CN113005988B - Dam protection device for environment-friendly water conservancy project and installation method - Google Patents
Dam protection device for environment-friendly water conservancy project and installation method Download PDFInfo
- Publication number
- CN113005988B CN113005988B CN202110183282.3A CN202110183282A CN113005988B CN 113005988 B CN113005988 B CN 113005988B CN 202110183282 A CN202110183282 A CN 202110183282A CN 113005988 B CN113005988 B CN 113005988B
- Authority
- CN
- China
- Prior art keywords
- buffer
- box
- water
- buffer tank
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
- Barrages (AREA)
Abstract
The invention discloses a dam protection device for environment-friendly water utilization engineering and an installation method, and belongs to the technical field of dam protection devices. The invention provides a dam protection device for environmental protection water conservancy projects, which comprises a dam body and a fixing plate, wherein the fixing plate is fixedly connected to one side, close to a river channel, of the dam body through fixing bolts, the fixing plate is far away from one side of the dam body and is fixedly connected with a fixing box, the fixing box is in sliding connection with a buffer box, one side, far away from the dam body, of the fixing plate is provided with a chute, and two symmetrical buffer mechanisms are fixedly connected in the chute.
Description
Technical Field
The invention relates to the technical field of dam protection, in particular to a dam protection device for environment-friendly water conservancy projects and an installation method.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in the nature to achieve the purpose of removing harm and benefiting, is also called water engineering, water is a valuable resource essential for human production and life, but the naturally existing state of the water does not completely meet the needs of human beings, and only when the hydraulic engineering is built, water flow can be controlled to prevent flood disasters, and water quantity regulation and distribution are performed to meet the needs of people's life and production on water resources.
Along with the continuous development of society, hydraulic engineering has also obtained rapid development, and in the hydraulic construction process, the dykes and dams are mainly a building and a structure that are used for preventing water and retaining water, and modern dams mainly have two main types: earth-rock dam and concrete dam, in recent years, large-scale dykes and dams all adopt high technology reinforced concrete building, need use a dykes and dams protector in hydraulic engineering construction to ensure dykes and dams's security.
In the prior art, what river course protection adopted usually is simple stone bedding, and the protector that this kind of stone was built, this kind of dykes and dams protector is very easy to cause the damage or even break down because river erodees for a long time to give people's life and brought very big trouble, the personal safety of giving people has led to the fact very big threat even, simultaneously, water pollution is serious day by day now, current protector does not have the function of salvaging rubbish in the river, consequently, need a dykes and dams protector that can solve above-mentioned problem urgently.
Disclosure of Invention
The invention aims to solve the problems that in the prior art, river protection usually adopts simple stone bedding, and the dam protection device built by stones is easy to damage or even collapse due to long-term washing of river water, so that great troubles are brought to life of people, and even personal safety of people is greatly threatened, meanwhile, the water quality pollution is increasingly serious at present, and the existing protection device does not have the function of salvaging garbage in the river water, so that the dam protection device for the environmental protection water utilization engineering is provided.
In order to achieve the purpose, the invention adopts the following technical scheme:
a dam protection device for environmental protection water conservancy projects comprises a dam body and a fixing plate, wherein the fixing plate is fixedly connected to one side, close to a river channel, of the dam body through a fixing bolt, one side, far away from the dam body, of the fixing plate is fixedly connected with a fixing box, a buffer box is slidably connected in the fixing box, one side, far away from the dam body, of the fixing plate is provided with a chute, two symmetrical buffer mechanisms are fixedly connected in the chute, one side, close to the fixing plate, of the buffer box is rotatably connected with two symmetrical connecting rods, one end, far away from the buffer box, of each connecting rod is rotatably connected with the corresponding buffer mechanism, one side, far away from the corresponding connecting rod, of the buffer box is provided with a plurality of water inlets, two sides of each water inlet are fixedly connected with a plurality of barbed nails, a spiral pushing mechanism is arranged in the buffer box, and the upper end, close to one side of the fixing plate, of the buffer box is hermetically connected with a blow-off pipe, the one end that the baffle-box was kept away from to the blow off pipe runs through in fixed case, and has a connecting pipe through connecting joint sealing connection, be equipped with collection mechanism in the dykes and dams main part, the one end that the blow off pipe was kept away from to the connecting pipe is connected with collection mechanism.
Preferably, the buffer mechanism comprises a cylindrical barrel, a moving rod and a sliding block, the cylindrical barrel is fixedly connected to two sides of the sliding groove respectively, the moving rod is connected to the inside of the cylindrical barrel in a sliding mode, one end, far away from the cylindrical barrel, of the moving rod is fixedly connected with the sliding block, an expansion spring is sleeved on the moving rod, two ends of the expansion spring are fixedly connected with the cylindrical barrel and the sliding block respectively, and the connecting rod is rotatably connected with the sliding block.
Preferably, one end of the sliding block, which is far away from the cylindrical barrel, is fixedly connected with two symmetrical L-shaped sleeves, a first push rod and a second push rod are slidably connected in the L-shaped sleeves, one end of the sliding block, which is far away from the moving rod, is connected with the first push rod, and one end of the second push rod, which is close to the buffer box, is connected with a push plate.
Preferably, the screw propulsion mechanism includes motor, screw propulsion pole, motor fixed connection is at the inside lower extreme of baffle-box, the one end that the motor is close to the output is equipped with the closing plate, fixed connection between closing plate and the baffle-box, the output fixed connection of screw propulsion pole and motor, the one end that the motor was kept away from to the screw propulsion pole runs through in the closing plate, and with rotate between the baffle-box and be connected.
Preferably, the spiral propelling rod is connected with the sealing plate in a sealing mode through a sealing piece.
Preferably, the collecting mechanism comprises a collecting box and a sewage pumping pump, the sewage pumping pump is fixedly connected to the collecting box, one end of the connecting pipe, far away from the sewage discharge pipe, is in sealed connection with a sewage inlet of the sewage pumping pump, and a sewage outlet of the sewage pumping pump is in sealed connection with a sewage inlet of the collecting box.
Preferably, telescopic rods are fixedly connected to two sides in the collecting box, one end, far away from the inner wall of the collecting box, of each telescopic rod is connected with an extrusion plate, a water outlet is formed in the lower end of the collecting box, a filter screen is connected to the water outlet, and a water outlet of the collecting box is connected with a water drain pipe in a sealing mode.
Preferably, the collecting box is rotatably connected with a box cover through a hinge, and a transparent plate is arranged on the box cover.
Preferably, collecting box lower extreme fixedly connected with locomotive, locomotive roll connection is on dykes and dams main part, the one end of dykes and dams main part upper end keeping away from the blow off pipe is equipped with the cotter way, the one end sliding connection that the locomotive is close to the cotter way has the fixed pin, fixed pin sliding connection is in the cotter way.
A method for installing a dam protection device for environment-friendly water conservancy projects mainly comprises the following steps:
s1: when the device is used by a user, the device is moved to a designated working position, and then the fixing plate is fixed on one side of the dam body close to a river channel through the fixing bolt;
s2: when the buffer tank is impacted by water waves, the buffer tank moves backwards under the impact of the water waves, the buffer tank is connected with the buffer mechanism through the connecting rod, the water waves can be buffered under the action of the buffer mechanism, so that the impact of the water waves is relieved, and when the river is cooled down, the buffer tank is reset under the action of the telescopic spring in the buffer mechanism, so that the impact of the river on the dam body is repeatedly buffered;
s3: the buffer tank is provided with a water inlet, when the buffer tank is hit by river water, garbage can be carried into the buffer tank through the water inlet, two rows of barbed nails are arranged on two sides of the water inlet of the buffer tank, and through the arrangement of the barbed nails, when the river water is retreated, the garbage can be remained in the buffer tank under the action of the barbed nails, so that the garbage in the river water can be collected;
s4: when the rubbish in the buffer bin is too much, the spiral propelling mechanism is started at the moment, the rubbish is pushed to the upper end of the buffer bin, then the discharge pipe and the collection mechanism are connected through the connecting pipe, after the connection is completed, the rubbish in the buffer bin is pumped into the collection mechanism through the discharge pipe by the dirt pumping pump in the collection mechanism, and the rubbish is collected.
Compared with the prior art, the invention provides a dam protection device for environment-friendly water conservancy projects, which has the following beneficial effects:
1. the dam protection device for the environment-friendly hydraulic engineering is characterized in that when a user uses the dam protection device, the user firstly moves the dam protection device to a work designated position, then fixes a fixing plate at one side of a dam body close to a river channel through a fixing bolt, when the buffer tank is impacted by water waves, the buffer tank moves backwards under the impact of the water waves, the buffer tank is connected with a buffer mechanism through a connecting rod, the water waves can be buffered under the action of the buffer mechanism, so that the impact on the water waves is effectively relieved, the dam body is protected, when river water is cooled down, the buffer tank is reset under the action of a spring in the buffer mechanism, therefore, the buffer tank can repeatedly and effectively protect the dam body, the impact force of the river water on the dam body is reduced, and due to the lack of protection of the river water by human beings, various wastes can be scattered on the surface of the river water, wherein the buffer tank is provided with a water inlet, when the buffer tank is hit by river water, garbage can be driven to enter the buffer tank through the water inlet, two rows of barbed nails are arranged on two sides of the water inlet of the buffer tank, when the river water is cooled down, the garbage can be left in the buffer tank under the action of the barbed nails, the garbage in the river water can be collected, the water quality of the river water is improved, when the garbage in the buffer tank is too much, the spiral propelling mechanism is started to propel the garbage to the upper end of the buffer tank, then the sewage discharge pipe is connected with the collecting mechanism through the connecting pipe, after connection is completed, the sewage pump in the collecting mechanism is started to pump the garbage in the buffer tank into the collecting mechanism through the sewage discharge pipe, the garbage is collected, and convenience is brought for a user to carry out centralized treatment on the garbage, the device not only can effectively reduce the impact force of the river water on a dam body, but also can salvage, collect and treat the garbage in the river water, the practicability of the device is effectively improved;
the device has the advantages that the impact force of water waves on the dam body can be effectively reduced through the arrangement of the buffer mechanism, the dam body is protected from being damaged, the use safety of the dam body is improved, meanwhile, the spiral propelling mechanism, the collecting mechanism and the barbed nails are further arranged, so that the device not only can effectively reduce the impact force of river water on the dam body, but also can salvage and collect garbage in the river water, and the practicability of the device is effectively improved.
Drawings
Fig. 1 is a first structural schematic view of a dam protection device for environmental protection water conservancy projects according to the present invention;
FIG. 2 is a schematic structural view of a dam protection device for environmental protection water conservancy projects according to the present invention;
FIG. 3 is a third schematic structural view of a dam protection device for environmental protection water conservancy projects according to the present invention;
fig. 4 is a schematic structural view of a portion a in fig. 2 of an embankment protection device for environmental protection water conservancy projects according to the present invention;
FIG. 5 is a schematic structural view of a portion B in FIG. 2 of an eco-friendly water conservancy project embankment block according to the present invention;
fig. 6 is a schematic structural view of a part C in fig. 3 of an embankment protection device for environmental protection water conservancy project according to the present invention;
fig. 7 is a fourth schematic structural view of a dam protection device for environmental protection water conservancy projects according to the present invention;
fig. 8 is a perspective view of a fixing plate, a fixing box and a buffer box in the embankment protection device for environmental protection water conservancy project according to the present invention.
In the figure: 1. a dam body; 2. a fixing plate; 3. a fixed box; 4. a buffer tank; 5. a screw propulsion rod; 6. a blow-off pipe; 7. a collection box; 8. a motor; 9. a telescopic rod; 10. a pressing plate; 11. a mobile vehicle; 12. a fixing pin; 13. a drain pipe; 14. a cylindrical barrel; 15. a travel bar; 16. a slider; 17. a connecting rod; 18. a first push rod; 19. an L-shaped sleeve; 20. a second push rod; 21. pushing the plate; 22. a sealing plate; 23. barbed nails; 24. a seal member; 28. a sewage pumping pump; 701. a box cover; 702. a transparent plate; 703. and (4) a filter screen.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Example 1:
referring to fig. 1-8, a dam protection device for environmental protection water conservancy projects, comprising a dam body 1 and a fixing plate 2, wherein the fixing plate 2 is fixedly connected to one side of the dam body 1 close to a river channel through a fixing bolt, one side of the fixing plate 2 far away from the dam body 1 is fixedly connected with a fixing box 3, the fixing box 3 is in sliding connection with a buffer box 4, one side of the fixing plate 2 far away from the dam body 1 is provided with a chute, two symmetrical buffer mechanisms are fixedly connected in the chute, one side of the buffer box 4 close to the fixing plate 2 is rotatably connected with two symmetrical connecting rods 17, one end of the connecting rod 17 far away from the buffer box 4 is rotatably connected with the buffer mechanisms, one side of the buffer box 4 far away from the connecting rods 17 is provided with a plurality of water inlets, two sides of the water inlets are fixedly connected with a plurality of barbed nails 23, a spiral pushing mechanism is arranged in the buffer box 4, the upper end of the buffer box 4 close to one side of the fixing plate 2 is hermetically connected with a drain pipe 6, the one end that baffle-box 4 was kept away from to blow off pipe 6 runs through in fixed box 3, and has a connecting pipe through connecting sealing connection, is equipped with on the dykes and dams main part 1 and collects the mechanism, and the one end that blow off pipe 6 was kept away from to the connecting pipe is connected with collection mechanism.
When the user uses the device, firstly, the device is moved to a designated working position, then the fixing plate 2 is fixed on one side of the dam body 1 close to a river channel through the fixing bolt, when the buffer tank 4 is impacted by water waves, the buffer tank 4 moves backwards under the impact of the water waves, the buffer tank 4 is connected with the buffer mechanism through the connecting rod 17, the water waves can be buffered under the action of the buffer mechanism, thereby effectively relieving the impact of the water waves and achieving the effect of protecting the dam body 1, when the river water is cooled down, the buffer tank 4 is reset under the action of the spring in the buffer mechanism, thereby repeatedly effectively protecting the dam body 1 and reducing the impact force of the river water on the dam body 1, because human beings lack the protection of the river water, various wastes can float on the surface of the river water, wherein the buffer tank 4 is provided with a water inlet, when the river water hits the buffer tank 4, can take rubbish to enter the buffer box 4 through the water inlet, two rows of barbed nails 23 are arranged on two sides of the water inlet of the buffer box 4, through the arrangement of the barbed nails 23, when the river is retreated, the rubbish can be remained in the buffer box 4 under the action of the barbed nails 23, and then the rubbish in the river is collected, the water quality of the river is improved, when the rubbish in the buffer box 4 is too much, the spiral propelling mechanism is started at the moment, the rubbish is pushed to the upper end of the buffer box 4, then the drain pipe 6 is connected with the collecting mechanism through the connecting pipe, after the connection is completed, the suction pump 28 in the collecting mechanism is started to suck the rubbish in the buffer box 4 into the dam collecting mechanism through the drain pipe 6, the rubbish is collected, and convenience is brought for users to carry out centralized treatment on the rubbish, the device not only can effectively reduce the impact force of the river on the main body 1, but also can salvage and collect the rubbish in the river, the practicability of the device is effectively improved.
Example 2:
referring to fig. 2 and 5, an embankment protection device for environmental protection water conservancy project, which is substantially the same as the embodiment 1, further comprising: buffer gear includes cylinder 14, the carriage release lever 15, slider 16, two cylinder 14 respectively fixed connection are in the both sides of spout, carriage release lever 15 sliding connection is in cylinder 14, carriage release lever 15 keeps away from cylinder 14 one end and slider 16 fixed connection, the expanding spring has been cup jointed on carriage release lever 15, expanding spring's both ends respectively with cylinder 14, slider 16 fixed connection, rotate between connecting rod 17 and the slider 16 and be connected, when river hit dykes and dams main part 1, at first can strike baffle-box 4, make baffle-box 4 remove to the direction of fixed plate 2, baffle-box 4 makes slider 16 remove in the spout through connecting rod 17, thereby carry out the pressure release to the impact force of river, when the river returns back, slider 16 gets back to the primary importance under expanding spring's pulling force, from this relapse, protect dykes and dams main part 1.
Example 3:
referring to fig. 1, 2 and 5, an embankment protection device for environmental protection water conservancy project, which is substantially the same as the embodiment 1, further comprising: two symmetrical L-shaped sleeves 19 are fixedly connected to one end, far away from the cylindrical barrel 14, of the sliding block 16, a first push rod 18 and a second push rod 20 are connected to the L-shaped sleeves 19 in a sliding mode, one end, far away from the moving rod 15, of the sliding block 16 is connected with the first push rod 18, one end, close to the buffer box 4, of the second push rod 20 is connected with a push plate 21, when the sliding block 16 moves in the direction far away from the cylindrical barrel 14, the first push rod 18 can be driven to move, the first push rod 18 pushes gas in the L-shaped sleeves 19 to the second push rod 20, the second push rod 20 drives the push plate 21 to move in the direction of the buffer box 4 under the pushing of the gas, the buffer box 4 is further pushed outwards, the impact force of river water on the buffer box 4 is counteracted, and the protection effect on the dam body 1 is further improved.
Example 4:
referring to fig. 1, 2 and 4, an embankment protection device for environmental protection water conservancy project, which is substantially the same as the embodiment 1, further comprising: the spiral propelling mechanism comprises a motor 8 and a spiral propelling rod 5, the motor 8 is fixedly connected with the lower end in the buffer box 4, a sealing plate 22 is arranged at one end of the motor 8 close to the output end, the sealing plate 22 is fixedly connected with the buffer box 4, the spiral propelling rod 5 is fixedly connected with the output end of the motor 8, one end of the spiral propelling rod 5 far away from the motor 8 penetrates through the sealing plate 22, and is rotatably connected with the buffer tank 4, the garbage in the river water enters the buffer tank 4 along with the water, the garbage can be prevented from flowing out through the barbed nails 23 and is left in the buffer tank 4, when rubbish is too much in buffer bin 4, starter motor 8 this moment, motor 8 drive screw propulsion pole 5 and rotate, and screw propulsion pole 5 carries the upper end of buffer bin 4 with the rubbish in the buffer bin 4, then in carrying collection mechanism through blow off pipe 6, collects rubbish.
Example 5:
referring to fig. 4, an embankment protection device for environmental protection water conservancy project, which is substantially the same as the embodiment 1, further comprising: the spiral propelling rod 5 is connected with the sealing plate 22 in a sealing mode through the sealing piece 24, the sealing performance of the sealing plate 22 and the spiral propelling rod 5 can be improved through the arrangement of the sealing piece 24, river water is prevented from entering the motor 8, the motor is enabled to be out of order, and the use is affected.
Example 6:
referring to fig. 3, an embankment protection device for environmental protection water conservancy project, which is substantially the same as the embodiment 1, further comprising: the collecting mechanism comprises a collecting box 7 and a sewage pumping pump 28, the sewage pumping pump 28 is fixedly connected to the collecting box 7, one end of the connecting pipe, far away from the sewage discharge pipe 6, is in sealing connection with a sewage inlet of the sewage pumping pump 28, a sewage outlet of the sewage pumping pump 28 is in sealing connection with a sewage inlet of the collecting box 7, and a user carries the garbage in the buffer box 4 into the collecting box 7 through the sewage discharge pipe 6 and the connecting pipe by virtue of the sewage pumping pump 28 and collects the garbage.
Example 7:
referring to fig. 3 and 6, an embankment protection device for environmental protection water conservancy project, which is substantially the same as the embodiment 1, further comprising: both sides fixedly connected with telescopic link 9 in the collecting box 7, the one end that the inner wall of collecting box 7 was kept away from to telescopic link 9 is connected with stripper plate 10, 7 lower ends of collecting box are equipped with the outlet, be connected with filter screen 703 on the outlet, the outlet sealing connection of collecting box 7 has drain pipe 13, wherein telescopic link 9 is the electric telescopic column, meet with external power supply electrical property, when rubbish is too much in collecting box 7, at this moment, control telescopic link 9 is inside extension, and then drive stripper plate 10 and extrude the moisture in the rubbish, then in the rethread drain pipe 13 discharges back the river, setting through filter screen 703, can prevent rubbish from discharging in collecting box 7, through extruding rubbish, the person of facilitating the use carries out centralized processing to rubbish.
Example 8:
referring to fig. 7, an embankment protection device for environmental protection water conservancy project, which is substantially the same as the embodiment 1, further comprising: the collection box 7 is rotatably connected with a box cover 701 through a hinge, the box cover 701 is provided with a transparent plate 702, and a user can observe the amount of garbage in the collection box 7 through the transparent plate 702 so as to extrude the garbage.
Example 9:
referring to fig. 3, a dam protection device for environmental protection water conservancy project, which is substantially the same as the embodiment 1, further comprising: 7 lower extreme fixedly connected with locomotive 11 of collecting box, 11 roll connections of locomotive are on dyke main part 1, the one end of keeping away from blow off pipe 6 in dyke main part 1 upper end is equipped with the cotter way, one end sliding connection that locomotive 11 is close to the cotter way has fixed pin 12, fixed pin 12 sliding connection is in the cotter way, setting through locomotive 11, the person of facilitating the use transports the river rubbish of salvaging, reduce staff's the amount of labour, setting through fixed pin 12, can fix locomotive 11, improve its stability.
According to the invention, through the arrangement of the buffer mechanism, the impact force of water waves on the dam body 1 can be effectively reduced, the dam body 1 is protected from being damaged, and the use safety of the dam body 1 is improved, and meanwhile, the spiral propelling mechanism, the collecting mechanism and the barbed nails 23 are also arranged, so that the device not only can effectively reduce the impact force of river water on the dam body 1, but also can salvage and collect garbage in the river water, and the practicability of the device is effectively improved.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.
Claims (8)
1. The utility model provides a dykes and dams protector for environmental protection water conservancy project, includes dykes and dams main part (1), fixed plate (2) are through fixing bolt fixed connection in dykes and dams main part (1) one side near the river course, its characterized in that, one side fixedly connected with fixed box (3) of dykes and dams main part (1) is kept away from to fixed plate (2), sliding connection has baffle-box (4) in fixed box (3), one side that dykes and dams main part (1) is kept away from to fixed plate (2) is equipped with the spout, fixedly connected with two symmetrical buffer gear in the spout, one side that baffle-box (4) are close to fixed plate (2) rotates and is connected with two symmetrical connecting rod (17), the one end that baffle-box (4) were kept away from to connecting rod (17) rotates with buffer gear to be connected, one side that connecting rod (17) were kept away from to baffle-box (4) is equipped with a plurality of water inlets, the water inlet structure comprises a water inlet, a plurality of barbed nails (23) fixedly connected to two sides of the water inlet, a spiral pushing mechanism is arranged in a buffer tank (4), a blow-off pipe (6) is hermetically connected to the upper end of one side, close to a fixed plate (2), of the buffer tank (4), one end, far away from the buffer tank (4), of the blow-off pipe (6) penetrates through the fixed tank (3), a connecting pipe is hermetically connected with the upper end of the buffer tank (4), a collecting mechanism is arranged on a dam body (1), one end, far away from the blow-off pipe (6), of the connecting pipe is connected with the collecting mechanism, the buffer mechanism comprises a cylindrical barrel (14), a moving rod (15) and a sliding block (16), the two cylindrical barrels (14) are respectively and fixedly connected to two sides of a sliding groove, the moving rod (15) is slidably connected in the cylindrical barrel (14), one end, far away from the cylindrical barrel (14), of the moving rod (15) is fixedly connected with the sliding block (16), the gas-liquid separation device is characterized in that a telescopic spring is sleeved on the moving rod (15), two ends of the telescopic spring are respectively fixedly connected with the cylindrical barrel (14) and the sliding block (16), the connecting rod (17) is rotatably connected with the sliding block (16), one end, far away from the cylindrical barrel (14), of the sliding block (16) is fixedly connected with two symmetrical L-shaped sleeves (19), a first push rod (18) and a second push rod (20) are connected in the L-shaped sleeves (19) in a sliding mode, one end, far away from the moving rod (15), of the sliding block (16) is connected with the first push rod (18), one end, close to the buffer box (4), of the second push rod (20) is connected with a push plate (21), when the sliding block (16) moves towards the direction far away from the cylindrical barrel (14), the first push rod (18) can be driven to move, and the first push rod (18) can push gas in the L-shaped sleeves (19) to the second push rod (20), the second push rod (20) drives the push plate (21) to move towards the direction of the buffer box (4) under the pushing of gas, and then outwards pushes the buffer box (4) to offset the impact force of river water on the buffer box (4), so that the protection effect on the dam body (1) is further improved.
2. The dam protection device for the environmental protection water conservancy project as claimed in claim 1, wherein the spiral propulsion mechanism comprises a motor (8) and a spiral propulsion rod (5), the motor (8) is fixedly connected to the lower end of the inside of the buffer tank (4), a sealing plate (22) is arranged at one end, close to the output end, of the motor (8), the sealing plate (22) is fixedly connected with the buffer tank (4), the spiral propulsion rod (5) is fixedly connected with the output end of the motor (8), and one end, far away from the motor (8), of the spiral propulsion rod (5) penetrates through the sealing plate (22) and is rotatably connected with the buffer tank (4).
3. An embankment protection device according to claim 2, wherein the screw propulsion rod (5) is connected with the sealing plate (22) in a sealing manner through a sealing member (24).
4. The dam protection device for the environmental protection water conservancy project of claim 1, wherein the collection mechanism comprises a collection box (7) and a sewage pump (28), the sewage pump (28) is fixedly connected to the collection box (7), one end of the connecting pipe, which is far away from the sewage pipe (6), is hermetically connected with a sewage inlet of the sewage pump (28), and a sewage outlet of the sewage pump (28) is hermetically connected with a sewage inlet of the collection box (7).
5. The dam protection device for the environmental protection water conservancy project according to claim 4, characterized in that telescopic rods (9) are fixedly connected to both sides in the collection box (7), one end of each telescopic rod (9) far away from the inner wall of the collection box (7) is connected with a squeezing plate (10), a water outlet is arranged at the lower end of the collection box (7), a filter screen (703) is connected to the water outlet, and a water outlet pipe (13) is hermetically connected to the water outlet of the collection box (7).
6. An embankment protection device according to claim 5, wherein the collection box (7) is rotatably connected with a box cover (701) through a hinge, and a transparent plate (702) is arranged on the box cover (701).
7. The dam protection device for the environmental protection water conservancy project of claim 6, wherein the lower end of the collection box (7) is fixedly connected with a moving vehicle (11), the moving vehicle (11) is connected to the dam body (1) in a rolling manner, a pin slot is arranged at one end of the upper end of the dam body (1) far away from the sewage discharge pipe (6), a fixed pin (12) is connected to one end of the moving vehicle (11) close to the pin slot in a sliding manner, and the fixed pin (12) is connected to the pin slot in a sliding manner.
8. An installation method of a dam protection device for environmental protection hydraulic engineering, which adopts the dam protection device for environmental protection hydraulic engineering of any one of claims 1 to 7, and is characterized by mainly comprising the following steps:
s1: when the device is used, a user firstly moves the device to a designated working position, and then fixes the fixing plate (2) on one side of the dam body (1) close to the river channel through the fixing bolt;
s2: when the buffer tank (4) is impacted by water waves, the buffer tank (4) moves backwards under the impact of the water waves, the buffer tank (4) is connected with a buffer mechanism through a connecting rod (17), the water waves can be buffered under the action of the buffer mechanism, so that the impact of the water waves is relieved, and when river water is cooled down, the buffer tank (4) is reset under the action of a telescopic spring in the buffer mechanism, so that the impact force of the river water on the dam body (1) is buffered repeatedly;
s3: the water inlet is formed in the buffer tank (4), when the buffer tank (4) is hit by river water, garbage can be driven to enter the buffer tank (4) through the water inlet, two rows of barbed nails (23) are arranged on two sides of the water inlet of the buffer tank (4), and through the arrangement of the barbed nails (23), when the river water is cooled down, the garbage can be remained in the buffer tank (4) under the action of the barbed nails (23), so that the garbage in the river water can be collected;
s4: when rubbish in buffer bin (4) is too much, start spiral advancing mechanism this moment, with rubbish propelling movement to buffer bin (4) upper end, then be being connected blow off pipe (6) and collection mechanism through the connecting pipe, after connecting, in starting the collection mechanism rubbish pump (28) take out the collection mechanism with the rubbish in buffer bin (4) through blow off pipe (6), collect rubbish.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110183282.3A CN113005988B (en) | 2021-02-08 | 2021-02-08 | Dam protection device for environment-friendly water conservancy project and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110183282.3A CN113005988B (en) | 2021-02-08 | 2021-02-08 | Dam protection device for environment-friendly water conservancy project and installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113005988A CN113005988A (en) | 2021-06-22 |
CN113005988B true CN113005988B (en) | 2022-08-16 |
Family
ID=76402195
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110183282.3A Active CN113005988B (en) | 2021-02-08 | 2021-02-08 | Dam protection device for environment-friendly water conservancy project and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113005988B (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191222772A (en) * | 1912-10-07 | 1913-04-17 | Albert Ernest Boyce | A Spring Buffer for Dock Entrances, Docksides, Quaysides, Wharfs, Landings, and the like. |
SU1532375A1 (en) * | 1988-04-19 | 1989-12-30 | Центральный научно-исследовательский автомобильный и автомоторный институт | Anti-shock device |
KR20140014727A (en) * | 2012-07-25 | 2014-02-06 | 한국남부발전 주식회사 | Up-down type movable fender |
CN210086158U (en) * | 2019-04-28 | 2020-02-18 | 中国电建集团贵阳勘测设计研究院有限公司 | Dykes and dams anticollision protection architecture |
CN210216310U (en) * | 2019-05-07 | 2020-03-31 | 冯涛 | Water conservancy dykes and dams guard plate |
CN210857109U (en) * | 2019-08-20 | 2020-06-26 | 曹慧明 | Hydraulic engineering dykes and dams protector |
CN211645989U (en) * | 2019-12-24 | 2020-10-09 | 安徽永庆建筑工程有限公司 | Water conservancy construction safety device |
CN111817143A (en) * | 2020-07-14 | 2020-10-23 | 江西明正变电设备有限公司 | Low-noise prefabricated substation |
CN211773365U (en) * | 2020-03-03 | 2020-10-27 | 江苏海事职业技术学院 | Intelligent wharf for unmanned ship berthing |
CN212248064U (en) * | 2020-03-19 | 2020-12-29 | 福建省万陆建设发展有限公司 | Protector for hydraulic engineering |
-
2021
- 2021-02-08 CN CN202110183282.3A patent/CN113005988B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191222772A (en) * | 1912-10-07 | 1913-04-17 | Albert Ernest Boyce | A Spring Buffer for Dock Entrances, Docksides, Quaysides, Wharfs, Landings, and the like. |
SU1532375A1 (en) * | 1988-04-19 | 1989-12-30 | Центральный научно-исследовательский автомобильный и автомоторный институт | Anti-shock device |
KR20140014727A (en) * | 2012-07-25 | 2014-02-06 | 한국남부발전 주식회사 | Up-down type movable fender |
CN210086158U (en) * | 2019-04-28 | 2020-02-18 | 中国电建集团贵阳勘测设计研究院有限公司 | Dykes and dams anticollision protection architecture |
CN210216310U (en) * | 2019-05-07 | 2020-03-31 | 冯涛 | Water conservancy dykes and dams guard plate |
CN210857109U (en) * | 2019-08-20 | 2020-06-26 | 曹慧明 | Hydraulic engineering dykes and dams protector |
CN211645989U (en) * | 2019-12-24 | 2020-10-09 | 安徽永庆建筑工程有限公司 | Water conservancy construction safety device |
CN211773365U (en) * | 2020-03-03 | 2020-10-27 | 江苏海事职业技术学院 | Intelligent wharf for unmanned ship berthing |
CN212248064U (en) * | 2020-03-19 | 2020-12-29 | 福建省万陆建设发展有限公司 | Protector for hydraulic engineering |
CN111817143A (en) * | 2020-07-14 | 2020-10-23 | 江西明正变电设备有限公司 | Low-noise prefabricated substation |
Also Published As
Publication number | Publication date |
---|---|
CN113005988A (en) | 2021-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220100141U (en) | Foundation pit drainage device with automatic cleaning and blocking functions | |
CN116770874B (en) | Deep foundation pit water lowering and draining method | |
CN211080365U (en) | River course sediment removal device for hydraulic engineering | |
CN111188322A (en) | Water surface sundry cleaning device for hydraulic engineering | |
CN113005988B (en) | Dam protection device for environment-friendly water conservancy project and installation method | |
CN213805199U (en) | Hydraulic engineering is with high-efficient durable flood bank | |
CN212153521U (en) | Power station dredging device | |
CN201704717U (en) | Underwater silt remover | |
CN211816757U (en) | Sponge urban drainage device | |
CN208329150U (en) | A kind of municipal works drainage dredging equipment | |
CN216839641U (en) | River course dredging device for hydraulic engineering | |
CN215245405U (en) | Overwater garbage collector | |
CN216405548U (en) | Be used for normalized river course desilting equipment | |
CN109723381A (en) | A kind of coal mine automatically continuously drilling drill carriage | |
CN215406231U (en) | Hydraulic engineering is with desilting device of being convenient for remove | |
CN214573929U (en) | Improved emergency pile driver | |
CN211397657U (en) | Mining underground drainage device based on PLC | |
CN210421331U (en) | Rainwater discarding and recycling device | |
CN111997125A (en) | Desilting device that air-lift formula hydraulic engineering used | |
CN209144903U (en) | A kind of urban river sediment cleaning hydraulic suction dredge | |
CN113638460A (en) | River channel dredging ship | |
CN106586416A (en) | Sludge digger | |
CN221193996U (en) | Energy-saving roof of industrial building | |
CN216194550U (en) | Multifunctional water conservancy hydroelectric strain device | |
CN221481030U (en) | Hydraulic engineering dredging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |