CN113013881B
CN113013881B CN202110425757.5A CN202110425757A CN113013881B CN 113013881 B CN113013881 B CN 113013881B CN 202110425757 A CN202110425757 A CN 202110425757A CN 113013881 B CN113013881 B CN 113013881B
Authority
CN
China
Prior art keywords
power
node
distribution network
power distribution
distributed photovoltaic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110425757.5A
Other languages
English (en)
Other versions
CN113013881A (zh
Inventor
罗凤章
矫政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN202110425757.5A priority Critical patent/CN113013881B/zh
Publication of CN113013881A publication Critical patent/CN113013881A/zh
Application granted granted Critical
Publication of CN113013881B publication Critical patent/CN113013881B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Abstract

一种考虑能源站的配电网分布式光伏并网接纳能力计算方法。其包括获取基础数据;构建分布式光伏并网最大接纳能力计算模型;转化成混合整数二阶锥规划模型并求解;构建能源站日前经济调度的优化模型;转化成混合整数二阶锥规划模型并求解,获得分布式光伏最大并网容量、能源站全天运行总费用、配电网潮流计算结果和能源站各组成单元的运行方案等步骤。本发明效果:根据能源行业及能源市场化改革的发展趋势,结合了分布式能源站来考虑分布式光伏并网接纳能力计算问题,在提升了配电网对分布式光伏的消纳能力的同时保证了分布式能源站的运行经济性。

Description

考虑能源站的配电网分布式光伏并网接纳能力计算方法
技术领域
本发明属于配电网分布式光伏并网接纳能力计算技术领域,特别是涉及一种考虑能源站的配电网分布式光伏并网接纳能力计算方法。
背景技术
近年来,随着化石燃料资源的逐渐枯竭和环境问题的日益突出,光伏发电、风力发电等可再生能源得到了大力发展和利用,同时作为区域综合能源系统中典型多能耦合载体的分布式能源站也得到了大力应用推广。由于可再生能源发电受环境因素的影响,其具有明显的随机性和波动性,从而给配电网的安全运行带来了诸多问题,同时分布式能源站作为区域综合能源系统中的重要组成部分,通过充分利用多能源的互补特性,能够提升配电系统运行的灵活性、提高能源利用效率、提高配电网的分布式光伏并网接纳能力。因此,如何实现考虑含分布式能源站的配电网光伏最大接入能力分析与评估,对于实现光伏的充分消纳与能源的高效利用具有重要意义。
目前,针对配电网分布式电源的接纳能力计算方法主要有内点法、解析法、启发式算法等,同时考虑到分布式能源站的引入,其自身的经济调度问题也必须被考虑进来,在完成光伏最大接入能力分析的同时确定出分布式能源站最优策略,由于计算规模的限制,以及对于求解速度、精度的要求使得传统分析方法不再适用,具有一定的局限性。
发明内容
为了解决上述问题,本发明的目的在于提供一种通过优化分布式能源站中可控单元的运行方案,确定配电网分布式光伏最大并网容量的基于添加割平面约束的混合整数二阶锥规划的考虑能源站的配电网分布式光伏并网接纳能力计算方法。
为了达到上述目的,本发明提供的考虑能源站的配电网分布式光伏并网接纳能力计算方法包括按顺序进行的下列步骤:
步骤A、获取配电网的包括网架结构、线路参数、负荷水平,能源站在配电网中的连接节点,能源站的基本架构和设备参数,分布式光伏的接入位置和功率因数,分布式光伏及电、热负荷的日运行特性预测曲线,室外温度预测曲线、室内温度变化范围及房屋基础参数,配电网的基准电压、基准功率、平衡节点的电压幅值及相角、运行电压水平和支路电流限制在内的基础数据;
步骤B、设置锥松弛最大偏差的计算精度和最大迭代次数,并设置迭代次数初值;
步骤C、依据步骤A获取的基础参数,选取配电网中根节点为配电网的平衡节点,以分布式光伏并网容量最大为目标函数,设定电功率平衡(配电网潮流约束)、热功率平衡、用户室内舒适度、能源站设备运行、配电网运行电压水平、配电网支路电流和分布式光伏运行约束条件,构建考虑分布式能源站的分布式光伏并网最大接纳能力计算模型;
步骤D、根据二阶锥规划的标准形式对步骤C构建的考虑分布式能源站的分布式光伏并网最大接纳能力计算模型中的约束条件进行线性化和锥转换,转化成混合整数二阶锥规划模型(Mixed Integer Second-Order Cone Programming,MISOCP);
步骤E、从步骤B中设置的迭代次数初值开始进行迭代,并判断迭代次数是否小于步骤B中设置的最大迭代次数,若不小于则结束,否则进入下一步骤;
步骤F、采用CPLEX求解器求解步骤D中获得的混合整数二阶锥规划模型,获得分布式光伏最大并网容量;
步骤G、判断锥松弛最大偏差是否满足步骤B中设置的锥松弛最大偏差的计算精度,若满足,转到步骤I,否则进入下一步骤;
步骤H、迭代次数加1,在步骤D中得到的混合整数二阶锥规划模型基础上增加割平面约束条件,然后返回步骤E;
步骤I、再次设置锥松弛最大偏差的计算精度和最大迭代次数,并设置迭代次数初值;
步骤J、依据步骤A提供的基础参数和步骤F计算得到的分布式光伏最大并网容量,选取配电网中根节点为配电网的平衡节点,以能源站全天运行总费用最小为目标函数,设定电功率平衡(配电网潮流约束)、热功率平衡、用户室内舒适度、能源站设备运行、配电网运行电压水平、配电网支路电流和分布式光伏运行约束条件,构建能源站日前经济调度的优化模型;
步骤K、根据二阶锥规划的标准形式对步骤J构建的能源站日前经济调度的优化模型中的约束条件进行线性化和锥转换,转化成混合整数二阶锥规划模型;
步骤L、从步骤I中设置的迭代次数初值开始进行迭代,并判断迭代次数是否小于步骤I中设置的最大迭代次数,若不小于则结束,否则进入下一步骤;
步骤M、采用CPLEX求解器求解步骤K中获得的混合整数二阶锥规划模型,获得分布式光伏最大并网容量、能源站全天运行总费用、配电网潮流计算结果和能源站各组成单元的运行方案;
步骤N、判断锥松弛最大偏差是否满足步骤I中设置的计算精度,若满足,转到步骤P,否则进入下一步骤;
步骤O、迭代次数加1,在步骤K中得到的混合整数二阶锥规划模型基础上增加割平面约束条件,然后返回步骤L;
步骤P、输出步骤M获得的分布式光伏最大并网容量、能源站全天运行总费用、配电网潮流计算结果和能源站各组成单元的运行方案。
在步骤C中,所述的考虑分布式能源站的分布式光伏并网最大接纳能力计算模型的目标函数表达式为:
Figure BDA0003029501050000031
其中,NPV表示配电系统中接入的分布式光伏总数,
Figure BDA0003029501050000032
表示第k次迭代中节点i上接入的分布式光伏的装机容量;
电功率平衡约束条件表达式为:
Figure BDA0003029501050000033
Figure BDA0003029501050000034
Figure BDA0003029501050000035
Figure BDA0003029501050000036
Figure BDA0003029501050000037
Figure BDA0003029501050000038
其中,δ(j)表示以j为末端节点的支路首端节点集合;ξ(j)表示以j为首端节点的支路末端节点集合;Pij,t,k和Qij,t,k分别表示第k次迭代中t时刻节点i流向节点j的有功和无功功率;Pj,t,k和Qj,t,k分别表示第k次迭代中t时刻节点i的有功和无功注入功率;rij和xij分别表示线路ij的电阻和电抗;Iij,t,k表示第k次迭代中t时刻线路ij上的电流幅值;Ui,t,k表示第k次迭代中t时刻节点i的电压幅值;
Figure BDA0003029501050000039
Figure BDA00030295010500000310
分别表示第k次迭代中t时刻节点j处的CHP机组的有功、无功出力;
Figure BDA00030295010500000311
表示t时刻节点j处的分布式光伏波动系数;
Figure BDA00030295010500000312
表示第k次迭代中t时刻节点j处的分布式光伏无功出力;
Figure BDA00030295010500000313
Figure BDA00030295010500000314
分别表示第k次迭代中t时刻节点j处的电储能设备的放电功率和充电功率;
Figure BDA00030295010500000315
表示第k次迭代中在t时刻节点j处的电加热锅炉设备的用电功率;
Figure BDA0003029501050000041
Figure BDA0003029501050000042
分别表示t时刻节点j处基础负荷所消耗的有功和无功功率。
热功率平衡约束条件表达式为:
Figure BDA0003029501050000043
Figure BDA0003029501050000044
其中,
Figure BDA0003029501050000045
和Tt OUT分别表示第k次迭代中t时刻的室内和室外温度;R表示房屋的热阻;CAIR表示空气的比热容;
Figure BDA0003029501050000046
表示节点i处的用户数目;Ht,k表示第k次迭代中t时刻的单个用户所消耗的热功率;
Figure BDA0003029501050000047
Figure BDA0003029501050000048
分别表示第k次迭代中t时刻节点i处的CHP机组、燃气锅炉和电加热锅炉的热出力。
用户室内舒适度约束条件表达式为:
Figure BDA0003029501050000049
Figure BDA00030295010500000410
-ΔH≤Ht+1,k-Ht,k≤ΔH    (40)
Figure BDA00030295010500000411
其中,
Figure BDA00030295010500000412
Tt IN 分别表示t时刻的室内温度上下限;
Figure BDA00030295010500000413
Figure BDA00030295010500000414
分别表示第k次迭代中起始时刻和末端时刻的室内温度;ΔH表示用户热功率的爬坡率;
Figure BDA00030295010500000415
H分别表示用户热功率的上下限。
能源站设备运行约束条件表达式为:
1)CHP机组:
Figure BDA00030295010500000416
其中,
Figure BDA00030295010500000417
Figure BDA00030295010500000418
分别表示第k次迭代中t时刻节点i处的CHP机组的输入功率和CHP机组的工作状态;ηCHP-E和ηCHP-H分别表示CHP机组的电转换和热转换效率;
Figure BDA00030295010500000419
表示节点i处CHP机组的功率因数角;
Figure BDA0003029501050000051
PCHP 分别表示CHP机组有功出力的上下限。
2)燃气锅炉:
Figure BDA0003029501050000052
其中,
Figure BDA0003029501050000053
Figure BDA0003029501050000054
分别表示第k次迭代中t时刻节点i处的燃气锅炉的输入功率和燃气锅炉的工作状态;ηGB-H表示燃气锅炉的热转换效率;
Figure BDA0003029501050000055
HGB 分别表示燃气锅炉热出力的上下限。
3)电加热锅炉:
Figure BDA0003029501050000056
其中,
Figure BDA0003029501050000057
Figure BDA0003029501050000058
分别表示第k次迭代中t时刻节点i处的电加热锅炉的输入功率和电加热锅炉的工作状态;ηEB-H表示电加热锅炉的热转换效率;
Figure BDA0003029501050000059
HEB 分别表示电加热锅炉热出力的上下限。
4)电储能设备:
Figure BDA00030295010500000510
其中,EESi,t,k表示第k次迭代中t时刻节点i处的电储能设备的容量;τ表示电储能设备的自放电率;A+和A-分别表示电储能设备的充、放电效率;
Figure BDA00030295010500000511
EES分别表示电储能设备的容量上下限;
Figure BDA00030295010500000512
Figure BDA00030295010500000513
分别表示第k次迭代中t时刻节点i处储能设备的充电状态和放电状态,为0-1整数变量;
Figure BDA00030295010500000514
Figure BDA00030295010500000515
分别表示电储能设备的最大充电和放电功率。
配电网运行电压水平约束条件表达式为:
Figure BDA00030295010500000516
其中,
Figure BDA0003029501050000061
Ui 分别表示节点i所允许的电压上限和下限。
配电网支路电流约束条件表达式为:
Figure BDA0003029501050000062
其中,
Figure BDA0003029501050000063
表示线路ij所允许的最大电流。
分布式光伏运行约束条件表达式为:
Figure BDA0003029501050000064
其中,
Figure BDA0003029501050000065
表示节点i处分布式光伏的功率因数角。
在步骤D中,所述的根据二阶锥规划的标准形式对步骤C构建的考虑分布式能源站的分布式光伏并网最大接纳能力计算模型中的约束条件进行线性化和锥转换,转化成混合整数二阶锥规划模型的方法是:
Figure BDA0003029501050000066
将式(5)所示的支路视在功率二次约束松弛为锥形约束:
Figure BDA0003029501050000067
再将式(21)通过等价变换为标准二阶锥约束,表达式为:
Figure BDA0003029501050000068
在步骤G中,所述的判断锥松弛最大偏差是否满足步骤B中设置的锥松弛最大偏差的计算精度的表达式为:
Figure BDA0003029501050000069
其中,rgapk表示第k次迭代中锥松弛最大偏差,ε为锥松弛最大偏差的计算精度。
在步骤H中,所述的割平面约束条件的表达式为:
Figure BDA00030295010500000610
在步骤J中,所述的能源站日前经济调度的优化模型的目标函数表达式为:
Figure BDA00030295010500000611
其中,T为总调度时间,
Figure BDA0003029501050000071
表示节点i处的能源站t时段向电网购电或售电的电价;
Figure BDA0003029501050000072
表示节点i处的能源站t时段购电天然气单位热值价格;Δt表示单位调度时长。
电功率平衡约束条件表达式同式(2)-(5);
Figure BDA0003029501050000073
Figure BDA0003029501050000074
其中,
Figure BDA0003029501050000075
表示由步骤F计算得到的节点j处分布式光伏最大并网容量;
Figure BDA0003029501050000076
表示由步骤F计算得到的节点j处t时刻分布式光伏的无功出力。
热功率平衡的约束条件表达式同式(8)-(9)。
用户室内舒适度的约束条件表达式同式(10)-(13)。
能源站设备运行的约束条件表达式同式(14)-(17)。
配电网运行电压水平的约束条件表达式同式(18)。
配电网支路电流的约束条件表达式同式(19)。
分布式光伏运行约束条件表达式为:
Figure BDA0003029501050000077
在步骤K中,所述的根据二阶锥规划的标准形式对步骤J构建的能源站日前经济调度的优化模型中的约束条件进行线性化和锥转换,转化成混合整数二阶锥规划模型的方法同步骤D。
在步骤N中,所述的判断锥松弛最大偏差是否满足步骤I中设置的计算精度的方法同步骤G。
在步骤O中,所述的割平面约束条件的表达式同步骤H。
本发明提供的考虑能源站的配电网分布式光伏并网接纳能力计算方法具有如下有益效果:
(1)本发明采用配电网Distflow潮流模型,依据二阶锥规划原理,对考虑分布式能源站的分布式光伏并网最大接纳能力计算模型这一非凸模型,通过线性化和锥转换,将原问题模型转换成混合整数二阶锥规划模型,通过迭代计算增加割平面约束条件,不仅能够保证松弛误差满足计算精度,而且降低了求解难度,并应用数学规划方法对模型进行求解,保证了考虑分布式能源站的分布式光伏并网最大接纳能力计算模型的求解速度,同时提升了配电网对分布式光伏的消纳能力。
(2)可以在快速求解出分布式光伏并网最大并网容量基础上,同时兼顾到分布式能源站的利益,构建了考虑了配电系统和分布式光伏的分布式能源站日前经济调度的优化模型,使用本方法可以得到使分布式能源站全天运行总费用最小的日前优化调度策略,保证了分布式能源站的运行经济性。与其他的分布式光伏并网接纳能力计算方法相比,本发明根据能源行业及能源市场化改革的发展趋势,结合了分布式能源站来考虑分布式光伏并网接纳能力计算问题,在提升了配电网对分布式光伏的消纳能力的同时保证了分布式能源站的运行经济性。
附图说明
图1为本发明提供的考虑能源站的配电网分布式光伏并网接纳能力计算方法流程图。
图2为修改后的IEEE33节点算例拓扑、节点编号、分布式光伏和分布式能源站接入位置图。
图3为分布式光伏及电负荷的日运行特性预测曲线图。
图4为分布式能源站基本结构示意图。
图5(a)—(e)分别为7、14、22、25、32号节点分布式能源站可控单元的日前优化调度结果示意图。
图6(a)—(e)分别为7、14、22、25、32号节点的电功率平衡示意图。
图7(a)—(e)分别为7、14、22、25、32号节点的热功率平衡示意图。
图8为用户室内温度曲线图。
具体实施方式
下面结合附图及实施例对本发明所提供的考虑能源站的配电网分布式光伏并网接纳能力计算方法做进一步说明。
如图1所示,本发明提供的考虑能源站的配电网分布式光伏并网接纳能力计算方法包括按顺序进行的下列步骤:
步骤A、获取配电网的包括网架结构、线路参数、负荷水平,能源站在配电网中的连接节点,能源站的基本架构和设备参数,分布式光伏的接入位置和功率因数,分布式光伏及电、热负荷的日运行特性预测曲线,室外温度预测结果、室内温度变化范围及房屋基础参数,配电网的基准电压、基准功率、平衡节点的电压幅值及相角、运行电压水平和支路电流限制在内的基础数据;
在本实施例中,网架结构如图2所示,能源站和分布式光伏的接入位置如图2所示;线路参数、负荷水平如表1和表2所示;能源站设备参数如表3所示,其中CHP机组的功率因数为1.0;分布式光伏的功率因数为1.0,以1h为时间间隔,模拟出分布式光伏及电负荷的日运行特性预测曲线,如图3所示;以1h为时间间隔,模拟出室外温度预测结果如表4所示;室内温度变化范围如表5所示,用户热功率的爬坡率为1kW,用户热功率的上下限分别为1kW和3kW;房屋基础参数中房屋的热阻为18℃/kW,空气的比热容为0.525kWh/℃,7、14、22、25、32号节点的房屋数分别为83户、50户、37户、175户和87户;根节点与上级电网允许交换的有功和无功功率分别为6000kW和4000kVar;配电网的基准电压12.66kV、基准功率10MVA;平衡节点的电压幅值1.0、相角0.0deg;安全运行电压水平上下限分别为1.07和0.90;支路电流限制为1500A;各时段能源价格如表6所示。
表1、修改后的IEEE33节点算例线路阻抗数据
首端节点 末端节点 电阻/Ω 电抗/Ω 首端节点 末端节点 电阻/Ω 电抗/Ω
1 2 0.0922 0.047 17 18 0.732 0.574
2 3 0.493 0.2511 2 19 0.164 0.1565
3 4 0.366 0.1864 19 20 1.5042 1.3554
4 5 0.3811 0.1941 20 21 0.4095 0.4784
5 6 0.819 0.707 21 22 0.7089 0.9373
6 7 0.1872 0.6188 3 23 0.4512 0.3083
7 8 0.7114 0.2351 23 24 0.898 0.7091
8 9 1.03 0.74 24 25 0.896 0.7011
9 10 1.044 0.74 6 26 0.203 0.1034
10 11 0.1966 0.065 26 27 0.2842 0.1447
11 12 0.3744 0.1238 27 28 1.059 0.9337
12 13 1.468 1.155 28 29 0.8042 0.7006
13 14 0.5416 0.7129 29 30 0.5075 0.2585
14 15 0.591 0.526 30 31 0.9744 0.963
15 16 0.7463 0.545 31 32 0.3105 0.3619
16 17 1.289 1.721 32 33 0.341 0.5302
表2、修改后的IEEE33节点负荷基准数据
Figure BDA0003029501050000091
Figure BDA0003029501050000101
表3、能源站设备参数
Figure BDA0003029501050000102
表4、室外温度预测结果
Figure BDA0003029501050000103
Figure BDA0003029501050000111
表5、室内温度变化范围
时段 用户状态 温度下限(℃) 温度上限(℃)
07:00-11:00 室内无人 - -
11:00-13:00 室内有人 20 24
13:00-17:00 室内无人 - -
17:00-22:00 室内有人 20 24
22:00-7:00 夜间睡觉 12 19
表6、各时段能源价格
Figure BDA0003029501050000112
步骤B、设置锥松弛最大偏差的计算精度为1e-7;最大迭代次数30次;并设置迭代次数初值k=1;
步骤C、依据步骤A获取的基础参数,选取配电网中根节点为配电网的平衡节点,以分布式光伏并网容量最大为目标函数,设定电功率平衡(配电网潮流约束)、热功率平衡、用户室内舒适度、能源站设备运行、配电网运行电压水平、配电网支路电流和分布式光伏运行约束条件,构建考虑分布式能源站的分布式光伏并网最大接纳能力计算模型;
其中,考虑分布式能源站的分布式光伏并网最大接入容量计算模型的目标函数的表达式为:
Figure BDA0003029501050000121
其中,NPV表示配电系统中接入的分布式光伏总数,
Figure BDA0003029501050000122
表示第k次迭代中节点i上接入的分布式光伏的装机容量;
电功率平衡的约束条件表达式为:
Figure BDA0003029501050000123
Figure BDA0003029501050000124
Figure BDA0003029501050000125
Figure BDA0003029501050000126
Figure BDA0003029501050000127
Figure BDA0003029501050000128
其中,δ(j)表示以j为末端节点的支路首端节点集合;ξ(j)表示以j为首端节点的支路末端节点集合;Pij,t,k和Qij,t,k分别表示第k次迭代中t时刻节点i流向节点j的有功和无功功率;Pj,t,k和Qj,t,k分别表示第k次迭代中t时刻节点i的有功和无功注入功率;rij和xij分别表示线路ij的电阻和电抗;Iij,t,k表示第k次迭代中t时刻线路ij上的电流幅值;Ui,t,k表示第k次迭代中t时刻节点i的电压幅值;
Figure BDA0003029501050000129
Figure BDA00030295010500001210
分别表示第k次迭代中t时刻节点j处的CHP机组的有功、无功出力;
Figure BDA00030295010500001211
表示t时刻节点j处的分布式光伏波动系数;
Figure BDA00030295010500001212
表示第k次迭代中t时刻节点j处的分布式光伏无功出力;
Figure BDA00030295010500001213
Figure BDA00030295010500001214
分别表示第k次迭代中t时刻节点j处的电储能设备的放电功率和充电功率;
Figure BDA00030295010500001215
表示第k次迭代中t时刻节点j处的电加热锅炉设备的用电功率;
Figure BDA00030295010500001216
Figure BDA00030295010500001217
分别表示t时刻节点j处基础负荷所消耗的有功和无功功率。
热功率平衡约束条件表达式为:
Figure BDA00030295010500001218
Figure BDA00030295010500001219
其中,
Figure BDA0003029501050000131
和Tt OUT表示第k次迭代中t时刻的室内和室外温度;R表示房屋的热阻;CAIR表示空气的比热容;
Figure BDA0003029501050000132
表示节点i处的用户数目;Ht,k表示第k次迭代中t时刻的单个用户所消耗的热功率;
Figure BDA0003029501050000133
Figure BDA0003029501050000134
分别表示第k次迭代中t时刻节点i处的CHP机组、燃气锅炉和电加热锅炉的热出力。
用户室内舒适度约束条件表达式为:
Figure BDA0003029501050000135
Figure BDA0003029501050000136
-ΔH≤Ht+1,k-Ht,k≤ΔH    (68)
Figure BDA0003029501050000137
其中,
Figure BDA0003029501050000138
Tt IN 分别表示t时刻的室内温度上下限;
Figure BDA0003029501050000139
Figure BDA00030295010500001310
分别表示第k次迭代中起始时刻和末端时刻的室内温度;ΔH表示用户热功率的爬坡率;
Figure BDA00030295010500001311
H分别表示用户热功率的上下限。
能源站设备运行约束条件表达式为:
1)CHP机组:
Figure BDA00030295010500001312
其中,
Figure BDA00030295010500001313
Figure BDA00030295010500001314
分别表示第k次迭代中t时刻节点i处的CHP机组的输入功率和CHP机组的工作状态;ηCHP-E和ηCHP-H分别表示CHP机组的电转换和热转换效率;
Figure BDA00030295010500001315
表示节点i处CHP机组的功率因数角;
Figure BDA00030295010500001316
PCHP 分别表示CHP机组有功出力的上下限。
2)燃气锅炉:
Figure BDA00030295010500001317
其中,
Figure BDA0003029501050000141
Figure BDA0003029501050000142
分别表示第k次迭代中t时刻节点i处的燃气锅炉的输入功率和燃气锅炉的工作状态;ηGB-H表示燃气锅炉的热转换效率;
Figure BDA0003029501050000143
HGB 分别表示燃气锅炉热出力的上下限。
3)电加热锅炉:
Figure BDA0003029501050000144
其中,
Figure BDA0003029501050000145
Figure BDA0003029501050000146
分别表示第k次迭代中t时刻节点i处的电加热锅炉的输入功率和电加热锅炉的工作状态;ηEB-H表示电加热锅炉的热转换效率;
Figure BDA0003029501050000147
HEB 分别表示电加热锅炉热出力的上下限。
4)电储能设备:
Figure BDA0003029501050000148
其中,EESi,t,k表示第k次迭代中t时刻节点i处的电储能设备的容量;τ表示电储能设备的自放电率;A+和A-分别表示电储能设备的充、放电效率;
Figure BDA0003029501050000149
EES分别表示电储能设备的容量上下限;
Figure BDA00030295010500001410
Figure BDA00030295010500001411
分别表示第k次迭代中t时刻节点i处储能设备的充电状态和放电状态,为0-1整数变量;
Figure BDA00030295010500001412
Figure BDA00030295010500001413
分别表示电储能设备的最大充电和放电功率。
配电网运行电压水平约束条件表达式为:
Figure BDA00030295010500001414
其中,
Figure BDA00030295010500001415
Ui 分别表示节点i所允许的电压上限和下限。
配电网支路电流约束条件表达式为:
Figure BDA00030295010500001416
其中,
Figure BDA00030295010500001417
表示线路ij所允许的最大电流。
分布式光伏运行约束条件表达式为:
Figure BDA0003029501050000151
其中,
Figure BDA0003029501050000152
表示节点i处分布式光伏的功率因数角。
步骤D、根据二阶锥规划的标准形式对步骤C构建的考虑分布式能源站的分布式光伏并网最大接纳能力计算模型中的约束条件进行线性化和锥转换,转化成混合整数二阶锥规划模型;
Figure BDA0003029501050000153
将式(5)所示的支路视在功率二次约束松弛为锥形约束:
Figure BDA0003029501050000154
再将式(21)通过等价变换为标准二阶锥约束,表达式为:
Figure BDA0003029501050000155
步骤E、从步骤B中设置的迭代次数初值开始进行迭代,并判断迭代次数是否小于步骤B中设置的最大迭代次数,若不小于则结束,否则进入下一步骤;
步骤F、采用CPLEX求解器求解步骤D中获得的混合整数二阶锥规划模型,获得分布式光伏最大并网容量;
步骤G、判断锥松弛最大偏差是否满足步骤B中设置的锥松弛最大偏差的计算精度,若满足,转到步骤I,否则进入下一步骤;
所述的判断锥松弛最大偏差是否满足步骤B中设置的锥松弛最大偏差的计算精度的表达式为:
Figure BDA0003029501050000156
其中,rgapk表示第k次迭代中锥松弛最大偏差,ε为锥松弛最大偏差的计算精度。
步骤H、迭代次数加1,在步骤D中得到的混合整数二阶锥规划模型基础上增加割平面约束条件,然后返回步骤E;
所述的割平面约束条件的表达式为:
Figure BDA0003029501050000157
步骤I、再次设置锥松弛最大偏差的计算精度为1e-7;最大迭代次数30次;并设置迭代次数初值k=1;
步骤J、依据步骤A提供的基础参数和步骤F计算得到的分布式光伏最大并网容量,选取配电网中根节点为配电网的平衡节点,以能源站全天运行总费用最小为目标函数,设定电功率平衡(配电网潮流约束)、热功率平衡、用户室内舒适度、能源站设备运行、配电网运行电压水平、配电网支路电流和分布式光伏运行约束条件,构建能源站日前经济调度的优化模型;
所述的能源站日前经济调度的优化模型的目标函数表达式为:
Figure BDA0003029501050000161
其中,T为总调度时间,
Figure BDA0003029501050000162
表示节点i处能源站t时段向电网购电或售电的电价;
Figure BDA0003029501050000163
表示节点i处能源站t时段购电天然气单位热值价格;Δt为单位调度时长。
电功率平衡约束条件表达式同式(2)-(5);
Figure BDA0003029501050000164
Figure BDA0003029501050000165
其中,
Figure BDA0003029501050000166
表示由步骤F计算得到的节点j处分布式光伏最大并网容量;
Figure BDA0003029501050000167
表示由步骤F计算得到的节点j处t时刻分布式光伏的无功出力。
热功率平衡约束条件表达式同式(8)-(9)。
用户室内舒适度约束条件表达式同式(10)-(13)。
能源站设备运行约束条件表达式同式(14)-(17)。
配电网运行电压水平约束条件表达式同式(18)。
配电网支路电流约束条件表达式同式(19)。
分布式光伏运行约束条件表达式为:
Figure BDA0003029501050000168
步骤K、根据二阶锥规划的标准形式对步骤J构建的能源站日前经济调度的优化模型中的约束条件进行线性化和锥转换,转化成混合整数二阶锥规划模型;
所述的根据二阶锥规划的标准形式对步骤J构建的能源站日前经济调度的优化模型中的约束条件进行线性化和锥转换,转化成混合整数二阶锥规划模型的方法同步骤D。
步骤L、从步骤I中设置的迭代次数初值开始进行迭代,并判断迭代次数是否小于步骤I中设置的最大迭代次数,若不小于则结束,否则进入下一步骤;
步骤M、采用CPLEX求解器求解步骤K中获得的混合整数二阶锥规划模型,获得分布式光伏最大并网容量、能源站全天运行总费用、配电网潮流计算结果和能源站各组成单元的运行方案;
步骤N、判断锥松弛最大偏差是否满足步骤I中设置的计算精度,若满足,转到步骤P,否则进入下一步骤;
判断锥松弛最大偏差是否满足步骤I中设置的计算精度的表达式同式(23)。
步骤O、迭代次数加1,在步骤K中得到的混合整数二阶锥规划模型基础上增加割平面约束条件,然后返回步骤L;
所述的割平面约束条件同式(24)。
步骤P、输出步骤M获得的分布式光伏最大并网容量、能源站全天运行总费用、配电网潮流计算结果和能源站各组成单元的运行方案。
本发明采用添加割平面约束的混合整数二阶锥规划方法,建立了考虑分布式能源站的分布式光伏并网最大接入容量计算模型,以提高配电网对分布式光伏的消纳能力,同时建立了能源站日前经济调度的优化模型,在已成功计算得到的分布式光伏最大接入容量的基础上,计算得到使分布式能源站全天运行总费用最小的日前优化调度策略,以保证分布式能源站的运行经济性。
对于本实施例,在计算分布式光伏并网最大接入容量时考虑了分布式光伏和负荷的波动情况、用户室内舒适度约束以及分布式能源站的设备调度策略,通过在满足各类约束条件的前提下,合理地调度分布式能源站内设备,提高配电网对分布式光伏的消纳能力,同时保证分布式能源站的运行经济性。考虑分布式能源站前、后的7、14、22、25、32号节点的分布式光伏最大接入容量计算结果如表7所示,5个节点的分布式光伏总接入量由9.838MW变为12.576MW,考虑分布式能源站前、后的7、14、22、25、32号节点的用能成本如表8所示,5个节点的总用能成本由14185元变为12001元,分布式能源站的日前优化调度结果如图5所示,分布式能源站的电功率平衡如图6所示,分布式能源站的热功率平衡如图7所示,室外温度和用户室内温度曲线如图8所示。
表7、分布式光伏最大接入容量计算结果
Figure BDA0003029501050000171
Figure BDA0003029501050000181
表8、用能成本比较
Figure BDA0003029501050000182

Claims (9)

1.一种考虑能源站的配电网分布式光伏并网接纳能力计算方法,其特征在于:所述的计算方法包括按顺序进行的下列步骤:
步骤A、获取配电网的包括网架结构、线路参数、负荷水平,能源站在配电网中的连接节点,能源站的基本架构和设备参数,分布式光伏的接入位置和功率因数,分布式光伏及电、热负荷的日运行特性预测曲线,室外温度预测曲线、室内温度变化范围及房屋基础参数,配电网的基准电压、基准功率、平衡节点的电压幅值及相角、运行电压水平和支路电流限制在内的基础数据;
步骤B、设置锥松弛最大偏差的计算精度和最大迭代次数,并设置迭代次数初值;
步骤C、依据步骤A获取的基础参数,选取配电网中根节点为配电网的平衡节点,以分布式光伏并网容量最大为目标函数,设定电功率平衡即配电网潮流约束、热功率平衡、用户室内舒适度、能源站设备运行、配电网运行电压水平、配电网支路电流和分布式光伏运行约束条件,构建考虑分布式能源站的分布式光伏并网最大接纳能力计算模型;
步骤D、根据二阶锥规划的标准形式对步骤C构建的考虑分布式能源站的分布式光伏并网最大接纳能力计算模型中的约束条件进行线性化和锥转换,转化成混合整数二阶锥规划模型;
步骤E、从步骤B中设置的迭代次数初值开始进行迭代,并判断迭代次数是否小于步骤B中设置的最大迭代次数,若不小于则结束,否则进入下一步骤;
步骤F、采用CPLEX求解器求解步骤D中获得的混合整数二阶锥规划模型,获得分布式光伏最大并网容量;
步骤G、判断锥松弛最大偏差是否满足步骤B中设置的锥松弛最大偏差的计算精度,若满足,转到步骤I,否则进入下一步骤;
步骤H、迭代次数加1,在步骤D中得到的混合整数二阶锥规划模型基础上增加割平面约束条件,然后返回步骤E;
步骤I、再次设置锥松弛最大偏差的计算精度和最大迭代次数,并设置迭代次数初值;
步骤J、依据步骤A提供的基础参数和步骤F计算得到的分布式光伏最大并网容量,选取配电网中根节点为配电网的平衡节点,以能源站全天运行总费用最小为目标函数,设定电功率平衡即配电网潮流约束、热功率平衡、用户室内舒适度、能源站设备运行、配电网运行电压水平、配电网支路电流和分布式光伏运行约束条件,构建能源站日前经济调度的优化模型;
步骤K、根据二阶锥规划的标准形式对步骤J构建的能源站日前经济调度的优化模型中的约束条件进行线性化和锥转换,转化成混合整数二阶锥规划模型;
步骤L、从步骤I中设置的迭代次数初值开始进行迭代,并判断迭代次数是否小于步骤I中设置的最大迭代次数,若不小于则结束,否则进入下一步骤;
步骤M、采用CPLEX求解器求解步骤K中获得的混合整数二阶锥规划模型,获得分布式光伏最大并网容量、能源站全天运行总费用、配电网潮流计算结果和能源站各组成单元的运行方案;
步骤N、判断锥松弛最大偏差是否满足步骤I中设置的计算精度,若满足,转到步骤P,否则进入下一步骤;
步骤O、迭代次数加1,在步骤K中得到的混合整数二阶锥规划模型基础上增加割平面约束条件,然后返回步骤L;
步骤P、输出步骤M获得的分布式光伏最大并网容量、能源站全天运行总费用、配电网潮流计算结果和能源站各组成单元的运行方案。
2.根据权利要求1所述的考虑能源站的配电网分布式光伏并网接纳能力计算方法,其特征在于:在步骤C中,所述的考虑分布式能源站的分布式光伏并网最大接纳能力计算模型的目标函数表达式为:
Figure FDA0004138304660000021
其中,NPV表示配电系统中接入的分布式光伏总数,
Figure FDA0004138304660000022
表示第k次迭代中节点i上接入的分布式光伏的装机容量;
电功率平衡约束条件表达式为:
Figure FDA0004138304660000023
Figure FDA0004138304660000024
Figure FDA0004138304660000025
Figure FDA0004138304660000026
Figure FDA0004138304660000027
Figure FDA0004138304660000028
其中,δ(j)表示以j为末端节点的支路首端节点集合;ξ(j)表示以j为首端节点的支路末端节点集合;Pij,t,k和Qij,t,k分别表示第k次迭代中t时刻节点i流向节点j的有功和无功功率;Pj,t,k和Qj,t,k分别表示第k次迭代中t时刻节点j的有功和无功注入功率;rij和xij分别表示线路ij的电阻和电抗;Iij,t,k表示第k次迭代中t时刻线路ij上的电流幅值;Ui,t,k表示第k次迭代中t时刻节点i的电压幅值;
Figure FDA0004138304660000031
Figure FDA0004138304660000032
分别表示第k次迭代中t时刻节点j处的CHP机组的有功、无功出力;
Figure FDA0004138304660000033
表示t时刻节点j处的分布式光伏波动系数;
Figure FDA0004138304660000034
表示第k次迭代中t时刻节点j处的分布式光伏无功出力;
Figure FDA0004138304660000035
Figure FDA0004138304660000036
分别表示第k次迭代中t时刻节点j处的电储能设备的放电功率和充电功率;
Figure FDA0004138304660000037
表示第k次迭代中在t时刻节点j处的电加热锅炉设备的用电功率;
Figure FDA0004138304660000038
Figure FDA0004138304660000039
分别表示t时刻节点j处基础负荷所消耗的有功和无功功率;
热功率平衡约束条件表达式为:
Figure FDA00041383046600000310
Figure FDA00041383046600000311
其中,
Figure FDA00041383046600000312
和Tt OUT分别表示第k次迭代中t时刻的室内和室外温度;R表示房屋的热阻;CAIR表示空气的比热容;
Figure FDA00041383046600000313
表示节点i处的用户数目;Ht,k表示第k次迭代中t时刻的单个用户所消耗的热功率;
Figure FDA00041383046600000314
Figure FDA00041383046600000315
分别表示第k次迭代中t时刻节点i处的CHP机组、燃气锅炉和电加热锅炉的热出力;
用户室内舒适度约束条件表达式为:
Figure FDA00041383046600000316
Figure FDA00041383046600000317
-ΔH≤Ht+1,k-Ht,k≤ΔH    (12)
Figure FDA00041383046600000318
其中,
Figure FDA00041383046600000319
Tt IN 分别表示t时刻的室内温度上下限;
Figure FDA00041383046600000320
Figure FDA00041383046600000321
分别表示第k次迭代中起始时刻和末端时刻的室内温度;ΔH表示用户热功率的爬坡率;
Figure FDA00041383046600000322
H分别表示用户热功率的上下限;
能源站设备运行约束条件表达式为:
1)CHP机组:
Figure FDA0004138304660000041
其中,
Figure FDA0004138304660000042
Figure FDA0004138304660000043
分别表示第k次迭代中t时刻节点i处的CHP机组的输入功率和CHP机组的工作状态;ηCHP-E和ηCHP-H分别表示CHP机组的电转换和热转换效率;
Figure FDA0004138304660000044
表示节点i处CHP机组的功率因数角;
Figure FDA0004138304660000045
PCHP 分别表示CHP机组有功出力的上下限;
2)燃气锅炉:
Figure FDA0004138304660000046
其中,
Figure FDA0004138304660000047
Figure FDA0004138304660000048
分别表示第k次迭代中t时刻节点i处的燃气锅炉的输入功率和燃气锅炉的工作状态;ηGB-H表示燃气锅炉的热转换效率;
Figure FDA0004138304660000049
HGB 分别表示燃气锅炉热出力的上下限;
3)电加热锅炉:
Figure FDA00041383046600000410
其中,
Figure FDA00041383046600000411
Figure FDA00041383046600000412
分别表示第k次迭代中t时刻节点i处的电加热锅炉的输入功率和电加热锅炉的工作状态;ηEB-H表示电加热锅炉的热转换效率;
Figure FDA00041383046600000413
HEB 分别表示电加热锅炉热出力的上下限;
4)电储能设备:
Figure FDA0004138304660000051
其中,EESi,t,k表示第k次迭代中t时刻节点i处的电储能设备的容量;τ表示电储能设备的自放电率;A+和A-分别表示电储能设备的充、放电效率;
Figure FDA0004138304660000052
EES分别表示电储能设备的容量上下限;
Figure FDA0004138304660000053
Figure FDA0004138304660000054
分别表示第k次迭代中t时刻节点i处储能设备的充电状态和放电状态,为0-1整数变量;
Figure FDA0004138304660000055
Figure FDA0004138304660000056
分别表示电储能设备的最大充电和放电功率;
配电网运行电压水平约束条件表达式为:
Figure FDA0004138304660000057
其中,
Figure FDA0004138304660000058
Ui 分别表示节点i所允许的电压上限和下限;
配电网支路电流约束条件表达式为:
Figure FDA0004138304660000059
其中,
Figure FDA00041383046600000510
表示线路ij所允许的最大电流;
分布式光伏运行约束条件表达式为:
Figure FDA00041383046600000511
其中,
Figure FDA00041383046600000512
表示节点i处分布式光伏的功率因数角。
3.根据权利要求2所述的考虑能源站的配电网分布式光伏并网接纳能力计算方法,其特征在于:在步骤D中,所述的根据二阶锥规划的标准形式对步骤C构建的考虑分布式能源站的分布式光伏并网最大接纳能力计算模型中的约束条件进行线性化和锥转换,转化成混合整数二阶锥规划模型的方法是:
Figure FDA00041383046600000513
将式(5)所示的支路视在功率二次约束松弛为锥形约束:
Figure FDA00041383046600000514
再将式(21)通过等价变换为标准二阶锥约束,表达式为:
Figure FDA0004138304660000061
4.根据权利要求2所述的考虑能源站的配电网分布式光伏并网接纳能力计算方法,其特征在于:在步骤G中,所述的判断锥松弛最大偏差是否满足步骤B中设置的锥松弛最大偏差的计算精度的表达式为:
Figure FDA0004138304660000062
其中,rgapk表示第k次迭代中锥松弛最大偏差,ε为锥松弛最大偏差的计算精度。
5.根据权利要求2所述的考虑能源站的配电网分布式光伏并网接纳能力计算方法,其特征在于:在步骤H中,所述的割平面约束条件的表达式为:
Figure FDA0004138304660000063
6.根据权利要求2所述的考虑能源站的配电网分布式光伏并网接纳能力计算方法,其特征在于:在步骤J中,所述的能源站日前经济调度的优化模型的目标函数表达式为:
Figure FDA0004138304660000064
其中,T为总调度时间,
Figure FDA0004138304660000065
表示节点i处的能源站t时段向电网购电或售电的电价;
Figure FDA0004138304660000066
表示节点i处的能源站t时段购电天然气单位热值价格;Δt表示单位调度时长;
电功率平衡约束条件表达式同式(2)-(5);
Figure FDA0004138304660000067
Figure FDA0004138304660000068
其中,
Figure FDA0004138304660000069
表示由步骤F计算得到的节点j处分布式光伏最大并网容量;
Figure FDA00041383046600000610
表示由步骤F计算得到的节点j处t时刻分布式光伏的无功出力;
热功率平衡的约束条件表达式同式(8)-(9);
用户室内舒适度的约束条件表达式同式(10)-(13);
能源站设备运行的约束条件表达式同式(14)-(17);
配电网运行电压水平的约束条件表达式同式(18);
配电网支路电流的约束条件表达式同式(19);
分布式光伏运行约束条件表达式为:
Figure FDA0004138304660000071
7.根据权利要求2所述的考虑能源站的配电网分布式光伏并网接纳能力计算方法,其特征在于:在步骤K中,所述的根据二阶锥规划的标准形式对步骤J构建的能源站日前经济调度的优化模型中的约束条件进行线性化和锥转换,转化成混合整数二阶锥规划模型的方法同步骤D。
8.根据权利要求2所述的考虑能源站的配电网分布式光伏并网接纳能力计算方法,其特征在于:在步骤N中,所述的判断锥松弛最大偏差是否满足步骤I中设置的计算精度的方法同步骤G。
9.根据权利要求2所述的考虑能源站的配电网分布式光伏并网接纳能力计算方法,其特征在于:在步骤O中,所述的割平面约束条件的表达式同步骤H。
CN202110425757.5A 2021-04-20 2021-04-20 考虑能源站的配电网分布式光伏并网接纳能力计算方法 Active CN113013881B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110425757.5A CN113013881B (zh) 2021-04-20 2021-04-20 考虑能源站的配电网分布式光伏并网接纳能力计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110425757.5A CN113013881B (zh) 2021-04-20 2021-04-20 考虑能源站的配电网分布式光伏并网接纳能力计算方法

Publications (2)

Publication Number Publication Date
CN113013881A CN113013881A (zh) 2021-06-22
CN113013881B true CN113013881B (zh) 2023-05-05

Family

ID=76389044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110425757.5A Active CN113013881B (zh) 2021-04-20 2021-04-20 考虑能源站的配电网分布式光伏并网接纳能力计算方法

Country Status (1)

Country Link
CN (1) CN113013881B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114819508B (zh) * 2022-03-28 2024-03-29 上海交通大学 综合能源系统分布式光伏最大准入容量计算方法及系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106655177A (zh) * 2017-01-18 2017-05-10 中国南方电网有限责任公司电网技术研究中心 基于扩展二阶锥规划的分布式电源最大接入能力计算方法
CN106655227A (zh) * 2017-01-18 2017-05-10 天津大学 一种基于智能软开关的有源配电网馈线负载平衡方法
CN109474013A (zh) * 2018-12-12 2019-03-15 天津大学 含高渗透分布式光伏的增量配电网日前优化调度方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106655177A (zh) * 2017-01-18 2017-05-10 中国南方电网有限责任公司电网技术研究中心 基于扩展二阶锥规划的分布式电源最大接入能力计算方法
CN106655227A (zh) * 2017-01-18 2017-05-10 天津大学 一种基于智能软开关的有源配电网馈线负载平衡方法
CN109474013A (zh) * 2018-12-12 2019-03-15 天津大学 含高渗透分布式光伏的增量配电网日前优化调度方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Haoran Ji.A Strengthened SOCP-based Approach for Evaluating the Distributed Generation Hosting Capacity with Soft Open Points.ScienceDirect.2018,全文. *
孔顺飞 ; 胡志坚 ; 谢仕炜 ; 杨黎 ; 郑云飞 ; .含电动汽车充电站的主动配电网二阶段鲁棒规划模型及其求解方法.电工技术学报.2020,(第05期),全文. *

Also Published As

Publication number Publication date
CN113013881A (zh) 2021-06-22

Similar Documents

Publication Publication Date Title
Ma et al. The optimal structure planning and energy management strategies of smart multi energy systems
CN110689189B (zh) 考虑供能侧和需求侧的冷热电联合供需平衡优化调度方法
Violante et al. An energy management system for isolated microgrids with thermal energy resources
CN110889600A (zh) 一种考虑柔性热负荷的区域综合能源系统优化调度方法
CN108665188B (zh) 一种基于优化模型的园区多能源主体综合配比方法
Gong et al. Dynamic modeling and optimal design for net zero energy houses including hybrid electric and thermal energy storage
Yang et al. Research on heat and electricity coordinated dispatch model for better integration of wind power based on electric boiler with thermal storage
CN111950807A (zh) 计及不确定性与需求响应的综合能源系统优化运行方法
CN110474370B (zh) 一种空调可控负荷、光伏储能系统的协同控制系统及方法
CN114330827B (zh) 多能流虚拟电厂分布式鲁棒自调度优化方法及其应用
CN114595868A (zh) 一种综合能源系统源网荷储协同规划方法及系统
Bracco et al. A system of systems model for the control of the University of Genoa Smart Polygeneration Microgrid
Song et al. A fuzzy‐based multi‐objective robust optimization model for a regional hybrid energy system considering uncertainty
CN112036652A (zh) 基于机会约束规划的光伏-储能综合能源系统规划方法
Dong et al. Hierarchical multi-objective planning for integrated energy systems in smart parks considering operational characteristics
Yuan et al. Interval optimization for integrated electrical and natural‐gas systems with combined cooling, heating, and power considering demand response
Zhang et al. Optimized scheduling model for isolated microgrid of wind-photovoltaic-thermal-energy storage system with demand response
CN113013881B (zh) 考虑能源站的配电网分布式光伏并网接纳能力计算方法
Deng et al. Real-coded quantum optimization-based bi-level dispatching strategy of integrated power and heat systems
Li et al. Planning model of integrated energy system considering P2G and energy storage
Ikram et al. Optimizing energy consumption in smart homes: Load scheduling approaches
CN116961008A (zh) 计及电力弹簧与负荷需求响应的微电网容量双层优化方法
Yu et al. Optimization of urban multi-energy flow systems considering seasonal peak shaving of natural gas
CN107528352B (zh) 一种基于可再生能源高渗透率的配电网有功优化方法
CN115906456A (zh) 考虑需求侧响应不确定性的含氢储能ies调度优化模型

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant