CN113046512A CN202110251363.2A CN202110251363A CN113046512A CN 113046512 A CN113046512 A CN 113046512A CN 202110251363 A CN202110251363 A CN 202110251363A CN 113046512 A CN113046512 A CN 113046512A
Authority
CN
China
Prior art keywords
equal
less
rare earth
pipe
sizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110251363.2A
Other languages
Chinese (zh)
Inventor
余泽金
张昭
李东明
王鹏
米永峰
张行刚
许占海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baotou Iron and Steel Group Co Ltd
Original Assignee
Baotou Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baotou Iron and Steel Group Co Ltd filed Critical Baotou Iron and Steel Group Co Ltd
Priority to CN202110251363.2A priority Critical patent/CN113046512A/en
Publication of CN113046512A publication Critical patent/CN113046512A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/30Regulating or controlling the blowing
    • C21C5/35Blowing from above and through the bath
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/10Supplying or treating molten metal
    • B22D11/11Treating the molten metal
    • B22D11/114Treating the molten metal by using agitating or vibrating means
    • B22D11/115Treating the molten metal by using agitating or vibrating means by using magnetic fields
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/22Controlling or regulating processes or operations for cooling cast stock or mould
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/04Removing impurities by adding a treating agent
    • C21C7/06Deoxidising, e.g. killing
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/04Removing impurities by adding a treating agent
    • C21C7/072Treatment with gases
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/10Handling in a vacuum
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/10Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of tubular bodies
    • C21D8/105Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of tubular bodies of ferrous alloys

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Treatment Of Steel In Its Molten State (AREA)

Abstract

The invention discloses a method for producing a high-end rare earth bearing steel pipe through a whole process, which belongs to the technical field of metallurgy and forming, and comprises the following steps of (Wt%) 90% of blast furnace molten iron and 10% of high-quality scrap steel as raw materials: molten iron pretreatment → smelting in a top-bottom combined blown converter → refining in an LF furnace → VD vacuum treatment → round billet continuous casting → sizing cutting → heating of pipe blank → mushroom type perforation → continuous rolled pipe → micro tension sizing → cooling of a cooling bed → sizing sawing → hydrostatic test → nondestructive inspection; the product of the invention has the characteristics of low production cost, low impurity content and high dimensional precision. The gas oxygen in the finished product pipe prepared by the method is less than or equal to 10PPm, and the nitrogen is less than or equal to 50 PPm; the A, B, C, D, DS types of non-metallic inclusions are all less than or equal to 1.5 grade; the net-shaped and band-shaped carbide is less than or equal to 2.0 grade.

Description

Method for producing high-end rare earth bearing steel pipe in whole process
Technical Field
The invention relates to the field of ferrous metal smelting and metal pressure processing, in particular to a method for producing a high-end rare earth bearing steel pipe through a whole process.
Background
The bearing steel is required to have high and uniform hardness and wear resistance and high elastic limit, and the bearing steel has strict requirements on the uniformity of chemical components in the steel, the content and distribution of non-metallic inclusions, the distribution of carbides and the like; the excellent comprehensive performance of the alloy depends on the aspects of steel purity, structure, grain refinement degree and the like, so the control of material components, non-metal inclusions and structure is realized through the process control of molten iron pretreatment, a converter, an LF furnace, VD vacuum treatment, continuous casting, heating, rolling and the like.
Disclosure of Invention
The invention aims to provide a method for producing a high-end rare earth bearing steel pipe in a whole process, which can meet the process requirements of users and produce the rare earth bearing steel pipe with high dimensional accuracy.
In order to solve the technical problems, the invention adopts the following technical scheme:
a method for producing a high-end rare earth bearing steel pipe in a whole process comprises the following steps: firstly, pretreating blast furnace molten iron, then adding a top-bottom combined blowing converter for smelting, then putting the smelted molten steel into a ladle, feeding the molten steel into an LF furnace station for refining, feeding the molten steel into a VD station for vacuum degassing treatment after the refining is finished, then carrying out round billet continuous casting, cutting a continuous casting billet into a pipe blank, then heating the continuous casting pipe blank, then perforating and continuously rolling the heated pipe blank to form a continuously rolled pipe, then sizing the rolled pipe, then feeding the pipe blank into a cooling bed for cooling, then carrying out fixed-length saw cutting, and sequentially carrying out hydraulic test and nondestructive flaw detection, wherein qualified products are finished products of high-end rare earth bearing steel pipes produced in the whole process.
Further, the specific process comprises the following steps: molten iron pretreatment → smelting in a top-bottom combined blown converter → LF furnace refining → VD vacuum treatment → round billet continuous casting → sizing cutting → pipe blank heating → mushroom type perforation → PQF continuous rolling pipe → micro tension sizing → cooling bed cooling → sizing sawing → hydrostatic test → nondestructive inspection.
Further, the method specifically comprises the following steps:
s1, pretreating blast furnace molten iron to ensure that P in the molten iron is less than or equal to 0.120%; less than or equal to 0.050 percent of S, less than or equal to 0.002 percent of harmful elements Pb, less than or equal to 0.010 percent of As, less than or equal to 0.010 percent of Sn, less than or equal to 0.005 percent of Sb and less than or equal to 0.005 percent of Bi;
s2, adding the pretreated molten iron into a top-bottom combined blown converter, smelting by adopting a single slag process, controlling the final slag alkalinity and the end point target, carrying out deoxidation alloying in the tapping process, wherein the final deoxidation adopts an aluminum deoxidation process, slag is required to be blocked or removed in the tapping process, the tapping carbon is more than or equal to 0.20 percent, the tapping temperature is more than or equal to 1610 ℃, and the slag amount is less than 2 kg/t;
s3, refining in an LF (ladle furnace): blowing Ar normally in the whole refining process as required, and heating and raising the temperature by adopting a mode of gradually increasing the temperature raising speed from a low level to a high level; oxygen in the aluminum granules is used for deslagging and is added in batches in the smelting process; adjusting components according to the sample in position, adjusting slag system, and ensuring the alkalinity to be 4.5-5.5; al in place is more than or equal to 0.04 percent, and a calcium silicon wire of 100m is fed when LF is out of place;
s4, keeping the bottom to be soft-blown with Ar after the refining of the LF furnace is finished, and adding a predetermined amount of rare earth alloy;
s5, VD vacuum treatment: the vacuum degree is less than or equal to 0.10KPa, the deep vacuum time is more than or equal to 15 minutes, and the soft blowing time after wire feeding is more than or equal to 15 minutes; the flow of the soft argon blowing is strictly controlled after the air is broken, the molten steel cannot be exposed, and secondary oxidation is prevented;
s6, performing round billet continuous casting on the molten steel subjected to VD vacuum treatment, and adopting constant-speed control of low drawing speed, electromagnetic stirring and full-process protection pouring process; controlling the superheat degree delta T of the molten steel to be less than or equal to 30 ℃; specific water production: 0.30L/kg; sealing the sliding water port of the bale by adopting a graphite sealing bowl; drawing steel with a low drawing speed on the phi 200 section, wherein the drawing speed is in a range of 1.2m/min-1.50 m/min; the casting blank enters a slow cooling pit for slow cooling, and the slow cooling time is more than or equal to 72 hours;
s7, the standard qualified by the will-change inspection is
Figure BDA0002966208330000021
The tube blank is made into a tube, and the tube making process is as follows:
will be specified as
Figure BDA0002966208330000031
The tube blank is put into an annular heating furnace for heating, the charging temperature is less than or equal to 850 ℃, the soaking temperature is less than or equal to 1220 ℃, and the total heating time is more than or equal to 5 hours;
s8, heating to the specification of
Figure BDA0002966208330000032
The tube blank is subjected to bacterial perforation and then to
Figure BDA0002966208330000033
And continuously rolling and sizing on a PQF pipe rolling unit, wherein the temperature control range of the sized steel pipe is more than or equal to 820 ℃.
Further, in step S2, 400kg of top slag lime, 150kg of aluminum ingot and 100kg of fluorite pellets were added to the converter.
Furthermore, the blast furnace molten iron with the weight ratio of 90 percent and the high-quality scrap steel with the weight ratio of 10 percent are used as raw materials.
Further, the blast furnace molten iron is pretreated, and then the blast furnace molten iron and scrap steel are added into a top-bottom combined blown converter for smelting.
Further, the chemical components of the tube blank are as follows according to the weight percentage: 0.96-1.05% of C, 0.15-0.35% of Si, 0.30-0.45% of Mn, 1.45-1.60% of Cr, 0.0005-0.0015% of Ce, less than or equal to 0.020% of P, less than or equal to 0.010% of S, less than or equal to 0.002% of Pb, less than or equal to 0.005% of Ti, and the balance of Fe and trace impurity elements.
Further, the rare earth alloy is a Ce-Fe alloy.
Compared with the prior art, the invention has the beneficial technical effects that:
firstly, 90% of blast furnace molten iron and 10% of high-quality scrap steel are used as raw materials, the content of impurity elements is relatively low, and noble elements Mo, Nb, Cu and Ni are not contained, so that the production difficulty of the steel pipe is relatively low, and the production cost is relatively low;
secondly, a series of technical measures such as electromagnetic stirring, stacking slow cooling, scientific heating temperature, mature pipe rolling process, accurate forming of steel pipes and the like are adopted;
thirdly, a series of technical measures such as blast furnace molten iron, high-quality scrap steel, molten iron pretreatment, converter final slag alkalinity control, white slag refining, deep vacuum treatment, proper amount of CaSi wires, rare earth element Ce, soft blowing Ar, full-stroke protection pouring and the like are adopted, so that the inclusion content of the steel pipe is relatively low;
a series of technical measures such as continuous casting of the round pipe billet, stacking and slow cooling, accurate centering, bacteria type perforation, PQF continuous pipe rolling, micro-tension diameter reduction, whole-process online detection and the like are adopted, so that the size precision of the steel pipe is relatively high;
fifthly, the special component design of the rare earth element Ce, pure steel, electromagnetic stirring, ideal cast structure, mature tube rolling process and temperature straightening are carried out, so that the steel tube has excellent performance, and the specific performance indexes are as follows:
the oxygen content of the gas in the finished product pipe is less than or equal to 10PPm, and the nitrogen content is less than or equal to 50 PPm; the A, B, C, D, DS types of non-metallic inclusions are all less than or equal to 1.5 grade; the net-shaped and band-shaped carbide is less than or equal to 2.0 grade.
Aiming at the problems in the background technology, the invention well solves the technical problems and makes remarkable progress through the technical measures of 'unique chemical component design and unique production process taking blast furnace molten iron as raw material'.
Detailed Description
The present invention will be described in further detail with reference to examples 1 to 2.
A method for producing a high-end rare earth bearing steel pipe in a whole process comprises the following raw materials in percentage by weight: the blast furnace molten iron accounts for 90 percent, and the high-quality scrap steel accounts for 10 percent;
the production process flow sequence is as follows: molten iron pretreatment → smelting in a top-bottom combined blown converter → LF furnace refining → VD vacuum treatment → round billet continuous casting → sizing cutting → pipe blank heating → mushroom type perforation → PQF continuous rolling pipe → micro-expansion force sizing → cooling bed cooling → sizing sawing → hydrostatic test → nondestructive inspection.
The specific production process flow is briefly described as follows:
pretreating molten iron, wherein P in the molten iron is 0.110%; and S is 0.045%.
Adding the pretreated molten iron into a top-bottom combined blown converter, adding 10 percent (by weight) of high-quality scrap steel, smelting by adopting a single slag process, controlling final slag alkalinity and a terminal point target, carrying out deoxidation alloying in the tapping process, carrying out aluminum deoxidation process in the final deoxidation, pushing off slag and skimming slag in the tapping process, wherein the tapping carbon is 0.21 percent, and the tapping temperature is 1620 ℃; 400kg of top slag lime, 150kg of aluminum ingot and 100kg of fluorite balls are added into the converter.
Blowing Ar normally in the whole refining process as required, and heating and raising the temperature by adopting a mode of gradually increasing the temperature raising speed from a low level to a high level; oxygen in the aluminum granules is used for deslagging, and 80kg of oxygen is added in batches in the smelting process; adjusting components according to the sample in position, adjusting slag system, and ensuring the alkalinity to be 4.5-5.5; in-place Al0.041%, and feeding 100m calcium silicate wire when LF is out-of-place.
After the refining of the LF furnace is finished, keeping the bottom to perform soft blowing of Ar, and adding 5kg of rare earth alloy containing 50% of rare earth; performing VD vacuum treatment: the vacuum degree is 0.06KPa, the deep vacuum time is 15 minutes, and the soft blowing time is 15 minutes after the wire feeding;
performing round billet continuous casting on the molten steel subjected to VD vacuum treatment, and adopting constant-speed control of low drawing speed, electromagnetic stirring and whole-process protection pouring process; controlling the superheat degree delta T of the molten steel to be 25 ℃; specific water production: 0.30L/kg; sealing the sliding water port of the bale by adopting a graphite sealing bowl; drawing speed of phi 200 section is 1.2m/min-1.50 m/min; the casting blank enters a slow cooling pit for slow cooling, and the slow cooling time is 72 hours;
to the specification of
Figure BDA0002966208330000053
The tube blank is sampled and examined, and the chemical composition test results (weight percentage content) are shown in table 2.
TABLE 2 chemical composition test results (wt%) of tube blanks
Examples C Si Mn P S Cr Ce Ti Pb
Example 1 0.97 0.24 0.36 0.017 0.005 1.34 0.0011 0.0030 0.0009
Example 2 1.00 0.31 0.40 0.019 0.006 1.40 0.0012 0.0028 0.0012
And (4) sulfur printing: all the products do not exceed 1.5 grade, and the products are qualified through low-power inspection.
The standard qualified by chemical examination is
Figure BDA0002966208330000051
The tube blank is made into a tube, and the tube making process is as follows:
will be specified as
Figure BDA0002966208330000052
The tube blank is put into an annular heating furnace for heating, the temperature of each section of a preheating section, a heating section, a soaking section and the like of the annular heating furnace is continuously checked and controlled, the thorough and uniform heating is ensured, the overheating is avoided, the control range of the temperature of each section is shown in a table 3, and the total heating time is 5.5;
TABLE 3 temperature control (. degree. C.) of each stage of the annular furnace
Preheating I section Preheating stage II Heating stage I Heating stage II Soaking section I Soaking II section
750 850~1000 1000~1100 1100~1150 1150~1200 1200~1220
The temperature of each section of the annular heating furnace is automatically controlled and recorded by a microcomputer.
The hot tool must be measured before use, and the roller way must be checked and processed before rolling, so as to avoid scratching the pipe wall.
The heated specification is
Figure BDA0002966208330000061
The tube blank is subjected to bacterial perforation and then to
Figure BDA0002966208330000062
Continuously rolling the tube on a PQF tube rolling mill, sizing and forming the tube into a finished product with the specification
Figure BDA0002966208330000063
The seamless steel pipe of (1) is subjected to thermal sampling once per batch, and the geometric dimension is checked.
The specification of the production process is
Figure BDA0002966208330000064
The seamless steel pipe is subjected to nondestructive flaw detection and hydrostatic test in sequence, and then the finished product of the high-end rare earth bearing steel pipe produced by the whole process is formed. The prepared sample is used for testing the mechanical property and the metallographic property.
The specifications of the products produced in the examples 1 to 2 are verified to be
Figure BDA0002966208330000065
The results of the seamless steel pipe testing are shown in tables 4 to 7.
TABLE 4 bearing steel pipe chemical composition test results (% by weight)
Examples C Si Mn P S Cr Ce Ti Pb
Example 1 0.97 0.24 0.36 0.017 0.005 1.34 0.0011 0.0030 0.0009
Example 2 1.00 0.31 0.40 0.019 0.006 1.40 0.0012 0.0028 0.0012
TABLE 5 finished pipe gas content test results (PPm)
Examples H O N
Example 1 1.1 9 45
Example 2 0.80 8 40
TABLE 6 detection rating result (grade) of non-metallic inclusion in finished pipe
Examples Class A subfamily Class B subfamily Class C subfamily Class D subfamily Class DS system
Example 1 0.5 1.0 0 0.5 0
Example 2 0.5 0.5 0 0.5 0
TABLE 7 finished pipe carbide test rating results (grade)
Examples Net shape Strip shape Liquid chromatography
Example 1 2.0 1.0 0
Example 2 1.5 2.0 0
The above-described embodiments are merely illustrative of the preferred embodiments of the present invention, and do not limit the scope of the present invention, and various modifications and improvements of the technical solutions of the present invention can be made by those skilled in the art without departing from the spirit of the present invention, and the technical solutions of the present invention are within the scope of the present invention defined by the claims.

Claims (8)

1. A method for producing a high-end rare earth bearing steel pipe in a whole process is characterized by comprising the following steps: firstly, pretreating blast furnace molten iron, then adding a top-bottom combined blowing converter for smelting, then putting the smelted molten steel into a ladle, feeding the molten steel into an LF furnace station for refining, feeding the molten steel into a VD station for vacuum degassing treatment after the refining is finished, then carrying out round billet continuous casting, cutting a continuous casting billet into a pipe blank, then heating the continuous casting pipe blank, then perforating and continuously rolling the heated pipe blank to form a continuously rolled pipe, then sizing the rolled pipe, then feeding the pipe blank into a cooling bed for cooling, then carrying out fixed-length saw cutting, and sequentially carrying out hydraulic test and nondestructive flaw detection, wherein qualified products are finished products of high-end rare earth bearing steel pipes produced in the whole process.
2. The full-process production method of the high-end rare earth bearing steel pipe according to claim 1, wherein the specific process comprises the following steps: molten iron pretreatment → smelting in a top-bottom combined blown converter → LF furnace refining → VD vacuum treatment → round billet continuous casting → sizing cutting → pipe blank heating → mushroom type perforation → PQF continuous rolling pipe → micro tension sizing → cooling bed cooling → sizing sawing → hydrostatic test → nondestructive inspection.
3. The full-process production method of the high-end rare earth bearing steel pipe according to claim 2, characterized by comprising the following steps:
s1, pretreating blast furnace molten iron to ensure that P in the molten iron is less than or equal to 0.120%; less than or equal to 0.050 percent of S, less than or equal to 0.002 percent of harmful elements Pb, less than or equal to 0.010 percent of As, less than or equal to 0.010 percent of Sn, less than or equal to 0.005 percent of Sb and less than or equal to 0.005 percent of Bi;
s2, adding the pretreated molten iron into a top-bottom combined blown converter, smelting by adopting a single slag process, controlling the final slag alkalinity and the end point target, carrying out deoxidation alloying in the tapping process, wherein the final deoxidation adopts an aluminum deoxidation process, slag is required to be blocked or removed in the tapping process, the tapping carbon is more than or equal to 0.20 percent, the tapping temperature is more than or equal to 1610 ℃, and the slag amount is less than 2 kg/t;
s3, refining in an LF (ladle furnace): blowing Ar normally in the whole refining process as required, and heating and raising the temperature by adopting a mode of gradually increasing the temperature raising speed from a low level to a high level; oxygen in the aluminum granules is used for deslagging and is added in batches in the smelting process; adjusting components according to the sample in position, adjusting slag system, and ensuring the alkalinity to be 4.5-5.5; al in place is more than or equal to 0.04 percent, and a calcium silicon wire of 100m is fed when LF is out of place;
s4, keeping the bottom to be soft-blown with Ar after the refining of the LF furnace is finished, and adding a predetermined amount of rare earth alloy;
s5, VD vacuum treatment: the vacuum degree is less than or equal to 0.10KPa, the deep vacuum time is more than or equal to 15 minutes, and the soft blowing time after wire feeding is more than or equal to 15 minutes; the flow of the soft argon blowing is strictly controlled after the air is broken, the molten steel cannot be exposed, and secondary oxidation is prevented;
s6, performing round billet continuous casting on the molten steel subjected to VD vacuum treatment, and adopting constant-speed control of low drawing speed, electromagnetic stirring and full-process protection pouring process; controlling the superheat degree delta T of the molten steel to be less than or equal to 30 ℃; specific water production: 0.30L/kg; sealing the sliding water port of the bale by adopting a graphite sealing bowl; drawing steel with a lower drawing speed on the section, wherein the drawing speed is within a range of 1.2m/min-1.50 m/min; the casting blank enters a slow cooling pit for slow cooling, and the slow cooling time is more than or equal to 72 hours;
s7, placing the tube blank into a heating furnace for heating, wherein the charging temperature is less than or equal to 850 ℃, the soaking temperature is less than or equal to 1220 ℃, and the total heating time is more than or equal to 5 hours.
S8, performing mushroom perforation on the heated tube blank, then performing continuous rolling and sizing on a PQF tube rolling mill unit, wherein the temperature control range of the steel tube after sizing is more than or equal to 820 ℃.
4. The method for producing a high-end rare earth bearing steel pipe through the whole process according to claim 3, wherein 400kg of top dross lime, 150kg of aluminum ingot and 100kg of fluorite pellets are added in the converter in the step S2.
5. The method for producing a high-end rare earth bearing steel pipe through the whole process according to any one of claims 1 to 4, wherein the raw materials are molten iron of a blast furnace in an amount of 90% by weight and scrap steel in an amount of 10% by weight.
6. The method for producing the high-end rare earth bearing steel pipe through the whole process according to claim 5, wherein molten iron in a blast furnace is pretreated and then added into a top-bottom combined blown converter together with scrap steel for smelting.
7. The full-process production method of the high-end rare earth bearing steel pipe according to claim 5, wherein the chemical components of the pipe blank are as follows according to weight percentage: 0.96-1.05% of C, 0.15-0.35% of Si, 0.30-0.45% of Mn0.45%, 1.45-1.60% of Cr, 0.0005-0.0015% of Ce, less than or equal to 0.020% of P, less than or equal to 0.010% of S, less than or equal to 0.002% of Pb, less than or equal to 0.005% of Ti, and the balance of Fe and trace impurity elements.
8. The full process method for producing a high end rare earth bearing steel pipe according to claim 3, wherein the rare earth alloy is a Ce-Fe alloy.
CN202110251363.2A 2021-03-08 2021-03-08 Method for producing high-end rare earth bearing steel pipe in whole process Pending CN113046512A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110251363.2A CN113046512A (en) 2021-03-08 2021-03-08 Method for producing high-end rare earth bearing steel pipe in whole process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110251363.2A CN113046512A (en) 2021-03-08 2021-03-08 Method for producing high-end rare earth bearing steel pipe in whole process

Publications (1)

Publication Number Publication Date
CN113046512A true CN113046512A (en) 2021-06-29

Family

ID=76510263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110251363.2A Pending CN113046512A (en) 2021-03-08 2021-03-08 Method for producing high-end rare earth bearing steel pipe in whole process

Country Status (1)

Country Link
CN (1) CN113046512A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114350881A (en) * 2021-12-03 2022-04-15 包头钢铁(集团)有限责任公司 Method for producing low-carbon medium-alloy round pipe billet by LD-LF-VD-MCC system through double refining process
CN115094189A (en) * 2022-05-06 2022-09-23 包头钢铁(集团)有限责任公司 Method for changing appearance of nitride in bearing steel by adopting rare earth La
CN115558861A (en) * 2022-10-18 2023-01-03 包头钢铁(集团)有限责任公司 Economical X70Q thick-wall seamless steel tube manufacturing method
CN117344220A (en) * 2023-09-26 2024-01-05 包头钢铁(集团)有限责任公司 Rare earth-containing intermediate steel grade petroleum casing pipe and production method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103602904A (en) * 2013-04-24 2014-02-26 内蒙古包钢钢联股份有限公司 Rare earth containing low-cost seamless steel pipe for L415N pipeline and production method thereof
CN111304536A (en) * 2020-03-25 2020-06-19 包头钢铁(集团)有限责任公司 Bearing steel containing rare earth BTZC15 and production method thereof
CN111349855A (en) * 2020-03-25 2020-06-30 包头钢铁(集团)有限责任公司 BTZC15 bearing steel produced by adopting two-fire forming process and production method thereof
CN111441003A (en) * 2020-04-03 2020-07-24 包头钢铁(集团)有限责任公司 Rare earth-containing bearing circular tube blank
CN111589870A (en) * 2020-04-03 2020-08-28 包头钢铁(集团)有限责任公司 Method for producing rare earth bearing seamless steel pipe by adopting phi 200mm round pipe blank

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103602904A (en) * 2013-04-24 2014-02-26 内蒙古包钢钢联股份有限公司 Rare earth containing low-cost seamless steel pipe for L415N pipeline and production method thereof
CN111304536A (en) * 2020-03-25 2020-06-19 包头钢铁(集团)有限责任公司 Bearing steel containing rare earth BTZC15 and production method thereof
CN111349855A (en) * 2020-03-25 2020-06-30 包头钢铁(集团)有限责任公司 BTZC15 bearing steel produced by adopting two-fire forming process and production method thereof
CN111441003A (en) * 2020-04-03 2020-07-24 包头钢铁(集团)有限责任公司 Rare earth-containing bearing circular tube blank
CN111589870A (en) * 2020-04-03 2020-08-28 包头钢铁(集团)有限责任公司 Method for producing rare earth bearing seamless steel pipe by adopting phi 200mm round pipe blank

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114350881A (en) * 2021-12-03 2022-04-15 包头钢铁(集团)有限责任公司 Method for producing low-carbon medium-alloy round pipe billet by LD-LF-VD-MCC system through double refining process
CN115094189A (en) * 2022-05-06 2022-09-23 包头钢铁(集团)有限责任公司 Method for changing appearance of nitride in bearing steel by adopting rare earth La
CN115558861A (en) * 2022-10-18 2023-01-03 包头钢铁(集团)有限责任公司 Economical X70Q thick-wall seamless steel tube manufacturing method
CN117344220A (en) * 2023-09-26 2024-01-05 包头钢铁(集团)有限责任公司 Rare earth-containing intermediate steel grade petroleum casing pipe and production method thereof

Similar Documents

Publication Publication Date Title
CN113046512A (en) Method for producing high-end rare earth bearing steel pipe in whole process
CN107604250B (en) A kind of heavy truck transmission gear 21MnCrMoS steel and its manufacturing method
CN109797339A (en) A kind of tensile strength >=960MP martensite Micro Alloying high-strength steel and its manufacturing method
CN106917033A (en) A kind of preparation method of high-quality 40Cr alloy structures vertical bar round steel
CN114645208B (en) Tellurium-treated non-quenched and tempered steel for connecting rod and production method thereof
CN111996443A (en) Rare earth wear-resistant NM 360-shaped steel and production process thereof
CN112962027B (en) Optimized machining method of alloy structural steel
CN112695248B (en) Wear-resistant hot-rolled seamless steel tube for conveying concrete containing rare earth and production method thereof
CN114480987A (en) Rare earth-containing NM600 wear-resistant steel plate and preparation method thereof
CN107779775A (en) H13 high speeds precision forging die steel and steel ingot production method
CN109055859A (en) A kind of industrial robot joint flexbile gear high intensity RL40 steel and preparation method
CN102965589B (en) Mechanical expanding machine pull rod shaft with high fatigue strength and preparation method thereof
CN111304536A (en) Bearing steel containing rare earth BTZC15 and production method thereof
CN114855084B (en) Hot-rolled round steel for 120ksi steel grade high-strength high-toughness high-grade sulfur-resistant drill rod joint and preparation method thereof
CN112813359B (en) Medium-carbon low-alloy high-strength hydrogen sulfide corrosion-resistant oil well pipe
CN113136526B (en) Steel 35CrNiMo for large-specification steel pull rod for bridge and production method thereof
CN112853214B (en) Economical type rare earth-containing 80ksi steel grade hydrogen sulfide corrosion and collapse resistant petroleum casing pipe
CN115094304A (en) Steel for producing ball screw with ultra-long service life by continuous casting round billet and preparation method thereof
CN103667930A (en) Moisture-proof H2S-corrosion-resistant L555QS pipeline tube containing rare earth and production method of pipeline tube
CN113957348A (en) Steel for long-life hydraulic breaking hammer drill rod and preparation method thereof
CN113604742A (en) Corrosion-resistant plastic die steel flat steel with high pre-hardening hardness and excellent cutting processing performance and manufacturing method thereof
CN118222906A (en) Manufacturing method of seamless steel tube for rare earth bearing formed by adopting phi 200mm continuous casting blank through PQF hot continuous rolling unit
CN111187994A (en) Steel C60 hot-rolled coil for high-C cutter and preparation method thereof
CN112962030B (en) Large-specification high-fragment-rate steel and preparation method thereof
CN113802068B (en) Alloy structural steel containing tungsten and production method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210629

RJ01 Rejection of invention patent application after publication