CN113073635A - A connection structure for installation of concrete pipe pile - Google Patents

A connection structure for installation of concrete pipe pile Download PDF

Info

Publication number
CN113073635A
CN113073635A CN202110242799.5A CN202110242799A CN113073635A CN 113073635 A CN113073635 A CN 113073635A CN 202110242799 A CN202110242799 A CN 202110242799A CN 113073635 A CN113073635 A CN 113073635A
Authority
CN
China
Prior art keywords
ring
concrete pipe
pipe pile
fixedly connected
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110242799.5A
Other languages
Chinese (zh)
Inventor
史赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110242799.5A priority Critical patent/CN113073635A/en
Publication of CN113073635A publication Critical patent/CN113073635A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a connecting structure for mounting concrete tubular piles, which comprises a horizontally arranged mounting base, wherein the mounting base is fixedly connected with the ground, the mounting base is in a half-open cylindrical shape, a plurality of concrete tubular piles are vertically arranged above the mounting base, the concrete tubular piles are in a circular ring shape, the bottom surfaces of the concrete tubular piles are respectively provided with a first connecting groove, the upper surfaces of the concrete tubular piles are respectively and fixedly connected with a connecting ring, the first connecting grooves are in a ring shape matched with the connecting rings, the concrete tubular piles are connected end to end, the inner bottom surface of the mounting base is provided with a second connecting groove, and the second connecting grooves are in a ring shape matched with the connecting rings. The concrete pipe pile connecting device has the advantages that the traditional screw and nut are replaced by a clamping mode, so that the connecting and fixing of the device are more convenient, meanwhile, the connecting strength cannot be influenced due to corrosion, the concrete pipe pile is decomposed into a multi-section structure, the transportation is convenient, and meanwhile, the installation is more convenient, safe and stronger in practicability.

Description

A connection structure for installation of concrete pipe pile
Technical Field
The invention relates to the technical field of concrete pipe piles, in particular to a connecting structure for mounting a concrete pipe pile.
Background
At the end of the last 60 years of the century, pre-tensioning prestressed concrete pipe piles (PC pipe piles for short) were produced in Fengtai bridge factories in Ministry of railways, and were mainly used for the infrastructure of railway bridge engineering at that time, and post-tensioning prestressed concrete pipe piles were developed and produced in the 70 s.
Present concrete tubular pile utilizes the screw to carry out fixed connection more, and this kind of connected mode is easy to lead to the linkage effect to receive the influence because of the corrosion along with the lapse of time, and present concrete tubular pile is mostly monolithic structure, and length is great for the installation is all comparatively troublesome with the transportation, consequently, for solving above-mentioned problem, provides a connection structure for concrete tubular pile installation.
Disclosure of Invention
The invention aims to provide a connecting structure for mounting a concrete pipe pile, which aims to solve the problems that a connecting component is easy to rust and is troublesome to mount and transport in the prior art.
In order to achieve the purpose, the invention adopts the following technical scheme:
a connecting structure for concrete pipe pile installation comprises a horizontally arranged installation base which is fixedly connected with the ground, the mounting base is in a half-open cylindrical shape, a plurality of concrete pipe piles are vertically arranged above the mounting base, the concrete pipe piles are circular, the bottom surfaces of the concrete pipe piles are all provided with first connecting grooves, the upper surfaces of the concrete pipe piles are all fixedly connected with connecting rings, the first connecting groove is in a ring shape matched with the connecting ring, a plurality of concrete pipe piles are connected end to end, the bottom surface in the installation base is provided with a second connecting groove which is annular and matched with the connecting ring, the connecting ring of the concrete pipe pile at the lowest part is inserted into the second connecting groove, the installation base lateral wall contacts with the concrete pipe pile counterbalance of below, be provided with a plurality of first latch mechanisms in the installation base lateral wall.
Preferably, first clamping mechanism is including setting up the recess at installation base lateral wall inboard surface, sliding connection has the slider of vertical setting in the recess, the slider is towards the first fixture block of one side fixedly connected with of groove port, the first spring and the recess inner wall fixed connection that the slider set up through the level, slider inside surface fixedly connected with copper wire, first spring winding is on the steel wire, the copper wire runs through installation base lateral wall and sliding connection with it, first pull ring has been cup jointed in the installation base outside, first pull ring and many copper wire fixed connection are a plurality of concrete pipe pile outside surface all is provided with the first draw-in groove that agrees with first fixture block.
Preferably, it is a plurality of the first solid fixed ring of the equal fixedly connected with of concrete pipe pile outer wall lower extreme, it is a plurality of the solid fixed ring of the equal fixedly connected with second in concrete pipe pile outer wall upper end is provided with the retainer plate between the solid fixed ring of the first solid fixed ring that is located the top and the solid fixed ring of the second that is located the below, the retainer plate all offsets the contact with the solid fixed ring of the first solid fixed ring of upper and lower side and second, the retainer plate cup joints in two concrete pipe pile junctions, retainer plate and two concrete pipe pile sliding connection.
Preferably, it is a plurality of the fixed column of the equal fixedly connected with many vertical settings of the solid fixed ring upper surface of second, it is a plurality of the fixed ring lower surface all is provided with a plurality of fixed slots, and is a plurality of the fixed slot matches with a plurality of fixed column one-to-one, and is a plurality of all be provided with second latch mechanism on the solid fixed ring of first.
Preferably, the second clamping mechanism comprises a plurality of joint rods fixedly connected with the lower surface of the first fixing ring, the joint rods are arranged in a hollow manner, the joint rods are arranged vertically, a fixing plate is fixedly connected with the inner bottom surface of the joint rods, the fixing plate is connected with a vertically arranged sliding rod in a sliding manner, the sliding rod penetrates through the first fixing ring and is connected with the first fixing ring in a sliding manner, both sides of the fixing plate are fixedly connected with horizontally arranged sliding rail plates, both surfaces of the two sliding rail plates are connected with second clamping blocks in a sliding manner, the two second clamping blocks are respectively connected with the sliding rod in a rotating manner through a connecting rod, the two second clamping blocks are respectively fixedly connected with the fixing plate through horizontally arranged second springs, both sides of the two second clamping blocks are horizontally provided with baffle plates fixedly connected with the fixing plate, the baffle plates are respectively contacted with the second clamping blocks corresponding to the same side in an abutting manner, both, the upper surface of the fixing ring is provided with a plurality of linking grooves, second clamping grooves matched with second clamping blocks are formed in the linking grooves, the upper surface of the first fixing ring is provided with a second pull ring, the second pull ring is sleeved on the concrete pipe pile and is in sliding connection with the concrete pipe pile, and the second pull ring is fixedly connected with a plurality of sliding rods.
Preferably, the level is provided with first spacing ring in the joint pole, first spacing ring cup joints at the slide bar and fixed connection with it, first spacing ring and joint pole inner wall sliding connection, first spacing ring top level is provided with the second spacing ring with joint pole inner wall fixed connection, the second spacing ring cup joints on the slide bar and sliding connection with it, first spacing ring passes through third spring and second spacing ring fixed connection, the winding of third spring is on the slide bar.
Preferably, the top concrete pipe pile top is provided with the nut, the nut cup joints on concrete pipe pile and threaded connection with it.
Preferably, the top the equal fixedly connected with of the solid fixed ring both sides of second circle collar, two all install fixed rope, two on the collar the one end that the collar was kept away from to fixed rope all with ground fixed connection.
Preferably, the first fixing ring positioned at the lowest part is contacted with the upper surface of the mounting base in an abutting mode.
Compared with the prior art, the invention has the beneficial effects that:
1. through setting up the first fixture block in the installation base, the first draw-in groove of cooperation concrete tubular pile side realizes that concrete tubular pile and installation base are connected fixedly, replaces traditional screw nut's the fixed mode of being connected, simplifies the connected mode of concrete tubular pile under the prerequisite of guaranteeing device joint strength for concrete tubular pile's connection is simple and convenient more, saves installation and dismantlement time, improves the installation and dismantlement efficiency.
2. Through setting up the concrete pipe pile of many segment formulas, replace traditional integral type concrete pipe pile, decompose concrete pipe pile into segment formula structure like this for concrete pipe pile's transportation is more convenient, has reduced the danger in the transportation, also makes concrete pipe pile total length simultaneously can splice the change according to actual demand, and the practicality is stronger.
3. Cover the concrete pipe pile of the top through setting up the nut, prevent the inside ponding of concrete pipe pile, set up the relation between installation circle and the fixed rope reinforcing concrete pipe pile and the ground simultaneously for concrete pipe pile's stability is stronger.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic cross-sectional view of the present invention;
FIG. 3 is a front view of a concrete pipe pile according to the present invention;
fig. 4 is a schematic view of the bottom structure of the concrete pipe pile of the present invention;
FIG. 5 is a schematic top view of a concrete pipe pile according to the present invention;
FIG. 6 is a schematic top view of the mounting base of the present invention;
FIG. 7 is an enlarged view of portion A of FIG. 2 according to the present invention;
FIG. 8 is an enlarged view of portion B of FIG. 2 according to the present invention;
fig. 9 is an enlarged view of the portion C in fig. 8 according to the present invention.
In the figure: 1. installing a base; 2. concrete pipe piles; 3. a first connecting groove; 4. a connecting ring; 5. a second connecting groove; 6. a first clamping mechanism; 7. a groove; 8. a slide sheet; 9. a first clamping block; 10. a first spring; 11. a steel wire; 12. a first pull ring; 13. a first card slot; 14. a first retaining ring; 15. a second retaining ring; 16. a stationary ring; 17. fixing a column; 18. fixing grooves; 19. a second clamping mechanism; 20. a connecting rod; 21. a fixing plate; 22. a slide bar; 23. a slide rail plate; 24. a second fixture block; 25. a connecting rod; 26. a second spring; 27. a baffle plate; 28. a notch; 29. a joining groove; 30. a second card slot; 31. a second tab; 32. a first limit ring; 33. a second stop collar; 34. a third spring; 35. a nut; 36. installing a ring; 37. and (5) fixing the rope.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-9, the present invention provides a technical solution:
embodiment one, as shown in fig. 1 to 9, a connection structure for concrete pipe pile installation comprises a horizontally arranged installation base 1, the installation base 1 is fixedly connected with the ground, the installation base 1 is in a half-open cylindrical shape, a plurality of concrete pipe piles 2 are vertically arranged above the installation base 1, the concrete pipe piles 2 are in a circular ring shape, a first connection groove 3 is arranged on the bottom surface of each of the concrete pipe piles 2, a connection ring 4 is fixedly connected to the upper surface of each of the concrete pipe piles 2, the first connection groove 3 is in a ring shape matched with the connection ring 4, the concrete pipe piles 2 are connected end to end, a second connection groove 5 is arranged on the inner bottom surface of the installation base 1, the second connection groove 5 is in a ring shape matched with the connection ring 4, the connection ring 4 of the lowermost concrete pipe pile 2 is inserted into the second connection groove 5, the side wall of the installation base 1 is abutted against the lowermost concrete pipe pile 2, be provided with a plurality of first latch mechanisms 6 in the installation base 1 lateral wall, be located the first solid fixed ring 14 of below and the contact of surface counterbalance on the installation base 1, this device realizes being connected of concrete pipe pile 2 and installation base 1 through setting up first fixture block 9 and first draw-in groove 13 for it is more simple and convenient to connect, reforms transform the positive multistage formula structure with husing's soil tubular pile 2 simultaneously, not only conveniently transports, also makes the installation more convenient.
In the second embodiment, as shown in fig. 1, 2 and 7, the first clamping mechanism 6 includes a groove 7 disposed on the inner side surface of the side wall of the mounting base 1, a vertically disposed sliding sheet 8 is slidably connected in the groove 7, a first clamping block 9 is fixedly connected to one side of the sliding sheet 8 facing the port of the groove 7, the sliding sheet 8 is fixedly connected to the inner wall of the groove 7 through a horizontally disposed first spring 10, a steel wire 11 is fixedly connected to the inner side surface of the sliding sheet 8, the first spring 10 is wound on the steel wire 11, the steel wire 11 penetrates through and is slidably connected to the side wall of the mounting base 1, a first pull ring 12 is sleeved on the outer side of the mounting base 1, the first pull ring 12 is fixedly connected to a plurality of steel wires 11, first clamping grooves 13 matched with the first clamping blocks 9 are disposed on the outer side surfaces of the plurality of concrete pipe piles 2, the connection between the concrete pipe piles 2 and the mounting base 1 is, the installation and the connection are simpler and more convenient, and the time is saved.
In the third embodiment, as shown in fig. 1 to 5, the lower ends of the outer walls of a plurality of concrete pipe piles 2 are fixedly connected with first fixing rings 14, the upper ends of the outer walls of a plurality of concrete pipe piles 2 are fixedly connected with second fixing rings 15, a fixing ring 16 is arranged between the first fixing ring 14 positioned above and the second fixing ring 15 positioned below, the fixing ring 16 is in abutting contact with the first fixing ring 14 and the second fixing ring 15 positioned above and below, the fixing ring 16 is sleeved at the joint of two concrete pipe piles 2, the fixing ring 16 is slidably connected with the two concrete pipe piles 2, the upper surfaces of the second fixing rings 15 are fixedly connected with a plurality of vertically arranged fixing columns 17, the lower surfaces of the fixing rings 16 are provided with a plurality of fixing grooves 18, the fixing grooves 18 are matched with the fixing columns 17 in a one-to-one correspondence, the first fixing rings 14 are provided with second clamping mechanisms 19, the two concrete pipe piles 2 are connected by arranging the fixing rings 16, and the first fixing ring 14 and the second fixing ring 15 are used for auxiliary positioning and matching connection, so that the connection of the device is more stable.
In the fourth embodiment, as shown in fig. 2, 8 and 9, the second snapping mechanism 19 includes a plurality of engaging rods 20 fixedly connected to the lower surface of the first fixing ring 14, the engaging rods 20 are hollow, the engaging rods 20 are vertically arranged, a fixing plate 21 is fixedly connected to the inner bottom surface of the engaging rods 20, the fixing plate 21 is slidably connected to a vertically arranged sliding rod 22, the sliding rod 22 penetrates through the first fixing ring 14 and is slidably connected to the first fixing ring 14, horizontally arranged sliding rail plates 23 are fixedly connected to both sides of the fixing plate 21, second locking blocks 24 are slidably connected to the surfaces of the two sliding rail plates 23, the two second locking blocks 24 are rotatably connected to the sliding rod 22 through connecting rods 25, the two second locking blocks 24 are fixedly connected to the fixing plate 21 through horizontally arranged second springs 26, two sides of the two second locking blocks 24 are horizontally arranged with blocking plates 27 fixedly connected to the fixing plate 21, the blocking plates 27 are respectively abutted to the corresponding second locking blocks 24 on the same side, both sides of the joint rod 20 are provided with notches 28, the upper surface of the fixing ring 16 is provided with a plurality of joint grooves 29, second clamping grooves 30 matched with the second clamping blocks 24 are formed in the joint grooves 29, the upper surface of the first fixing ring 14 is provided with second pull rings 31, the second pull rings 31 are sleeved on the concrete pipe piles 2 and are in sliding connection with the concrete pipe piles, the second pull rings 31 are fixedly connected with the plurality of sliding rods 22, the second clamping blocks 24 are matched with the second clamping grooves 30 to realize connection between the concrete pipe piles, traditional screw fixed connection is replaced, connection is simpler and more convenient, and connection strength is guaranteed.
In the fifth embodiment, as shown in fig. 2, 8 and 9, a first limiting ring 32 is horizontally disposed in the connecting rod 20, the first limiting ring 32 is sleeved on and fixedly connected with the sliding rod 22, the first limiting ring 32 is slidably connected with the inner wall of the connecting rod 20, a second limiting ring 33 fixedly connected with the inner wall of the connecting rod 20 is horizontally disposed above the first limiting ring 32, the second limiting ring 33 is sleeved on and slidably connected with the sliding rod 22, the first limiting ring 32 is fixedly connected with the second limiting ring 33 through a third spring 34, the third spring 34 is wound on the sliding rod 22, and the first limiting ring 32 cooperates with the second limiting ring 33 and the third spring 34 to help the second locking block 24 to reset, so that the second locking block 24 and the second locking groove 30 are locked, and the connection between the concrete pipe piles 2 is firmer.
Sixth embodiment, as shown in fig. 1 and 2, a nut 35 is disposed above the uppermost concrete pipe pile 2, the nut is sleeved on the concrete pipe pile 2 and is in threaded connection with the concrete pipe pile 2, and the nut 35 is used for sealing an opening at the upper end of the concrete pipe pile 2 to prevent water from accumulating in the concrete pipe pile.
Seventh embodiment, as shown in fig. 1 and 2, the two sides of the uppermost second fixing ring 15 are fixedly connected with mounting rings 36, two mounting rings 36 are provided with fixing ropes 37, one ends of the two fixing ropes 37 far away from the mounting rings 36 are fixedly connected with the ground, the fixing ropes 37 are made of steel wires, and the mounting rings 36 and the fixing ropes 37 are used for assisting in fixing the concrete pipe pile 2, so that the device has better stability and higher strength.
The working principle is as follows: a first pull ring 12 is pulled downwards, the first pull ring 12 pulls a first clamping block 9 to move towards the groove 7 through a steel wire 11, so that the first clamping block 9 retracts into the groove 7 against the acting force of a first spring 10, then the concrete pipe pile 2 is inserted into the installation base 1, the connecting ring 4 is butted with a first connecting groove 3, then the first pull ring 12 is loosened, the first clamping block 9 moves towards the outside of the groove 7 under the pushing of the first spring 10, so that the first clamping block 9 is jointed with a first clamping groove 13 to complete the connection and fixation of the concrete pipe pile 2, then a fixing ring 16 is sleeved on the concrete pipe pile 2, so that a fixing groove 18 on the fixing ring 16 is butted with a fixing column 17 on a second fixing ring 15, then the second section of concrete pipe pile 2 is taken out and inserted into the fixing ring 16, so that the first fixing ring 15 of the second section of concrete pipe pile is abutted with the fixing ring 16, simultaneously pulling a second pull ring 31, the second pull ring 31 drives a sliding rod 22 to move upwards, the sliding rod 22 pulls a second clamping block 24 to slide towards the inner side of the connecting rod 20 through a connecting rod 25, the second clamping block 24 retracts into the notch 28 against the acting force of a second spring 26, the connecting rod 20 is inserted into the connecting groove 29 at the moment, then the second pull ring 31 is loosened, at the moment, a third spring 34 pushes a first limiting ring 32 to move downwards, the first limiting ring 32 drives the sliding rod 22 to move downwards, so that the connecting rod 25 is driven to push the second clamping block 24 to move outwards of the notch 28, meanwhile, the second spring pushes the second clamping block 24 to move outwards of the notch 28, the second clamping block 24 is butted with a ground clamping groove 30, a second section of concrete pipe pile 2 can be connected, the steps are repeated, a plurality of concrete pipe piles 2 are connected, a nut 35 is installed at the top end of the uppermost concrete pipe pile 2, and then a fixing ring 36 is connected and fixed with the ground through a fixing rope 37, and finishing the installation.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (9)

1. The utility model provides a connection structure for concrete pipe pile installation, includes installation base (1) that the level set up, its characterized in that: the installation base (1) is fixedly connected with the ground, the installation base (1) is half-opened cylindrical, a plurality of concrete tubular piles (2) are vertically arranged above the installation base (1), the concrete tubular piles (2) are circular rings, a plurality of concrete tubular piles (2) are all provided with a first connecting groove (3) on the bottom surface, a plurality of concrete tubular piles (2) are all fixedly connected with a connecting ring (4) on the upper surface, the first connecting groove (3) is annular and matched with the connecting ring (4), a plurality of concrete tubular piles (2) are connected end to end, a second connecting groove (5) is arranged on the inner bottom surface of the installation base (1), the second connecting groove (5) is annular and matched with the connecting ring (4), the connecting ring (4) of the lowest concrete tubular pile (2) is inserted into the second connecting groove (5), the side wall of the installation base (1) is in abutting contact with the lowest concrete tubular pile (2), a plurality of first clamping mechanisms (6) are arranged in the side wall of the mounting base (1).
2. A connection structure for concrete pipe pile installation according to claim 1, wherein: the first clamping mechanism (6) comprises a groove (7) arranged on the inner side surface of the side wall of the mounting base (1), a vertically arranged sliding sheet (8) is slidably connected in the groove (7), a first clamping block (9) is fixedly connected on one side of the sliding sheet (8) facing to the port of the groove (7), the sliding sheet (8) is fixedly connected with the inner wall of the groove (7) through a first spring (10) which is horizontally arranged, the inner side surface of the sliding sheet (8) is fixedly connected with a steel wire (11), the first spring (10) is wound on the steel wire (11), the steel wire (11) penetrates through the side wall of the mounting base (1) and is connected with the side wall in a sliding way, first pull ring (12) have been cup jointed in installation base (1) outside, first pull ring (12) and many copper wires (11) fixed connection, it is a plurality of concrete pipe pile (2) outside surface all is provided with first draw-in groove (13) that agree with first fixture block (9).
3. A connection structure for concrete pipe pile installation according to claim 1, wherein: it is a plurality of first solid fixed ring (14) of the equal fixedly connected with of concrete pipe pile (2) outer wall lower extreme, it is a plurality of the solid fixed ring (15) of the equal fixedly connected with second in concrete pipe pile (2) outer wall upper end is provided with retainer plate (16) between the solid fixed ring (15) of the first solid fixed ring (14) that is located the top and the solid fixed ring (15) of second that is located the below, the equal looks butt contact of first solid fixed ring (14) and the solid fixed ring (15) of second of retainer plate (16) and upper and lower side, the retainer plate (16) cup joint in two concrete pipe pile (2) junctions, retainer plate (16) and two concrete pipe pile (2) sliding connection.
4. A connection structure for concrete pipe pile installation according to claim 3, wherein: it is a plurality of the fixed column (17) of many vertical settings of the equal fixedly connected with in second solid fixed ring (15) upper surface, it is a plurality of the retainer plate (16) lower surface all is provided with a plurality of fixed slots (18), and is a plurality of fixed slot (18) match with a plurality of fixed column (17) one-to-one, and is a plurality of all be provided with second latch mechanism (19) on first solid fixed ring (14).
5. A connection structure for concrete pipe pile installation according to claim 3, wherein: the second clamping mechanism (19) comprises a plurality of joint rods (20) fixedly connected with the lower surface of the first fixing ring (14), the joint rods (20) are arranged in a hollow mode, the joint rods (20) are arranged vertically, a fixing plate (21) is fixedly connected with the inner bottom surface of the joint rods (20), the fixing plate (21) is slidably connected with sliding rods (22) which are arranged vertically, the sliding rods (22) penetrate through the first fixing ring (14) and are slidably connected with the first fixing ring, sliding rail plates (23) which are arranged horizontally are fixedly connected to the two sides of the fixing plate (21), second clamping blocks (24) are slidably connected to the surfaces of the sliding rail plates (23) respectively, the second clamping blocks (24) are rotatably connected with the sliding rods (22) through connecting rods (25), and the second clamping blocks (24) are fixedly connected with the fixing plate (21) through second springs (26) which are arranged horizontally, two the equal level in second fixture block (24) both sides is provided with baffle (27) with fixed plate (21) fixed connection, polylith baffle (27) contact with second fixture block (24) counterbalance that the homonymy corresponds respectively, it all is provided with breach (28) to join pole (20) both sides, retainer plate (16) upper surface is provided with a plurality of linking grooves (29), it is provided with second draw-in groove (30) that agree with mutually with second fixture block (24) to join in the palm in groove (29), first solid fixed ring (14) upper surface is provided with second pull ring (31), second pull ring (31) cup joint on concrete pipe pile (2) and sliding connection with it, second pull ring (31) and many slide bars (22) fixed connection.
6. A connection structure for concrete pipe pile installation according to claim 5, wherein: the utility model discloses a spacing pole, including linking pole (20), first spacing ring (32) cup joint slide bar (22) and fixed connection with it, first spacing ring (32) and linking pole (20) inner wall sliding connection, first spacing ring (32) top level is provided with second spacing ring (33) with linking pole (20) inner wall fixed connection, second spacing ring (33) cup joint on slide bar (22) and sliding connection with it, first spacing ring (32) are through third spring (34) and second spacing ring (33) fixed connection, third spring (34) winding is on slide bar (22).
7. A connection structure for concrete pipe pile installation according to claim 1, wherein: the concrete pipe pile (2) top of the top is provided with a nut (35), the nut is sleeved on the concrete pipe pile (2) and is in threaded connection with the concrete pipe pile.
8. A connection structure for concrete pipe pile installation according to claim 1, wherein: the top the equal fixedly connected with of second solid fixed ring (15) both sides circle (36), two all install fixed rope (37), two on the circle (36) fixed rope (37) keep away from the one end of circle (36) all with ground fixed connection.
9. A connection structure for concrete pipe pile installation according to claim 1, wherein: the first fixing ring (14) positioned at the lowest part is propped against the upper surface of the mounting base (1).
CN202110242799.5A 2021-03-05 2021-03-05 A connection structure for installation of concrete pipe pile Pending CN113073635A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110242799.5A CN113073635A (en) 2021-03-05 2021-03-05 A connection structure for installation of concrete pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110242799.5A CN113073635A (en) 2021-03-05 2021-03-05 A connection structure for installation of concrete pipe pile

Publications (1)

Publication Number Publication Date
CN113073635A true CN113073635A (en) 2021-07-06

Family

ID=76610020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110242799.5A Pending CN113073635A (en) 2021-03-05 2021-03-05 A connection structure for installation of concrete pipe pile

Country Status (1)

Country Link
CN (1) CN113073635A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208328919U (en) * 2018-06-25 2019-01-04 福建省地科勘测规划有限公司 A kind of pile for prestressed pipe stake bottom floating sealing device
CN210177502U (en) * 2019-06-02 2020-03-24 泰州市恒瑞管桩有限公司 Prestressed concrete tubular pile locking type mechanical quick joint
CN210177498U (en) * 2019-05-31 2020-03-24 泰州市恒瑞管桩有限公司 Tubular pile connecting sleeve structure
CN211057876U (en) * 2019-11-06 2020-07-21 赣州市魏氏长春水泥制品有限公司 Concrete pipe pile structure
CN211368670U (en) * 2019-09-25 2020-08-28 长春昌驰新材料科技有限公司 Concrete pipe pile
CN212153366U (en) * 2020-03-24 2020-12-15 陕西秦汉恒盛新型建材科技股份有限公司 Concrete pipe pile connecting structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208328919U (en) * 2018-06-25 2019-01-04 福建省地科勘测规划有限公司 A kind of pile for prestressed pipe stake bottom floating sealing device
CN210177498U (en) * 2019-05-31 2020-03-24 泰州市恒瑞管桩有限公司 Tubular pile connecting sleeve structure
CN210177502U (en) * 2019-06-02 2020-03-24 泰州市恒瑞管桩有限公司 Prestressed concrete tubular pile locking type mechanical quick joint
CN211368670U (en) * 2019-09-25 2020-08-28 长春昌驰新材料科技有限公司 Concrete pipe pile
CN211057876U (en) * 2019-11-06 2020-07-21 赣州市魏氏长春水泥制品有限公司 Concrete pipe pile structure
CN212153366U (en) * 2020-03-24 2020-12-15 陕西秦汉恒盛新型建材科技股份有限公司 Concrete pipe pile connecting structure

Similar Documents

Publication Publication Date Title
CN107916724B (en) Assembly type concrete frame connecting system and mounting method thereof
CN111395513A (en) Assembled super high-rise core tube structure
CN113073635A (en) A connection structure for installation of concrete pipe pile
CN212641758U (en) Assembly type building bottom connecting mechanism
CN204326260U (en) The connector of a kind of precast wall body and beam
CN110103321B (en) Reinforced concrete I-beam construction template and operation method thereof
CN111305472A (en) Shear force wall construction light reinforcing bar fixture is built in room
CN115142675A (en) Hole reservation construction equipment
CN209760856U (en) Adjustable assembled face limit guardrail bar convenient to use
CN211815279U (en) Assembly type road with quick installation function for construction site
CN2893075Y (en) Fastening pin pipe type fences
CN220285457U (en) Fence supporting structure for municipal house building
CN208856818U (en) A kind of tower crane anchor
KR100992403B1 (en) Indow structure of building
CN215443427U (en) Anticorrosive wooden railing node structure of view
CN214246073U (en) Assembled house fast assembly structure
CN216974145U (en) Fixing device of outrigger steel mesh piece
CN113006365B (en) Assembled concrete building structure of modularization construction
CN219527757U (en) Be used for building engineering foundation stabilization device
CN213682777U (en) Supporting structure of assembled precast concrete furred ceiling
CN211736113U (en) Assembled balcony guardrail
CN213477866U (en) Safety railing for construction management of building engineering
CN219863461U (en) Assembled shear wall connection structure
CN110005195B (en) Supporting mechanism for rapid mounting and dismounting of concrete formwork
CN221072998U (en) Building beam column connection structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210706

RJ01 Rejection of invention patent application after publication