CN113001118A - Manufacturing method of community water purifying equipment - Google Patents

Manufacturing method of community water purifying equipment Download PDF

Info

Publication number
CN113001118A
CN113001118A CN202110247503.9A CN202110247503A CN113001118A CN 113001118 A CN113001118 A CN 113001118A CN 202110247503 A CN202110247503 A CN 202110247503A CN 113001118 A CN113001118 A CN 113001118A
Authority
CN
China
Prior art keywords
water
manufacturing
water purification
water purifying
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110247503.9A
Other languages
Chinese (zh)
Inventor
刘春雨
梁向东
刘海硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shuijiuzun Environmental Protection Technology Co ltd
Original Assignee
Beijing Shuijiuzun Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shuijiuzun Environmental Protection Technology Co ltd filed Critical Beijing Shuijiuzun Environmental Protection Technology Co ltd
Priority to CN202110247503.9A priority Critical patent/CN113001118A/en
Publication of CN113001118A publication Critical patent/CN113001118A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention discloses a manufacturing method of community water purifying equipment, which comprises the following steps of S1: at first choose the panel beating of making water purification unit for use, carry out accurate marking off, punch and cutting to the panel beating according to the water purification unit drawing that will make, S2: carry out holistic burnishing and polishing with the water purification unit box that the equipment was accomplished, prevent the problem of barb unevenness, S3: and (4) installing a water pipe, a water container and a water faucet on the box body after paint spraying, and after all water purifying parts are installed, carrying out complete machine hydroelectric test and S4. The invention optimizes the traditional manufacturing method of the water purifying equipment, ensures the product quality by adopting a mode of combining automatic grinding and polishing and manual operation, carries out corresponding quality detection after the working procedure of each step is finished, ensures that the product is reworked in time when the product quality is unqualified, is convenient to directly find the corresponding responsible person, changes the original production mode of final unified detection, improves the production efficiency, reduces the probability of defective products and reduces the manufacturing cost.

Description

Manufacturing method of community water purifying equipment
Technical Field
The invention relates to the technical field of water purification equipment manufacturing, in particular to a community water purification equipment manufacturing method.
Background
In order to improve the quality of life of residents and improve the health level, a lot of communities select to install water purification equipment, so that residents in the communities can conveniently and directly take water by swiping cards, and the community residents are facilitated.
Disclosure of Invention
Therefore, the invention aims to provide a community water purification equipment manufacturing method, which optimizes the traditional water purification equipment manufacturing method, ensures the product quality by adopting a mode of combining automatic grinding and polishing and manual operation, performs corresponding quality detection after the process of each step is completed, ensures that the product is reworked in time when the product quality is unqualified, is convenient to directly find the corresponding responsible person, changes the original production mode of final unified detection, improves the production efficiency, reduces the probability of defective products and reduces the manufacturing cost.
To solve the above technical problem, according to an aspect of the present invention, the present invention provides the following technical solutions:
a method for manufacturing a community water purifying device comprises the following steps:
s1: firstly, selecting a metal plate for manufacturing water purification equipment, accurately marking, punching and cutting the metal plate according to a drawing of the water purification equipment to be manufactured, primarily processing the metal plate, and welding the processed metal plate to assemble a water purification equipment box body;
s2: the assembled water purification equipment box body is integrally ground and polished, the problem that barbs are not flat is prevented, flatness detection is carried out on the whole body after grinding and polishing, if the detected flatness data are out of error values, the detection is unqualified, reworking is needed to continue grinding and polishing, the flatness detection is carried out again after grinding, and if the flatness data are qualified, paint spraying is carried out on the whole box body;
s3: installing a water pipe, a water container and a water faucet on the box body sprayed with the paint, after all water purifying parts are installed, carrying out complete machine hydroelectric test, judging whether the installed water purifying equipment can be normally carried out or not, if the test is qualified, carrying out integral machine wiping on the assembled water purifying equipment by workers, carrying out brand labeling after the water purifying equipment is cleaned, packaging and taking out of a warehouse, and if the hydroelectric test is unqualified, carrying out the next step;
s4: and reworking and overhauling the products unqualified in the hydroelectric test, and ensuring that the products are qualified, packaged and delivered out of the warehouse.
As a preferable scheme of the manufacturing method of the community water purification equipment, in the step S2, a large-area metal plate of a box panel is automatically polished by a machine, and corners of the box are manually polished, so that flatness after polishing is guaranteed.
As a preferable scheme of the manufacturing method of the community water purification equipment, in the step S2, the box body after being polished is repeatedly detected, and the next step is performed after the flatness is qualified, so that the attractiveness of the painted box body after being painted is ensured.
As a preferable scheme of the method for manufacturing a community water purification device, in the step S2, the paint spraying is performed by an automatic overall spraying, so that the integrity of the paint spraying is ensured, and the problem that the manual spraying has uneven thickness and affects the appearance is prevented.
As a preferable scheme of the manufacturing method of the community water purifying equipment, in the step S3, the energization time of the hydroelectric test is more than 20 minutes.
As a preferable scheme of the manufacturing method of the community water purification device, in the step S3, the water purification device needs to be packaged and wrapped in an all-around manner in the packaging process, so as to prevent the water purification device from colliding during transportation.
Compared with the prior art, the invention has the beneficial effects that: optimizing the traditional water purifying equipment manufacturing method, ensuring the product quality by adopting the mode of combining automatic polishing and manual operation, and carrying out corresponding quality detection after the working procedure of each step is completed, ensuring that the product is reworked in time when the product quality is unqualified, thus facilitating the direct finding of the corresponding responsible person, changing the original production mode of final unified detection, improving the production efficiency, reducing the probability of defective products and reducing the manufacturing cost, firstly selecting the sheet metal for manufacturing the water purifying equipment, accurately marking, punching and cutting the sheet metal according to the drawing of the water purifying equipment to be manufactured, primarily processing the sheet metal, welding the processed sheet metal to assemble the water purifying equipment box body, secondly carrying out integral polishing on the assembled water purifying equipment box body to prevent the problem of barbs, and carrying out flatness detection on the whole body after polishing, if the detected flatness data are outside the error value, the detection is unqualified, the polishing and the polishing are continuously carried out by reworking, the flatness detection is carried out again after the polishing, if the flatness data are qualified, paint spraying is carried out on the whole box body, then a water pipe, a water container and a water faucet are installed on the box body after the paint spraying, after all water purifying parts are installed, the complete machine hydroelectric test is carried out, whether the installed water purifying equipment can be normally carried out or not is judged, if the test is qualified, a worker integrally wipes the assembled water purifying equipment, after the water purifying equipment is wiped cleanly, brand labeling is carried out, packaging and ex-warehouse are carried out, if the hydroelectric test is unqualified, the next step is carried out, finally, the products unqualified in the hydroelectric test are reworked and overhauled, and the products.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the present invention will be described in detail below with reference to the accompanying drawings and detailed embodiments, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without inventive exercise. Wherein:
FIG. 1 is a flow chart of a method for manufacturing a community water purification device according to the present invention.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in detail below.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, but the present invention may be practiced in other ways than those specifically described herein, and it will be apparent to those of ordinary skill in the art that the present invention may be practiced without departing from the spirit and scope of the present invention, and therefore the present invention is not limited to the specific embodiments disclosed below.
Next, the present invention will be described in detail with reference to the drawings, and in the detailed description of the embodiments of the present invention, the cross-sectional views illustrating the structure of the device are not enlarged partially according to the general scale for convenience of illustration, and the drawings are only examples, which should not limit the scope of the present invention. In addition, the three-dimensional dimensions of length, width and depth should be included in the actual fabrication.
In order to make the objects, technical solutions and advantages of the present invention more apparent, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
The invention provides a community water purification equipment manufacturing method, which optimizes the traditional water purification equipment manufacturing method, ensures the product quality by adopting a mode of combining automatic grinding and polishing and manual operation, carries out corresponding quality detection after the working procedure of each step is completed, ensures that the product is reworked in time when the product quality is unqualified, thus being convenient to directly find the corresponding responsible person, changing the original production mode of final unified detection, improving the production efficiency, reducing the probability of defective products and reducing the manufacturing cost.
Fig. 1 is a schematic diagram illustrating an overall structure of an embodiment of a method for manufacturing a community water purification apparatus of the present invention, and referring to fig. 1, a main body of the method for manufacturing a community water purification apparatus of the present embodiment includes: s1, S2, S3 and S4.
S1: firstly, selecting a metal plate for manufacturing water purification equipment, accurately marking, punching and cutting the metal plate according to a drawing of the water purification equipment to be manufactured, primarily processing the metal plate, and welding the processed metal plate to assemble a water purification equipment box body;
s2: the assembled water purification equipment box body is integrally ground and polished, the problem that barbs are not flat is prevented, flatness detection is carried out on the whole body after grinding and polishing, if the detected flatness data are out of error values, the detection is unqualified, reworking is needed to continue grinding and polishing, the flatness detection is carried out again after grinding, and if the flatness data are qualified, paint spraying is carried out on the whole box body;
s3: installing a water pipe, a water container and a water faucet on the box body sprayed with the paint, after all water purifying parts are installed, carrying out complete machine hydroelectric test, judging whether the installed water purifying equipment can be normally carried out or not, if the test is qualified, carrying out integral machine wiping on the assembled water purifying equipment by workers, carrying out brand labeling after the water purifying equipment is cleaned, packaging and taking out of a warehouse, and if the hydroelectric test is unqualified, carrying out the next step;
s4: and reworking and overhauling the products unqualified in the hydroelectric test, and ensuring that the products are qualified, packaged and delivered out of the warehouse.
Referring to fig. 1, in the method for manufacturing a community water purification device of the embodiment, when the method is used specifically, firstly, a metal plate for manufacturing the water purification device is selected, the metal plate is accurately scribed, punched and cut according to a drawing of the water purification device to be manufactured, the processed metal plate is welded to be assembled into a water purification device box body, then, the assembled water purification device box body is integrally polished to prevent the problem of uneven barbs, the whole body is subjected to flatness detection after polishing, if the detected flatness data is outside an error value, the detection is unqualified, reworking is required to continue polishing, the flatness detection is performed again after polishing, if the flatness data is qualified, the whole box body is painted, then, a water pipe, a water tank and a water faucet are installed on the box body after painting, and after all water purification parts are installed, and carrying out a complete machine hydroelectric test, judging whether the water purifying equipment after the installation can be normally carried out or not, if the test is qualified, wholly wiping the assembled water purifying equipment by a worker, carrying out brand labeling after the water purifying equipment is cleaned, packaging and taking out of a warehouse, and if the hydroelectric test is unqualified, carrying out the next step, and finally carrying out rework maintenance on the unqualified product of the hydroelectric test to ensure that the product is qualified, packaging and taking out of the warehouse.
While the invention has been described above with reference to an embodiment, various modifications may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention. In particular, the various features of the disclosed embodiments of the invention may be used in any combination, provided that no structural conflict exists, and the combinations are not exhaustively described in this specification merely for the sake of brevity and resource conservation. Therefore, it is intended that the invention not be limited to the particular embodiments disclosed, but that the invention will include all embodiments falling within the scope of the appended claims.

Claims (6)

1. A method for manufacturing community water purifying equipment is characterized by comprising the following steps:
s1: firstly, selecting a metal plate for manufacturing water purification equipment, accurately marking, punching and cutting the metal plate according to a drawing of the water purification equipment to be manufactured, primarily processing the metal plate, and welding the processed metal plate to assemble a water purification equipment box body;
s2: the assembled water purification equipment box body is integrally ground and polished, the problem that barbs are not flat is prevented, flatness detection is carried out on the whole body after grinding and polishing, if the detected flatness data are out of error values, the detection is unqualified, reworking is needed to continue grinding and polishing, the flatness detection is carried out again after grinding, and if the flatness data are qualified, paint spraying is carried out on the whole box body;
s3: installing a water pipe, a water container and a water faucet on the box body sprayed with the paint, after all water purifying parts are installed, carrying out complete machine hydroelectric test, judging whether the installed water purifying equipment can be normally carried out or not, if the test is qualified, carrying out integral machine wiping on the assembled water purifying equipment by workers, carrying out brand labeling after the water purifying equipment is cleaned, packaging and taking out of a warehouse, and if the hydroelectric test is unqualified, carrying out the next step;
s4: and reworking and overhauling the products unqualified in the hydroelectric test, and ensuring that the products are qualified, packaged and delivered out of the warehouse.
2. The manufacturing method of a community water purifying device as claimed in claim 1, wherein in the step S2, the large-area metal plate of the box panel is automatically polished by a machine, and the corners of the box are manually polished, so as to ensure the flatness after polishing.
3. The manufacturing method of a community water purifying device as claimed in claim 2, wherein in the step S2, the box body after being polished is repeatedly detected, and the next step is performed after the flatness is qualified, so that the attractiveness of the painted box body after being painted is ensured.
4. The method for manufacturing a community water purification unit as claimed in claim 3, wherein the paint spraying in step S2 is performed by automatic overall spraying, so as to ensure the integrity of the paint spraying and prevent the problem of uneven thickness and poor appearance caused by manual spraying.
5. The method for manufacturing a community water purifying device as claimed in claim 4, wherein in the step S3, the electrification time of the hydropower test is more than 20 minutes.
6. The manufacturing method of a community water purification unit as claimed in claim 5, wherein in the step S3, the water purification unit needs to be packaged and wrapped in an all-around manner, so as to prevent the water purification unit from colliding during transportation.
CN202110247503.9A 2021-03-05 2021-03-05 Manufacturing method of community water purifying equipment Pending CN113001118A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110247503.9A CN113001118A (en) 2021-03-05 2021-03-05 Manufacturing method of community water purifying equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110247503.9A CN113001118A (en) 2021-03-05 2021-03-05 Manufacturing method of community water purifying equipment

Publications (1)

Publication Number Publication Date
CN113001118A true CN113001118A (en) 2021-06-22

Family

ID=76407440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110247503.9A Pending CN113001118A (en) 2021-03-05 2021-03-05 Manufacturing method of community water purifying equipment

Country Status (1)

Country Link
CN (1) CN113001118A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000028594A (en) * 1998-10-05 2000-05-25 스카르파리 프란세스코 Process and equipment for the manufacture of metal sheet box-like struct-ures with seam folded edges
CN202820957U (en) * 2012-09-27 2013-03-27 广东豪美电器有限公司 Water dispenser with locking function
CN104690506A (en) * 2015-02-11 2015-06-10 河北义博通信设备有限公司 Production method for optical fiber cable distribution box
CN105929498A (en) * 2016-05-30 2016-09-07 河南昊方通信工程技术有限公司 Production method of optical fiber distribution box
CN108214114A (en) * 2018-04-10 2018-06-29 安庆永大体育文化有限公司 A kind of grinding process technique for the surfboard that foams
CN109604229A (en) * 2018-12-14 2019-04-12 深圳市友信鑫五金制品有限公司 Sheet metal component production technology and its dust pelletizing system
CN111069854A (en) * 2019-12-23 2020-04-28 湖北天仕达机械装备有限公司 Preparation process of water tank of dual-purpose vehicle

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000028594A (en) * 1998-10-05 2000-05-25 스카르파리 프란세스코 Process and equipment for the manufacture of metal sheet box-like struct-ures with seam folded edges
CN202820957U (en) * 2012-09-27 2013-03-27 广东豪美电器有限公司 Water dispenser with locking function
CN104690506A (en) * 2015-02-11 2015-06-10 河北义博通信设备有限公司 Production method for optical fiber cable distribution box
CN105929498A (en) * 2016-05-30 2016-09-07 河南昊方通信工程技术有限公司 Production method of optical fiber distribution box
CN108214114A (en) * 2018-04-10 2018-06-29 安庆永大体育文化有限公司 A kind of grinding process technique for the surfboard that foams
CN109604229A (en) * 2018-12-14 2019-04-12 深圳市友信鑫五金制品有限公司 Sheet metal component production technology and its dust pelletizing system
CN111069854A (en) * 2019-12-23 2020-04-28 湖北天仕达机械装备有限公司 Preparation process of water tank of dual-purpose vehicle

Similar Documents

Publication Publication Date Title
Kumar et al. Process improvement through Lean-Kaizen using value stream map: a case study in India
Maruthi et al. Green Manufacturing: It's Tools and Techniques that can be implemented in Manufacturing Sectors
CN106094746B (en) A kind of automobile exterior product manufacturing execution system and method
Detty et al. Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study
Pałucha World Class Manufacturing model in production management
CN103106617A (en) Method and system for monitoring overall process of finished vehicle productive task executive condition
Huang et al. Production flow analysis through environmental value stream mapping: a case study of cover glass manufacturing facility
CN110766477A (en) Machining order quotation method based on production scheduling and process scheduling
Zakoldaev et al. Algorithm of choosing type of mechanical assembly production of instrument making enterprises of Industry 4.0
CN101493693B (en) Vehicle body soldering, and drop forging shop work integration control system
CN101950388A (en) Comprehensive optimization method and system for order scheduling of pulping and paper making enterprises
CN109624188B (en) Intelligent production process of bumper assembly
Li et al. Integrated predictive maintenance approach for multistate manufacturing system considering geometric and non-geometric defects of products
CN113001118A (en) Manufacturing method of community water purifying equipment
Nabiilah et al. Improving quality of light commercial vehicle using PDCA approach
Raut et al. A Case Study of Productivity Improvement by using IE Tools
Patel et al. A review on benefits of implementing Lean Manufacturing
Garg et al. Execution of single minute exchange of die on corrugation machine in cardboard box manufacturing company: a case study
Ertay Simulation approach in comparison of a pull system in a cell production system with a push system in a conventional production system according to flexible cost: A case study
Amasaka The foundation for advancing the Toyota production system utilizing new JIT
CN111319730A (en) Production line for ship support fittings
Vijayvargy et al. Assessment of Green Supply Chain Practices for Sustainable Organizational Performance for the Automotive Sector
Putri et al. Reducing bag defects using six Sigma methodology: A case study in a cement industry
CN111347052A (en) Part repairing method and device
Gunasekaran et al. Experiences of a small company in productivity improvements

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210622