CN113057044B CN202110362227.0A CN202110362227A CN113057044B CN 113057044 B CN113057044 B CN 113057044B CN 202110362227 A CN202110362227 A CN 202110362227A CN 113057044 B CN113057044 B CN 113057044B
Authority
CN
China
Prior art keywords
sound insulation
insulation board
water pipe
water
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110362227.0A
Other languages
Chinese (zh)
Other versions
CN113057044A (en
Inventor
郑伟生
黎颢明
姚崇武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hongmao Construction Supervision Co ltd
Original Assignee
Guangdong Hongmao Construction Supervision Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Hongmao Construction Supervision Co ltd filed Critical Guangdong Hongmao Construction Supervision Co ltd
Priority to CN202110362227.0A priority Critical patent/CN113057044B/en
Publication of CN113057044A publication Critical patent/CN113057044A/en
Application granted granted Critical
Publication of CN113057044B publication Critical patent/CN113057044B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/027Pots connected in horizontal rows
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G27/00Self-acting watering devices, e.g. for flower-pots
    • A01G27/005Reservoirs connected to flower-pots through conduits
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/023Multi-tiered planters
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/024Hanging flower pots and baskets
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Transplanting Machines (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The application relates to a municipal road sound insulation green belt and a water treatment system for the green belt, which comprises a plurality of sound insulation boards which are spliced with each other and a plurality of planting grooves; the upper end surface of each sound insulation board is provided with a bulge, the lower end surface of each sound insulation board is provided with a groove, and two adjacent sound insulation boards are fixedly inserted through the bulges and the grooves; one side of the sound insulation board is communicated with a connecting pipe, a water pipe is connected in the cavity of the sound insulation board in a horizontal sliding manner, the water pipe is communicated with the connecting pipe, the water pipe penetrates through one side of the sound insulation board, which is far away from the connecting pipe, and the sound insulation board is provided with a driving piece for driving the water pipe to horizontally slide; two adjacent left and right sound insulation boards are respectively spliced and fixed with connecting pipes of the two sound insulation boards through two ends of a water pipe; a plurality of through-hole has openly been seted up to the acoustic celotex board, and a plurality of apopore has been seted up to the connecting pipe, and when the connecting pipe was pegged graft with the connecting pipe, a plurality of apopore and a plurality of through-hole of planting the groove top communicate one by one. This application has the effect that improves greenbelt installation effectiveness.

Description

Municipal administration road sound insulation greenbelt and be used for water treatment system of greenbelt
Technical Field
The application relates to the technical field of municipal road sound insulation facilities, in particular to a municipal road sound insulation green belt and a water treatment system for the green belt.
Background
In municipal road infrastructure, greenbelts play roles in eliminating visual fatigue, purifying the environment, beautifying the city, reducing traffic accidents and the like, and occupy an irreplaceable important position in the city.
Among the correlation technique, in order to improve greenbelt sound insulation effect, can splice the acoustic celotex board in road both sides usually, and at the fixed planting groove of the positive installation of acoustic celotex board, and toward planting green vegetation in the planting groove, and openly lay water supply pipe at the acoustic celotex board, water supply pipe sets up the delivery port of a plurality of and various groove one-to-one of planting, rivers flow from the delivery port, be used for providing moisture for green vegetation, when green vegetation plays the afforestation city, also play dual syllable-dividing effect with the acoustic celotex board.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: adjacent acoustic celotex board all is through the bolt fastening, and water supply pipe and plant the groove and all fix at the acoustic celotex board openly through connecting pieces such as bolts, has the problem that makes greenbelt installation effectiveness low, consequently still has the improvement space.
Disclosure of Invention
In order to improve greenbelt installation effectiveness, this application provides a town road sound insulation greenbelt and be used for the water treatment system of greenbelt.
The application provides a municipal administration road sound insulation greenbelt and be used for water treatment system of greenbelt adopts following technical scheme:
a municipal road sound insulation green belt comprises a plurality of sound insulation boards which are arranged side by side and in a stacked mode and a plurality of planting grooves which correspond to the sound insulation boards one to one; the upper end surface of each sound insulation board is provided with a bulge, the lower end surface of each sound insulation board is provided with a groove, and two adjacent sound insulation boards are fixedly inserted through the bulges and the grooves; one side of the sound insulation board is communicated with a connecting pipe, a water pipe is connected to the cavity of the sound insulation board in a horizontal sliding manner, the water pipe is communicated with the connecting pipe, the water pipe penetrates through one side of the sound insulation board, which is far away from the connecting pipe, and the sound insulation board is provided with a driving piece for driving the water pipe to horizontally slide; two adjacent left and right sound insulation boards are respectively spliced and fixed with connecting pipes of the two sound insulation boards through two ends of a water pipe; the acoustic celotex board openly has seted up a plurality of evenly distributed's through-hole, a plurality of apopore has been seted up to the connecting pipe, works as when the connecting pipe is pegged graft with the connecting pipe, it is a plurality of apopore and a plurality of through-hole of planting the groove top communicate one by one.
By adopting the technical scheme, the sound insulation boards which are adjacent up and down are inserted and fixed through the bulges and the grooves, which is favorable for reducing the situation that the sound insulation boards are horizontally staggered, the water pipe horizontally slides in the sound insulation boards, the driving piece drives the water pipe to horizontally slide, so that the two ends of the water pipe are respectively inserted with the connecting pipes of the two sound insulation boards, thereby completing the connection of the adjacent baffle pipes, connecting and fixing the left and right adjacent baffles, reducing the probability of the upper and lower dislocation of the baffles which are distributed side by side, the step of fixing the water pipe is also reduced, the sound insulation board is convenient to assemble quickly, the installation efficiency of the green belt is integrally improved, the water pipe is provided with the water outlet hole which is communicated with the through hole of the sound insulation board, therefore, the through hole which is originally used for silencing is used as a water outlet channel, the problem of water outlet of the water pipe is solved ingeniously, and the water pipe is favorable for conveying water for green plants in the planting groove.
Preferably, the planting groove is provided with a hook which is hooked at the upper end of the sound insulation board.
By adopting the technical scheme, the hook of the planting groove is hooked with the upper end of the sound insulation board in a dry hanging mode, so that the installer can install the planting groove quickly.
Preferably, the hook part of the hook penetrates through the mounting hole along the vertical direction, and the hook is fixedly connected with the sound insulation board through the mounting hole and the protrusion in an inserted manner.
Through adopting above-mentioned technical scheme, protruding and mounting hole grafting cooperation down, protruding plays spacing and the effect of location to the couple, is favorable to fixing planting the groove in suitable position, and simultaneously, the recess and the protruding grafting of top acoustic celotex board are favorable to assembling fast of upper and lower adjacent acoustic celotex board promptly, also are favorable to restricting the hook portion of couple between upper and lower adjacent acoustic celotex board.
Preferably, the sound-proof plate upper end is sunken to have the holding tank, the hook portion of couple holds in the holding tank.
Through adopting above-mentioned technical scheme, the hook portion embedding that will get in touch is located the holding tank of the acoustic celotex board of below, and the concatenation of the adjacent acoustic celotex board about being convenient for is favorable to reducing the probability of production in the adjacent acoustic celotex board clearance about simultaneously.
Preferably, the water pipe is equipped with the rack, rack length direction is unanimous with water pipe length direction, the driving piece is including rotating the gear of connecting in the acoustic celotex board cavity inner wall, the gear with rack toothing transmission, the acoustic celotex board openly is equipped with the operation piece with gear coaxial coupling.
Through adopting above-mentioned technical scheme to the accessible rotates the operation piece and orders about gear revolve to under the meshing transmission of gear and rack, the water pipe carries out horizontal migration, thereby accomplishes pegging graft of water pipe and connecting pipe, and the meshing transmission of gear and rack has the accurate advantage of transmission, the through-hole of being convenient for aligns with the apopore.
Preferably, a locking member is arranged between the operating block and the planting groove.
Through adopting above-mentioned technical scheme to carry out the lock solid to operation piece and planting groove, reduce the connecting pipe and take place gliding condition when carrying water.
Preferably, the retaining member comprises a limiting ring connected with the planting groove and a screw rod with a thread penetrating through the operation block, and the screw rod is fixedly connected with the limiting ring in an inserting mode.
By adopting the technical scheme, the screw rod is inserted into the limit ring by rotating the screw rod, and the limit ring has a limit function on the screw rod and can prevent the operation block from rotating when the locking piece is in a locking state; meanwhile, the screw rod also has a limiting effect on the connecting ring, so that the planting groove is stabilized on the front surface of the sound insulation board, the situation that the planting groove turns outwards due to other external force factors and the hook is broken is reduced, the screw rod and the connecting block are mutually limited, the number of locking pieces is reduced, and the installation efficiency of the green belt is improved; because the alignment of the acoustic celotex board through-hole and the apopore of water pipe is difficult to observe through between the naked eye, the screw rod plays the effect of sighting rod, and when the screw rod aimed at spacing hole, apopore and through-hole also were in the alignment status, are favorable to improving the installation effectiveness of greenbelt.
The utility model provides a water treatment system of town road sound insulation greenbelt, including water supply installation, with house steward and a plurality of branch pipes and house steward intercommunication that water supply installation communicates, a plurality of the branch pipe is pegged graft one by one and is fixed in the connecting tube of a plurality of vertical distribution's acoustic celotex board.
Through adopting above-mentioned technical scheme, water supply installation provides the required moisture of green planting as the water source for the greenbelt, and house steward and branch pipe outside playing the function of carrying the water source, also play the limiting action to adjacent acoustic celotex board from top to bottom, reduce adjacent acoustic celotex board from top to bottom and receive other probabilities that break away from each other, are favorable to reducing the use of locking part, have further improved the installation effectiveness of greenbelt.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the water pipe is connected with the sound insulation board cavity in a horizontal sliding manner, one end of the water pipe is connected with the connecting pipe on one side of the sound insulation board in an inserting manner, and the water pipe is driven to horizontally slide by the driving piece, so that the other end of the water pipe is connected with the adjacent connecting pipe in an inserting manner, the two sound insulation boards which are adjacent to each other on the left and right are spliced, the movement of the sound insulation boards which are adjacent to each other up and down is limited, the connection of pipelines is completed, the steps of pipeline installation and sound insulation board splicing are simplified, and the installation efficiency of a green belt is improved;
2. run through in the continuous operation piece of driving piece through the screw rod screw thread to peg graft with the spacing ring of planting the groove, the mutual restriction of screw rod and spacing ring when preventing the operation piece pivoted, and accomplish the fixed to planting the groove, reduced retaining member quantity, and the screw rod plays the effect of sighting rod, is favorable to improving the installation effectiveness of greenbelt.
Drawings
FIG. 1 is a schematic overall structure diagram of a municipal road sound insulation green belt according to an embodiment of the application.
FIG. 2 is a vertical cross-sectional view of the sound insulation board in the municipal road sound insulation green belt according to the embodiment of the application.
FIG. 3 is a transverse cross-sectional view of a sound insulating panel in a municipal road sound insulating green belt according to an embodiment of the application.
Description of reference numerals: 1. a sound insulating board; 11. accommodating grooves; 111. a protrusion; 12. a groove; 13. a through hole; 14. a connecting pipe; 15. a fixed block; 16. sound insulation cotton; 2. planting grooves; 21. hooking; 211. mounting holes; 3. a water supply device; 31. a water tank; 32. a water pump; 33. a header pipe; 34. a branch pipe; 35. connecting lugs; 4. a water pipe; 41. a water outlet hole; 42. a rack; 5. a locking member; 51. a screw; 52. a limiting ring; 6. a gear; 61. and an operation block.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses town road sound insulation greenbelt and be used for water treatment system of greenbelt. Referring to fig. 1 and 2, a municipal road sound-insulating green belt comprises a plurality of sound-insulating boards 1 and a plurality of planting grooves 2. The planting grooves 2 correspond to the sound insulation boards 1 one by one. The plurality of acoustic panels 1 are arranged side by side and in a stacked manner, the front and back surfaces of the plurality of acoustic panels 1 located at the lowermost layer are respectively fixed with a fixing block 15, and the fixing blocks 15 are fixed on the ground through screws. A plurality of through holes 13 which are uniformly distributed penetrate through the front surface of each sound insulation board 1, and sound insulation cotton 16 is filled in each sound insulation board 1.
Referring to fig. 2 and 3, the upper end surface of the baffle plate 1 is recessed with two receiving grooves 11, and the receiving grooves 11 communicate with the front and rear surfaces of the baffle plate 1. A protrusion 111 is fixed on the bottom wall of each receiving groove 11, and the upper end of the protrusion 111 extends out of the upper end opening of the receiving groove 11. Plant 2 openings in groove up, plant 2 opening edge in groove and be fixed with two hooks and connect in acoustic celotex board 1's upper end couple 21, and the hook portion of two couples 21 holds respectively in two holding tanks 11. Hook 21's hook portion has run through along vertical direction has mounting hole 211, mounting hole 211 with correspond protruding 111 grafting cooperation in the holding tank 11, is favorable to improving couple 21 and acoustic celotex board 1's the steadiness of being connected to the realization will be planted groove 2 and adorn and hang in the positive purpose of acoustic celotex board 1.
Referring to fig. 2 and 3, the lower terminal surface of acoustic celotex board 1 is sunken to have two recesses 12, and two acoustic celotex boards 1 adjacent from top to bottom are pegged graft fixedly through protruding 111 and recess 12, and protruding 111 cooperates with the grafting of recess 12, has improved the connection steadiness of upper and lower adjacent acoustic celotex board 1, plays the effect of installation location simultaneously, is favorable to improving acoustic celotex board 1 and assembles the quality.
Referring to fig. 2 and 3, the equal horizontal intercommunication in left side of every acoustic celotex board 1 has connecting pipe 14, and in connecting pipe 14 was embedded and was fixed in 1 cavity of acoustic celotex board, horizontal sliding connection had water pipe 4 in 1 cavity of acoustic celotex board, and water pipe 4 one end is pegged graft in connecting pipe 14 for water pipe 4 and connecting pipe 14 intercommunication. The connecting pipe 14 and the water pipe 4 are square pipes, which is beneficial for the water pipe 4 to stably slide in the connecting pipe 14. The inner wall of the connecting pipe 14 is bonded and covered with a rubber ring (not shown in the figure) to reduce the gap at the joint of the connecting pipe 14 and the water pipe 4.
Referring to fig. 2 and 3, a driving member is rotatably coupled to the baffle 1 in the cavity. The driving part is specifically a gear 6, and the rotation axis of the gear 6 is horizontally arranged and is vertical to the sliding direction of the water pipe 4. An operation block 61 located outside the baffle plate 1 is coaxially connected to the gear 6, and the operation block 61 is provided on the front surface of the baffle plate 1 and above the planting groove 2. The lower end face of the water pipe 4 is fixed with a rack 42 which is meshed with the gear 6 for transmission, and the length direction of the rack 42 is consistent with that of the water pipe 4. Through rotating operation piece 61, and under the meshing transmission of gear 6 and rack 42, water pipe 4 slides, accomplish to peg graft with the connecting pipe 14 of adjacent acoustic celotex board 1, at this moment, it is fixed with the connecting pipe 14 of two acoustic celotex boards 1 to peg graft respectively through a water pipe 4 both ends between two adjacent acoustic celotex boards 1 about not only accomplishing, the connection work of two adjacent acoustic celotex board 1 pipelines about not only finishing, the removal restriction to adjacent acoustic celotex board 1 has also been realized simultaneously, be favorable to improving the connection steadiness of adjacent greenbelt.
Referring to fig. 2 and 3, water pipe 4 has seted up a plurality of apopore 41 along 4 length direction equal interval distribution of water pipe towards the positive one side of acoustic celotex board 1, the interval of two adjacent apopores 41 equals with the interval of two adjacent through-holes 13, when the grafting is accomplished with the connecting pipe 14 of both sides respectively at water pipe 4 both ends, a plurality of apopores 41 of water pipe 4 aim at and communicate with a plurality of through-holes 13 of planting 2 tops in the groove, be favorable to water 4 interior water to flow from through-hole 13, thereby accomplish the intercommunication work of the pipeline delivery end of greenbelt.
Referring to fig. 2 and 3, a locking member 5 is disposed between the operation block 61 and the planting slot 2, and the locking member 5 includes a screw 51 threaded through the operation block 61 in a vertical direction and a stop ring 52 disposed on an inner side wall of the planting slot 2 and located right below the operation block 61. The purpose of mutual limitation of the screw rod 51 and the limiting ring is realized by inserting and fixing the lower end of the screw rod 51 and the limiting ring 52, and the planting groove 2 is fixed while the operation block 61 is limited to rotate. Therefore, the number of the locking parts 5 is reduced through ingenious position design and locking modes, the locking steps are simplified, and the installation efficiency of the green belt is improved. When the screw rod 51 aims at the limiting rod, the through hole 13 is communicated with the water outlet hole 41, so that the screw rod 51 has an identification function, and an installer can conveniently connect the water pipe 4.
Referring to fig. 1 and 2, the water treatment system of the municipal road sound-insulation green belt comprises a water supply device 3, a main pipe 33 communicated with the water supply device 3 and a plurality of branch pipes 34 communicated with the main pipe 33. The water supply device 3 comprises a water tank 31 and a water pump 32 communicated with the water tank 31, the output end of the water pump 32 is communicated with a main pipe 33, the main pipe 33 extends to the left side of the green belt, a plurality of branch pipes 34 are in one-to-one correspondence with the connecting pipes 14 of the sound insulation boards 1 on the leftmost side of the green belt, the branch pipes 34 are square pipes, and the branch pipes 34 are fixedly inserted into the corresponding connecting pipes 14 one by one, so that the connection between the water supply device 3 and the pipelines in the green belt is completed. The main pipe 33 is fixed to the soundproof panel 1 on the leftmost side of the green belt by a plurality of coupling lugs 35 to prevent the branch pipes 34 from being separated from the coupling pipes 14. Meanwhile, a plurality of connecting pipes 14 at the rightmost side of the green belt are plugged, so that water of the water supply device 3 can smoothly flow out from the through holes 13. The branch pipe 34 is inserted into the connection pipe 14, which is advantageous for connecting the water supply device 3 pipeline and the green belt pipeline, and limits the upper and lower sound insulation boards 1 to prevent the adjacent sound insulation boards 1 from separating up and down.
The implementation principle of municipal road sound insulation greenbelt and water treatment system for the greenbelt in the embodiment of the application is as follows:
when installing greenbelt and water treatment system, installer adopts from a left side to the right side, from supreme installation principle down to assemble acoustic celotex board 1, after assembling and accomplishing one row of acoustic celotex board 1, installs corresponding planting groove 2 in acoustic celotex board 1 openly again. When planting groove 2 is installed, the installer hangs hook 21 on the upper end of sound insulation board 1, and simultaneously completes the insertion of mounting hole 211 of hook 21 and protrusion 111 of sound insulation board 1, so that the hook part of hook 21 is positioned in accommodating groove 11, and the positioning installation of planting groove 2 is facilitated. Adjacent acoustic celotex board 1 in-process about the installation, through the grafting of arch 111 with recess 12, be favorable to acoustic celotex board 1's location installation, after acoustic celotex board 1 and planting groove 2 are all installed and are accomplished, clockwise rotation each acoustic celotex board 1's operation piece 61 one by one, under the meshing transmission of gear 6 and rack 42, water pipe 4 moves toward acoustic celotex board 1 right side, until the grafting intercommunication of water pipe 4 and adjacent acoustic celotex board 1's connecting pipe 14, and apopore 41 and the through-hole 13 intercommunication that corresponds, thereby the joint work of pipeline and the concatenation fixed work of acoustic celotex board 1 have been accomplished, then through rotating screw 51, make screw 51 peg graft with spacing ring 52, thereby accomplish the locking fixed work of acoustic celotex board 1 and planting groove 2, be favorable to improving greenbelt installation effectiveness.
When the water treatment system is connected with the green belt through the pipeline, an installer inserts the branch pipes 34 of the main pipe 33 and the connecting pipes 14 on the left side of the green belt one by one, fixes the main pipe 33 on the leftmost side of the green belt through the connecting lugs 35, and simultaneously plugs the connecting pipe 14 on the rightmost side of the green belt, so that the pipeline connection work of the water treatment system and the green belt is completed.
When the green plants in the planting groove 2 are watered, the water pump 32 is started firstly, under the driving of the water pump 32, water in the water tank 31 enters the connecting pipe 14 and the water pipe 4 of the green belt through the main pipe 33 and the branch pipe 34, sequentially passes through the water outlet holes 41 of the water pipe 4 and the through holes 13 of the sound insulation board 1, and flows into the planting groove 2 below, so that the purpose of providing water for the green plants is achieved.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (5)

1. The utility model provides a town road sound insulation greenbelt which characterized in that: comprises a plurality of sound insulation boards (1) which are arranged side by side and in a stacked manner and a plurality of planting grooves (2) which are in one-to-one correspondence with the plurality of sound insulation boards (1); the sound insulation board is characterized in that a protrusion (111) is arranged on the upper end face of each sound insulation board (1), a groove (12) is formed in the lower end face of each sound insulation board (1), and two adjacent sound insulation boards (1) are spliced and fixed through the protrusion (111) and the groove (12); one side of the sound insulation board (1) is communicated with a connecting pipe (14), a water pipe (4) is connected to the cavity of the sound insulation board (1) in a horizontal sliding mode, the water pipe (4) is communicated with the connecting pipe (14), the water pipe (4) penetrates through one side, away from the connecting pipe (14), of the sound insulation board (1), and a driving piece driving the water pipe (4) to slide horizontally is arranged on the sound insulation board (1); the two sound insulation boards (1) which are adjacent left and right are respectively spliced and fixed with the connecting pipes (14) of the two sound insulation boards (1) through the two ends of the water pipe (4); the front surface of the sound insulation board (1) is provided with a plurality of through holes (13) which are uniformly distributed, the water pipe (4) is provided with a plurality of water outlet holes (41), and when the water pipe (4) is spliced with the connecting pipe (14), the water outlet holes (41) are communicated with the through holes (13) above the planting groove (2) one by one;
the water pipe (4) is provided with a rack (42), the length direction of the rack (42) is consistent with that of the water pipe (4), the driving piece comprises a gear (6) which is rotatably connected to the inner wall of the cavity of the sound insulation board (1), the gear (6) is in meshing transmission with the rack (42), and the front surface of the sound insulation board (1) is provided with an operation block (61) which is coaxially connected with the gear (6);
a locking piece (5) is arranged between the operation block (61) and the planting groove (2);
the locking piece (5) comprises a limiting ring (52) connected with the planting groove (2) and a screw rod (51) with threads penetrating through the operation block (61), and the screw rod (51) is fixedly inserted into the limiting ring (52);
when the screw rod (51) is aligned with the limiting ring (52), the water outlet hole (41) and the through hole (13) are also in an aligned state.
2. The municipal road sound-insulation green belt according to claim 1, characterized in that: the planting groove (2) is provided with a hook (21), and the hook (21) is hooked on the upper end of the sound insulation board (1).
3. The municipal road sound-insulation green belt according to claim 2, characterized in that: the hook part of couple (21) has run through mounting hole (211) along vertical direction, couple (21) pass through mounting hole (211) are fixed in acoustic celotex board (1) with protruding (111) grafting.
4. The municipal road sound-insulation green belt according to claim 3, characterized in that: the upper end of the sound insulation board (1) is sunken to form an accommodating groove (11), and a hook part of the hook (21) is accommodated in the accommodating groove (11).
5. A water treatment system for municipal road sound-insulating green belts according to any one of claims 1 to 4, characterized in that: including water supply installation (3), with house steward (33) and a plurality of branch pipes (34) that communicate with house steward (33) that water supply installation (3) communicate, a plurality of branch pipes (34) are pegged graft one by one and are fixed in connecting pipe (14) of a plurality of vertical distribution's acoustic celotex board (1).
CN202110362227.0A 2021-04-02 2021-04-02 Municipal administration road sound insulation greenbelt and be used for water treatment system of greenbelt Active CN113057044B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110362227.0A CN113057044B (en) 2021-04-02 2021-04-02 Municipal administration road sound insulation greenbelt and be used for water treatment system of greenbelt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110362227.0A CN113057044B (en) 2021-04-02 2021-04-02 Municipal administration road sound insulation greenbelt and be used for water treatment system of greenbelt

Publications (2)

Publication Number Publication Date
CN113057044A CN113057044A (en) 2021-07-02
CN113057044B true CN113057044B (en) 2022-08-16

Family

ID=76565509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110362227.0A Active CN113057044B (en) 2021-04-02 2021-04-02 Municipal administration road sound insulation greenbelt and be used for water treatment system of greenbelt

Country Status (1)

Country Link
CN (1) CN113057044B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113892366B (en) * 2021-09-16 2023-03-10 山东泰东公路工程有限公司 Municipal administration road sound insulation greenbelt and be used for water treatment system of greenbelt
CN115380799A (en) * 2022-07-12 2022-11-25 天津鑫路桥建设工程有限公司 Municipal administration road sound insulation greenbelt and be used for water treatment system of greenbelt

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206157937U (en) * 2016-11-16 2017-05-10 内蒙古化工职业学院 Building sound insulation panel
CN107980416A (en) * 2017-12-29 2018-05-04 林柏伦 The green wall of plant
CN207959029U (en) * 2018-01-24 2018-10-12 深圳市旭生骏鹏建筑工程有限公司 A kind of municipal administration sound barrier
CN108252232B (en) * 2018-01-25 2020-10-02 浙江嘉善市政园林有限公司 Municipal administration road sound insulation greenbelt and be used for water treatment system of greenbelt
CN108811927A (en) * 2018-07-25 2018-11-16 深圳润植科技有限公司 A kind of board-like plant ecological wall with water purifying function
CN211558157U (en) * 2020-01-20 2020-09-25 广东粤壮园林建设有限公司 Combinable plant wall

Also Published As

Publication number Publication date
CN113057044A (en) 2021-07-02

Similar Documents

Publication Publication Date Title
CN113057044B (en) Municipal administration road sound insulation greenbelt and be used for water treatment system of greenbelt
CN111593836A (en) Combined light steel keel wall module and mounting method thereof
CN102792205B (en) For the optical fiber dispensing net of multi-storey building unit
CN219477518U (en) Cable bridge convenient to installation
CN109057131A (en) A kind of integrated form furred ceiling and its installation method
CN204156310U (en) The quick Routing Switch case of standardization
CN219365554U (en) Assembled box room convenient to drainage
CN212984204U (en) Connecting structure of prefabricated wall and prefabricated air conditioner board
CN212129789U (en) Dampproofing ground structure convenient to repair
CN213173778U (en) Mountain slope repairing system
CN209725985U (en) Device is fixed with LED light in a kind of tunnel
CN220814673U (en) Ceramic tile dry hanging structure
CN219622456U (en) Noise reduction type garden decoration wall
KR20210051609A (en) Hydroponics cultivation system using underground structure
CN219242810U (en) Building pipeline installation location structure
CN211345548U (en) Mounting structure in tuber pipe indoor set furred ceiling
CN220778916U (en) Mounting structure of fire hydrant case
CN218861891U (en) Integral furred ceiling
CN212002080U (en) Residential water heating pipe well
CN218400433U (en) Automotive interior panel with environment-friendly and flame-retardant functions
CN214307276U (en) Energy-saving floor heating system of prefabricated house
CN216385863U (en) Automatic change gas processing apparatus
CN212248996U (en) Mounting member for building construction
CN216848293U (en) Branch device type prefabricated optical cable installation device
CN216689121U (en) Environmental protection device for municipal works

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant