CN113062479A - Grout seam plugging device of prefabricated assembled structure - Google Patents

Grout seam plugging device of prefabricated assembled structure Download PDF

Info

Publication number
CN113062479A
CN113062479A CN202110347294.5A CN202110347294A CN113062479A CN 113062479 A CN113062479 A CN 113062479A CN 202110347294 A CN202110347294 A CN 202110347294A CN 113062479 A CN113062479 A CN 113062479A
Authority
CN
China
Prior art keywords
film
rod
connecting strip
strip
film rolling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202110347294.5A
Other languages
Chinese (zh)
Inventor
马相明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Vocational Institute of Engineering
Original Assignee
Chongqing Vocational Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Vocational Institute of Engineering filed Critical Chongqing Vocational Institute of Engineering
Priority to CN202110347294.5A priority Critical patent/CN113062479A/en
Publication of CN113062479A publication Critical patent/CN113062479A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to the field of buildings, and particularly discloses a grouting joint plugging device with a prefabricated structure, which comprises two flexible connecting strips, a plurality of connecting rods for connecting the two connecting strips and a film coating unit, wherein a supporting rod capable of abutting against the surface of a component is fixedly arranged on one side of each connecting strip, and the axis of each supporting rod is vertical to the axis of each connecting strip; the film coating unit comprises a film rolling rod, a film rolling cylinder and a film rolling cylinder, wherein the film rolling cylinder is installed on the film rolling cylinder, one side of each connecting strip, which is close to the connecting rod, is provided with a sliding groove arranged along the axial direction of the connecting strip, one end of the film rolling rod is in sliding connection with the sliding groove on one connecting strip, the other end of the film rolling rod is in sliding connection with the sliding groove on the other connecting strip, and the film rolling cylinder is rotatably installed on the film rolling rod; one end of the connecting strip can be detachably connected with the other end of the connecting strip. The roll film can be fast coated at the joint of two adjacent layers under the control of the film coating unit, and the roll film is convenient to install.

Description

Grout seam plugging device of prefabricated assembled structure
Technical Field
The invention belongs to the field of buildings, and particularly relates to a grouting joint plugging device with a prefabricated structure.
Background
The fabricated building is a building which is formed by transferring a large amount of field operation work in the traditional building mode to a factory, processing and manufacturing building components and accessories (such as floor slabs, wall plates, stairs, balconies and the like) in the factory, transporting the components and accessories to a building construction site, and assembling and mounting the components and the accessories on the site through a reliable connection mode.
When prefabricated wall, plate, beam, column and other members are installed and connected, the joint of each member is inevitably connected and solidified by concrete, when the joint between the members is poured with concrete, the concrete is easy to flow out from the joint, which causes concrete waste, and meanwhile, the residual concrete at the joint is not tightly adhered to the joint of the members, which directly influences the connection strength between the members; the workman generally stops to the edge of seam according to experience at present, seals seam department, and this process can make getting of plank put inconvenient, and the installation operation of plank is also very wasted time and energy.
Disclosure of Invention
The invention aims to provide a grouting joint plugging device with a prefabricated structure, which aims to solve the problem that a wood board is inconvenient to take and place when the joint of two adjacent components is plugged by the wood board.
In order to achieve the above object, the basic scheme of the invention is as follows: a grouting seam plugging device with a prefabricated structure comprises two flexible connecting strips, a plurality of connecting rods for connecting the two connecting strips and a film coating unit, wherein the connecting strips for connecting the two connecting strips are welded between the two connecting strips in parallel; the film coating unit comprises a film rolling rod, a film rolling cylinder and a film rolling cylinder arranged on the film rolling cylinder, the lengths of the film rolling rod and the connecting rod are both larger than the maximum width of a joint between the two components, one side of the connecting strip close to the connecting rod is provided with a sliding groove arranged along the axial direction of the connecting strip, one end of the film rolling rod is in sliding connection with the sliding groove on one of the connecting strips, the other end of the film rolling rod is in sliding connection with the sliding groove on the other connecting strip, and the film rolling cylinder is rotatably arranged on the film rolling rod; one end of the connecting strip can be detachably connected with the other end of the connecting strip.
The principle and advantages of the basic scheme are as follows: when plugging the joint, bending the flexible connecting strip at the joint of two adjacent members, wherein one end of each of the plurality of supporting rods, which is far away from the connecting strip, abuts against the surface of the member, the film rolling rod, the film rolling cylinder and the film rolling are positioned at one end of each of the two connecting strips, the two connecting strips are respectively positioned on the two members, and the film rolling cylinder and the film rolling are opposite to the joint of the two members; then, one end of the same connecting strip is connected with the other end of the connecting strip, so that the connecting strip is tensioned on the surfaces of the members, and the whole grouting joint plugging device is rapidly fixed on the two members.
Then will grip the free end of rolling up the membrane, stir a roll membrane pole and remove along the spout, roll up the membrane pole and drive a roll membrane section of thick bamboo and roll up the surface synchronous motion of membrane along the component, a roll membrane section of thick bamboo and a roll membrane remove to the other end department of connecting strip along the spout for roll membrane parcel is in seam crossing, cut off the roll membrane this moment, will convolute the roll membrane tip of seam crossing and fuse, whole grout seam plugging device's simple to operate, and it is also convenient to roll up the cover of membrane butt joint crossing, make the shutoff of seam crossing quick and convenient.
Then pouring concrete into the rolling film, so that the joints are filled with the concrete, and all the concrete is limited in the rolling film, and the concrete is convenient to pour; after the concrete is solidified, the coiled membrane at the joint can be detached, and the detachment of the coiled membrane is also convenient.
Furthermore, an elastic strip is connected between one end of the connecting strip and the other end of the connecting strip, one end of the elastic strip is detachably connected with one end of the connecting strip, and the other end of the elastic strip is detachably connected with the other end of the connecting strip.
When being fixed to two components with grout seam plugging device, the one end of elasticity strip is connected with the one end of connecting strip, and the other end of elasticity strip is connected with the other end of connecting strip, and the elasticity strip can adaptability extend or shorten according to the profile length of seam, is convenient for connect the both ends of connecting strip, lets the both ends of connecting strip fixed convenient adjustable more.
Furthermore, the lower end of the supporting rod is fixedly provided with a sucker.
Through the arrangement, when the lower end of the supporting rod is abutted to the surface of the component, the sucker can be conveniently attached to the surface of the component, and can be more effectively supported between the component and the connecting strip, so that the connecting strip is more stably installed.
And the other end of the pull rope penetrates through the sliding groove and is not arranged outside the connecting strip.
After the installation of accomplishing grout seam plugging device, roll up the membrane and be located the tie strip and keep away from one of stay cord and serve, stimulate the stay cord this moment, two roll up membrane poles of stay cord pulling move to the other end department of tie strip, and the drive that can be convenient rolls up membrane pole, roll up a membrane section of thick bamboo and roll up the membrane and remove along the spout for it is more convenient to roll up laying of membrane.
Further, roll up membrane pole, roll up a membrane section of thick bamboo and roll up the membrane and all be located between bracing piece and the connecting rod, the axis of rolling up the membrane pole is parallel with the axis of connecting rod.
Through the setting, roll up membrane pole, roll up a membrane section of thick bamboo and roll up the inboard removal at a plurality of connecting rods that the membrane can be more stable for roll up the membrane and not hinder along the removal of spout, roll up the removal of membrane convenient more fast.
Furthermore, a plurality of exhaust holes are arranged on the rolling film.
Through the arrangement, in the process of pouring concrete, air between the rolling film and the member is exhausted through the exhaust hole, so that the pouring of the concrete is convenient and quick; simultaneously at the in-process that the concrete solidifies, the exhaust hole can let concrete and air contact for the concrete can be quick solidification, the moisture in the concrete of also being convenient for discharges fast and solidifies.
Drawings
FIG. 1 is a sectional view of a grout joint plugging device of a prefabricated structure according to the present invention in a front view direction;
FIG. 2 is a top view of a grout joint plugging device of a prefabricated structure of FIG. 1;
fig. 3 is an enlarged view of a point a in fig. 1.
Detailed Description
The following is further detailed by the specific embodiments:
reference numerals in the drawings of the specification include: the film winding device comprises a connecting bar 10, a connecting bar 101, a supporting bar 102, a suction cup 103, a sliding groove 104, a first protrusion 105, a second protrusion 106, a film winding bar 201, a film winding barrel 202, a film winding 203, a limiting block 204, an elastic bar 30, a first clamping hole 301, a second clamping hole 303, a pull rope 40 and a member 50.
The embodiments are substantially as shown in figures 1, 2 and 3: the utility model provides a grout seam plugging device of prefabricated assembled structure, includes two flexible connecting strip 10, a plurality of connecting rod 101 and the diolame unit of connecting two connecting strip 10, and connecting strip 10 is made by the spring steel, and the welding has the bracing piece 102 that can offset with the surface of component 50 on one side of connecting strip 10, and the axis of bracing piece 102 is perpendicular with the axis of connecting strip 10, and the one of bracing piece 102 that is close to component 50 is served and all is glued there is sucking disc 103.
As shown in fig. 1 and 3, the film wrapping unit comprises a film wrapping 203 rod 201, a film wrapping 203 cylinder 202 and a film wrapping 203 mounted on the film wrapping 203 cylinder 202, the lengths of the film wrapping 203 and the connecting rod 101 are both greater than the maximum width of the seam between the two members 50, and a sliding groove 104 arranged along the axial direction of the connecting rod 10 is arranged on one side of the connecting rod 10 close to the connecting rod 101; the number of the film winding 203 rods 201 is two, the two film winding 203 rods 201 are respectively arranged at the sliding grooves 104 on the two connecting strips 10, the longitudinal section of each sliding groove 104 is T-shaped, one ends of the film winding 203 rods 201 close to the connecting strips 10 are welded with limiting blocks 204, and the limiting blocks 204 are abutted against the inner walls of the sliding grooves 104; one end of the film winding 203 cylinder 202 is in snap connection with one end of one film winding 203 rod 201 far away from the connecting strip 10, the other end of the film winding 203 cylinder 202 is in snap connection with one end of the other film winding 203 rod 201 far away from the connecting strip 10, and the film winding 203 cylinder 202 is coaxially arranged on the film winding 203 cylinder 202; meanwhile, the rod 201 of the rolled film 203, the cylinder 202 of the rolled film 203 and the rolled film 203 are all positioned between the support rod 102 and the connecting rod 101, and the axis of the rod 201 of the rolled film 203 is parallel to the axis of the connecting rod 101.
As shown in fig. 2, the elastic strip 30 is installed to the buckle between the one end of connecting strip 10 and the other end of connecting strip 10, be equipped with first calorie of hole 301 on the left end of elastic strip 30, be equipped with second calorie of hole 303 on the right-hand member of elastic strip 30, integrated into one piece has first arch 105 on one side that connecting rod 101 was kept away from to the left end of connecting strip 10, first arch 105 can be embedded into first calorie of hole 301, integrated into one piece has second arch 106 on one side that connecting rod 101 was kept away from to the right-hand member of connecting strip 10, second arch 106 can be embedded into the first and the card is downthehole.
In addition, the film winding device also comprises a pull rope 40, the left end of the pull rope 40 is fixed with the end part of the rod 201 of the film winding 203 through a knot, the right end of the pull rope 40 penetrates through the sliding groove 104 and is not arranged outside the connecting strip 10, and the film winding 203 is provided with a plurality of exhaust holes with the diameter of 1-2 mm.
When the grouting joint plugging device with the prefabricated structure is used, the connecting strip 10 made of spring steel is bent at the joint of two adjacent members 50, at the moment, the connecting strip 10 is in a shape matched with the surface contour of the members 50, and the suckers 103 on the lower ends of the plurality of support rods 102 are abutted against the surfaces of the members 50; at the same time, the roll film 203 rod 201, the roll film 203 cylinder 202 and the roll film 203 are all positioned on the left ends of the two connecting strips 10, and the roll film 203 cylinder 202 and the roll film 203 are opposite to the seam of the two members 50.
At this time, both ends of the elastic strip 30 are pulled, so that the first locking hole 301 on the left end of the elastic strip 30 is locked to the first protrusion 105 of the connecting strip 10, the second locking hole 303 on the right end of the elastic strip 30 is locked to the second protrusion 106 of the connecting strip 10, and the elastic strip 30 locks the whole grouting joint plugging device at the joint of the two members 50. Then the free end of the rolled film 203 is held, the free end of the rolled film 203 is laid between two ends of the connecting strip 10, then the pull rope 40 is pulled, the pull rope 40 pulls the two rolled film 203 rods 201 to move along the sliding grooves 104 of the two connecting strips 10 respectively, at the moment, the rolled film 203 rods 201 drive the rolled film 203 cylinders 202 and the rolled film 203 to move synchronously along the surface of the member 50, so that the rolled film 203 cylinders 202 and the rolled film 203 move to the right end of the connecting strips 10 along the sliding grooves 104, the rolled film 203 is wrapped at the seam, the rolled film 203 is cut off at the moment, the end parts of the rolled film 203 wound at the seam are fused, the whole grouting seam plugging device is convenient to install, the rolled film 203 is convenient to cover the seam, and plugging of the seam is quick and convenient.
Then pouring concrete into the rolling film 203 to fill the joints with the concrete, and limiting all the concrete in the rolling film 203, wherein in the process of pouring the concrete, air between the rolling film 203 and the member 50 is exhausted through the exhaust holes, so that the pouring of the concrete is convenient and rapid; meanwhile, in the process of concrete solidification, the concrete can be contacted with air through the exhaust holes, so that the concrete can be quickly solidified, and moisture in the concrete can be conveniently and quickly discharged and solidified; after the concrete is solidified, the coiled film 203 at the joint can be detached, and the detachment of the coiled film 203 is also convenient.

Claims (6)

1. A grouting seam plugging device with a prefabricated structure is characterized by comprising two flexible connecting strips, a plurality of connecting rods for connecting the two connecting strips and a film coating unit, wherein a supporting rod capable of abutting against the surface of a component is fixedly arranged on one side of each connecting strip, and the axis of the supporting rod is vertical to the axis of each connecting strip; the film coating unit comprises a film rolling rod, a film rolling cylinder and a film rolling cylinder arranged on the film rolling cylinder, the lengths of the film rolling rod and the connecting rod are both larger than the maximum width of a joint between the two components, one side of the connecting strip close to the connecting rod is provided with a sliding groove arranged along the axial direction of the connecting strip, one end of the film rolling rod is in sliding connection with the sliding groove on one of the connecting strips, the other end of the film rolling rod is in sliding connection with the sliding groove on the other connecting strip, and the film rolling cylinder is rotatably arranged on the film rolling rod; one end of the connecting strip can be detachably connected with the other end of the connecting strip.
2. The grouting joint plugging device with the prefabricated structure as claimed in claim 1, wherein an elastic strip is connected between one end of the connecting strip and the other end of the connecting strip, one end of the elastic strip is detachably connected with one end of the connecting strip, and the other end of the elastic strip is detachably connected with the other end of the connecting strip.
3. The prefabricated structure grouting joint plugging device according to claim 2, wherein the lower ends of the support rods are fixedly provided with suckers.
4. The grout joint plugging device of the prefabricated structure, according to claim 3, further comprises a pulling rope, one end of the pulling rope is fixedly connected with the end part of the film rolling rod, and the other end of the pulling rope passes through the sliding groove and is not arranged outside the connecting strip.
5. The prefabricated structure grouting seam plugging device of claim 4, wherein the film winding rod, the film winding barrel and the film winding are arranged between the support rod and the connecting rod, and the axis of the film winding rod is parallel to the axis of the connecting rod.
6. The prefabricated structure grouting seam plugging device as claimed in claim 5, wherein a plurality of vent holes are formed in the roll film.
CN202110347294.5A 2021-03-31 2021-03-31 Grout seam plugging device of prefabricated assembled structure Withdrawn CN113062479A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110347294.5A CN113062479A (en) 2021-03-31 2021-03-31 Grout seam plugging device of prefabricated assembled structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110347294.5A CN113062479A (en) 2021-03-31 2021-03-31 Grout seam plugging device of prefabricated assembled structure

Publications (1)

Publication Number Publication Date
CN113062479A true CN113062479A (en) 2021-07-02

Family

ID=76564990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110347294.5A Withdrawn CN113062479A (en) 2021-03-31 2021-03-31 Grout seam plugging device of prefabricated assembled structure

Country Status (1)

Country Link
CN (1) CN113062479A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114352019A (en) * 2022-01-06 2022-04-15 苏州良浦住宅工业有限公司 Vertical component exhaust apparatus that is in milk

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114352019A (en) * 2022-01-06 2022-04-15 苏州良浦住宅工业有限公司 Vertical component exhaust apparatus that is in milk
CN114352019B (en) * 2022-01-06 2024-05-24 苏州良浦节能新材料股份有限公司 Vertical component grouting exhaust device

Similar Documents

Publication Publication Date Title
CN113235807A (en) Energy-saving assembly type building wall and construction process thereof
CN113062479A (en) Grout seam plugging device of prefabricated assembled structure
CN117432221B (en) Energy-conserving wallboard installation auxiliary structure of green building
CN112575946A (en) Prefabricated coincide floor of assembled
CN110397180B (en) Construction process of outer wall
CN111749441A (en) A exterior wall ceramic brick laying device for individual layer building
CN214402321U (en) Built-in split screw rod reinforcing bar net rack and built-in split screw rod internal partition plate
CN215331486U (en) Reinforcing device for door and window opening of ALC (autoclaved lightweight concrete) batten wall body
CN215519420U (en) Superimposed sheet concatenation reinforcing apparatus
CN104594529A (en) Outer wall of steel structure plant, model frame of upright post at corner and outer wall construction method
CN204418425U (en) Steel-structure factory building exterior wall and steel-structure factory building exterior wall corner column framed
CN102121278B (en) Waterproof method for deformation joint on building and adhesive anchorage built-in water stop
CN208473286U (en) A kind of wall form of car ramp circular arc wall
CN211873413U (en) Plaster-free wall based on gypsum hollow building blocks
CN210210746U (en) Fixed connecting device for template
CN111691657A (en) Anchoring bolt structure of cantilever scaffold and mounting method
CN113323388A (en) Reinforcing device for door and window opening of ALC (autoclaved lightweight concrete) batten wall body
CN104196256A (en) Carbon fiber reinforcement structure and construction method
CN213449076U (en) Pour rust-resistant truss plate of exempting from to tear open of floor
CN213087168U (en) Assembled T-shaped plate connecting node structure
CN204112760U (en) Carbon fiber reinforcing concrete structure
CN217151262U (en) Consolidate in template support bracket in split screw rod hole
CN110565976B (en) Method for reinforcing reinforced concrete column by self-compacting concrete with FRP (fiber reinforced plastic) -steel composite pipe sleeved outside and expanding cross section
CN210713817U (en) Fair-faced concrete formwork for roof arc parapet wall cornice
CN215978079U (en) Can have enough to meet need direct pre-buried locator of flat floor reinforcing bar that waters after

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20210702

WW01 Invention patent application withdrawn after publication