CN113076511A - 一种主配网变压器技术降损节能量量化计算方法 - Google Patents
一种主配网变压器技术降损节能量量化计算方法 Download PDFInfo
- Publication number
- CN113076511A CN113076511A CN202110199930.4A CN202110199930A CN113076511A CN 113076511 A CN113076511 A CN 113076511A CN 202110199930 A CN202110199930 A CN 202110199930A CN 113076511 A CN113076511 A CN 113076511A
- Authority
- CN
- China
- Prior art keywords
- transformer
- loss reduction
- loss
- energy saving
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000009467 reduction Effects 0.000 title claims abstract description 57
- 238000005516 engineering process Methods 0.000 title claims abstract description 46
- 238000004364 calculation method Methods 0.000 title claims abstract description 20
- 230000009466 transformation Effects 0.000 claims abstract description 16
- 238000000034 method Methods 0.000 claims abstract description 10
- XOFYZVNMUHMLCC-ZPOLXVRWSA-N prednisone Chemical compound O=C1C=C[C@]2(C)[C@H]3C(=O)C[C@](C)([C@@](CC4)(O)C(=O)CO)[C@@H]4[C@@H]3CCC2=C1 XOFYZVNMUHMLCC-ZPOLXVRWSA-N 0.000 claims description 9
- 230000008569 process Effects 0.000 claims description 3
- 238000009795 derivation Methods 0.000 claims description 2
- 230000006872 improvement Effects 0.000 claims description 2
- 201000004569 Blindness Diseases 0.000 abstract 1
- 238000011156 evaluation Methods 0.000 abstract 1
- 230000004048 modification Effects 0.000 description 4
- 238000012986 modification Methods 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/11—Complex mathematical operations for solving equations, e.g. nonlinear equations, general mathematical optimization problems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
本发明公开了一种主配网变压器技术降损节能量量化计算方法。不同的技术降损措施对电网变压器带来的节能量并不相同,传统通过人工经验选取技术降损措施的方法具有一定的盲目性,通过事后评估的方式具有一定的滞后性,同时计算方法不够精确。本发明采用一种主配网变压器技术降损改造前的节能量量化计算方法,其采用公式计算节能量。本发明使得技术降损节能量计算更准确,同时技术降损措施更具针对性。
Description
技术领域
本发明属于电网变压器技术降损领域,具体地说是一种主配网变压器技术降损节能量量化计算方法。
背景技术
随着我国构建资源节约型、环境友好型社会发展战略工作的逐步推进,节能降损工作得到了政府、企业、社会等各方面的高度重视。如何通过开展有针对性的技术降损措施是目前亟需解决的重要课题。
传统技术降损多依托技改大修、配网工程等实现部分高损设备的整改,通过事后粗略评估分析经济效益,并未在改造前有针对性地准确分析技术降损措施带来的节能量,以及相关措施的有效性。
发明内容
针对上述现有技术存在的缺陷,本发明提供一种主配网变压器技术降损节能量量化计算方法,以实现技术降损措施实施前较准确的节能量分析和比对。
为此,本发明采用如下的技术方案:一种主配网变压器技术降损节能量量化计算方法,其变压器技术降损节能量的量化计算公式如下:
其中,Δ(ΔE)为变压器技术降损节能量,单位为kWh;P0、P0′分别为变压器技术降损前、后的空载功率损耗,单位为kW;Pk、Pk′分别为变压器技术降损前、后的额定负载功率损耗,单位为kW;S、S′分别为变压器技术降损前、后的额定容量,单位为kVA;空载功率损耗、额定负载功率损耗和额定容量数据来自变压器自身参数,βav为变压器技术降损前平均负载率;T为变压器运行时间,单位为h,平均负载率和运行时间来自实际运行采集数据,K为负载率形状曲线修正系数。
进一步地,所述的负载率形状曲线修正系数K,K2由负载率曲线的形状确定,计算步骤如下:
令
式中,βmax为变压器技术降损前T时段内最大负载率,βmin为变压器技术降损前T时段内最小负载率,最大负载率和最小负载率来自实际运行采集数据;
当f≥0.5时,按直线变化的持续负载率曲线计算K2,即:
当f<0.5时,按二阶梯变化的持续负载率曲线计算K2,即:
进一步地,变压器技术降损节能量的量化计算公式的推导过程如下:
1)变压器技术降损前的功率损耗ΔPT为:
ΔPT=P0+β2Pk
其中,P0为变压器空载功率损耗,单位为kW;Pk为变压器额定负载功率损耗,单位为kW;空载功率损耗和额定负载功率损耗数据来自变压器自身参数,β为变压器负载率,变压器负载率数据来自实际运行采集数据;
2)对变压器进行技术降损改造,包括变压器增容、更换变压器、并列运行变压器开停控制、有载调容高压变压器节能运行等;
3)变压器技术降损节能量Δ(ΔE)为:
Δ(ΔE)=(ΔPT-ΔPT′)×T
式中,ΔPT′为变压器技术降损后的功率损耗,单位为kW;
4)化简Δ(ΔE)
其中,β、β′分别为变压器技术降损前、后的负载率,负载率来自实际运行采集数据,技术降损后的变压器负载率β′为Sβ/S′,βjf为变压器技术降损前 T时段内的均方负载率,即:
其中,β1、β2…βn为各分时段瞬时负载率,n为T时段内分时段总数;
令βjf=Kβav,则:
本发明具有以下有益效果:本发明可使电网变压器技术降损节能量在改造前计算得到,实现技术降损措施实施前较准确的节能量分析和比对,相较实施后进行的节能量计算,有益于选出有针对性的技术降损措施;同时,通过引入负载率曲线形状系数K,有利于大幅提升节能量计算的准确性。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚,下面将结合本发明具体实施例对本发明技术方案进行清楚、完整地描述。显然,所描述的实施例仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
实施例
本实施例为一种主配网变压器技术降损节能量量化计算方法。
主配网变压器技术降损节能量的量化计算过程如下:
1)变压器技术降损前的功率损耗ΔPT(kW)为:
ΔPT=P0+β2Pk
其中,变压器空载功率损耗为P0(kW),变压器额定负载功率损耗为Pk (kW)。空载损耗、额定负载损耗数据来自变压器自身参数。变压器负载率为β,负载率来自实际运行采集数据。
2)对该变压器进行技术降损改造,改造前、后空载功率损耗分别为P0、 P0′(kW),额定负载功率损耗分别为Pk、Pk′为(kW),额定容量分别为S、S′ (kVA),空载损耗、额定负载损耗、额定容量数据来自变压器自身参数。变压器改造前、后负载率分别为β、β′,负载率来自实际运行采集数据,则改造后变压器负载率β′为Sβ/S′。
3)变压器技术降损改造后的节能量Δ(ΔE)(kWh)为:
Δ(ΔE)=(ΔPT-ΔPT′)×T
式中,ΔPT为技术改造前变压器功率损耗,单位为(kW);ΔPT′为技术改造后变压器功率损耗,单位为(kW);T为变压器运行时间,单位为(h)。
4)化简Δ(ΔE),
其中,βjf为变压器改造前T时段内的均方负载率,即
其中,β1、β2…βn为各分时段瞬时负载率,n为T时段内分时段总数。
βjf实际工程并不易获得。
令βjf=Kβav,K可称为负载率形状曲线修正系数,βav为变压器技术降损前平均负载率,则
因此,求得Δ(ΔE)关键在于求得K2,K2由负载率曲线的形状确定,可通过如下计算步骤估计:
令
式中,βmax为变压器改造前T时段内最大负载率,βmax为变压器改造前T 时段内最小负载率。
当f≥0.5时,可按直线变化的持续负载率曲线计算K2,即:
当f<0.5时,可按二阶梯变化的持续负载率曲线计算K2,即:
应用例
以某35kV变电站为例,原变压器为SZ9-6300/35,空载损耗为7.2kW,额定负载损耗为43kW,改造前日平均负载率为80%,最大负载率为96%,最小负载率为30%。
技术降损改造计划将该变压器更换为SZ11-10000/35,空载损耗为 9.76kW,额定负载损耗为46.91kW,改造后平均负载率即为 6300/10000×80%=50.4%。
则改造后预计日节能量为:
计算f和g:
当f=0.8333≥0.5,可按直线变化的持续负荷曲线计算K2,即:
即:Δ(ΔE)=374.5K2-61.44≈346.8kWh,
改造后预计日节能量为:346.8kWh。
以上所述仅为本发明的实施例而已,并不用于限制本发明。对于本领域技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原理之内所作的任何修改、等同替换、改进等,均应包含在本发明的权利要求范围之内。
Claims (4)
3.根据权利要求1或2所述的一种主配网变压器技术降损节能量量化计算方法,其特征在于,变压器技术降损节能量的量化计算公式的推导过程如下:
1)变压器技术降损前的功率损耗ΔPT为:
ΔPT=P0+β2Pk
其中,P0为变压器空载功率损耗,单位为kW;Pk为变压器额定负载功率损耗,单位为kW;空载功率损耗和额定负载功率损耗数据来自变压器自身参数,β为变压器负载率,变压器负载率数据来自实际运行采集数据;
2)对变压器进行技术降损改造;
3)变压器技术降损节能量Δ(ΔE)为:
Δ(ΔE)=(ΔPT-ΔPT′)×T
式中,ΔPT′为变压器技术降损后的功率损耗,单位为kW;
4)化简Δ(ΔE)
其中,β、β′分别为变压器技术降损前、后的负载率,负载率来自实际运行采集数据,技术降损后的变压器负载率β′为Sβ/S′,βjf为变压器技术降损前T时段内的均方负载率,即:
其中,β1、β2…βn为各分时段瞬时负载率,n为T时段内分时段总数;
令βjf=Kβav,则:
4.根据权利要求3所述的一种主配网变压器技术降损节能量量化计算方法,其特征在于,所述变压器的技术降损改造包括变压器增容、更换变压器、并列运行变压器开停控制和有载调容高压变压器节能运行。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110199930.4A CN113076511A (zh) | 2021-02-22 | 2021-02-22 | 一种主配网变压器技术降损节能量量化计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110199930.4A CN113076511A (zh) | 2021-02-22 | 2021-02-22 | 一种主配网变压器技术降损节能量量化计算方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113076511A true CN113076511A (zh) | 2021-07-06 |
Family
ID=76609561
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110199930.4A Pending CN113076511A (zh) | 2021-02-22 | 2021-02-22 | 一种主配网变压器技术降损节能量量化计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113076511A (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011061171A (ja) * | 2009-08-12 | 2011-03-24 | Tokyo Electric Power Co Inc:The | 変圧器設計システムおよび変圧器設計プログラム |
US20120323382A1 (en) * | 2011-06-15 | 2012-12-20 | Expanergy, Llc | Systems and methods to assess and optimize energy usage for a facility |
CN102914706A (zh) * | 2012-07-20 | 2013-02-06 | 中国电力科学研究院 | 一种配电变压器更换的节能量测量与验证方法 |
CN103942727A (zh) * | 2014-04-10 | 2014-07-23 | 国家电网公司 | 一种基于电网特征差异的线损水平评价方法 |
CN105426979A (zh) * | 2014-09-12 | 2016-03-23 | 国家电网公司 | 一种变压器运行成本的优化方法 |
CN106777512A (zh) * | 2016-11-11 | 2017-05-31 | 国网浙江省电力公司经济技术研究院 | 变压器节能降损适应性评估方法 |
EP3203598A1 (en) * | 2016-02-05 | 2017-08-09 | Sungrow Power Supply Co., Ltd. | Medium and high voltage grid-connected power generation system, medium and high voltage grid-connected system and control unit thereof |
CN107093897A (zh) * | 2017-05-13 | 2017-08-25 | 国网安徽省电力公司芜湖供电公司 | 一种配电网台区低压损耗分析方法 |
CN107122920A (zh) * | 2017-05-19 | 2017-09-01 | 浙江大学 | 一种变压器增容方案经济性评价方法 |
-
2021
- 2021-02-22 CN CN202110199930.4A patent/CN113076511A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011061171A (ja) * | 2009-08-12 | 2011-03-24 | Tokyo Electric Power Co Inc:The | 変圧器設計システムおよび変圧器設計プログラム |
US20120323382A1 (en) * | 2011-06-15 | 2012-12-20 | Expanergy, Llc | Systems and methods to assess and optimize energy usage for a facility |
CN102914706A (zh) * | 2012-07-20 | 2013-02-06 | 中国电力科学研究院 | 一种配电变压器更换的节能量测量与验证方法 |
CN103942727A (zh) * | 2014-04-10 | 2014-07-23 | 国家电网公司 | 一种基于电网特征差异的线损水平评价方法 |
CN105426979A (zh) * | 2014-09-12 | 2016-03-23 | 国家电网公司 | 一种变压器运行成本的优化方法 |
EP3203598A1 (en) * | 2016-02-05 | 2017-08-09 | Sungrow Power Supply Co., Ltd. | Medium and high voltage grid-connected power generation system, medium and high voltage grid-connected system and control unit thereof |
CN106777512A (zh) * | 2016-11-11 | 2017-05-31 | 国网浙江省电力公司经济技术研究院 | 变压器节能降损适应性评估方法 |
CN107093897A (zh) * | 2017-05-13 | 2017-08-25 | 国网安徽省电力公司芜湖供电公司 | 一种配电网台区低压损耗分析方法 |
CN107122920A (zh) * | 2017-05-19 | 2017-09-01 | 浙江大学 | 一种变压器增容方案经济性评价方法 |
Non-Patent Citations (8)
Title |
---|
JULIO ROMERO AGÜERO 等: "Improving the efficiency of power distribution systems through technical and non-technical losses reduction", PES T&D 2012, 27 May 2012 (2012-05-27), pages 1 - 7 * |
SHOUXIANG WANG 等: "A Novel Method of Statistical Line Loss Estimation for Distribution Feeders Based on Feeder Cluster and Modified XGBoost", JOURNALS ENERGIES, vol. 10, no. 12, 5 December 2017 (2017-12-05), pages 1 - 17 * |
VAZQUEZ 等: "A Fully Decentralized Adaptive Droop Optimization Strategy for Power Loss Minimization in Microgrids With PV-BESS", IEEE TRANSACTIONS ON ENERGY CONVERSION, vol. 34, no. 1, 1 March 2019 (2019-03-01), pages 385, XP011712042, DOI: 10.1109/TEC.2018.2878246 * |
YUANYUAN SUN: "The impact analysis of various unbalance factors on the PCC voltage imbalance", IEEE ELECTRICAL POWER AND ENERGY CONFERENCE, 30 November 2014 (2014-11-30), pages 23, XP032741650, DOI: 10.1109/EPEC.2014.56 * |
周躲: "基于主变压器有载逆调压的降损节能分析", CNKI优秀硕士学位论文, 15 January 2018 (2018-01-15), pages 1 - 61 * |
陈峰 等: "MY-HVDC系统下垂控制的传输损耗分析", 机械与电子, vol. 36, no. 10, 31 October 2018 (2018-10-31), pages 62 - 66 * |
陈峰 等: "在线理论线损计算及线损精益化管理系统设计与应用", 浙 江 电 力, vol. 37, no. 11, 30 November 2018 (2018-11-30), pages 79 - 83 * |
陈峰 等: "统一潮流控制器对电网降损节能的作用研究", 浙江省电力学会2018年度优秀论文集, 13 August 2018 (2018-08-13), pages 230 - 235 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2016124062A1 (zh) | 一种高效节能的电力网络的运行方法 | |
CN101431240A (zh) | 一种计及梯级电站的省地一体化avc系统控制方法 | |
CN105552882A (zh) | 一种电网合环的控制方法 | |
CN113572179B (zh) | 一种基于雷击概率的储能与负荷功率协调控制方法 | |
CN109713693B (zh) | 基于换相开关组网的三相不平衡负载切换方法 | |
CN101777764A (zh) | 基于区域控制偏差和机组发电偏差的调度反馈控制系统 | |
CN103678819A (zh) | 一种配电变压器节能量测量与评估方法 | |
CN111817299B (zh) | 基于模糊推理的配电台区线损率异常成因智能辨识方法 | |
CN107769218B (zh) | 一种配电网无功电压的综合协调控制策略 | |
CN113076511A (zh) | 一种主配网变压器技术降损节能量量化计算方法 | |
CN102567645A (zh) | 基于在线理论网损计算的电网设备统计及计算网损的方法 | |
CN103824124A (zh) | 一种针对电网公司的节能潜力评估方法 | |
CN112633605A (zh) | 一种城市配电网规划方法 | |
WO2024021531A1 (zh) | 电力系统及其调频控制方法 | |
CN110808589A (zh) | 基于预测数据的母线电压优化控制方法、系统及存储介质 | |
CN110850831A (zh) | 一种玻璃基板生产水足迹核算与在线控制方法 | |
CN114462811A (zh) | 基于智能融合终端的配电变压器经济运行评价方法 | |
CN109471411B (zh) | 综合能效监控方法 | |
CN108090636B (zh) | 一种基于分压线损模型的线损率趋势预测方法 | |
CN106329548B (zh) | 基于关口功率因数线性约束的高压配电网无功控制方法 | |
Fan et al. | The maximum power supply capability calculation based on the actual load characteristics | |
Qiao et al. | Analysis of Abnormal Low-voltage Line Loss in the Transformer Area Caused by Distributed Photovoltaic Access | |
SU et al. | A Voltage Regulating Method Considering the Control Benefit for Medium-voltage Bus | |
Tao et al. | Analysis and Evaluation of Power Grid Loss Reduction from the Perspective of Operation Inspection Based on Risk Theory | |
Shan et al. | Quantitative Evaluation of Technical Solutions for Control of Distribution Grid with DERs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |