CN113089836A - Metal otter board domes of assembled superelevation corridor - Google Patents

Metal otter board domes of assembled superelevation corridor Download PDF

Info

Publication number
CN113089836A
CN113089836A CN202110322714.4A CN202110322714A CN113089836A CN 113089836 A CN113089836 A CN 113089836A CN 202110322714 A CN202110322714 A CN 202110322714A CN 113089836 A CN113089836 A CN 113089836A
Authority
CN
China
Prior art keywords
fixing piece
fixing
corridor
plate
arch structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110322714.4A
Other languages
Chinese (zh)
Other versions
CN113089836B (en
Inventor
闫君堂
苏明
金大跃
许波
张新宝
谢贺来
卜庆涛
王子东
顾琪
权朋
徐赏
王雷
涂俊
张志�
黄丽媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN202110322714.4A priority Critical patent/CN113089836B/en
Publication of CN113089836A publication Critical patent/CN113089836A/en
Application granted granted Critical
Publication of CN113089836B publication Critical patent/CN113089836B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/32Arched structures; Vaulted structures; Folded structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Tents Or Canopies (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

The invention discloses a metal mesh plate arch structure of an assembled type ultrahigh corridor, which belongs to the technical field of architectural decoration and comprises a fixing piece and a plate mesh body, wherein the fixing piece is an upwards arched polygonal piece, the plate mesh body is an upwards arched arc-shaped plate, a plurality of back ribs are arranged at the top of the plate mesh body, the back ribs are positioned at the corners of the fixing piece, and circular-tube-shaped fixing sleeves are arranged at the corners of the fixing piece and extend to the outside of the fixing piece; according to the invention, the back of the plate net body is provided with the plurality of parallel back ribs, and the back ribs are fixed on the fixing piece, so that the installation of the arched metal plate net can be completed, the installation operation process is simple and convenient, the installation of other reinforcing structures is not required, the falling of the plate net body is avoided, the safety coefficient is improved, and the construction cost is reduced; through setting up the polygon mounting of multistage, make the back of the body muscle correspond and install the corner at the mounting, guarantee decorative effect's aesthetic property.

Description

Metal otter board domes of assembled superelevation corridor
Technical Field
The invention belongs to the technical field of architectural decoration, and particularly relates to a metal mesh plate arch structure of an assembled ultrahigh corridor.
Background
The pursuit of people to modern interior decoration and finishing style is trending towards diversification, and along with the continuous promotion of decoration design theory, the special molding is more and more applied to the large-scale public space of modern high-grade hotel, market, meeting place, office building, and the third dimension of office space has been increased to many curved surfaces, many radians molding.
The metal plate net is characterized by that its surface has various shapes of holes, and because it has the characteristics of small deformation coefficient, no harmful substance, high fire-resisting property and is not easy to be affected with damp, it is often used for decorating top surface of elevator hall, so that it can be used for decorating top portion of arched gallery, and can be matched with light to make penetration, and has an unexpected space effect.
At present, big layout metal mesh plate has the gradient, the problem of droing appears because of gravity easily after generally fixing, there is danger coefficient, can only have pertinence to carry out basic unit reinforcement processing, ensure the stability of whole basic unit, the security, can cause construction cost's increase like this, also influence holistic aesthetic property simultaneously, whole molding is the slope arch, and whole surface course area is great, the deviation problem appears easily when adopting artifical installation, need carry out holistic dismantlement and rework, just can ensure that the plate interval is unified, whole effect is pleasing to the eye, extravagant manpower, the installation effectiveness is low.
Chinese patent (CN202020097187.2) discloses a heat preservation corridor for tunnel winter construction, which includes: each pair of vertical rod foundation embedded parts are symmetrically embedded at two sides of a road, the multiple vertical rod foundation embedded parts are arranged along the extending direction of the road, each vertical rod foundation embedded part is fixedly connected with a vertical supporting rod piece, a plurality of first longitudinal connecting rod pieces are sequentially connected between two adjacent vertical supporting rod pieces at the same side from top to bottom, arc trusses are erected at the top ends of the vertical supporting rod pieces corresponding to the vertical rod foundation embedded parts, and a plurality of second longitudinal connecting rod pieces are connected between the two adjacent arc trusses; a daylighting panel is attached to the outside of a corridor frame formed by the vertical supporting rod pieces, the first longitudinal connecting rod pieces, the arc-shaped truss and the second longitudinal connecting rod pieces. The invention can ensure effective lighting and heat preservation in the gallery, reduce the loss of concrete temperature in the transportation process, and the arched/arc structure is built through a steel structure, so that the structural design is complex.
Chinese patent (CN201410721675.5) discloses a solar concentrating sheet, which comprises a back support plate and a solar reflector plate with a square curved surface structure, wherein the solar reflector plate is bonded with the surface of the back support plate, and further comprises a plurality of connecting rods and three or more mounting bolts, the back of the back support plate is fixedly connected with a plurality of arc back ribs, the arc back ribs are connected with each other through the connecting rods, the three or more mounting bolts are fixedly connected with or hinged on the connecting rods, each arc back rib is provided with two or more process holes, and the corresponding process holes are located at the fan-shaped equal-radius positions formed by the arc back ribs. The light-gathering sheet has light weight, high rigidity and strength, low production cost, high light-gathering precision, easy control and long service life, is suitable for random batch production and ordering, and can not locally adjust the radian although being connected by the back ribs.
Chinese patent (cn201310005927.x) discloses an adjustable pendant. The invention aims to design an adjustable pendant which is convenient to use and reasonable in structure. The invention has the technical scheme that the adjustable hanging piece comprises a hanging piece, wherein the hanging piece is in a 'Yuan' shape, the upper part of the hanging piece is hollow, the lower part of the hanging piece is provided with a transverse support, and the hanging piece is matched with a fixing piece. The invention has reasonable structure and convenient use, can quickly hang objects needing to be hung, such as large-format photos, boards and the like, can carry out certain adjustment, greatly reduces the difficulty of hanging operation, but cannot realize the adjustment of multiple degrees of freedom.
Disclosure of Invention
The invention aims to: the assembled metal mesh plate arch structure of the ultrahigh gallery is provided for solving the problems that when the arch metal mesh plate of the ultrahigh gallery is installed, the arch metal mesh plate falls off due to gravity, and when manual installation is adopted, deviation easily occurs, and integral disassembly and rework are needed, so that the problems of low safety coefficient, high construction cost, low installation precision, low construction efficiency and poor decoration attractiveness are caused.
In order to achieve the purpose, the invention adopts the following technical scheme: an arch structure of a metal mesh plate of an assembled ultrahigh corridor comprises a fixing part and a mesh plate body, wherein the fixing part is an upwards arched polygonal part, the mesh plate body is an upwards arched arc plate, a plurality of back ribs are arranged at the top of the mesh plate body and are positioned at the corners of the fixing part, tubular fixing sleeves are arranged at the corners of the fixing part and extend to the outside of the fixing part, the fixing sleeves and the back ribs are connected through an adjusting mechanism, one end of the adjusting mechanism is clamped in the back ribs, the other end of the adjusting mechanism is fixedly connected to the side walls of the fixing sleeves, the adjusting mechanism comprises a connecting rod, a limiting part and an adjusting bolt, the connecting rod is positioned in the fixing sleeves, the limiting part is positioned in the back ribs, and the connecting rod penetrates through a first adjusting groove in the back ribs to be connected with the limiting part, adjusting bolt passes second adjustment tank on the fixed sleeve lateral wall and with the connecting rod spiro union sets up many back of the body muscle that are parallel to each other through the back with the expanded metal body to fix the back of the body muscle on the mounting, can accomplish the installation of arch expanded metal, installation operation process is simple and convenient, need not to carry out other reinforced structure's installation, has avoided falling of expanded metal body, has improved factor of safety, has reduced construction cost.
As a further description of the above technical solution:
the back rib is of a circular tubular structure, so that the back rib can slide on the polygonal fixing piece conveniently during adjustment; .
As a further description of the above technical solution:
the included angle between two adjacent edges of the fixing piece is 120-140 degrees.
As a further description of the above technical solution:
first adjustment tank is the straight flute, just first adjustment tank follows the circumference of back of the body muscle is arranged for the connecting rod can move in the circumference of back of the body muscle, is convenient for follow not equidirectional pulling regulation to back of the body muscle, and convenient to use is nimble, adjusts the precision height.
As a further description of the above technical solution:
the locating part is spacing ball, just the diameter of spacing ball is greater than the width of first adjustment tank, and when the connecting rod moved in the week of back of the body muscle, spacing ball was tangent with the inner wall of back of the body muscle to the removal of connecting rod is convenient for.
As a further description of the above technical solution:
the second adjustment tank is the straight flute, just the second adjustment tank is followed fixed sleeve's circumference is arranged, and adjusting bolt can remove in fixed sleeve's circumference, is convenient for follow not equidirectional to carry on the back of the body muscle pulling regulation, and convenient to use is nimble, adjusts the precision height.
As a further description of the above technical solution:
the length of the second adjusting groove is smaller than one half of the perimeter of the fixing sleeve, so that the structural strength of the fixing sleeve is guaranteed while the adjusting bolt is guaranteed to have a large rotating range, and the structure is guaranteed to be stable.
As a further description of the above technical solution:
the outer end of the fixed sleeve is sleeved with a protective cover to protect the interior of the adjusting mechanism from water entering and corroding.
In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:
1. according to the invention, the back of the plate net body is provided with the plurality of parallel back ribs, and the back ribs are fixed on the fixing piece, so that the installation of the arched metal plate net can be completed, the installation and operation process is simple and convenient, the installation of other reinforcing structures is not required, the falling of the plate net body is avoided, the safety coefficient is improved, and the construction cost is reduced.
2. According to the invention, the back ribs are correspondingly arranged at the corners of the fixing pieces by arranging the multi-section polygonal fixing pieces, so that the position of the large-span arc-shaped plate net body can be positioned and corrected, and the attractiveness of the decorative effect is ensured.
3. According to the invention, the adjusting connecting rod rotates along the circumferential direction of the back rib, the adjusting bolt rotates along the circumferential direction of the fixing sleeve, and the adjusting bolt is screwed, so that the position of the back rib is corrected in multiple degrees of freedom, thereby compensating for deviation generated during manual installation, and the adjusting device is flexible in adjustment, high in installation precision and high in construction efficiency.
Drawings
Fig. 1 is a schematic overall structure diagram of a metal mesh plate arch structure of an assembled ultrahigh corridor.
Fig. 2 is a partially enlarged view of a portion a in fig. 1.
Fig. 3 is a schematic view of the internal structure of a metal mesh plate arch structure of an assembled ultrahigh corridor.
Fig. 4 is a partially enlarged view of a portion B in fig. 3.
Illustration of the drawings:
1. a fixing member; 2. a plate net body; 3. back ribs; 4. fixing the sleeve; 5. an adjustment mechanism; 51. a connecting rod; 52. a limiting member; 53. adjusting the bolt; 6. a first regulating groove; 7. a second regulating groove; 8. a limiting ball; 9. a shield.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention. It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures. In the description of the embodiments of the present invention, it should be noted that the terms "upper", "inner", and the like refer to orientations or positional relationships based on the orientations or positional relationships shown in the drawings or orientations or positional relationships that are conventionally arranged when the products of the present invention are used, and are used only for convenience in describing the present invention and simplifying the description, but do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, the present invention provides a technical solution: an arch structure of a metal mesh plate of an assembled type ultrahigh corridor comprises a fixing piece 1 and a mesh plate body 2, wherein the fixing piece 1 is an upwards arched polygonal piece, the mesh plate body 2 is an upwards arched arc-shaped plate, a plurality of back ribs 3 are arranged at the top of the mesh plate body 2, the back ribs 3 are positioned at the corners of the fixing piece 1, a tubular fixing sleeve 4 is arranged at the corners of the fixing piece 1, the fixing sleeve 4 extends to the outside of the fixing piece 1, the fixing sleeve 4 and the back ribs 3 are connected through an adjusting mechanism 5, one end of the adjusting mechanism 5 is clamped inside the back ribs 3, the other end of the adjusting mechanism 5 is fixedly connected to the side wall of the fixing sleeve 4, the adjusting mechanism 5 comprises a connecting rod 51, a limiting piece 52 and an adjusting bolt 53, the connecting rod 51 is positioned in the fixing sleeve 4, the limiting part 52 is positioned inside the back rib 3, the connecting rod 51 penetrates through the first adjusting groove 6 on the back rib 3 to be connected with the limiting part 52, the adjusting bolt 53 penetrates through the second adjusting groove 7 on the side wall of the fixing sleeve 4 and is in threaded connection with the connecting rod 51, the back of the plate net body 2 is provided with a plurality of parallel back ribs 3, and the back ribs 3 are fixed on the fixing part 1, so that the installation of the arched metal plate net can be completed, the installation and operation process is simple and convenient, the installation of other reinforcing structures is not needed, the falling of the plate net body 2 is avoided, the safety factor is improved, and the construction cost is reduced;
the back rib 3 is of a circular tubular structure, so that the back rib can slide on the polygonal fixing piece 1 conveniently during adjustment;
the included angle between two adjacent edges on the fixing piece 1 is 120-140 degrees;
the first adjusting grooves 6 are straight grooves, and the first adjusting grooves 6 are arranged along the circumferential direction of the back rib 3, so that the connecting rods 51 can move in the circumferential direction of the back rib 3, the back rib 3 can be conveniently pulled and adjusted from different directions, the use is convenient and flexible, and the adjusting precision is high;
the limiting piece 52 is a limiting ball 8, the diameter of the limiting ball 8 is larger than the width of the first adjusting groove 6, and when the connecting rod 51 moves in the circumferential direction of the back rib 3, the limiting ball 8 is tangent to the inner wall of the back rib 3, so that the connecting rod 51 can move conveniently;
the second adjusting groove 7 is a straight groove, the second adjusting groove 7 is arranged along the circumferential direction of the fixing sleeve 4, and the adjusting bolt 53 can move in the circumferential direction of the fixing sleeve 4, so that the back rib 3 can be conveniently pulled and adjusted from different directions, the use is convenient and flexible, and the adjusting precision is high;
the length of the second adjusting groove 7 is less than one half of the circumference of the fixing sleeve 4, so that the structural strength of the fixing sleeve 4 is ensured while the adjusting bolt 53 is ensured to have a larger rotating range, and the stability of the structure is ensured;
the outer end part of the fixed sleeve 4 is sleeved with a protective cover 9 to protect the interior of the adjusting mechanism 5 from water inlet corrosion.
In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:
1. according to the invention, the back of the plate net body is provided with the plurality of parallel back ribs, and the back ribs are fixed on the fixing piece, so that the installation of the arched metal plate net can be completed, the installation and operation process is simple and convenient, the installation of other reinforcing structures is not required, the falling of the plate net body is avoided, the safety coefficient is improved, and the construction cost is reduced.
2. According to the invention, the back ribs are correspondingly arranged at the corners of the fixing pieces by arranging the multi-section polygonal fixing pieces, so that the position of the large-span arc-shaped plate net body can be positioned and corrected, and the attractiveness of the decorative effect is ensured.
3. According to the invention, the adjusting connecting rod rotates along the circumferential direction of the back rib, the adjusting bolt rotates along the circumferential direction of the fixing sleeve, the adjusting bolt is screwed, and the position of the back rib is corrected in multiple degrees of freedom, so that the deviation generated during manual installation is compensated, the adjustment is flexible, the installation precision is high, and the construction efficiency is high
The working principle is as follows: firstly, aim at the corner of mounting 1 with back of the body muscle 3 on the expanded metal body 2, pass fixed sleeve 4 with connecting rod 51 on the back of the body muscle 3, penetrate connecting rod 51's tip from second adjustment tank 7 with adjusting bolt 53 again, accomplish the preliminary fixed of expanded metal body 2, secondly, according to the deviation of position, adjusting rod 51 slides and along the circumferential direction of back of the body muscle 3 in first adjustment tank 6, adjusting bolt 53 slides and along fixed sleeve 4 circumferential direction in second adjustment tank 7, treat that position control accomplishes the back, screw up adjusting bolt 53, connecting rod 51 pulling back of the body muscle 3 slides on the inclined plane of mounting 1, accomplish the compensation of deviation and adjust, finally, cover protection casing 9 on the top of fixed sleeve 4, accomplish the installation.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (8)

1. The utility model provides a metal mesh plate domes of assembled superelevation corridor which characterized in that: the novel adjustable expanded metal netting comprises a fixing piece (1) and a netting body (2), wherein the fixing piece (1) is a polygonal piece which is arched upwards, the netting body (2) is an arc-shaped plate which is arched upwards, a plurality of back ribs (3) are arranged at the top of the netting body (2), the back ribs (3) are located at the corners of the fixing piece (1), a tubular fixing sleeve (4) is arranged at the corners of the fixing piece (1), the fixing sleeve (4) extends to the outside of the fixing piece (1), the fixing sleeve (4) and the back ribs (3) are connected through an adjusting mechanism (5), one end of the adjusting mechanism (5) is clamped inside the back ribs (3), the other end of the adjusting mechanism (5) is fixedly connected to the side wall of the fixing sleeve (4), and the adjusting mechanism (5) comprises a connecting rod (51), Locating part (52) and adjusting bolt (53), connecting rod (51) are located in fixed sleeve (4), locating part (52) are located the inside of back of the body muscle (3), connecting rod (51) pass first adjustment tank (6) on back of the body muscle (3) are connected locating part (52), adjusting bolt (53) pass second adjustment tank (7) on fixed sleeve (4) lateral wall and with connecting rod (51) spiro union.
2. The metallic mesh plate arch structure of fabricated ultra-high corridor as claimed in claim 1, wherein the back rib (3) is a round tubular structure.
3. The metal mesh plate arch structure of the fabricated ultra-high corridor as claimed in claim 1, wherein the included angle between two adjacent sides on the fixing member (1) is 120-140 °.
4. The sheet metal arch structure of an assembled ultrahigh corridor according to claim 1, characterized in that the first adjustment grooves (6) are straight grooves, and the first adjustment grooves (6) are arranged along the circumference of the back rib (3).
5. The fabricated metallic mesh plate arch structure of an ultrahigh corridor according to claim 4, wherein the limiting piece (52) is a limiting ball (8), and the diameter of the limiting ball (8) is larger than the width of the first adjusting groove (6).
6. The sheet metal arch structure of an assembled ultrahigh corridor according to claim 1, characterized in that the second adjustment grooves (7) are straight grooves, and the second adjustment grooves (7) are arranged along the circumference of the fixing sleeve (4).
7. The sheet metal arch structure of the fabricated ultra-high gallery according to claim 6, wherein the length of the second adjustment groove (7) is less than half of the circumference of the fixing sleeve (4).
8. The metallic mesh plate arch structure of fabricated ultra-high gallery according to claim 1, characterized in that the outer end of the fixing sleeve (4) is sleeved with a shield (9).
CN202110322714.4A 2021-03-25 2021-03-25 Metal otter board domes of assembled superelevation corridor Active CN113089836B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110322714.4A CN113089836B (en) 2021-03-25 2021-03-25 Metal otter board domes of assembled superelevation corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110322714.4A CN113089836B (en) 2021-03-25 2021-03-25 Metal otter board domes of assembled superelevation corridor

Publications (2)

Publication Number Publication Date
CN113089836A true CN113089836A (en) 2021-07-09
CN113089836B CN113089836B (en) 2022-08-23

Family

ID=76670010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110322714.4A Active CN113089836B (en) 2021-03-25 2021-03-25 Metal otter board domes of assembled superelevation corridor

Country Status (1)

Country Link
CN (1) CN113089836B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700497A (en) * 2021-09-27 2021-11-26 苏州美瑞德建筑装饰有限公司 Modular clamping installation design structure of arc-shaped aluminum plate for rail transit

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6729096B1 (en) * 2002-09-09 2004-05-04 Aaon Inc. System for installing suspended ceiling
CN101575893A (en) * 2008-05-06 2009-11-11 沃辛顿阿姆斯特朗风险投资公司 Suspended ceiling cloud with flexible panel
CN103981994A (en) * 2014-05-26 2014-08-13 苏州设计研究院股份有限公司 Arch-shaped ceiling structure
CN205421673U (en) * 2015-12-14 2016-08-03 苏州金螳螂建筑装饰股份有限公司 Cable suspension device of furred ceiling
CN205653960U (en) * 2016-05-30 2016-10-19 浙江豪门塑业有限公司 Modified knurling type high strength light furred ceiling
CN108005292A (en) * 2017-12-29 2018-05-08 广州康普顿至高建材有限公司 A kind of intermediate plate press fitting curved surface smallpox and its installation method
CN209837434U (en) * 2019-03-20 2019-12-24 中建七局建筑装饰工程有限公司 A prevent structure of ftractureing for special-shaped curved surface GRG furred ceiling
CN210013372U (en) * 2018-12-21 2020-02-04 苏州柯利达装饰股份有限公司 Variable angle grid system
CN210562938U (en) * 2019-06-27 2020-05-19 苏州金螳螂建筑装饰股份有限公司 Quick mounting structure of finished product formula hemisphere top facing
CN111608319A (en) * 2020-05-19 2020-09-01 苏州美瑞德建筑装饰有限公司 Optimized mounting structure and mounting method of dome-shaped suspended ceiling
CN112081293A (en) * 2020-09-29 2020-12-15 金螳螂精装科技(苏州)有限公司 Adjustable mounting structure of arc assembled furred ceiling
CN212617788U (en) * 2020-08-10 2021-02-26 海太欧林集团华南有限公司 Energy-saving lamp capable of being hung on screen and occupying no office space

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6729096B1 (en) * 2002-09-09 2004-05-04 Aaon Inc. System for installing suspended ceiling
CN101575893A (en) * 2008-05-06 2009-11-11 沃辛顿阿姆斯特朗风险投资公司 Suspended ceiling cloud with flexible panel
CN103981994A (en) * 2014-05-26 2014-08-13 苏州设计研究院股份有限公司 Arch-shaped ceiling structure
CN205421673U (en) * 2015-12-14 2016-08-03 苏州金螳螂建筑装饰股份有限公司 Cable suspension device of furred ceiling
CN205653960U (en) * 2016-05-30 2016-10-19 浙江豪门塑业有限公司 Modified knurling type high strength light furred ceiling
CN108005292A (en) * 2017-12-29 2018-05-08 广州康普顿至高建材有限公司 A kind of intermediate plate press fitting curved surface smallpox and its installation method
CN210013372U (en) * 2018-12-21 2020-02-04 苏州柯利达装饰股份有限公司 Variable angle grid system
CN209837434U (en) * 2019-03-20 2019-12-24 中建七局建筑装饰工程有限公司 A prevent structure of ftractureing for special-shaped curved surface GRG furred ceiling
CN210562938U (en) * 2019-06-27 2020-05-19 苏州金螳螂建筑装饰股份有限公司 Quick mounting structure of finished product formula hemisphere top facing
CN111608319A (en) * 2020-05-19 2020-09-01 苏州美瑞德建筑装饰有限公司 Optimized mounting structure and mounting method of dome-shaped suspended ceiling
CN212617788U (en) * 2020-08-10 2021-02-26 海太欧林集团华南有限公司 Energy-saving lamp capable of being hung on screen and occupying no office space
CN112081293A (en) * 2020-09-29 2020-12-15 金螳螂精装科技(苏州)有限公司 Adjustable mounting structure of arc assembled furred ceiling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700497A (en) * 2021-09-27 2021-11-26 苏州美瑞德建筑装饰有限公司 Modular clamping installation design structure of arc-shaped aluminum plate for rail transit
CN113700497B (en) * 2021-09-27 2024-01-16 苏州美瑞德建筑装饰有限公司 A modular joint installation design structure for arc aluminum plate of track traffic

Also Published As

Publication number Publication date
CN113089836B (en) 2022-08-23

Similar Documents

Publication Publication Date Title
CN113089836B (en) Metal otter board domes of assembled superelevation corridor
CN205743670U (en) A kind of Telescopic herringbone ladder
CN204781548U (en) Aluminum plate furred ceiling suspended structure
CN206753009U (en) One kind building fabricated scaffold
CN213268543U (en) GRG furred ceiling mounting structure
CN204916734U (en) Regulation formula unit goods shelves
CN214402378U (en) Grating pipe decorative structure and decorative grating
CN208056694U (en) A kind of building-supporting frame
CN113585608A (en) Design fast-assembling structure with adjustable super special-shaped aluminium square tube furred ceiling
CN202532135U (en) Light emitting diode (LED) display screen multifunctional fixing bracket
CN215106458U (en) Light-duty firm light steel house ceiling structure
CN207686076U (en) A kind of building curtain wall ventilation device
CN216053577U (en) Lightweight model of building
CN204206842U (en) The greenhouse of adjustable shade structures
CN218814621U (en) Self-balancing structure of cross-unit decorative moulding
CN209244026U (en) A kind of assembled arthitecutral structure wall
CN217871729U (en) Rear supporting leg adjusting and mounting structure of hanging basket for building
CN215717034U (en) Support for building engineering
CN205829548U (en) Adjustable inclination angle photovoltaic bracket
CN206438690U (en) A kind of large-scale carving hollow-out aluminum plate lamp box glass awning construction
CN217175956U (en) Landscape corridor frame structure based on garden design
CN204206843U (en) The greenhouse of removable shade structures
CN211817241U (en) Novel metal curtain wall's connecting elements and metal curtain wall connected system
CN208586801U (en) A kind of integrated smallpox light trough construction of lightgage steel joist frame
CN214834133U (en) Roof structure of green energy-saving building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant