CN112962790A - Assembly type green building system and construction method - Google Patents

Assembly type green building system and construction method Download PDF

Info

Publication number
CN112962790A
CN112962790A CN202110176015.3A CN202110176015A CN112962790A CN 112962790 A CN112962790 A CN 112962790A CN 202110176015 A CN202110176015 A CN 202110176015A CN 112962790 A CN112962790 A CN 112962790A
Authority
CN
China
Prior art keywords
stand
plate
groove
bottom plate
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110176015.3A
Other languages
Chinese (zh)
Inventor
郑文龙
李日炎
钟智红
李惠玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jinzhu Engineering Management Co ltd
Original Assignee
Guangdong Jinzhu Engineering Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jinzhu Engineering Management Co ltd filed Critical Guangdong Jinzhu Engineering Management Co ltd
Priority to CN202110176015.3A priority Critical patent/CN112962790A/en
Publication of CN112962790A publication Critical patent/CN112962790A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34321Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34326Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by longitudinal elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The utility model relates to a technical field of green building, especially, relate to an assembled green building system and construction method, it includes the bottom plate, curb plate and stand, the stand is provided with four at least, and each stand all articulates and sets up in the bottom plate, the bottom plate is provided with the fixing base that sets up with stand quantity unanimity and position one-to-one, when the stand rotated to the state perpendicular with the bottom plate, each stand passes through bolt difference fixed connection in each fixing base, the curb plate is provided with a plurality ofly between adjacent two stands, one side fixedly connected with screens strip of curb plate, the opposite side of curb plate is seted up with the screens strip joint complex screens groove of another curb plate, the stand is seted up towards one side of curb plate with stand joint complex spacing groove. This application has the work efficiency who improves the staff, and the staff of being convenient for carries out the effect assembled to stand and bottom plate.

Description

Assembly type green building system and construction method
Technical Field
The application relates to the field of green buildings, in particular to an assembly type green building system and a construction method.
Background
The fabricated building is mainly formed by transferring a large amount of field operation work in the traditional construction mode to a factory, processing and manufacturing building components and accessories in the factory, then transporting the components and accessories to a building construction site, and assembling the components and accessories on the site in a reliable connection mode.
The assembly building in the related art mainly includes bottom plate, stand, roof and curb plate, welds the stand in the bottom plate top usually during the assembly, splices each curb plate in proper order between adjacent two stands afterwards, and at last with top fixed connection in the top of each stand and then accomplish the assembly of building.
Aiming at the related technologies, the inventor thinks that the operation is tedious when the staff assembles the upright post and the bottom plate through welding, and the work efficiency is low.
Disclosure of Invention
In order to improve the working efficiency of workers and facilitate the workers to assemble the upright posts and the bottom plate, the application provides an assembly type green building system and a construction method.
In a first aspect, the application provides an assembled green building system, adopts following technical scheme:
the utility model provides an assembled green building system, includes bottom plate, curb plate and stand, the stand is provided with four at least, and each the stand is all articulated to be set up in the bottom plate, the bottom plate is provided with the fixing base that sets up with stand quantity unanimity and position one-to-one, the stand rotates when the state mutually vertically with the bottom plate, each the stand passes through bolt difference fixed connection in each fixing base, the curb plate is adjacent two be provided with a plurality ofly between the stand, one side fixedly connected with screens strip of curb plate, the screens strip joint complex screens groove with another curb plate is seted up to the opposite side of curb plate, the stand towards one side of curb plate seted up with stand joint complex spacing groove.
Through adopting above-mentioned technical scheme, when assembling the assembly building, at first rotate the stand to perpendicular promptly vertical state mutually with the bottom plate, fix stand and fixing base through the bolt afterwards, place rigidity when making the fixed vertical state of stand is stable, rotate the stand to vertical state and through the bolt fastening during stand and bottom plate assembly can, and is easy and simple to handle, work efficiency is higher, later with the screens strip card of one of them curb plate go into the spacing inslot of stand, and can accomplish the assembly of each curb plate with the screens groove of the screens strip card income another curb plate in proper order, thereby make the staff carry out the easy and simple operation of installing to the curb plate.
Optionally, the equal fixedly connected with sand grip in top of curb plate links to each other two be provided with the connecting rod between the stand, the connecting rod is seted up and is extended to the recess of connecting rod both sides along its length direction, sand grip and recess grafting cooperation, just the longitudinal section of sand grip and recess all is the dovetail.
Through adopting above-mentioned technical scheme, when going into each sand grip with the recess card of connecting rod, the connecting rod plays the further connection effect to each curb plate to be favorable to further strengthening the joint strength between the adjacent both sides board, simultaneously, the setting up of dovetail makes the connecting rod be difficult for breaking away from the curb plate, thereby is favorable to guaranteeing the stability of its position after the connecting rod assembly.
Optionally, the top plate is further included, the side, away from the bottom plate, of the stand column is provided with insertion grooves, the top plate is fixedly connected with insertion rods, the number of the insertion rods is consistent with that of the insertion grooves, the insertion rods are arranged in one-to-one correspondence with the insertion grooves, the insertion rods are in insertion fit with the insertion grooves, and after the insertion rods are inserted into the insertion grooves, one side of each connecting rod is abutted to one side, facing the bottom plate, of the top plate.
Through adopting above-mentioned technical scheme, insert each spliced pole of roof into each inserting groove and can accomplish the installation to the roof, easy and simple to handle, connecting rod and roof are inconsistent to be provided with does benefit to the leakproofness between guaranteeing roof installation back and curb plate.
Optionally, one side of the upright column is hinged to a reinforcing rod, and one side of the reinforcing rod, which is far away from the upright column, is fixedly connected to the top plate through a bolt.
Through adopting above-mentioned technical scheme, being provided with of stiffener does benefit to further reinforcing roof and stand between joint strength to further guarantee the stability of its position after the roof installation.
Optionally, the stiffener includes the body of rod and fixed part, the one end of the body of rod is articulated to be set up in the stand, the fixed part is articulated to be set up in the body of rod and keeps away from the one end of stand, the fixed part passes through bolt fixed connection in the roof towards one side of bottom plate.
Through adopting above-mentioned technical scheme, the staff of being convenient for carries out the micro-adjustment of certain degree to the roof of different roughness with the articulated setting of the body of rod looks to be convenient for strengthen the stability when the roof of different roughness is fixed, strong adaptability.
Optionally, one end of the insertion rod, which is far away from the top plate, is provided with a chamfer, a sealing gasket is fixedly arranged in the insertion groove, and after the insertion rod is inserted into the insertion groove, the sealing gasket abuts against the insertion rod tightly.
Through adopting above-mentioned technical scheme, the setting up of chamfer makes the spliced pole have certain clearance transition when inserting the inserting groove to the staff of being convenient for inserts the inserting groove with the spliced pole, sealed pad plays the further tight effect of supporting of extension pole of pegging graft, thereby is favorable to further strengthening the stability of its position behind the spliced pole inserting groove.
Optionally, the bottom of the side plate is fixedly connected with a fixing strip, and the top of the bottom plate is provided with a fixing groove matched with the fixing strip in an inserting mode.
Through adopting above-mentioned technical scheme, the grafting cooperation of fixed strip and fixed slot plays further limiting displacement behind the curb plate installation to be favorable to further strengthening the stability of its position behind the curb plate installation.
Optionally, the bottom plate is provided with fixing plates which are consistent in number with the columns and are arranged in a one-to-one correspondence with the columns, and when the columns rotate to a state parallel to the bottom plate, each column is fixed to each fixing plate through bolts.
Through adopting above-mentioned technical scheme, the setting up of fixed plate is convenient for rotate the stand to fix with the place position when the bottom plate parallel state to be convenient for strengthen the stability when stand and bottom plate are not assembled, and then be convenient for stably transport stand and bottom plate.
Optionally, the spacing groove extends to the stand along the length direction of stand and keeps away from one side of bottom plate, the screens groove extends to the curb plate along vertical direction and keeps away from one side of bottom plate, the cross section of screens strip, screens groove and spacing groove all is the dovetail.
Through adopting above-mentioned technical scheme, go into each spacing groove and screens groove with the screens strip of each curb plate in proper order along vertical direction and can accomplish the installation to the curb plate, the setting of dovetail makes curb plate and stand and curb plate and the side inter-plate connection stability strong.
In a second aspect, the present application provides a method for constructing an assembled green building system, which adopts the following technical solutions.
A construction method of an assembly type green building system comprises the following steps:
s1: rotating the upright column to a state vertical to the bottom plate, and fixing the positions of the fixed seat and the upright column through bolts;
s2: inserting the clamping strip of one side plate into the limiting groove of one stand column along the vertical direction, and then sequentially inserting the clamping strip of the next side plate into the clamping groove of the last clamping strip, so as to finish the installation of the side plates;
s3: sequentially inserting the grooves of the connecting rods into the raised lines at the tops of the side plates along the horizontal direction, so as to finish the installation of the connecting rods;
s4: inserting each insertion rod of the top plate into the insertion groove at the top of each upright column respectively so as to complete the splicing of the top plate;
s5: and rotating the reinforcing rods of the stand columns, and fixing the positions of the reinforcing rods and the top plate in sequence through bolts so as to finish splicing of the fabricated building.
Through adopting above-mentioned technical scheme, need not to fix the position of stand and bottom plate through the welding in the assembly process of assembly type structure, rotate the stand to vertical state and through the bolt fastening can, easy and simple to handle, work efficiency is higher, simultaneously, inserts the inserted bar of roof to the inserting groove to the installation of assembly type structure when fixing stiffener and roof through the bolt is quick, and structural stability is strong.
In summary, the present application includes at least one of the following beneficial technical effects:
when the upright post and the bottom plate are assembled, the upright post is rotated to be in a vertical state and is fixed through a bolt, the operation is simple and convenient, and the working efficiency is higher;
the arrangement of the reinforcing rods is beneficial to further enhancing the connection strength between the top plate and the stand column, so that the stability of the position of the top plate after installation is further ensured;
the splicing and matching of the fixing strip and the fixing groove plays a further limiting role after the side plate is installed, so that the stability of the position of the side plate after the side plate is installed is further enhanced.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 2 is a schematic view of the connection relationship between the fixing plate and the upright in the embodiment of the present application.
Fig. 3 is a schematic diagram of the explosive relationship of the top plate and the bottom plate in the embodiment of the present application.
Fig. 4 is a partially enlarged schematic view of a portion a in fig. 3.
Fig. 5 is a schematic structural view of the top plate in the embodiment of the present application.
Description of reference numerals: 1. a base plate; 2. a side plate; 3. a column; 4. a top plate; 5. a fixing plate; 6. a fixed seat; 601. a first plate body; 602. a second plate body; 7. a clamping strip; 8. a clamping groove; 9. a limiting strip; 10. a limiting groove; 11. a fixing strip; 12. fixing grooves; 13. a convex strip; 14. a connecting rod; 15. a groove; 16. inserting grooves; 17. a plug rod; 18. chamfering; 19. a gasket; 20. a containing groove; 21. a reinforcing bar; 211. a rod body; 212. a fixed part; 22. and (7) installing the opening.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses an assembled green building system. Referring to fig. 1 and 2, the green building system of assembled includes bottom plate 1, curb plate 2, stand 3 and roof 4, and bottom plate 1 roughly is the rectangular plate structure, and stand 3 is provided with four, and stand 3 roughly is square rod-shaped structure and each stand 3 all articulates and installs in the top of bottom plate 1, and four stands 3 are close to four edges of bottom plate 1 respectively and set up, and when each stand 3 all rotated to the state of laminating mutually with bottom plate 1, the overlooking visual angle of four stands 3 roughly is square.
Referring to fig. 2, the top of the bottom plate 1 is fixedly connected with four fixing plates 5, the four fixing plates 5 are arranged in a one-to-one correspondence with the positions of the stand columns 3, when each stand column 3 rotates to a state parallel to the bottom plate 1, one side of each stand column 3 facing the edge of the bottom plate 1 is abutted to one side of the fixing plate 5 away from the edge of the bottom plate 1, and each stand column 3 is fixed with each fixing plate 5 through a bolt respectively, so that the stand columns 3 rotate to be parallel to the bottom plate 1, namely, the positions of the stand columns are stable when the stand columns are in a state of.
Referring to fig. 1 and 2, the top of the bottom plate 1 is fixedly connected with four fixing seats 6 disposed in one-to-one correspondence with the positions of the pillars 3, each fixing seat 6 includes a first plate 601 and a second plate 602, one side of the first plate 601 is fixedly connected to one side of the second plate 602, and the first plate 601 is perpendicular to the second plate 602. When the upright posts 3 rotate to a state perpendicular to the bottom plate 1, the upright posts 3 respectively abut against the first plate bodies 601, and the first plate bodies 601 are respectively fixed to the upright posts 3 through bolts, so that the upright posts 3 are perpendicular to the bottom plate 1, namely, the upright posts 3 are fixed stably in the vertical state. The second plate body 602 is close to the one side setting of stand 3 towards bottom plate 1 border department to make second plate body 602 play the limiting displacement when rotating stand 3, thereby be convenient for be located the position when vertical state to stand 3 preliminary location.
Referring to fig. 3 and 4, curb plate 2 is roughly rectangle platelike structure, and curb plate 2 and 3 isometric settings of stand, curb plate 2 evenly distributed has a plurality ofly between coexistence post 3, 2 width direction's of curb plate one side fixedly connected with and 2 isometric screens strips 7 of curb plate, 2 width direction's of curb plate opposite side sets up along 2 length direction of curb plate and extends to the screens groove 8 of 2 both sides of curb plate, one of them screens strip 7 of curb plate 2 and the screens groove 8 of another curb plate 2 cooperation of sliding, and screens strip 7 all is the dovetail with the cross section in screens groove 8, so that behind the screens strip 7 of one of them curb plate 2 inserted the screens groove 8 of another curb plate 2, the difficult alternate segregation of both sides board 2.
Referring to fig. 2 and 3, one side of the column 3 facing the adjacent column 3 is fixedly connected with a limiting strip 9 with the same length as the column 3, the cross section of the limiting strip 9 is dovetail-shaped, the limiting strip 9 is in clamping fit with the clamping groove 8, one side of the column 3 facing the adjacent column 3 is provided with a limiting groove 10 extending to two sides of the column 3 along the vertical direction, namely the length direction of the column 3, the cross section of the limiting groove 10 is dovetail-shaped, the clamping strip 7 is in clamping fit with the limiting groove 10, when the side plates 2 are installed, the clamping strip 7 of one side plate 2 is inserted into the limiting groove 10 of one column 3, the clamping strip 7 of the other side plate 2 is sequentially clamped into the clamping groove 8 of the upper side plate 2, and finally the limiting strip 9 of the other column 3 is clamped into the clamping groove 8 of the other side plate 2, so that the splicing installation of the side plates 2 can be completed.
Continuing to refer to fig. 2 and 3, for the joint strength between 2 concatenation backs of further reinforcing curb plate and bottom plate 1, 2 equal fixedly connected with fixed strip 11 in one side of length direction of curb plate, the fixed slot 12 that sets up with 11 position one-to-one in each fixed strip is seted up at the top of bottom plate 1, and fixed strip 11 is pegged graft with fixed slot 12 and is cooperated to strengthen the stability of its position after 2 installations of each curb plate.
Referring to fig. 3 and 4, the top of each curb plate 2 is equal fixedly connected with sand grip 13 in one side that fixed strip 11 was kept away from to curb plate 2, be provided with connecting rod 14 between the adjacent two stands 3, the length of connecting rod 14 equals with the distance between two stands 3, connecting rod 14 is the direction shaft-like, recess 15 that extends to connecting rod 14 both sides along connecting rod 14 length direction is seted up to one side of connecting rod 14 width direction, sand grip 13 and recess 15 are pegged graft the cooperation, and sand grip 13 all is the dovetail with the longitudinal section of recess 15, it is favorable to guaranteeing the uniformity of each curb plate 2 direction of height to slide in the sand grip 13 of each curb plate 2 with the recess 15 of connecting rod 14, thereby guarantee planarization and joint strength between adjacent both sides board 2, when the setting of dovetail makes sand grip 13 be located recess 15, connecting rod 14 is difficult for droing from curb plate 2.
Referring to fig. 3 and 5, the top of each upright 3, i.e. the side of the upright 3 away from the bottom plate 1, is provided with an inserting groove 16. The top plate 4 is roughly in a rectangular plate-shaped structure, four insertion rods 17 which are arranged in one-to-one correspondence with the insertion grooves 16 are fixedly connected to the bottom of the top plate 4, namely, one side of the top plate 4 facing the bottom plate 1, the insertion rods 17 are roughly cylindrical, each insertion rod 17 is respectively inserted into each insertion groove 16 for matching, and the installation of the top can be completed by inserting each insertion rod 17 into each insertion groove 16.
Referring to fig. 4 and 5, in order to facilitate the insertion of each insertion rod 17 into each insertion groove 16, an end of the insertion rod 17 remote from the top plate 4, i.e., an end of the insertion rod 17 inserted into the insertion groove 16, is provided with a chamfer 18. In order to enhance the stability of the position of the insertion rod 17 after being inserted into the insertion groove 16, the groove wall of the insertion groove 16 is fixedly provided with a sealing gasket 19 through bonding, the material of the sealing gasket 19 is selected from rubber, and after each insertion rod 17 is inserted into each insertion groove 16, the sealing gasket 19 abuts against each insertion rod 17.
Referring to fig. 3 and 5, four accommodating grooves 20 are formed in one side of the top plate 4 facing the bottom plate 1, the four accommodating grooves 20 are in one-to-one correspondence with the positions of the connecting rods 14, the connecting rods 14 are respectively in insertion fit with the accommodating grooves 20, and the insertion rods 17 are respectively inserted into the insertion grooves 16, i.e., after the top plate 4 is installed, the connecting rods 14 are located in the accommodating grooves 20 and abut against one side of the top plate 4 facing the bottom plate 1, i.e., the groove wall of the accommodating groove 20 away from the notch of the top plate, so as to ensure the sealing performance between the installed top.
Referring to fig. 3 and 4, for further reinforcing the joint strength between the upright 3 and the top plate 4, thereby ensuring the stability of the whole structure, the free end of the upright 3 away from the bottom plate 1 is provided with a reinforcing rod 21, the reinforcing rod 21 comprises a rod body 211 and a fixing portion 212, one end of the rod body 211 is hinged to the upright 3, the fixing plate 5 is substantially in the shape of a rectangular plate, one side of the fixing plate 5 in the length direction is hinged to one end of the rod body 211 away from the upright 3, the fixing portion 212 is fixedly connected to one side of the top plate 4 facing the bottom plate 1 through a bolt, and the hinged arrangement of the rod body 211 and the fixing portion 212 is favorable for reinforcing the. The side plate 2 between two adjacent upright posts 3 is provided with an installation opening 22 for installing a door body and a window body, so that the door body and the window body can be conveniently installed.
The implementation principle of an assembled green building system of the embodiment of the application is as follows: when assembling this green assembled building, at first rotate stand 3 to with bottom plate 1 looks vertically vertical state promptly, fix stand 3 and first plate body 601 through the bolt afterwards for place rigidity when 3 fixed vertical states of stand is stable, rotate stand 3 to vertical state and through the bolt fastening can during the assembly of stand 3 and bottom plate 1, easy and simple to handle, work efficiency is higher. When installing curb plate 2, go into the spacing groove 10 of stand 3 with the screens strip 7 card of one of them curb plate 2 to in proper order go into the screens groove 8 of another curb plate 2 with the screens strip 7 card of each curb plate 2 and can accomplish the assembly of each curb plate 2, need not repeatedly to twist at this in-process and revolve the wrong bolt and fix curb plate 2, thereby make the staff carry out the easy and simple to handle of installing to curb plate 2.
The embodiment of the application also discloses a construction method of the assembly type green building system, which comprises the following steps:
s1: rotating the upright post 3 to a state vertical to the bottom plate 1, and fixing the positions of the fixed seat 6 and the upright post 3 through bolts;
s2: inserting the clamping strip 7 of one of the side plates 2 into the limiting groove 10 of one of the upright posts 3 along the vertical direction, and then sequentially inserting the clamping strip 7 of the next side plate 2 into the clamping groove 8 of the last clamping strip 7, thereby completing the installation of the side plates 2;
s3: inserting the grooves 15 of the connecting rods 14 into the convex strips 13 at the top of each side plate 2 in sequence along the horizontal direction, thereby completing the installation of the connecting rods 14;
s4: inserting each inserting rod 17 of the top plate 4 into the inserting groove 16 at the top of each upright post 3 respectively, thereby completing the splicing of the top plate 4;
s5: and rotating the reinforcing rods 21 of the stand columns 3, and sequentially fixing the positions of the reinforcing rods 21 and the top plate 4 through bolts, thereby completing the splicing of the prefabricated building.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. An assembled green building system which characterized in that: comprises a bottom plate (1), side plates (2) and upright posts (3), wherein at least four upright posts (3) are arranged, and each upright post (3) is hinged with the bottom plate (1), the bottom plate (1) is provided with fixed seats (6) which are consistent with the upright posts (3) in number and are arranged in one-to-one correspondence with the positions of the upright posts, when the upright posts (3) rotate to a state vertical to the bottom plate (1), each upright post (3) is respectively and fixedly connected with each fixed seat (6) through bolts, a plurality of side plates (2) are arranged between two adjacent upright posts (3), one side of the side plate (2) is fixedly connected with a clamping strip (7), the other side of the side plate (2) is provided with a clamping groove (8) which is matched with the clamping strip (7) of the other side plate (2) in a clamping way, the stand (3) is seted up towards one side of curb plate (2) with stand (3) joint complex spacing groove (10).
2. The fabricated green building system of claim 1, wherein: the equal fixedly connected with sand grip (13) in top of curb plate (2), link to each other two be provided with connecting rod (14) between stand (3), recess (15) that extend to connecting rod (14) both sides along its length direction are seted up in connecting rod (14), sand grip (13) and recess (15) cooperation of pegging graft, just the longitudinal section of sand grip (13) and recess (15) all is the dovetail.
3. The fabricated green building system of claim 2, wherein: still include roof (4), inserting groove (16) have all been seted up to one side that bottom plate (1) was kept away from in stand (3), roof (4) fixedly connected with and inserting groove (16) quantity unanimity and with inserting rod (17) that each inserting groove (16) one-to-one set up, inserting rod (17) and inserting groove (16) cooperation of pegging graft, each after inserting each inserting groove (16) inserting rod (17), one side of connecting rod (14) all contradicts in roof (4) one side towards bottom plate (1).
4. The fabricated green building system of claim 3, wherein: and one side of the upright post (3) is hinged with a reinforcing rod (21), and one side of the reinforcing rod (21) far away from the upright post (3) is fixedly connected to the top plate (4) through a bolt.
5. The fabricated green building system of claim 4, wherein: the stiffener (21) includes the body of rod (211) and fixed part (212), the one end of the body of rod (211) is articulated to be set up in stand (3), fixed part (212) are articulated to be set up in the body of rod (211) and keep away from the one end of stand (3), fixed part (212) pass through bolt fixed connection in roof (4) one side towards bottom plate (1).
6. The fabricated green building system of claim 3, wherein: one end, far away from the top plate (4), of the insertion rod (17) is provided with a chamfer (18), a sealing gasket (19) is fixedly arranged in the insertion groove (16), and after the insertion rod (17) is inserted into the insertion groove (16), the sealing gasket (19) abuts against the insertion rod (17).
7. The fabricated green building system of claim 1, wherein: the bottom of the side plate (2) is fixedly connected with a fixing strip (11), and the top of the bottom plate (1) is provided with a fixing groove (12) which is in plug-in fit with the fixing strip (11).
8. The fabricated green building system of claim 1, wherein: the base plate (1) is provided with fixing plates (5) which are consistent in number with the upright columns (3) and are arranged in a one-to-one correspondence mode, when the upright columns (3) rotate to be parallel to the base plate (1), the upright columns (3) are fixed with the fixing plates (5) through bolts respectively.
9. The fabricated green building system of claim 1, wherein: spacing groove (10) extend to stand (3) along the length direction of stand (3) and keep away from one side of bottom plate (1), screens groove (8) extend to curb plate (2) along vertical direction and keep away from one side of bottom plate (1), the cross section of screens strip (7), screens groove (8) and spacing groove (10) all is the dovetail.
10. A method of constructing an assembled green building system according to claim 1, comprising an assembled green building system according to any one of claims 1 to 9, wherein: the method comprises the following steps:
s1: the upright post (3) is rotated to be vertical to the bottom plate (1), and the positions of the fixed seat (6) and the upright post (3) are fixed through bolts;
s2: inserting the clamping strip (7) of one of the side plates (2) into the limiting groove (10) of one of the upright posts (3) along the vertical direction, and then sequentially inserting the clamping strip (7) of the next side plate (2) into the clamping groove (8) of the last clamping strip (7) so as to complete the installation of the side plates (2);
s3: sequentially inserting the grooves (15) of the connecting rods (14) into the convex strips (13) at the tops of the side plates (2) along the horizontal direction, so that the connecting rods (14) are installed;
s4: inserting each inserting rod (17) of the top plate (4) into the inserting groove (16) at the top of each upright post (3) respectively, thereby completing the splicing of the top plate (4);
s5: and rotating the reinforcing rods (21) of the stand columns (3), and sequentially fixing the positions of the reinforcing rods (21) and the top plate (4) through bolts so as to finish splicing of the fabricated building.
CN202110176015.3A 2021-02-07 2021-02-07 Assembly type green building system and construction method Pending CN112962790A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110176015.3A CN112962790A (en) 2021-02-07 2021-02-07 Assembly type green building system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110176015.3A CN112962790A (en) 2021-02-07 2021-02-07 Assembly type green building system and construction method

Publications (1)

Publication Number Publication Date
CN112962790A true CN112962790A (en) 2021-06-15

Family

ID=76284388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110176015.3A Pending CN112962790A (en) 2021-02-07 2021-02-07 Assembly type green building system and construction method

Country Status (1)

Country Link
CN (1) CN112962790A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605525A (en) * 2021-08-26 2021-11-05 庄汉毅 Assembly type ecological green building and construction method
CN113833123A (en) * 2021-10-08 2021-12-24 广州宇建建设工程有限公司 Green energy-saving house structure and construction method thereof
CN114215188A (en) * 2021-12-29 2022-03-22 浙江建投创新科技有限公司 Quick folding and unfolding emergency module box
CN114319598A (en) * 2021-12-21 2022-04-12 山东方大杭萧钢构科技有限公司 Steel structure assembly type building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209603284U (en) * 2018-11-30 2019-11-08 甘肃海纳塑业有限公司 A kind of collapsible board house braced frame
CN110528680A (en) * 2019-08-12 2019-12-03 成都市新宏建筑工程有限公司 A kind of assembled Green Architecture System and its method of construction
CN111021545A (en) * 2019-12-20 2020-04-17 成都建工装饰装修有限公司 Steel structure assembly type building for building engineering
CN211143886U (en) * 2019-09-17 2020-07-31 上海振南工程咨询监理有限责任公司 Semiconductor laboratory structure
CN111997412A (en) * 2020-08-18 2020-11-27 湖南创一建设工程有限公司 Structure is built to antidetonation room

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209603284U (en) * 2018-11-30 2019-11-08 甘肃海纳塑业有限公司 A kind of collapsible board house braced frame
CN110528680A (en) * 2019-08-12 2019-12-03 成都市新宏建筑工程有限公司 A kind of assembled Green Architecture System and its method of construction
CN211143886U (en) * 2019-09-17 2020-07-31 上海振南工程咨询监理有限责任公司 Semiconductor laboratory structure
CN111021545A (en) * 2019-12-20 2020-04-17 成都建工装饰装修有限公司 Steel structure assembly type building for building engineering
CN111997412A (en) * 2020-08-18 2020-11-27 湖南创一建设工程有限公司 Structure is built to antidetonation room

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605525A (en) * 2021-08-26 2021-11-05 庄汉毅 Assembly type ecological green building and construction method
CN113833123A (en) * 2021-10-08 2021-12-24 广州宇建建设工程有限公司 Green energy-saving house structure and construction method thereof
CN113833123B (en) * 2021-10-08 2022-11-22 广州宇建建设工程有限公司 Green energy-saving house structure and construction method thereof
CN114319598A (en) * 2021-12-21 2022-04-12 山东方大杭萧钢构科技有限公司 Steel structure assembly type building
CN114319598B (en) * 2021-12-21 2024-03-08 山东方大杭萧钢构科技有限公司 Steel structure assembled building
CN114215188A (en) * 2021-12-29 2022-03-22 浙江建投创新科技有限公司 Quick folding and unfolding emergency module box

Similar Documents

Publication Publication Date Title
CN112962790A (en) Assembly type green building system and construction method
ES2975145T3 (en) Connection system and method for prefabricated volumetric construction modules
CN108978875B (en) Quick-disassembly-type special-shaped column frame plate type supporting structure system and construction method thereof
US5022209A (en) Method for construction of building and joint apparatus for construction members
CN108331216B (en) Installation method of large carved stone curtain wall
CN112112279A (en) Assembled steel house room
CN113027002B (en) Modular partition wall and assembly method thereof
CN112482842B (en) Prefabricated light steel structure factory building and construction method thereof
CN102251585A (en) Eave connecting part, building framework structure and mounting method
CN203966446U (en) A kind ofly demonstrate the analogy model that interior architecture decorations are used
CN210194953U (en) Energy-concerving and environment-protective type assembled wall structure
CN114164943A (en) Assembly type steel structure integrated green building and installation method thereof
CN112922140B (en) Construction method for building modular integrated house
CN214696267U (en) Modular partition wall
CN108729813A (en) A kind of modularization assembling timber and its manufacturing method
CN112854551A (en) Assembled partition wall and construction method thereof
CN114406525A (en) Assembling device and assembling method for assembled enclosure of modular transformer substation
CN211774515U (en) Prefabricated building unit, assembly type building and assembly type building with roof
CN113047439A (en) Multilayer large-span assembled integral space steel grid building structure
CN217523342U (en) Landscape flower case is assembled to modular
CN215716309U (en) Assembled steel construction outer wall based on BIM
CN215483535U (en) Integrated assembly type steel structure building
CN218375373U (en) Assembly type canopy bifurcated column assembling jig frame
CN213869029U (en) Reinforcing member for assembled hollow light outer wall window opening
CN211458964U (en) Simulation tree framework structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210615

RJ01 Rejection of invention patent application after publication