CN113089674A - Visual high polymer grouting device for plugging earth-rock dam leakage channel - Google Patents

Visual high polymer grouting device for plugging earth-rock dam leakage channel Download PDF

Info

Publication number
CN113089674A
CN113089674A CN202110473601.4A CN202110473601A CN113089674A CN 113089674 A CN113089674 A CN 113089674A CN 202110473601 A CN202110473601 A CN 202110473601A CN 113089674 A CN113089674 A CN 113089674A
Authority
CN
China
Prior art keywords
grouting
sleeve
pipe
earth
clamping sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110473601.4A
Other languages
Chinese (zh)
Inventor
王钰轲
万永帅
郭成超
石明生
余翔
黄文清
付宏松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN202110473601.4A priority Critical patent/CN113089674A/en
Publication of CN113089674A publication Critical patent/CN113089674A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention belongs to the technical field of high polymer grouting. A visual high polymer grouting device for plugging an earth-rock dam leakage channel comprises a guide pipe, camera equipment, a cleaning pipe, a grouting pipe and an isolation sleeve, wherein the camera equipment, the cleaning pipe and the grouting pipe are arranged in the guide pipe; the first connecting unit is used for connecting and separating the cleaning spray head and the cleaning pipe, and the second connecting unit is used for connecting and separating the grouting head and the grouting pipe. This application can realize the accurate location of secondary, and the real-time supervision of high polymer reaction process to the slip casting device can used repeatedly.

Description

Visual high polymer grouting device for plugging earth-rock dam leakage channel
Technical Field
The invention belongs to the technical field of high polymer grouting, and particularly relates to a visual high polymer grouting device for plugging a seepage channel of an earth-rock dam.
Background
With the rapid development of economy in China, the construction of various infrastructures is also promoted synchronously, and the problems of complex and various geotechnical engineering can occur in the construction and service processes of infrastructures such as expressways, railways, bridges, defense and tunnels. At present, the development of high polymer grouting materials and grouting technology thereof is gradually improved, the effect is obvious in the problem of solving specific geotechnical engineering disasters, the high polymer grouting materials become the key research direction in the geotechnical engineering field, and the high polymer grouting materials are widely applied and have excellent effects in the lifting process of structures such as underground pipelines, plants, roads, ballastless tracks and the like and the seepage-proofing, leaking stoppage and emergency rescue operation of various underground engineering and defense construction. The high polymer grouting technology is an engineering maintenance technology developed in the end of the 70 s of the 20 th century, and is mainly used for building foundation reinforcement or floor repair abroad. The basic principle of the high polymer grouting technology is as follows: according to a certain proportion (1: 1), injecting two-component high polymer materials (special resin and hardening agent) into the foundation, mixing the two materials, then carrying out chemical reaction, rapidly expanding the volume and forming a foamy solid, thereby achieving the purposes of filling and removing the void and reinforcing the foundation.
Since the 70 s of the last century, the engineering maintenance technology of the high polymer grouting technology has been gradually developed, and the application research in the seepage-proofing and leakage-stopping of dams has also been gradually changed into a hot direction, and the basic principle is that two-component high polymer materials (a hardening agent and a special resin) with a certain proportion are injected into the pores of the dam, and the two materials are mixed to generate a chemical reaction, so that the volume is expanded and cured, and the purposes of filling the pores and preventing seepage and leakage are achieved. The two-component high polymer grouting technology has the excellent engineering characteristics of rapid and adjustable reaction, high expansion rate, water resistance, environmental protection, quick construction process, small structural damage, good durability and the like.
Most of the existing reservoirs in China are built in the fifties and sixties, are limited by conditions such as capital, technology and the like at the time, have potential safety hazards, and occupy a large proportion of earth-rock dams which are easy to leak and suffer from diseases. The anti-seepage and leak-stopping treatment of earth and rockfill dams is related to the national civilization. The proposal of the high polymer grouting technology provides an effective way for the danger removal and reinforcement of dike diseases, and how to realize accurate grouting for leakage channels becomes a problem which cannot be ignored. After the approximate position of a leakage channel is determined by using detection methods such as an electrical method, a transient electromagnetic method, a ground penetrating radar method, a sonar and the like, equipment capable of realizing secondary accurate positioning and real-time monitoring and grouting is urgently needed.
Disclosure of Invention
The invention aims to solve the problems and the defects, and provides a visual high polymer grouting device for plugging a leakage channel of an earth-rock dam, which has reasonable structural design, can greatly improve the grouting effect, realize the filling of a leakage disease area, realize secondary accurate positioning in the construction process and the real-time monitoring of the high polymer reaction process, and can be repeatedly used.
In order to realize the purpose, the adopted technical scheme is as follows:
a visual high polymer grouting device for plugging earth and rockfill dam leakage channels, comprising:
a guide tube;
the camera shooting equipment, the cleaning pipe and the grouting pipe are arranged in the guide pipe; and
the bottom of the isolation sleeve is provided with a lower sealing plate, the isolation sleeve is sleeved on the lower part of the guide tube in a matching sliding manner, a transparent part corresponding to the camera equipment is arranged on the lower sealing plate, the lower sealing plate is also provided with a cleaning nozzle and a grouting head, the cleaning nozzle is arranged corresponding to the transparent part, the cleaning nozzle is communicated with the cleaning tube through a first connecting unit, and the grouting head is communicated with the grouting tube through a second connecting unit;
the first connecting unit is used for connecting and separating the cleaning spray head and the cleaning pipe, and the second connecting unit is used for connecting and separating the grouting head and the grouting pipe.
According to the visual high polymer grouting device for blocking the earth-rock dam leakage channel, preferably, the isolation sleeve and the guide pipe are in a close-fit insertion structure.
According to the visual high polymer grouting device for plugging the earth-rock dam leakage channel, preferably, the lower sealing plate is further provided with a temperature detection probe and a pressure sensing piece, a temperature probe lead and a sensing piece lead are arranged in the guide pipe, the lower ends of the temperature probe lead and the sensing piece lead are respectively provided with a quick connection plug, and the temperature detection probe and the pressure sensing piece are respectively provided with a quick connection socket corresponding to the corresponding quick connection plug.
According to the visual high polymer grouting device for plugging the earth-rock dam leakage channel, the isolation sleeve, the cleaning spray head, the grouting head, the temperature detection probe and the pressure sensing sheet are all disposable products.
According to the visual high polymer grouting device for plugging the earth-rock dam leakage channel, the first connecting unit and the second connecting unit preferably comprise:
the first connecting sleeve is arranged at the inner end part of the corresponding cleaning spray head or grouting head; and
and the second connecting sleeve is arranged at the end part of the corresponding cleaning pipe or grouting pipe, and the first connecting sleeve is connected with the second connecting sleeve through a tightly-matched inserting structure.
According to the visual high polymer grouting device for plugging the earth-rock dam leakage channel, the first connecting unit and the second connecting unit preferably comprise:
the first clamping sleeve is arranged at the inner end part of the corresponding cleaning nozzle or grouting head, and an annular clamping groove is formed in the first clamping sleeve;
the second clamping sleeve is arranged at the end part of the corresponding cleaning pipe or grouting pipe, the first clamping sleeve is inserted into the second clamping sleeve in a matching manner, at least two eccentric clamping blocks are hinged to the second clamping sleeve, and the eccentric clamping blocks correspond to the annular clamping grooves; and
and the buckle pull rope is connected with the eccentric clamping block and drives the eccentric clamping block to rotate.
According to the visual high polymer grouting device for plugging the earth-rock dam leakage channel, the first connecting unit and the second connecting unit preferably comprise:
the first clamping sleeve is arranged at the inner end part of the corresponding cleaning nozzle or grouting head, and an annular clamping groove is formed in the first clamping sleeve;
the second clamping sleeve is arranged at the end part of the corresponding cleaning pipe or grouting pipe, a driving ring is further arranged on the second clamping sleeve in a sliding mode, a spring is arranged between the driving ring and the second clamping sleeve, the first clamping sleeve is inserted into the second clamping sleeve in a matched mode, a plurality of balls are arranged between the second clamping sleeve and the driving ring, round holes corresponding to the balls are formed in the second clamping sleeve, and a conical surface corresponding to the balls is arranged on the driving ring; and
and the buckle pull rope is connected with the driving ring and drives the driving ring to slide relative to the second clamping sleeve so as to realize the tightening and loosening of the balls.
According to the visual high polymer grouting device for plugging the earth-rock dam leakage channel, preferably, backflow prevention units are arranged between the cleaning spray head and the first connecting unit and between the grouting head and the second connecting unit.
The visual polymer grouting device for plugging the earth-rock dam leakage channel preferably further comprises a plurality of extension pipes, wherein the extension pipes are connected with the guide pipe through threads, and two adjacent extension pipes are also connected through threads.
According to the visual high polymer grouting device for blocking the earth and rockfill dam leakage channel, preferably, the camera comprises a fixed seat arranged in the guide pipe, and a camera and an infrared lamp which are arranged in the fixed seat, wherein the camera and the infrared lamp are both arranged corresponding to the transparent part.
By adopting the technical scheme, the beneficial effects are as follows:
the method and the device can visually detect the environment in the soil body in real time through the preset drill holes, so that the leakage channel can be accurately secondarily positioned; the temperature sensing probe and the pressure sensing sheet can monitor the temperature and pressure change conditions in the reaction process of the high polymer slurry in real time, and accurately master the change in the grouting process of a leakage position. After the slip casting, the isolation sleeve is infected with semi-cured high polymer slurry or is completely fixed in the cured high polymer, at the moment, the separation of the cleaning spray head and the cleaning pipe can be realized through the first connecting unit and the second connecting unit, the separation of the slip casting pipe and the slip casting head is realized, the temperature sensing probe and the pressure sensing sheet are connected with corresponding wires in a quick plug-in connection mode, the corresponding wires are pulled at the moment, the separation of a quick plug-in connection structure can be realized, further, the recovery of the guide pipe and internal structural components is realized, and the isolation sleeve and a structural component on the upper part of the isolation sleeve are left in a drill hole as a disposable structural component.
The backflow preventing unit that this application set up can avoid taking place the refluence when the high polymer inflation after slip casting, and it can arrange the check valve on the pipeline as backflow preventing unit, because between subsequent washing shower nozzle and the scavenge pipe, need separate between slip casting head and the slip casting pipe, consequently, the check valve also is disposable product, and it is laid at washing shower nozzle and slip casting overhead.
The arrangement of the integral structure can facilitate construction operation, improve the accuracy and effectiveness of detection and construction of leakage positions, enable the seepage-proofing and leakage-resisting maintenance and repair operation of the earth-rock dam, and contribute to further application of a high polymer grouting technology.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings of the embodiments of the present invention will be briefly described below. Wherein the drawings are only for purposes of illustrating some embodiments of the invention and are not to be construed as limiting the invention to all embodiments thereof.
Fig. 1 is a schematic top view of a visual polymer grouting device for blocking a leakage passage of an earth-rock dam according to an embodiment of the invention.
Fig. 2 is a schematic sectional view along the direction a-a in fig. 1.
Fig. 3 is a schematic sectional view along the direction B-B in fig. 1.
Fig. 4 is a schematic top view of a spacer according to an embodiment of the present invention.
Fig. 5 is a schematic sectional view along direction C-C in fig. 4.
Fig. 6 is a schematic sectional view along direction D-D in fig. 4.
Fig. 7 is a schematic structural diagram of a first connection unit according to an embodiment of the invention.
Fig. 8 is a schematic view of a connection structure of a temperature detection probe and a temperature probe wire according to an embodiment of the present invention.
Fig. 9 is a second schematic structural diagram of the first connection unit according to the embodiment of the invention.
Number in the figure:
100 is a guide tube;
110 is a camera device, 111 is a fixed seat, 112 is a camera, 113 is an infrared lamp, 120 is a cleaning tube, 130 is a grouting tube, 140 is a temperature probe wire, 141 is a quick-connection plug, and 150 is an induction sheet wire;
200 is an isolation sleeve, 210 is a cleaning spray head, 220 is a grouting head, 221 is a grouting hole, 230 is a temperature detection probe, 231 is a quick-connection socket, 232 is a temperature probe wire perforation, 240 is a pressure sensing sheet, and 241 is a sensing sheet wire perforation;
301 is a first clamping sleeve, 302 is a second clamping sleeve, 303 is a clamping pull rope, 304 is an annular clamping groove, 305 is an eccentric clamping block, 306 is a ball and 307 is a driving ring;
reference numeral 400 denotes a backflow preventing unit.
Detailed Description
Illustrative aspects of embodiments of the invention are described more fully hereinafter with reference to the accompanying drawings, in which specific embodiments of the invention are shown. Unless defined otherwise, technical or scientific terms used herein shall have the ordinary meaning as understood by one of ordinary skill in the art.
In the description of the present invention, it should be understood that the terms "first" and "second" are used to describe various elements of the invention, and are not intended to limit any order, quantity, or importance, but rather are used to distinguish one element from another.
It should be noted that when an element is referred to as being "connected," "coupled," or "connected" to another element, it can be directly connected, coupled, or connected, but it is understood that intervening elements may be present therebetween; i.e., positional relationships encompassing both direct and indirect connections.
It should be noted that the use of the terms "a" or "an" and the like do not necessarily denote a limitation of quantity. The word "comprising" or "comprises", and the like, means that the element or item listed before the word covers the element or item listed after the word and its equivalents, but does not exclude other elements or items.
It should be noted that terms indicating orientation or positional relationship such as "upper", "lower", "left", "right", and the like, are used only for indicating relative positional relationship, which is for convenience in describing the present invention, and do not indicate that the device or element must have a specific orientation, be constructed and operated in a specific orientation; when the absolute position of the object to be described is changed, the relative positional relationship may also be changed accordingly.
Referring to fig. 1-8, the application discloses a visual high polymer grouting device for blocking a leakage channel of an earth-rock dam, comprising a guide tube 100, a camera device 110 arranged in the guide tube 100, a cleaning tube 120 and a grouting tube 130, and an isolation sleeve 200, the bottom of the isolation sleeve 200 is provided with a lower sealing plate, the isolation sleeve 200 is sleeved on the lower part of the guide tube 100 in a matching sliding way, the lower sealing plate is provided with a transparent part corresponding to the camera shooting equipment, the lower sealing plate is also provided with a cleaning spray head 210 and a grouting head 220, the cleaning spray head 210 is arranged corresponding to the transparent part, when the transparent part is covered by soil, the cleaning liquid is sprayed out by the cleaning spray head to clean the transparent part, the cleaning nozzle 210 is communicated with the cleaning pipe 120 through a first connecting unit, and the grouting head 220 is communicated with the grouting pipe 130 through a second connecting unit; the first connection unit is used to connect and separate the cleaning nozzle 210 and the cleaning pipe 120, and the second connection unit is used to connect and separate the grouting head 220 and the grouting pipe 130.
Camera equipment in this application is including setting up fixing base 111 in the guide tube, laying camera 112 and infrared lamp 113 in the fixing base, camera 112 with infrared lamp 113 all with transparent portion corresponds the setting. Preferably, the isolation sleeve 200 and the guide tube 100 in this embodiment are in a close-fitting insertion structure. The tight-fit insertion structure in this embodiment means that the guide tube 100 and the spacer sleeve 200 are slidably sleeved with each other, and the friction force between abutting surfaces of the guide tube 100 and the spacer sleeve 200 is greater than the weight of the spacer sleeve 200, so that the spacer sleeve 200 cannot fall off from the guide tube 100, and after the spacer sleeve 200 is bonded with the castable, the guide tube 100 is lifted upwards, and at this time, the guide tube 100 can be easily separated from the spacer sleeve 200. Similar to the grafting between the comparatively common cell-phone among the existing equipment and the data line, mainly with the help of interference fit, realize can realizing relatively fixed after pegging graft between guide tube and the separation sleeve, the separation sleeve plays the guard action to the inside instrument and equipment of guide tube, gets into the guide tube or glues the guide tube when avoiding the high polymer to pour.
The isolation sleeve and the lower sealing plate are made of the same material and can be of an integral structure made of transparent plastic materials, so that the transparent part does not need to be processed and arranged independently; other materials can be selected according to the performance requirements of the isolation sleeve and the lower sealing plate, at the moment, the transparent part is made of transparent glass or plastic and is embedded in the lower sealing plate of the isolation sleeve in a matching mode, the lower sealing plate of the temperature detection probe 230 and the pressure sensing piece 240 are further arranged on the lower sealing plate, the temperature probe lead 140 and the sensing piece lead 150 are arranged in the guide tube 100, the lower ends of the temperature probe lead 140 and the sensing piece lead 150 are respectively provided with a quick-connection plug 141, the temperature detection probe 230 and the pressure sensing piece 240 are respectively provided with a quick-connection socket 231 corresponding to the corresponding quick-connection plug 141, and the connection mode can be the plug-socket connection mode or the data line port plug-in connection mode.
In specific practical application, the temperature sensing probe can be fixed outside the isolation sleeve through glue, and data of the temperature sensing probe is connected with reading equipment through a lead, so that the real-time reaction temperature in the reaction process of the high polymer slurry can be monitored. The pressure-sensitive piece can be pasted outside the isolation sleeve through glue, and the data of the pressure-sensitive piece is connected with reading equipment through a lead, so that the real-time pressure of the reaction of the high polymer slurry can be monitored.
The utility model provides an isolation sleeve, washing shower nozzle, slip casting head, temperature detect probe and forced induction piece are disposable product, do not retrieve, wait to water and accomplish the back, and it is kept somewhere in drilling, has the effect of shutoff on the one hand, and on the other hand also is convenient for stabilize the inner structure performance, can also improve the efficiency and the convenience of construction, more helps the application of high polymer in the anti hourglass of prevention of seepage.
For the structure of the first connection unit and the second connection unit, it can take many different forms, form one: the first connecting unit and the second connecting unit comprise a first connecting sleeve and a second connecting sleeve, and the first connecting sleeve is arranged at the inner end part of the corresponding cleaning spray head or grouting head; the second adapter sleeve sets up the tip at the scavenge pipe or the slip casting pipe that correspond, first adapter sleeve passes through the grafting structural connection of tight fit with second adapter sleeve, it also adopts the structural style of pegging graft, so that separation between the two after the slip casting is accomplished, in order to avoid the slip casting in-process two because slip casting pressure leads to unexpected separation, can pass through support piece support with first adapter sleeve and separation sleeve and fix, pass through support piece support with second adapter sleeve and guide tube and fix, first adapter sleeve and second adapter sleeve formed the grafting of rigid structure spare this moment, it is better to peg graft back stability.
The second form: the first connection unit and the second connection unit in this embodiment each include a first clamping sleeve 301, a second clamping sleeve 302, and a clamping pull rope 303, the first clamping sleeve 301 is disposed at an inner end of the corresponding cleaning nozzle 210 or grouting head 220, and the first clamping sleeve 301 is provided with an annular clamping groove 304 having an arc-shaped cross section; the second clamping sleeve 302 is arranged at the end of the corresponding cleaning tube 120 or grouting tube 130, the first clamping sleeve 301 is inserted into the second clamping sleeve 302 in a matching manner, at least two eccentric clamping blocks 305 are hinged to the second clamping sleeve 302, and the eccentric clamping blocks 305 correspond to the annular clamping grooves 304; the latch pull rope 303 is connected to the cam block 305, and the latch pull rope 303 drives the cam block 305 to rotate. Through eccentric fixture block and ring groove's effect, realize being connected between first joint sleeve pipe and the second joint sleeve pipe, guarantee slip casting pipe and slip casting head, scavenge pipe and wash the stable intercommunication between the shower nozzle, can realize the separation through the buckle stay cord simultaneously to be convenient for retrieve the repetition of guide tube and inner structure spare, it is more convenient to operate.
The third form: a buckle joint structure similar to that of a washing machine can be adopted, as shown in fig. 7, the action mode of the buckle joint structure is basically consistent with that of the second form, and the difference is only that an eccentric clamping block is replaced by a ball 306, a driving ring 307 and a spring are further arranged on the second clamping sleeve, the inner wall surface of the driving ring corresponding to the ball is of a conical surface structure, so that the ball can be tightly pushed and loosened when the driving ring acts, the ball is matched with an annular clamping groove, the structure is clamped, the driving ring 307 is driven by the spring to tightly push the ball 306, and the ball is correspondingly clamped with the annular clamping groove of the first clamping sleeve; when the separation is needed, the drive ring is pulled through the buckle pull rope to overcome the action of the spring, so that the balls are not stressed by the pressure of the drive ring any more, and then the balls are separated from the annular clamping groove, and the separation is realized.
Other structural forms in the prior art can also be adopted for the structures of the first connecting unit and the second connecting unit, such as a quick connector controlled electrically, and the modes of separating and clamping the corresponding clamping structure through an electromagnetic effect can be realized.
In order to avoid backflow, the backflow prevention unit 400 is arranged between the cleaning nozzle 210 and the first connecting unit and between the grouting head 220 and the second connecting unit, the backflow prevention unit can be a one-way valve, the backflow prevention unit is connected with the corresponding grouting head and the cleaning nozzle and is kept in a drill hole as a disposable product, and the expansion overflow after high polymer grouting is avoided.
The device is further provided with a plurality of lengthened pipes, the lengthened pipes are in threaded connection with the guide pipe, and the two adjacent lengthened pipes are also in threaded connection. The lengthening pipe and the guide pipe can be completely the same, namely, the lengthening pipe and the guide pipe are hollow metal pipes, the length and the size can be the same, the lengthening pipe and the guide pipe can also be divided into different specification lengths, two adjacent pipes are lengthened through threaded connection, and the lengthening pipe and the guide pipe are more convenient to be suitable for construction operation of drilling holes with different depths.
In the construction process, the environment inside the soil body is visually detected in real time through a preset drill hole, so that the leakage channel can be accurately secondarily positioned; the temperature sensing probe and the pressure sensing sheet can monitor the temperature and pressure change conditions in the reaction process of the high polymer slurry in real time, and accurately master the leakage treatment process; after grouting, the plastic shell is stained with semi-cured high polymer slurry or completely fixed in the cured high polymer, at the moment, the grouting pipe is pulled to connect with the drawing wire of the buckle, the grouting pipe and the buckle fall off (high-pressure gas is introduced into the grouting pipe to completely discharge the high polymer slurry), then the cleaning liquid guide pipe is pulled, and the cleaning liquid guide pipe and the top end of the disposable backflow prevention device fall off at the sleeving position. The temperature sensing probe and the pressure sensing sheet are pulled to lead the wires of the temperature sensing probe and the pressure sensing sheet to fall off, thus realizing repeated application of main equipment except disposable articles.
While the preferred embodiments for carrying out the invention have been described in detail, it should be understood that they have been presented by way of example only, and not limitation as to the scope, applicability, or configuration of the invention in any way. The scope of the invention is defined by the appended claims and equivalents thereof. Many modifications may be made to the foregoing embodiments by those skilled in the art, which modifications are within the scope of the present invention.

Claims (10)

1. A visual high polymer slip casting device for shutoff earth and rockfill dam seepage passage, its characterized in that includes:
a guide tube;
the camera shooting equipment, the cleaning pipe and the grouting pipe are arranged in the guide pipe; and
the bottom of the isolation sleeve is provided with a lower sealing plate, the isolation sleeve is sleeved on the lower part of the guide tube in a matching sliding manner, a transparent part corresponding to the camera equipment is arranged on the lower sealing plate, the lower sealing plate is also provided with a cleaning nozzle and a grouting head, the cleaning nozzle is arranged corresponding to the transparent part, the cleaning nozzle is communicated with the cleaning tube through a first connecting unit, and the grouting head is communicated with the grouting tube through a second connecting unit;
the first connecting unit is used for connecting and separating the cleaning spray head and the cleaning pipe, and the second connecting unit is used for connecting and separating the grouting head and the grouting pipe.
2. The visual polymer grouting device for plugging an earth and rockfill dam leakage channel according to claim 1, wherein the isolation sleeve and the guide tube are of a close-fitting insertion structure.
3. The visual high polymer grouting device for plugging an earth and rockfill dam leakage channel according to claim 1, wherein the lower sealing plate is further provided with a temperature detection probe and a pressure sensing piece, the guide tube is internally provided with a temperature probe lead and a sensing piece lead, the lower ends of the temperature probe lead and the sensing piece lead are both provided with quick-connection plugs, and the temperature detection probe and the pressure sensing piece are respectively provided with a quick-connection socket corresponding to the corresponding quick-connection plugs.
4. The visual high polymer grouting device for plugging the earth and rockfill dam leakage channel according to claim 3, wherein the isolation sleeve, the cleaning nozzle, the grouting head, the temperature detection probe and the pressure sensing sheet are all disposable products.
5. The visual polymer grouting device for plugging earth and rockfill dam leakage paths according to claim 1, wherein the first connection unit and the second connection unit each comprise:
the first connecting sleeve is arranged at the inner end part of the corresponding cleaning spray head or grouting head; and
and the second connecting sleeve is arranged at the end part of the corresponding cleaning pipe or grouting pipe, and the first connecting sleeve is connected with the second connecting sleeve through a tightly-matched inserting structure.
6. The visual polymer grouting device for plugging earth and rockfill dam leakage paths according to claim 1, wherein the first connection unit and the second connection unit each comprise:
the first clamping sleeve is arranged at the inner end part of the corresponding cleaning nozzle or grouting head, and an annular clamping groove is formed in the first clamping sleeve;
the second clamping sleeve is arranged at the end part of the corresponding cleaning pipe or grouting pipe, the first clamping sleeve is inserted into the second clamping sleeve in a matching manner, at least two eccentric clamping blocks are hinged to the second clamping sleeve, and the eccentric clamping blocks correspond to the annular clamping grooves; and
and the buckle pull rope is connected with the eccentric clamping block and drives the eccentric clamping block to rotate.
7. The visual polymer grouting device for plugging earth and rockfill dam leakage paths according to claim 1, wherein the first connection unit and the second connection unit each comprise:
the first clamping sleeve is arranged at the inner end part of the corresponding cleaning nozzle or grouting head, and an annular clamping groove is formed in the first clamping sleeve;
the second clamping sleeve is arranged at the end part of the corresponding cleaning pipe or grouting pipe, a driving ring is further arranged on the second clamping sleeve in a sliding mode, a spring is arranged between the driving ring and the second clamping sleeve, the first clamping sleeve is inserted into the second clamping sleeve in a matched mode, a plurality of balls are arranged between the second clamping sleeve and the driving ring, round holes corresponding to the balls are formed in the second clamping sleeve, and a conical surface corresponding to the balls is arranged on the driving ring; and
and the buckle pull rope is connected with the driving ring and drives the driving ring to slide relative to the second clamping sleeve so as to realize the tightening and loosening of the balls.
8. The visual high polymer grouting device for plugging an earth and rockfill dam leakage channel according to claim 1, wherein backflow prevention units are arranged between the cleaning nozzle and the first connection unit and between the grouting head and the second connection unit.
9. The visual polymer grouting device for plugging an earth and rockfill dam leakage channel according to claim 1, further comprising a plurality of extension pipes, wherein the extension pipes are connected with the guide pipe through threads, and two adjacent extension pipes are also connected through threads.
10. The visual high polymer grouting device for plugging an earth and rockfill dam leakage channel according to claim 1, wherein the camera device comprises a fixed seat arranged in the guide pipe, a camera and an infrared lamp, wherein the camera and the infrared lamp are arranged in the fixed seat and correspond to the transparent part.
CN202110473601.4A 2021-04-29 2021-04-29 Visual high polymer grouting device for plugging earth-rock dam leakage channel Pending CN113089674A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110473601.4A CN113089674A (en) 2021-04-29 2021-04-29 Visual high polymer grouting device for plugging earth-rock dam leakage channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110473601.4A CN113089674A (en) 2021-04-29 2021-04-29 Visual high polymer grouting device for plugging earth-rock dam leakage channel

Publications (1)

Publication Number Publication Date
CN113089674A true CN113089674A (en) 2021-07-09

Family

ID=76680567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110473601.4A Pending CN113089674A (en) 2021-04-29 2021-04-29 Visual high polymer grouting device for plugging earth-rock dam leakage channel

Country Status (1)

Country Link
CN (1) CN113089674A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114382083A (en) * 2021-10-09 2022-04-22 泽庆建设工程有限公司 Grouting reinforcement construction method and surface construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008106459A (en) * 2006-10-24 2008-05-08 World Engineering Kk Construction method for impervious wall
CN103411751A (en) * 2013-08-13 2013-11-27 中国科学院武汉岩土力学研究所 Visual intersected fracture flowing water grouting test device and method
CN109139051A (en) * 2018-09-28 2019-01-04 中铁二十二局集团轨道工程有限公司 A kind of tunnel grouting structure and construction
CN109778789A (en) * 2018-04-04 2019-05-21 水利部交通运输部国家能源局南京水利科学研究院 A kind of Face Slab of Concrete-faced Rockfill is come to nothing the underwater repair system in area
CN111042222A (en) * 2019-12-18 2020-04-21 广东工业大学 Test device for simulating influence of shield secondary grouting process on horizontal loaded pile
CN111042232A (en) * 2019-12-12 2020-04-21 三峡大学 Device for debridement and crack repair of underwater film bag concrete wall and construction method
CN111119158A (en) * 2020-01-13 2020-05-08 郑州维霖工程科技有限公司 High polymer deep hole positioning self-sealing grouting nozzle, grouting system and grouting method
CN111456196A (en) * 2020-04-20 2020-07-28 福光环境工程(上海)有限公司 Grouting structure for repairing sewage pipeline and pipeline grouting repairing method
CN214883663U (en) * 2021-04-29 2021-11-26 郑州大学 Visual high polymer grouting device for plugging earth-rock dam leakage channel

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008106459A (en) * 2006-10-24 2008-05-08 World Engineering Kk Construction method for impervious wall
CN103411751A (en) * 2013-08-13 2013-11-27 中国科学院武汉岩土力学研究所 Visual intersected fracture flowing water grouting test device and method
CN109778789A (en) * 2018-04-04 2019-05-21 水利部交通运输部国家能源局南京水利科学研究院 A kind of Face Slab of Concrete-faced Rockfill is come to nothing the underwater repair system in area
CN109139051A (en) * 2018-09-28 2019-01-04 中铁二十二局集团轨道工程有限公司 A kind of tunnel grouting structure and construction
CN111042232A (en) * 2019-12-12 2020-04-21 三峡大学 Device for debridement and crack repair of underwater film bag concrete wall and construction method
CN111042222A (en) * 2019-12-18 2020-04-21 广东工业大学 Test device for simulating influence of shield secondary grouting process on horizontal loaded pile
CN111119158A (en) * 2020-01-13 2020-05-08 郑州维霖工程科技有限公司 High polymer deep hole positioning self-sealing grouting nozzle, grouting system and grouting method
CN111456196A (en) * 2020-04-20 2020-07-28 福光环境工程(上海)有限公司 Grouting structure for repairing sewage pipeline and pipeline grouting repairing method
CN214883663U (en) * 2021-04-29 2021-11-26 郑州大学 Visual high polymer grouting device for plugging earth-rock dam leakage channel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114382083A (en) * 2021-10-09 2022-04-22 泽庆建设工程有限公司 Grouting reinforcement construction method and surface construction method

Similar Documents

Publication Publication Date Title
CN106121599A (en) The tool and method used in the completing of pit shaft
CN105804735A (en) Three-plunger type hydraulic fracturing ground stress measurement system
CN108643891B (en) Single-loop overburden fracture double-end plugging and leakage detection method
CN211824858U (en) Shield constructs around originating/arrival section tunnel stratum water and soil pressure monitoring devices
CN111322107A (en) Secondary grouting plugging device in drilling
CN214883663U (en) Visual high polymer grouting device for plugging earth-rock dam leakage channel
CN109162703B (en) Super-long soft coal seam drilling multi-stage pressure sealing pressure measuring device and method
CN205858333U (en) A kind of three plug hydraulic fracturing detecting earth stress systems
CN109138904B (en) Double-packer layered grouting water stop device and use method thereof
CN113089674A (en) Visual high polymer grouting device for plugging earth-rock dam leakage channel
CN103031847B (en) Reducing overlap joint combined type orifice pipe grouting method
CN210509154U (en) Horizontal well water exploration device
CN111676954A (en) Locking type high polymer anti-seepage wall forming groove plate and construction method
CN116677343B (en) Cementing plugging device and plugging method for large karst cave lost circulation
CN105735311A (en) Removable anchorage device and anchor cable including removable anchorage device
JP2008240425A (en) Water-stopping construction method
CN205387949U (en) Engineering slip casting stock
CN112554839A (en) Integral hose non-plug-in type gas hole packer and hole packing method thereof
CN210087252U (en) Underground continuous pipe cable separation sealing adapter
US20180171740A1 (en) Dual Bore Swell Packer
CN113186925B (en) Visual high polymer grouting construction process for treating earth and rockfill dam leakage
CN203161214U (en) Downward opening drill hole sound wave test water plugging device
CN207004472U (en) Mining hydraulic type pressure break hole packer
JP2006132301A (en) Ground injector
CN112855100B (en) Underground in-situ fixed online profile control and drive device, tubular column and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination