CN113006048A - Construction method of long spiral drilling retaining wall for soil-squeezing pile - Google Patents

Construction method of long spiral drilling retaining wall for soil-squeezing pile Download PDF

Info

Publication number
CN113006048A
CN113006048A CN202110206967.5A CN202110206967A CN113006048A CN 113006048 A CN113006048 A CN 113006048A CN 202110206967 A CN202110206967 A CN 202110206967A CN 113006048 A CN113006048 A CN 113006048A
Authority
CN
China
Prior art keywords
soil
pile
drilling
drill
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110206967.5A
Other languages
Chinese (zh)
Inventor
王吉良
贾君
童修富
王宇
孙权
姜曦
曹兴明
曹宇
崔伟婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110206967.5A priority Critical patent/CN113006048A/en
Publication of CN113006048A publication Critical patent/CN113006048A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a construction method of a long spiral drilling retaining wall for a soil-squeezing pile, which utilizes the characteristic that the forward and reverse rotation soil return directions of a spiral blade of a drilling machine are opposite, forward rotation drilling is carried out, part of residual soil is returned upwards until the drilling is stopped at a preset depth, reverse rotation lifting drilling is carried out, loose soil on a drill rod is filled back to the retaining wall in a hole, and then the soil-squeezing pile is constructed. The method has the advantages of simplicity, practicability, easy popularization, low cost and wide market prospect, can ensure both the side friction resistance and the end resistance of the pile, can be constructed by using a common long spiral drilling machine, and fills the blank of the construction of the soil-squeezing pile.

Description

Construction method of long spiral drilling retaining wall for soil-squeezing pile
Technical Field
The invention relates to the field of soil-squeezing pile construction methods, in particular to a long spiral drilling retaining wall used for a soil-squeezing pile construction method.
Background
The prior art of soil-squeezing piles in the construction market is called 'semi-screw pile and pile-forming method' patent number: ZL 031128265.2, according to "building pile foundation technical specification" call for crowded soil stake, the problem that this invention exists is: when a hard soil layer cannot be drilled and the depth of the hard soil layer cannot reach the design requirement, a long spiral drilling machine is generally adopted to drill a hole firstly, and the part with higher soil body strength is taken out to carry out half-screw pile construction, and the method has two disadvantages: firstly, the side friction resistance (higher) calculated according to the soil-squeezing pile is designed, the soil in the hole is returned to the ground by drilling the hole through the long auger drilling machine, the pile forming property of the soil-squeezing pile in the original design is changed into a non-soil-squeezing cast-in-place pile, and the side friction resistance of the pile is greatly reduced, so that the requirement of the vertical bearing capacity of a single pile cannot be met. And secondly, when the underground water soil layer construction is drilled to the designed depth and the drill is lifted, the underground water flows into the hole under the action of the underground water to drive the soil body of the hole wall to collapse, the original soil layer on the hole wall is disturbed, the lateral resistance of the pile is seriously influenced, and the requirement of the designed bearing capacity cannot be met.
Further, patent No.: 20111073430X "crowded native pile pine soil technology" provides a stake, if the adoption when meeting high strength soil body is short spiral drilling machine drilling, this model only has the drill bit to take helical blade resistance little so be favorable to drilling, step one in this patent specification states that the drill bit diameter ratio is driven 1cm to 5cm big by the rig (polished rod), this step has violated the design principle of "building pile foundation technical specification" JGJ94-2008, surpassed the original state that design stake footpath 1cm to 5cm destroyed the pore wall, serious influence stake side frictional resistance. And secondly, the process of the soil-squeezing pile does not have the process of squeezing the soil of the wall of the pile hole, the calculation theory of designing the soil-squeezing pile is changed, the process is actually changed into a non-soil-squeezing cast-in-place pile process, and the requirements of technical Specifications for building pile foundations, JGJ94-2008 are violated. And step two, the drilling machine drives the drill bit to reversely drill and exit the foundation soil, and the forward rotation speed of the drill bit is 2 times to 3 times of the reverse rotation speed. Understanding 1: the purpose of the drill bit rotating 2-3 times of the forward rotation speed after exiting the ground is to throw off the residual soil on the leaves of the short spiral drill bit by centrifugal force, which is not significant for soil squeezing piles. Understanding 2: the centrifugal force inevitably generated when the drilling machine drives the drill bit to reversely drill and withdraw in the hole at the speed 2-3 times of the forward rotation speed enables the pile diameter larger than the original diameter by 1-5 cm to seriously damage the side frictional resistance of the original soil layer of the hole wall, and the design regulation of the soil-squeezing pile in the technical Specification of building pile foundations JGJ94-2008 is violated.
An effective solution to the problems in the related art has not been proposed yet.
Disclosure of Invention
The invention aims to provide a construction method for a soil-extruding pile by using a long spiral drilling retaining wall, which solves the problems that the pile can reach a final pressure value or hammering penetration degree according to design requirements, but does not influence the design elevation, and how to reduce the soil body strength, not influence the side friction resistance and end resistance of the pile, and smoothly hammering or pressing the pile to the design elevation.
In order to achieve the purpose, the invention provides the following technical scheme: the long spiral drilling protecting wall is used for the construction method of the soil-extruding pile, when the soil layer is hard and has no underground water, a long spiral drilling machine is adopted to drill forward and return part of the residual soil upwards, when the drill is lifted to a preset depth, the residual soil on a drill rod returns to the protecting wall in the backfilling hole during the backward drilling, the diameter of the drilled hole is smaller than the designed pile diameter, and the original soil layer on the side of the pile is not disturbed according to the strength value of the soil layer.
Furthermore, the construction method adopts a long spiral drilling machine to drill forwards until the distance from the pile end is reserved with the thickness of a bearing layer, the soil layer of the cohesive soil is not less than 2d, d is the diameter of the pile, the sandy soil is not less than 1.5d, and the soil of the gravel is not less than 1 d.
Compared with the prior art, the construction method of the long spiral drilling retaining wall for the soil-extruding pile is an incomplete soil-discharging drilling method, the bearing capacity of the pile is not affected even if partial residual soil is discharged, and the requirement of double control of the soil-extruding pile can be completely met. The advantages are that:
1. the diameter of the drilled hole can be reduced under the condition of not influencing the side frictional resistance according to the soil layer strength, and the diameter and the side frictional resistance of the pile cannot be influenced when the hole is loosened through drilling.
2. The method is suitable for the soil layer with or without water, when the drill is lifted, the reverse drill can effectively backfill the loosened soil into the hole, and the specific gravity of the drilled loosened soil is generally far greater than the inward tension of the soil on the side wall of the hole at about 1.6, so that the effect of protecting the wall is effectively achieved, and the strength of the soil body is reduced to a limited extent.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a construction schematic view of a long auger drilling retaining wall for an earth-extruding pile construction method according to an embodiment of the invention.
Detailed Description
The invention is further described with reference to the following drawings and detailed description:
example (b):
the long spiral drilling retaining wall is used for the construction method of the soil-squeezing pile, a long spiral drilling machine is used for drilling before the construction of the soil-squeezing pile, the diameter of the drilled hole is smaller than the designed diameter of the pile, the thickness of a reserved bearing layer is determined according to the strength of a soil body, the thickness of a general cohesive soil layer is not smaller than 2d (d is the diameter of the pile), sandy soil is not smaller than 1.5d, and gravel soil is not smaller than 1 d. When the soil layer strength is higher, the reserved soil layer is thinner, and the original soil layer state designed and used at the pile side and the pile end is not disturbed, please refer to fig. 1. The construction sequence is as follows:
1. positioning a drilling machine;
2. drilling in a forward rotation mode until the thickness of the soil layer at the side and the end of the reserved pile is reached;
3. the residual soil on the drill rod is returned into the hole for wall protection while the drill rod is lifted in a reverse rotating mode;
4. and (5) constructing a soil-extruding pile.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art will understand that various changes, modifications and substitutions can be made without departing from the spirit and scope of the invention as defined by the appended claims. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (2)

1. The long spiral drilling protecting wall is used for the construction method of the soil-extruding pile, and is characterized in that when the soil layer is hard and has no underground water, a long spiral drilling machine is adopted to drill forward and return part of residual soil upwards, when the drill is lifted to a preset depth and the drill is reversely drilled, the residual soil on a drill rod returns to the protecting wall in a backfilling hole, the diameter of the drilled hole is smaller than the designed pile diameter, and the original soil layer on the side of the pile is taken as the standard according to the strength value of the soil layer without disturbance.
2. The long auger drilling retaining wall for soil-extruding pile construction method according to claim 1, wherein the construction method is characterized in that a retaining layer thickness is reserved when a long auger drilling machine is adopted to drill forwards to a distance from the pile end, the soil layer of the cohesive soil is not less than 2d, d is the diameter of the pile, the sandy soil is not less than 1.5d, and the soil of crushed stone is not less than 1 d.
CN202110206967.5A 2021-02-24 2021-02-24 Construction method of long spiral drilling retaining wall for soil-squeezing pile Pending CN113006048A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110206967.5A CN113006048A (en) 2021-02-24 2021-02-24 Construction method of long spiral drilling retaining wall for soil-squeezing pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110206967.5A CN113006048A (en) 2021-02-24 2021-02-24 Construction method of long spiral drilling retaining wall for soil-squeezing pile

Publications (1)

Publication Number Publication Date
CN113006048A true CN113006048A (en) 2021-06-22

Family

ID=76385704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110206967.5A Pending CN113006048A (en) 2021-02-24 2021-02-24 Construction method of long spiral drilling retaining wall for soil-squeezing pile

Country Status (1)

Country Link
CN (1) CN113006048A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113832957A (en) * 2021-09-09 2021-12-24 西北水利水电工程有限责任公司 Construction method of loess layer photovoltaic module support PHC pipe pile
CN115012392A (en) * 2022-04-09 2022-09-06 中铁上海工程局集团第五工程有限公司 Method for improving water stopping effect of Larsen steel sheet pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113832957A (en) * 2021-09-09 2021-12-24 西北水利水电工程有限责任公司 Construction method of loess layer photovoltaic module support PHC pipe pile
CN113832957B (en) * 2021-09-09 2023-02-03 西北水利水电工程有限责任公司 Construction method of loess layer photovoltaic module support PHC pipe pile
CN115012392A (en) * 2022-04-09 2022-09-06 中铁上海工程局集团第五工程有限公司 Method for improving water stopping effect of Larsen steel sheet pile

Similar Documents

Publication Publication Date Title
CN101812976B (en) Adjustable multiple coil extruding and expanding drilling tool
CN106088064B (en) A kind of construction method of the axle cement mixing pile drilling tool of hard stratum precrushing three
CN113006048A (en) Construction method of long spiral drilling retaining wall for soil-squeezing pile
CN109723373B (en) Hole forming construction process for rotary drilling bored pile in slightly weathered granite stratum
CN103046931A (en) Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode
Brown Practical considerations in the selection and use of continuous flight auger and drilled displacement piles
CN104164873B (en) Prestressed pipe pile and construction method thereof
CN203403404U (en) High-efficiency cast-in-place pile device
CN108086910A (en) Long spire extruded and extended pile drilling machine boring method and long spire extruded and extended pile drilling machine
CN113373925B (en) Method and device for mounting steel sheet pile in sandstone stratum by rotary drilling rig
CN102409978B (en) Rotary drilling hole forming method by using multi-stage alloy pilot roller bit in complex stratum cast-in-place pile construction
CN213682121U (en) Garden engineering construction foundation ditch compaction fill structure
CN106593456A (en) Method for setting shield tunneling machine free in water-rich sand cobble stratum due to stuck cutter
CN206562910U (en) A kind of auger machine
CN208089226U (en) A kind of extruding and removing soil combination drill tool and CFG extruding and removing soil stakes
CN110306540A (en) A kind of construction method of full circle swinging casing pile foundation pore-forming
CN109944251A (en) The drawing hole construction method that soft rock stratum steel sheet pile is squeezed into
CN108035680A (en) A kind of extruding and removing soil combination drill tool, the stake of CFG extruding and removing soils and preparation method
CN201190279Y (en) Construction equipment for spiral digging small-diameter bored pile
CN101338560A (en) Construction method for reinforced concrete pile
KR100478234B1 (en) Pile excution machine using screw hammer
CN113882363A (en) Pile end post-grouting device, grouting method and construction method for CFG pile
CN112377093A (en) Relates to a rotary drilling construction method for deep concrete blocks and gravel layers and special rotary drilling equipment
KR200285602Y1 (en) Pile excution machine using screw hammer
CN104863125A (en) Bougainvillea spectabilis willd-shaped drilling pile and shaping method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination