CN113006091A - Method for recycling engineering waste soil through backfilling - Google Patents

Method for recycling engineering waste soil through backfilling Download PDF

Info

Publication number
CN113006091A
CN113006091A CN202110242932.7A CN202110242932A CN113006091A CN 113006091 A CN113006091 A CN 113006091A CN 202110242932 A CN202110242932 A CN 202110242932A CN 113006091 A CN113006091 A CN 113006091A
Authority
CN
China
Prior art keywords
backfill
soil
backfilling
layer
recycling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110242932.7A
Other languages
Chinese (zh)
Other versions
CN113006091B (en
Inventor
廖雄飞
王婧
胡振华
邓凯芳
梁旭清
张璟泓
张小平
张鸣洲
马磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Fourth Harbor Engineering Co Ltd
CCCC Fourth Harbor Engineering Institute Co Ltd
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Original Assignee
CCCC Fourth Harbor Engineering Co Ltd
CCCC Fourth Harbor Engineering Institute Co Ltd
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Fourth Harbor Engineering Co Ltd, CCCC Fourth Harbor Engineering Institute Co Ltd, No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd filed Critical CCCC Fourth Harbor Engineering Co Ltd
Priority to CN202110242932.7A priority Critical patent/CN113006091B/en
Publication of CN113006091A publication Critical patent/CN113006091A/en
Application granted granted Critical
Publication of CN113006091B publication Critical patent/CN113006091B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0037Clays
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Abstract

The invention discloses a method for recycling engineering spoil backfill, which belongs to the technical field of engineering spoil treatment and comprises the following steps: 1) preparing backfill materials and a compacting machine; 2) leveling the field; 3) compacting the field; 4) backfilling and compacting in layers; 5) and detecting various properties of the backfill soil layer. The invention effectively solves the problems of treating the pollution and recycling of the engineering waste soil by using the engineering waste soil as the backfill material, simultaneously adopts a mode of controlling the process quality by backfilling and rolling in a layering way, increases solid particles in the unit volume of the soil body, reduces the porosity, eliminates the nonuniformity of foundation soil and reduces the residual settlement, improves the safety, shortens the construction period, avoids the capital investment caused by secondary treatment needed in the later stage of one-time filling, and has better economic benefit and social benefit.

Description

Method for recycling engineering waste soil through backfilling
Technical Field
The invention belongs to the technical field of engineering waste soil treatment, and particularly relates to a method for backfilling and recycling engineering waste soil.
Background
The waste soil is a component of construction waste and mainly comes from real estate construction projects, underground pipe gallery projects, subway projects and the like. With the acceleration of the pace of urban construction in China, the production and discharge amount of engineering waste soil are rapidly increased. In the waste soil treatment process, a construction unit stacks the waste soil everywhere in order to reduce the treatment cost, so that not only can a large amount of land be occupied, but also the silting of a river channel can be caused, the environment is polluted, and the water quality is influenced.
At present, the national advocates that the principle of 'reduction, reutilization and resource utilization' is adopted, the core is 'resource saving and cyclic utilization', the basic characteristics of 'low consumption, low emission and high efficiency' are adopted, and the waste treatment sequence is as follows: avoiding or reducing, recycling, harmless treatment, resource utilization and reutilization. In this regard, research on recycling of spoil is a positive response to national initiatives. However, most of the treatment of the engineering waste soil at the present stage is a landfill waste soil field, the application of reinforcing the waste soil as a building foundation is less, and the treatment modes of dynamic compaction, dynamic compaction replacement, preloading and the like are adopted at the later stage of a large-area backfill foundation, so that the construction cost is high.
Disclosure of Invention
In view of the above, the invention provides a method for backfilling and recycling engineering waste soil, which uses the engineering waste soil as backfill material to solve the problems of land occupation and pollution caused by the accumulation of the engineering waste soil, and adopts a mode of controlling the backfilling and the layered rolling at the same time to increase the number of solid particles in a unit volume of a soil body, reduce the porosity, eliminate the non-uniformity of foundation soil, reduce residual settlement and improve the safety.
The invention is realized by the following technical scheme:
a method for backfilling and recycling engineering waste soil comprises the following steps:
s1: preparing backfill materials and a compaction machine: selecting backfill meeting backfill requirements and selecting a proper compacting machine according to the actual condition of the backfill;
s2: leveling the field: dividing an operation area, filling by areas and construction sections, removing garbage, sludge and other impurities on the surface of the foundation pit, and keeping the foundation pit smooth and clean;
s3: and (3) field compaction: rolling and compacting the original soil of the substrate by adopting a compacting machine to ensure that the compaction coefficient of the original soil reaches 0.93, checking the depth and the horizontal elevation of the foundation pit, and paving a thickness mark;
s4: layered backfilling and compacting: backfilling backfill and medium coarse sand in a staggered and layered mode, dividing a foundation pit into horizontal layers from low to high, filling and rolling the horizontal layers layer by layer, detecting whether the compaction degree coefficient and the bearing capacity of each layer of backfill meet the design requirements or not after each layer of backfill is paved and compacted, and performing next layer construction after the design requirements are met, or performing re-rolling;
s5: and detecting the compaction coefficient, the water content, the compression modulus and the bearing capacity characteristic value of the whole backfill soil.
Compared with the prior art, the method adopts the engineering waste soil as the backfill material, the compaction coefficient of the obtained backfill soil layer is greater than 0.93, the bearing capacity characteristic value can reach 240KPa, the construction requirement can be well met, the problems of processing engineering waste soil pollution and recycling are effectively solved, and meanwhile, the quantity of solid particles in the unit volume of the soil body is increased by adopting a layered backfill and layered rolling control mode, the porosity is reduced, the compactness is increased, the nonuniformity of the foundation soil is eliminated, the residual settlement is reduced, the safety is improved, the construction period is shortened, and the capital investment caused by secondary processing needed in the later period of one-time filling is avoided.
Further, in step S4, each layer of backfill is performed in a sequence of backfilling from the edge to the middle, backfilling from the two ends to the middle, backfilling the lowest point of each layer first, then backfilling the highest point, and flattening by using a bulldozer.
Further, in step S4, when each layer of backfill is backfilled, the gaps are filled by leveling with fine stones and stone chips at the individual uneven places. In some uneven places, fine stones and stone chips are manually paved and filled, gaps are filled, the surface is flat, and subsequent compaction is facilitated.
Further, the paving thickness of each layer of backfill soil is not more than 50cm, preferably not more than 30 cm.
Furthermore, in step S4, the compacting sequence of slow compacting, fast compacting, edge compacting and middle compacting is performed on each layer of backfill soil, and the tracks of wheel compacting are ensured to be mutually overlapped, so as to prevent pressure leakage.
Further, in step S4, in the region where the compaction machine cannot roll, manual ramming, re-rolling, and layered ramming for compaction are adopted to ensure the compaction quality of the operation region.
Further, in step S4, the compaction degree of each layer of backfill soil is greater than or equal to 0.93, and the bearing capacity is greater than or equal to 120 KPa.
Further, in step S4, a slope of not less than 3% is set during backfilling to facilitate drainage and ensure no accumulated water after rain.
Further, in step S1, the selected backfill soil meets the natural gravity gamma > 16.5KN/m3Plasticity index IP<17, the bearing ratio CBR is more than or equal to 3, and the maximum grain diameter of the filler is not more than 200 mm.
Further, in step S1, when the backfill soil is selected, the backfill soil that does not meet the backfill requirements is subjected to the preliminary treatment.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the following further illustrates the contents of the present invention by examples, and it should be understood that the specific examples described herein are only for explaining the present invention and are not intended to limit the present invention.
The invention provides a method for recycling engineering spoil backfill, which comprises the following steps:
s1: preparing backfill materials and a compaction machine: and detecting the soil quality of the backfill soil to determine that the optimum water content, maximum dry density, particle size, water content and variety meet the backfill requirement. Performing early-stage pretreatment on the backfill soil which does not meet the requirements, such as adding a soil curing agent, loosening the soil, watering the wetted soil and the like; the selection of the compaction machinery is based on the actual situation of the backfill soil, and mainly adopts a light road roller, a 20t vibration road roller, a frog hammer, a forklift, a truck, an excavator, a bulldozer, a steel ruler and the like.
S2: leveling the field: and dividing an operation area, adopting zoning and construction work sections for filling, removing garbage, silt and other impurities on the surface of the foundation pit, keeping the foundation pit smooth and clean, and ensuring that the foundation meets the construction design requirements.
S3, field compaction: rolling and compacting the original soil of the substrate by adopting a compacting machine, wherein the compaction coefficient of the original soil reaches 0.93, checking the depth and the horizontal elevation of the foundation pit, and paving a thickness mark, such as placing a horizontal standard wood pile or dotting on a side slope; if the original soil of the substrate is wet, a layer of quicklime is paved and then rolled.
S4: layered backfilling and compacting: backfilling soil and medium coarse sand in a staggered layered mode, dividing the backfilled soil and the medium coarse sand into horizontal layers from low to high along a foundation pit, filling the horizontal layers layer by layer upwards, and filling and rolling one layer by layer, wherein the paving and filling thickness of each layer is determined according to the type and the specification of a compaction machine and is not more than 50cm, and generally not more than 30 cm;
in the process of backfilling each layer of soil body, the backfilling is carried out in the sequence of firstly backfilling the edge and then backfilling the middle from two ends, each layer is backfilled with the lowest point firstly and then with the highest point, and is spread by a bulldozer, and the individual uneven points are matched with manual fine stones and stone chips for leveling, so that gaps are filled;
after a layer of soil body is backfilled, rolling and compacting the layer of soil body, rolling and compacting the soil body according to the principle that tracks of rolling are overlapped with each other at the positions of slow and fast, edge and middle, and in the embodiment, a vibratory roller with the self weight of 20t is adopted for rolling, each layer of soil body is rolled for 4 times, the length of a rolling operation section is 60-100 m, the speed is gradually accelerated to 4km/h from the initial 2km/h, the overlapping range of main wheels of the roller is not less than 5m at the joint position of two operation sections, and when rolling, the tracks of rolling are overlapped with each other to prevent pressure leakage. In the filled soil area which can not be rolled by the vibratory roller, a frog rammer is manually used for re-rolling, the compaction is carried out in layers, and the compaction quality of the operation area is ensured.
After each layer of backfill soil is paved and compacted, whether the compaction coefficient and the bearing capacity of the backfill soil layer meet the design requirements or not is detected, the embodiment adopts a sand filling method to detect the compaction coefficient of the backfill soil, a flat plate load test is used for detecting the bearing capacity, the rolling layer of which the compaction coefficient does not reach 0.93 or the bearing capacity is lower than 120KPa is re-rolled, and after the re-rolling is finished, the detection of the compaction coefficient and the bearing capacity is performed again until the compaction coefficient and the bearing capacity meet the design requirements, the next layer of construction is performed.
S5: and after the soil body is backfilled in a layered mode and rolled in a layered mode to reach a design elevation, according to building foundation design specifications (GB50007-2011), the compaction coefficient, the water content, the compression modulus and the bearing capacity characteristic value of the soil body at each test point are measured.
Through the backfilling process, the compaction coefficients of soil bodies at all test points are detected to be larger than 0.95, the mean value of the water content is 20.1%, the mean value of the compression modulus is 8.21MPa, and the characteristic value of the bearing capacity can reach 240 kPa.
From the four detection index data, the foundation subjected to layered backfilling and layered rolling meets the design requirements on the compaction coefficient, the water content, the compression modulus and the bearing capacity, and the method for recycling the engineering spoil backfilling provided by the invention is feasible.
In one embodiment, the selected backfill has a physical-mechanical index meeting a natural gravity γ > 16.5KN/m3Plasticity index IP<17, the bearing ratio CBR is more than or equal to 3, and the maximum grain size of the filler is not more than 200 mm; in step S1, the backfill soil is selected from gravelly soil with good gradation, soil without pollution, organic soil, silt soil, expansive soil, humus soil, construction waste soil, and the like, preferably from mountain soil.
The invention effectively solves the problems of treating the pollution and recycling of the engineering waste soil by using the engineering waste soil as the backfill material, simultaneously adopts a mode of controlling the process quality by backfilling and rolling in a layering way, increases the quantity of solid particles in the unit volume of the soil body, reduces the porosity, eliminates the nonuniformity of foundation soil and reduces the residual settlement, improves the safety, shortens the construction period, avoids the capital investment caused by secondary treatment needed in the later stage of one-time filling, and has obvious economic benefit and social benefit.
The above description is only a partial example of the present invention, and does not limit the embodiments and the protection scope of the present invention, therefore, it should be recognized that the present invention is covered by the protection scope of the present invention by the equivalent substitution and obvious change made by the description of the present invention for those skilled in the art.

Claims (10)

1. A method for backfilling and recycling engineering waste soil is characterized by comprising the following steps:
s1: preparing backfill materials and a compaction machine: selecting backfill meeting backfill requirements and selecting a proper compacting machine according to the actual condition of the backfill;
s2: leveling the field: dividing an operation area, filling by areas and construction sections, removing garbage, sludge and other impurities on the surface of the foundation pit, and keeping the foundation pit smooth and clean;
s3: and (3) field compaction: rolling and compacting the original soil of the substrate by adopting a compacting machine to ensure that the compaction coefficient of the original soil reaches 0.93, checking the depth and the horizontal elevation of the foundation pit, and paving a thickness mark;
s4: layered backfilling and compacting: backfilling backfill and medium coarse sand in a staggered and layered mode, dividing a foundation pit into horizontal layers from low to high, filling and rolling the horizontal layers layer by layer, detecting whether the compaction degree coefficient and the bearing capacity of each layer of backfill meet the design requirements or not after each layer of backfill is paved and compacted, and performing next layer construction after the design requirements are met, or performing re-rolling;
s5: and detecting the compaction coefficient, the water content, the compression modulus and the bearing capacity characteristic value of the whole backfill soil.
2. The method as claimed in claim 1, wherein in step S4, each layer of backfill is performed in a sequence of backfilling from edge to middle, with the lowest point backfilled and the highest point backfilled.
3. The method of claim 2, wherein in step S4, each layer of backfill is filled with gaps by leveling with fine stones and stone chips.
4. A method of backfilling and recycling of engineering spoil according to claim 3, characterized in that the fill thickness of each layer of backfill is not more than 50cm, preferably not more than 30 cm.
5. The method of claim 1, wherein in step S4, the backfill is performed by a slow-first-then-fast-first-edge-then-middle compaction sequence for each layer of backfill.
6. The method for backfilling and recycling the engineering waste soil according to claim 5, wherein in step S4, the area which can not be compacted by the compacting machine is compacted and re-ground by manual operation.
7. The method for backfilling and recycling the engineering waste soil according to claim 1, wherein in step S4, the compaction degree of each layer of the backfilled soil is greater than or equal to 0.93, and the bearing capacity is greater than or equal to 120 KPa.
8. The method for recycling the backfill of the engineering waste soil according to the claim 1, wherein in the step S4, a gradient of not less than 3% is set during the backfill.
9. The method for backfilling and recycling of engineering waste soil according to claim 1, wherein in step S1, the selected backfill soil is in accordance with natural gravity γ>16.5KN/m3Plasticity index IP<17, the bearing ratio CBR is more than or equal to 3, and the maximum grain diameter of the filler is not more than 200 mm.
10. The method for backfilling and recycling of engineering waste soil according to claim 1, wherein in step S1, when the backfill soil is selected, the backfill soil which does not meet the backfill requirements is subjected to a pre-treatment.
CN202110242932.7A 2021-03-05 2021-03-05 Method for recycling engineering waste soil through backfilling Active CN113006091B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110242932.7A CN113006091B (en) 2021-03-05 2021-03-05 Method for recycling engineering waste soil through backfilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110242932.7A CN113006091B (en) 2021-03-05 2021-03-05 Method for recycling engineering waste soil through backfilling

Publications (2)

Publication Number Publication Date
CN113006091A true CN113006091A (en) 2021-06-22
CN113006091B CN113006091B (en) 2022-09-27

Family

ID=76406088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110242932.7A Active CN113006091B (en) 2021-03-05 2021-03-05 Method for recycling engineering waste soil through backfilling

Country Status (1)

Country Link
CN (1) CN113006091B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113836629A (en) * 2021-10-12 2021-12-24 浙江绿农生态环境有限公司 Pit repairing method and system based on solid waste recycling and storage medium
CN114319294A (en) * 2021-12-09 2022-04-12 国网江苏省电力工程咨询有限公司 Method for constructing water-deficient layer by using inferior engineering soil to inhibit plant growth

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532712A (en) * 2014-12-25 2015-04-22 中交第二公路勘察设计研究院有限公司 Design method and structure for preventing settlement-deformation damage of soft-rock subgrade of road
CN108951333A (en) * 2018-08-16 2018-12-07 河南省公路工程局集团有限公司 A kind of method that building castoff processing recycles
CN110080232A (en) * 2019-04-04 2019-08-02 程桂香 A kind of deep basal pit earth-filling method of underground high water level

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532712A (en) * 2014-12-25 2015-04-22 中交第二公路勘察设计研究院有限公司 Design method and structure for preventing settlement-deformation damage of soft-rock subgrade of road
CN108951333A (en) * 2018-08-16 2018-12-07 河南省公路工程局集团有限公司 A kind of method that building castoff processing recycles
CN110080232A (en) * 2019-04-04 2019-08-02 程桂香 A kind of deep basal pit earth-filling method of underground high water level

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113836629A (en) * 2021-10-12 2021-12-24 浙江绿农生态环境有限公司 Pit repairing method and system based on solid waste recycling and storage medium
CN113836629B (en) * 2021-10-12 2024-03-26 浙江绿农生态环境有限公司 Pit repairing method, system and storage medium based on solid waste recycling
CN114319294A (en) * 2021-12-09 2022-04-12 国网江苏省电力工程咨询有限公司 Method for constructing water-deficient layer by using inferior engineering soil to inhibit plant growth
CN114319294B (en) * 2021-12-09 2023-07-11 国网江苏省电力工程咨询有限公司 Method for constructing water-lack layer by using poor engineering soil to inhibit plant growth

Also Published As

Publication number Publication date
CN113006091B (en) 2022-09-27

Similar Documents

Publication Publication Date Title
CN113006091B (en) Method for recycling engineering waste soil through backfilling
CN102900001B (en) Construction method for road foundation
CN101713291A (en) Filling-reclaiming method for building land in coal mining subsidence areas
CN106283944B (en) The method for pressing washer stone and/or block stone to reinforce shallow layer soft ground
CN107740317A (en) Application process of the building waste in road fills
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN100535256C (en) Strong ramming semi-replacement construction technique
CN103510504B (en) High saturated uneven reclaimed ground processing method
CN101311418A (en) Exchange filling method for deep-foundation pit and large area equipment foundation
CN108677638A (en) Express highway roadbed dam filling construction based on building waste
CN112627154A (en) Water network zone lime solidified soil test section filling design method
CN104695419A (en) Soft soil roadbed construction method
CN208009180U (en) A kind of solidified slip soil and construction refuse regenerated grading are gathered materials the pavement structure of composition
CN101012648A (en) Method for compacting cohesive soil road embankment and ground foundation of highroad, road and railroad by using vacuum precompression
CN111576384B (en) Construction method of high-energy-level dynamic compaction
CN210529400U (en) Solidified building residue soil road structure
CN102031743A (en) Construction method of mudstone-filled embankment
CN111441331A (en) High-water-content clay dynamic compaction replacement filling foundation and construction method thereof
CN103669329A (en) Process for direct dynamic compaction method treatment of ultra-deep building dump pit
CN113235552B (en) Method for filling roadbed by using large-diameter broken stone through dynamic compaction
CN110747808B (en) Construction method for directly feeding dam material by using ice water accumulation body as main rockfill area
CN108643132B (en) Rolled concrete structure with composite slurry injected into stone slag material and construction method thereof
CN207228090U (en) Structure is repaired in soft clay area railway station platform sedimentation displacement
CN1141447C (en) Impact rolling to raise and stabilize road bed strength
CN112195699A (en) High-groundwater-level silty roadbed filling technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant