CN113122666A - Operation method for accurately positioning leakage point of blast furnace water-cooling wall - Google Patents

Operation method for accurately positioning leakage point of blast furnace water-cooling wall Download PDF

Info

Publication number
CN113122666A
CN113122666A CN202110423328.4A CN202110423328A CN113122666A CN 113122666 A CN113122666 A CN 113122666A CN 202110423328 A CN202110423328 A CN 202110423328A CN 113122666 A CN113122666 A CN 113122666A
Authority
CN
China
Prior art keywords
water
pipe
blast furnace
cooling
transparent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110423328.4A
Other languages
Chinese (zh)
Inventor
熊才年
余建伍
张�杰
夏建国
洪曙
何国芳
陈强
祝道朋
余家炎
祝文斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baowu Group Echeng Iron and Steel Co Ltd
Original Assignee
Baowu Group Echeng Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baowu Group Echeng Iron and Steel Co Ltd filed Critical Baowu Group Echeng Iron and Steel Co Ltd
Priority to CN202110423328.4A priority Critical patent/CN113122666A/en
Publication of CN113122666A publication Critical patent/CN113122666A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/10Cooling; Devices therefor
    • C21B7/103Detection of leakages of the cooling liquid

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Blast Furnaces (AREA)

Abstract

The invention relates to an operation method for accurately positioning a leakage point of a blast furnace water-cooling wall, which comprises the following steps; 1) detecting the cooling vertical pipe section with leakage according to a blast furnace pressure monitoring system; 2) selecting a transparent rubber tube, connecting the bottom of the transparent rubber tube with a drain valve at the bottom of the leaked cooling vertical tube, and vertically upwards drawing and fixing the transparent rubber tube; 3) opening an exhaust valve and a drain valve at the top of the leaked cooling vertical pipe, and filling water into the pipe from the top end of the transparent rubber pipe to enable the filled water to flow into the cooling vertical pipe through the drain valve, automatically discharging gas in the cooling vertical pipe from the exhaust valve, and finally filling the transparent pipe with water; 4) standing and observing the water level in the transparent pipe, wherein the position of the water level when falling back and finally stopping falling is the height position of a specific leakage point of the cooling vertical pipe; the invention prolongs the service life of the blast furnace water-cooling wall, can quickly and accurately position the leakage point position and shortens the overhaul period.

Description

Operation method for accurately positioning leakage point of blast furnace water-cooling wall
Technical Field
The invention relates to the technical field of ironmaking production, in particular to an operation method for accurately positioning a leakage point of a blast furnace water-cooled wall.
Background
The large-scale steelmaking industry adopts a blast furnace for smelting, a water-cooled wall is arranged in the blast furnace and mainly used for cooling the blast furnace, a circle of the water-cooled wall is arranged along the circumferential direction of the blast furnace and consists of hundreds of cooling vertical pipes, each cooling vertical pipe has a certain service life, leakage can be generated when the cooling vertical pipe is damaged, if the damage cannot be repaired in time, the damage is more and more serious, the normal operation of the blast furnace is finally influenced, and the production progress and the production quality are influenced; the repair work firstly needs to find out specific damaged positions and leakage points, the damaged positions are judged by methods such as a flow judgment method, a pressure-out judgment method and an ignition judgment method at present, but the leakage points cannot be quickly and accurately positioned in actual use, and the overhaul period is long.
Disclosure of Invention
The invention aims to solve the problem that the existing blast furnace water-cooling wall leakage point judgment method cannot quickly and accurately position the leakage point, and provides an operation method for accurately positioning the leakage point of the blast furnace water-cooling wall.
The specific scheme of the invention is as follows: an operation method for accurately positioning a leakage point of a blast furnace water-cooling wall comprises the following steps;
1) detecting the cooling vertical pipe section with leakage according to a blast furnace pressure monitoring system;
2) selecting a transparent rubber tube, connecting the bottom of the transparent rubber tube with a drain valve at the bottom of the leaked cooling vertical tube, and vertically upwards drawing and fixing the transparent rubber tube;
3) opening an exhaust valve and a drain valve at the top of the leaked cooling vertical pipe, and filling water into the pipe from the top end of the transparent rubber pipe to enable the filled water to flow into the cooling vertical pipe through the drain valve, automatically discharging gas in the cooling vertical pipe from the exhaust valve, and finally filling the transparent pipe with water;
4) and (4) standing and observing the water level in the transparent pipe, wherein the position where the water level falls back and finally stops falling is the height position of a specific leakage point of the cooling vertical pipe.
The diameter of the transparent rubber tube is 15-30 mm.
In the step 4), after the water level in the transparent adhesive tape tube is stabilized, standing and observing for 1-2min to determine that the water level does not drop any more.
Compared with the prior art, the invention has the following advantages: 1. the service life of the blast furnace water-cooling wall is prolonged, the position of a leakage point can be quickly and accurately positioned, the maintenance period is shortened, and the production benefit is improved; 2. the operation method is simple and effective, and the implementation difficulty is small.
Drawings
FIG. 1 is a schematic diagram of the operation of the present invention;
in the figure: 1-transparent rubber tube, 2-drain valve, 3-cooling vertical tube, 4-exhaust valve, 5-leakage point position.
Detailed Description
The embodiment is an operation method for accurately positioning a leakage point of a blast furnace water-cooling wall, which comprises the following steps of;
1) detecting the cooling vertical pipe section with leakage according to a blast furnace pressure monitoring system;
2) selecting a transparent rubber tube 1, connecting the bottom of the transparent rubber tube 1 with a drain valve 2 at the bottom of a leaked cooling vertical tube 3, and vertically drawing and fixing the transparent rubber tube 1 upwards;
3) opening an exhaust valve 4 at the top of the leaked cooling vertical pipe 3 and the drain valve 2, and filling water into the pipe from the top end of the transparent rubber pipe 1 to enable the filled water to flow into the cooling vertical pipe 3 through the drain valve 2, automatically discharging gas in the cooling vertical pipe 3 from the exhaust valve 4, and finally filling the transparent pipe 1 with water;
4) and (3) standing and observing the water level in the transparent pipe 1, wherein the position where the water level falls back and finally stops falling is the specific leakage point position 5 of the cooling vertical pipe 3.
The diameter of the transparent rubber tube 1 in the embodiment is 20 mm.
In the step 4) of this embodiment, after the water level in the transparent rubber tube 1 reaches a stable state, the water level is determined not to decrease after standing and observing for 1 min.

Claims (3)

1. An operation method for accurately positioning a leakage point of a blast furnace water-cooling wall is characterized by comprising the following steps: comprises the following steps;
detecting the cooling vertical pipe section with leakage according to a blast furnace pressure monitoring system;
selecting a transparent rubber tube, connecting the bottom of the transparent rubber tube with a drain valve at the bottom of the leaked cooling vertical tube, and vertically upwards drawing and fixing the transparent rubber tube;
opening an exhaust valve and a drain valve at the top of the leaked cooling vertical pipe, and filling water into the pipe from the top end of the transparent rubber pipe to enable the filled water to flow into the cooling vertical pipe through the drain valve, automatically discharging gas in the cooling vertical pipe from the exhaust valve, and finally filling the transparent pipe with water;
and (4) standing and observing the water level in the transparent pipe, wherein the position where the water level falls back and finally stops falling is the height position of a specific leakage point of the cooling vertical pipe.
2. The operation method for accurately positioning the leakage point of the blast furnace water-cooling wall as claimed in claim 1, wherein the operation method comprises the following steps: the diameter of the transparent rubber tube is 15-30 mm.
3. The operation method for accurately positioning the leakage point of the blast furnace water-cooling wall as claimed in claim 1, wherein the operation method comprises the following steps: and in the step 4), after the water level in the transparent adhesive tape tube is stabilized, standing and observing for 1-2min to determine that the water level does not drop any more.
CN202110423328.4A 2021-04-20 2021-04-20 Operation method for accurately positioning leakage point of blast furnace water-cooling wall Pending CN113122666A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110423328.4A CN113122666A (en) 2021-04-20 2021-04-20 Operation method for accurately positioning leakage point of blast furnace water-cooling wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110423328.4A CN113122666A (en) 2021-04-20 2021-04-20 Operation method for accurately positioning leakage point of blast furnace water-cooling wall

Publications (1)

Publication Number Publication Date
CN113122666A true CN113122666A (en) 2021-07-16

Family

ID=76777930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110423328.4A Pending CN113122666A (en) 2021-04-20 2021-04-20 Operation method for accurately positioning leakage point of blast furnace water-cooling wall

Country Status (1)

Country Link
CN (1) CN113122666A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114854913A (en) * 2022-05-19 2022-08-05 宝武集团鄂城钢铁有限公司 Method for repairing cooling vertical pipe jump connection in blast furnace

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09196803A (en) * 1996-01-18 1997-07-31 Kawasaki Steel Corp Method for detecting breakdown position of stave
CN101705322A (en) * 2009-12-30 2010-05-12 安阳钢铁股份有限公司 Leak-detecting method for cooling system of blast furnace
CN110846452A (en) * 2019-11-27 2020-02-28 邯郸钢铁集团有限责任公司 Device and method for searching leakage point of damaged cooling wall of blast furnace

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09196803A (en) * 1996-01-18 1997-07-31 Kawasaki Steel Corp Method for detecting breakdown position of stave
CN101705322A (en) * 2009-12-30 2010-05-12 安阳钢铁股份有限公司 Leak-detecting method for cooling system of blast furnace
CN110846452A (en) * 2019-11-27 2020-02-28 邯郸钢铁集团有限责任公司 Device and method for searching leakage point of damaged cooling wall of blast furnace

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王永贵等: "重钢3号高炉检漏实践", 《炼铁技术通讯》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114854913A (en) * 2022-05-19 2022-08-05 宝武集团鄂城钢铁有限公司 Method for repairing cooling vertical pipe jump connection in blast furnace
CN114854913B (en) * 2022-05-19 2023-06-27 宝武集团鄂城钢铁有限公司 Method for repairing jump-connection of cooling vertical pipe in blast furnace

Similar Documents

Publication Publication Date Title
CN100456009C (en) Leakage-checking spacing method of blast furnace
CN104611491A (en) Positioning device and method for leakage detection of blast furnace cooling wall
CN110846452B (en) Device and method for searching leakage points of damaged cooling wall of blast furnace
CN113122666A (en) Operation method for accurately positioning leakage point of blast furnace water-cooling wall
CN107164602B (en) A kind of converter bottom measurer for thickness and method
CN101805810B (en) Blast furnace cooling structure
CN104551524A (en) Oxygen lance vertically maintaining method and device corresponding to same
CN109457073A (en) A kind of big volume blast furnace assembles passage method offline
CN211367614U (en) Device for searching leakage point of damaged cooling wall of blast furnace
CN201873704U (en) Row-fixing and leakage-searching device for cooling wall of blast furnace
CN104726628A (en) Online blast furnace cooling stave leakage detection device and detection method thereof
CN115758624A (en) Method for prolonging service life of blast furnace waist and furnace belly cooling wall
CN210001882U (en) COREX furnace tuyere small sleeve damage inspection device
CN204401022U (en) A kind of blast furnace cooling stave leakage detection locating device
CN107941135A (en) A kind of device for measuring the easy attack sites tank block residual thickness of glass melter
CN110453023B (en) Blast furnace hearth elephant foot erosion prevention and analysis method
CN101812561B (en) Blast furnace cooling wall leakage detecting method
CN104928423B (en) A kind of blast furnace cooling stave leak detection device
CN207779326U (en) A kind of device measuring the easy attack sites tank block residual thickness of glass melter
CN210261840U (en) Blast furnace stave poling is prosthetic devices again
CN110184402A (en) A method of it is online quickly to determine the specific leak source of blast furnace cooling stave
CN102312027B (en) Onstream leaking stoppage technology of iron making blast furnace cooling water pipe
CN211574776U (en) Graded water distribution pipe set device
CN111579180B (en) Method for realizing online inspection and replacement of gas tank heat tracing system
CN217383810U (en) Off-line cooling device for electric furnace steelmaking furnace body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210716