm devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明涉及一种多变量矿山废石混入率动态测算方法,首先制作矿体各水平平面图,解析平面图,计算出矿体总面积和矿岩接触边长,确定包括矿石体重、围岩体重、挖机斗深、铲装容差、超挖比例在内的预设参数,参数;根据计算得出的矿岩接触边总边长以及矿体总面积,结合预设参数得到废石混入率;本发明综合考虑矿体产状、设备规格等多种因素,结合计算机图像识别技术进行测算,可以提高矿山废石混入率测算效率以及准确性。计算结果相较直接采用统一的经验数据更加准确,符合项目自身特点。适用范围广,不同的露天矿只需输入相关参数即可计算采矿贫化率。本发明提高了工作效率,节约大量人工时间。
Description
技术领域
本发明属于采矿工程技术领域,具体涉及一种多变量矿山废石混入率动态测算方法。
背景技术
废石混入率是露天矿山设计、评估的重要指标。目前业界通用的方法是采用平均经验数据,即只采用一个常规经验数据(厚大矿体3%—5%,小矿薄矿体8%左右)应用于项目,实际上矿山废石混入率与矿体产状、采用设备规格以及管理水平均密切相关,在不同矿山项目乃至同一个项目的不同区域该指标均会存在较大差异,采用单一指标不能很好地反应矿山现状,容易造成较大的误差。
发明内容
本发明提供一种多变量矿山废石混入率动态测算方法,要解决的技术问题是:解决矿山废石混入率测算效率以及准确性低的问题。
为了解决以上技术问题,本发明提供了一种多变量矿山废石混入率动态测算方法,其特征在于,具体包括以下步骤:
S1、制作矿体各层水平平面图,该平面图包括矿石和围岩;
S2、将彩色的平面图转为灰度图,解析平面图,计算出矿石总面积,以及矿石、围岩接触边总变长;
S3、确定预设参数,包括矿石体重、围岩体重、挖机斗深、铲装容差、超挖比例参数;
S4、测算废石混入率:根据计算得出的矿岩接触边总边长以及矿石总面积,结合S3确定的参数根据公式计算得到废石混入率:
有益效果:本发明通过识别矿体各台阶水平矿岩接触变长,并综合考虑矿体产状、设备规格、管理水平等多种因素,结合计算机图像识别技术进行测算废石混入率,可以提高矿山废石混入率测算效率以及准确性。计算结果相较直接采用统一的经验数据更加准确,符合项目自身特点。适用范围广,不同的露天矿只需输入相关参数即可计算采矿贫化率。本发明用于矿山评估设计工作以及矿山日常生产管理,提高了工作效率,节约大量人工时间。
附图说明
图1矿体水平平面图;
图2矿体超挖区域和重复计算区域;
图3测算流程图。
具体实施方式
为使本发明的目的、内容和优点更加清楚,下面对本发明的具体实施方式作进一步详细描述。
本发明提出的一种多变量矿山废石混入率动态测算方法,具体包括以下步骤:
S1、制作矿体各水平平面图:
通过三维矿业软件加载矿体模型,通过水平剖面工具得出矿体的水平剖面图,见图1,其中浅色为矿石,深色为围岩。
S2、解析图片:
将彩色的平面图转为灰度图,通过算法解析平面图,最终根据输入的方块长、宽并识别方块数量计算出矿石总面积(即矿石在平面图上的面积),以及矿石、围岩接触的总边长(即深色(围岩)以浅色(矿石)方块的接触边边长合计),具体步骤如下:
S201、逐行对灰度图进行扫描识别
a)当前浅色像素点的左侧是深色像素点或白色像素点,则接触像素点数量加1;
b)当前深色像素点的左侧是浅色像素点,则接触像素点数量加1;
c)当前深色像素点左侧是边框或者深色像素点右侧是边框,记录索引位置;
S202、逐列扫描识别
a)当前浅色像素点上方是深色像素的或者白色像素点,像素点数量加1;
b)当前深色像素点的上方是浅色像素的,像素点数量加1;
c)当前深色像素点上方是边框或者深色像素点下方是边框,记录所索引位置;
S203、根据像素计算总边长
a)水平方向:
计算水平方向每个方块的平均像素点数目,进而计算水平方向方块总边数,并根据输入的方块长度计算水平方向总长度;
b)垂直方向:计算垂直方向每个方块的平均像素点边长;计算垂直方向总边数;根据用户输入垂直边长计算垂直方向总长度;
S204、计算矿石总面积以及矿石、围岩接触的总边长。
S3、确定预设参数,包括矿石体重、围岩体重、挖机斗深、铲装容差(矿岩边界控制水平,以±斗深控制)、超挖比例(损失贫化比例,50%即损失贫化各占50%)参数;
S4、测算废石混入率:根据计算得出的矿岩接触边总边长以及矿石总面积,结合S3确定的参数根据公式计算得到废石混入率,公式如下。
需要注意的是,按照矿岩接触总边长计算超挖体积时,会有部分区域(矿体模型拐角处)产生重复计算,如图2,通过像素扫描识别,得出矿岩接触边角度为直角处即为重叠计算处,则最终废石混入率公式如下
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变形,这些改进和变形也应视为本发明的保护范围。
Claims (4)
1.一种多变量矿山废石混入率动态测算方法,其特征在于,具体包括以下步骤:
S1、制作矿体各层水平平面图,该平面图包括矿石和围岩;
S2、将彩色的平面图转为灰度图,解析平面图,计算出矿石总面积,以及矿石、围岩接触边总边长,浅色为矿石,深色为围岩;具体包括以下步骤:
S201、逐行对灰度图进行扫描识别
a)当前浅色像素点的左侧是深色像素点或白色像素点,则接触像素点数量加1;
b)当前深色像素点的左侧是浅色像素点,则接触像素点数量加1;
c)当前深色像素点左侧是边框或者深色像素点右侧是边框,记录索引位置;
S202、逐列扫描识别
a)当前浅色像素点上方是深色像素点或者白色像素点,像素点数量加1;
b)当前深色像素点的上方是浅色像素点,像素点数量加1;
c)当前深色像素点上方是边框或者深色像素点下方是边框,记录索引位置;
S203、根据像素计算总边长;
a)水平方向:
计算水平方向每个方块的平均像素点数目,进而计算水平方向方块总边数,并根据输入的方块长度计算水平方向总长度;
b)垂直方向:计算垂直方向每个方块的平均像素点数目;计算垂直方向总边数;根据输入的方块宽度计算垂直方向总长度;
S204、计算矿石总面积以及矿石、围岩接触的总边长;
S3、确定预设参数,包括矿石体重、围岩体重、挖机斗深、铲装容差、超挖比例参数;
S4、测算废石混入率:根据计算得出的矿岩接触边总边长以及矿石总面积,结合S3确定的参数根据公式计算得到废石混入率:
2.根据权利要求1所述的一种多变量矿山废石混入率动态测算方法,其特征在于,由三维矿业软件基于三维矿块模型生成矿体各层水平平面图。
3.根据权利要求1所述的一种多变量矿山废石混入率动态测算方法,其特征在于,铲装容差为矿石、围岩边界的控制水平,以±斗深控制。
4.根据权利要求1所述的一种多变量矿山废石混入率动态测算方法,其特征在于,超挖比例为损失贫化比例。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110394283.2A CN113153432B (zh) | 2021-04-13 | 2021-04-13 | 多变量矿山废石混入率动态测算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110394283.2A CN113153432B (zh) | 2021-04-13 | 2021-04-13 | 多变量矿山废石混入率动态测算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113153432A CN113153432A (zh) | 2021-07-23 |
CN113153432B true CN113153432B (zh) | 2024-03-15 |
Family
ID=76890165
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110394283.2A Active CN113153432B (zh) | 2021-04-13 | 2021-04-13 | 多变量矿山废石混入率动态测算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113153432B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1535995A1 (ru) * | 1988-04-20 | 1990-01-15 | С.М. Мауленкулов, С.Б. Бекбаев, М.Ж. Битимбаев, В.К. Гердт, Г.С. Цой, Ю.Д. Орлов, Б.Н. Севасть нов, А.Е. Удалов и М.А. Голованова | Способ управлени выпуском руды |
WO2004033853A1 (en) * | 2002-10-09 | 2004-04-22 | Bhp Billiton Innovation Pty Ltd | System and method(s) of mine planning, design and processing |
CN106226191A (zh) * | 2016-08-17 | 2016-12-14 | 鞍钢集团矿业有限公司 | 一种测定端部放矿废石混入情况的实验方法 |
CN109209496A (zh) * | 2018-09-18 | 2019-01-15 | 山西煤炭运销集团晋城有限公司 | 煤矿井筒防冻装置 |
CN111126692A (zh) * | 2019-12-21 | 2020-05-08 | 河北钢铁集团矿业有限公司 | 一种露天矿山损失率贫化率预测方法 |
CN111441772A (zh) * | 2020-03-26 | 2020-07-24 | 河北大白阳金矿有限公司 | 一种用于预控顶房柱法的分条切顶回采方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104570739B (zh) * | 2015-01-07 | 2017-01-25 | 东北大学 | 基于云和移动终端的选矿多生产指标优化决策系统及方法 |
-
2021
- 2021-04-13 CN CN202110394283.2A patent/CN113153432B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1535995A1 (ru) * | 1988-04-20 | 1990-01-15 | С.М. Мауленкулов, С.Б. Бекбаев, М.Ж. Битимбаев, В.К. Гердт, Г.С. Цой, Ю.Д. Орлов, Б.Н. Севасть нов, А.Е. Удалов и М.А. Голованова | Способ управлени выпуском руды |
WO2004033853A1 (en) * | 2002-10-09 | 2004-04-22 | Bhp Billiton Innovation Pty Ltd | System and method(s) of mine planning, design and processing |
CN106226191A (zh) * | 2016-08-17 | 2016-12-14 | 鞍钢集团矿业有限公司 | 一种测定端部放矿废石混入情况的实验方法 |
CN109209496A (zh) * | 2018-09-18 | 2019-01-15 | 山西煤炭运销集团晋城有限公司 | 煤矿井筒防冻装置 |
CN111126692A (zh) * | 2019-12-21 | 2020-05-08 | 河北钢铁集团矿业有限公司 | 一种露天矿山损失率贫化率预测方法 |
CN111441772A (zh) * | 2020-03-26 | 2020-07-24 | 河北大白阳金矿有限公司 | 一种用于预控顶房柱法的分条切顶回采方法 |
Non-Patent Citations (6)
Title |
---|
乌拉特前旗湾兔沟铁矿控制废石混入率的研究;陈世江;张飞;吴国良;;金属矿山(第07期);152-153 * |
多因素耦合作用下的边坡滑动机理研究;李路;贺超;徐鹏;王乃斌;邹平;王飞飞;李爱兵;;矿业研究与开发;20200420(04);87-92 * |
浅谈矿山企业控制和降低采矿损失率与矿石贫化率;张洪运;有色矿冶(第02期);18-21 * |
矿石贫化率的控制措施及计算方法探讨;覃健华;杨泽光;;企业科技与发展(第03期);87-89 * |
砂金矿开采设计中废石混入率的确定;温荣凯;有色金属设计(第02期);11-14 * |
露天开采设计中矿损与废石混入的计算;许清源;合肥工业大学学报(自然科学版)(第01期);28-40 * |
Also Published As
Publication number | Publication date |
---|---|
CN113153432A (zh) | 2021-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ali et al. | Artificial intelligence, machine learning and process automation: Existing knowledge frontier and way forward for mining sector | |
AU2015241095B2 (en) | A method and system for active load weight for mining excavating equipment | |
CN102509087B (zh) | 一种基于图像灰度共生矩阵的煤岩识别方法 | |
EP2758605B1 (en) | Method for selecting an attack pose for a working machine having a bucket | |
CN107784646B (zh) | 一种路用集料的自适应检测方法 | |
CN105066912B (zh) | 酸刻蚀物理模拟实验中岩板表面扫描数据的步长标定方法 | |
CN113153432B (zh) | 多变量矿山废石混入率动态测算方法 | |
Guevara et al. | Point cloud-based estimation of effective payload volume for earthmoving loaders | |
Magnusson et al. | Consistent pile-shape quantification for autonomous wheel loaders | |
AU2024202733A1 (en) | System and method for determining construction plan for work machine at construction site | |
CN110826128A (zh) | 一种任意形状底面疏浚挖槽快速成形设计方法 | |
CN113985873A (zh) | 一种装载机自主铲掘作业铲掘点规划方法 | |
Xia et al. | SDZM: Software for determining shear damage zones of rock joints | |
Molaei et al. | An approach for estimation of swing angle and digging depth during excavation operation | |
CN114330078B (zh) | 一种矿井采煤工作面的精确数值模拟模型的构建方法 | |
CN116660263A (zh) | 一种基于数字图像处理的注浆效果评价方法 | |
CN102651137A (zh) | 一种基于像素精度的代数曲线光栅化方法 | |
CN112489148B (zh) | 一种砂岩型铀矿平米铀量等值线图成图方法 | |
Jacobson et al. | A cotangent laplacian for images as surfaces | |
CN106446379B (zh) | 基于概率积分法的任意开采工作面地表移动变形预计方法 | |
CN114936392A (zh) | 一种非煤矿山开采坡面角预裂孔控制方法 | |
Whitehorn et al. | Stereo vision in LHD automation | |
Zhang et al. | Initial results from implementing a laminated overburden model into ARMPS | |
CN109447944B (zh) | 碳酸盐岩的岩相识别方法及系统 | |
CN111126692A (zh) | 一种露天矿山损失率贫化率预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |