CN112954071A - Intelligent construction site management system - Google Patents

Intelligent construction site management system Download PDF

Info

Publication number
CN112954071A
CN112954071A CN202110305437.6A CN202110305437A CN112954071A CN 112954071 A CN112954071 A CN 112954071A CN 202110305437 A CN202110305437 A CN 202110305437A CN 112954071 A CN112954071 A CN 112954071A
Authority
CN
China
Prior art keywords
management platform
information
environment
monitoring module
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110305437.6A
Other languages
Chinese (zh)
Inventor
薛晓宏
姜继果
杨磊
刘德兵
吴红兵
段锋
黄正业
姜子麒
宫富才
李萌
刘培良
王凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Original Assignee
Sixth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd filed Critical Sixth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Priority to CN202110305437.6A priority Critical patent/CN112954071A/en
Publication of CN112954071A publication Critical patent/CN112954071A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
    • H04L67/025Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C1/00Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
    • G07C1/10Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people together with the recording, indicating or registering of other data, e.g. of signs of identity
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/0202Child monitoring systems using a transmitter-receiver system carried by the parent and the child
    • G08B21/0205Specific application combined with child monitoring using a transmitter-receiver system
    • G08B21/0208Combination with audio or video communication, e.g. combination with "baby phone" function
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/0202Child monitoring systems using a transmitter-receiver system carried by the parent and the child
    • G08B21/0233System arrangements with pre-alarms, e.g. when a first distance is exceeded
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/0202Child monitoring systems using a transmitter-receiver system carried by the parent and the child
    • G08B21/028Communication between parent and child units via remote transmission means, e.g. satellite network
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/52Network services specially adapted for the location of the user terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast

Abstract

The invention discloses an intelligent construction site management system which comprises a personnel monitoring module, an environment monitoring module, an equipment monitoring module, a video monitoring module and a management platform, wherein the personnel monitoring module is used for monitoring the environment of a building; the personnel monitoring module collects information of operating personnel and information of visiting personnel and sends the information to the management platform; the equipment monitoring module collects information of the operation equipment and sends the information to the management platform; the environment monitoring module collects environment data and sends the environment data to the management platform, so that the management platform generates and sends an environment processing instruction and/or an alarm instruction to the environment monitoring module according to the environment data; the video monitoring module collects and sends the construction site scene images to the management platform in real time; the management platform displays worker information, work vehicle information, work equipment information, environmental data, and a worksite scene image. The invention aims to solve the technical problems of low management efficiency and poor management and control of the traditional construction site.

Description

Intelligent construction site management system
Technical Field
The invention relates to the field of building construction, in particular to an intelligent construction site management system.
Background
In the building construction process, safety accidents occur continuously. The main reasons for safety accidents are that the traditional construction site lacks an informatization means, the management efficiency is low, the feedback is not timely in personnel management and safety management, each data stream cannot be analyzed in real time to form timely feedback, the phenomena of potential safety hazards such as inadequate monitoring, various illegal operations and illegal construction exist in the site management, and the safety production and engineering quality management are influenced.
The above is only for the purpose of assisting understanding of the technical aspects of the present invention, and does not represent an admission that the above is prior art.
Disclosure of Invention
The invention mainly aims to provide an intelligent construction site management system, and aims to solve the technical problems of low management efficiency and poor management and control of the traditional construction site.
In order to achieve the purpose, the invention provides an intelligent construction site management system which comprises a personnel monitoring module, an environment monitoring module, an equipment monitoring module, a video monitoring module and a management platform;
the personnel monitoring module is connected with the management platform and used for acquiring the information of the operating personnel and the information of the visiting personnel and sending the information of the operating personnel and the information of the visiting personnel to the management platform;
the equipment monitoring module is connected with the management platform and used for acquiring operation equipment information and sending the operation equipment information to the management platform;
the environment monitoring module is connected with the management platform and used for acquiring environment data and sending the environment data to the management platform so that the management platform generates and sends an environment processing instruction and/or an alarm instruction to the environment monitoring module according to the environment data;
the video monitoring module is connected with the management platform and used for acquiring a construction site scene image in real time and sending the construction site scene image to the management platform;
the management platform is further used for displaying operator information, operating equipment information, environment data and a construction site scene image.
Optionally, the equipment monitoring module comprises a tower crane monitoring platform, a tower crane safety control assembly arranged on the tower crane and a tower crane sensing assembly arranged on the tower crane;
the tower crane sensing assembly is connected with the tower crane monitoring platform and used for detecting state data of a tower crane and sending the state data of the tower crane to the tower crane monitoring platform, wherein the state data comprises the height of a tower body, the rotation angle of a suspension arm, the elevation angle of the suspension arm and the position of a hoisting trolley;
the tower crane monitoring platform is connected with the tower crane safety control assembly and used for determining a tower crane entering a safety mode according to state data of each tower crane, and sending a safety control instruction to the tower crane safety control assembly corresponding to the tower crane entering the safety mode so that the tower crane safety control assembly corresponding to the tower crane entering the safety mode is determined to control the tower crane to enter the safety mode.
Optionally, the environment monitoring module includes an environment monitoring unit, an environment processing unit and an environment early warning unit;
the environment monitoring unit is connected with the management platform and used for acquiring environment data and sending the environment data to the management platform;
the environment processing unit is connected with the management platform and used for receiving an environment processing instruction sent by the management platform and responding to the environment processing instruction;
and the environment early warning unit is connected with the management platform and used for receiving the early warning instruction sent by the management platform and sending out early warning.
Optionally, the environment monitoring unit includes one or more of a wind speed and direction monitoring device, a temperature, humidity and pressure monitoring device, a PM2.5 monitoring device, a dust monitoring device, a noise monitoring module, or a sewage monitoring device.
Optionally, the environmental treatment unit comprises a dust removal device and/or a sewage treatment workstation.
Optionally, the worker information includes worker attendance information, and the worker monitoring module includes an attendance recording device and an access control device;
the attendance recording device is connected with the management platform and used for generating the attendance information of the operating personnel and sending the attendance information of the operating personnel to the management platform;
the access control device is connected with the management platform and used for collecting the information of the personnel visiting the outside and sending the information of the personnel visiting the outside to the management platform.
Optionally, the worker information further includes worker position information, the worker monitoring module further includes a positioning unit and a positioning base station, and the positioning unit is built in the safety helmet or the wearable device;
and the positioning base station is respectively in communication connection with the management platform and the positioning unit and is used for calculating the position information of the operating personnel and sending the position information of the operating personnel to the management platform.
Optionally, the worker information further includes worker physical health data, and the worker monitoring module further includes a health monitoring unit;
the health monitoring unit is connected with the management platform and used for collecting physical health data of the operating personnel and sending the physical health data of the operating personnel to the management platform.
Optionally, the intelligent worksite management system further comprises a mobile law enforcement terminal;
the mobile law enforcement terminal is connected with the management platform and used for recording illegal behaviors violating safety management regulations of a construction site and sending the illegal behaviors to the management platform.
Optionally, the intelligent construction site management system further comprises an edge protection module, wherein the edge protection module comprises a controller, a pressure sensor, a distance measuring sensor and an alarm, and the controller, the pressure sensor, the distance measuring sensor and the alarm are arranged on the edge protection fence; the controller is respectively connected with the pressure sensor, the distance measuring sensor and the alarm and is used for receiving pressure data sent by the pressure sensor and distance data sent by the distance measuring sensor and controlling the alarm to be started or closed according to the pressure data and/or the distance data.
According to the intelligent construction site management system provided by the embodiment of the invention, the real-time supervision of field operation personnel, equipment and environment can be realized through the intelligent construction site management system, abnormal conditions can be found in time, the joint action of automatic supervision facilities is realized, the emergency response speed and the handling speed of events are improved, the management level and the management efficiency of a construction site are effectively improved, and the construction safety is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the structures shown in the drawings without creative efforts.
FIG. 1 is a block diagram of an intelligent worksite management system according to an embodiment of the present invention.
The implementation, functional features and advantages of the objects of the present invention will be further explained with reference to the accompanying drawings.
The reference numbers illustrate:
reference numerals Name (R) Reference numerals Name (R)
10 Management platform 20 Personnel monitoring module
21 Attendance recording device 22 Entrance guard device
23 Positioning base station 24 Positioning unit
25 Health monitoring unit 30 Equipment monitoring module
31 Tower crane monitoring platform 32 Tower crane safety control subassembly
33 Tower crane sensing assembly 40 Video monitoring module
50 Environment monitoring module 51 Environment monitoring unit
52 Environment processing unit 53 Environment early warning unit
60 Mobile law enforcement terminal 70 Face limit protection module
71 Controller 72 Pressure sensor
73 Distance measuring sensor 74 Alarm device
Detailed Description
It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that all the directional indicators (such as up, down, left, right, front, and rear … …) in the embodiment of the present invention are only used to explain the relative position relationship between the components, the movement situation, etc. in a specific posture (as shown in the drawing), and if the specific posture is changed, the directional indicator is changed accordingly.
In addition, the descriptions related to "first", "second", etc. in the present invention are for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In addition, technical solutions between various embodiments may be combined with each other, but must be realized by a person skilled in the art, and when the technical solutions are contradictory or cannot be realized, such a combination should not be considered to exist, and is not within the protection scope of the present invention.
Referring to fig. 1, in a first embodiment of the intelligent worksite management system of the present invention, the intelligent worksite management system includes a personnel monitoring module 20, an environment monitoring module 50, an equipment monitoring module 30, a video monitoring module 40 and a management platform 10; the management platform 10 is in communication connection with the personnel monitoring module 20, the environment monitoring module 50, the equipment monitoring module 30 and the video monitoring module 40 respectively, and the communication connection can be a wireless communication connection and/or a wired communication connection.
The personnel monitoring module 20 collects the information of the operating personnel and the information of the visiting personnel in the construction site in real time, and then sends the information of the operating personnel and the information of the visiting personnel to the management platform 10 in real time, wherein the information of the operating personnel can comprise name and work number information of the operating personnel, attendance record data, position information, operation tracks and the like, and the information of the visiting personnel comprises names of the visiting personnel, contact numbers, face images, visiting personnel and the like.
The equipment monitoring module 30 can also communicate with the operating equipment on the construction site, so as to collect the information of the operating equipment in real time, and then send the collected information of the operating equipment to the management platform 10, wherein the information of the operating equipment can comprise the position information and the running state information of the operating equipment, and the operating equipment can be a muck truck, a concrete mixing pump truck, a bulldozer, an excavator, a road roller, a gantry crane, a tower crane and the like.
Specifically, equipment monitoring module 30 includes tower crane monitoring platform 31 and sets up tower crane safety control subassembly 32 and tower crane sensing subassembly 33 on every tower crane, tower crane safety control subassembly 32 and tower crane sensing subassembly 33 respectively with tower crane monitoring platform 31 communication connection, tower crane sensing subassembly 33 can detect the state data of place tower crane, state data includes including the body of the tower height, davit gyration angle, davit angle of elevation and hoisting trolley position etc. tower crane sensing subassembly 33 can send the state data of the place tower crane that detects to tower crane monitoring platform 31. Tower crane monitoring platform 31 can carry out the activity area of calculation analysis every tower crane according to the state data of each tower crane, then confirm whether there is the tower crane that the activity area has the overlap, if there is the tower crane that the activity area has the overlap with other tower crane activity areas, then confirm this tower crane needs to get into the safety mode, then send the safety control instruction to the tower crane safety control subassembly 32 that the tower crane that confirms to get into the safety mode corresponds, tower crane safety control subassembly 32 can control the tower crane that belongs to and get into the safety mode after receiving the safety control instruction, the safety mode specifically can be send out safety precaution, stop the tower crane work, at least one kind in the restriction tower crane moving direction. The tower crane monitoring platform 31 can also be in communication connection with the management platform 10, and sends the acquired state data of each tower crane to the management platform 10.
The environment monitoring module 50 collects environment data within a preset range, sends the environment data to the management platform 10, and after receiving the environment data, the management platform 10 generates an environment processing instruction and/or an alarm instruction according to the environment data and a preset environment analysis model, and then sends the environment processing instruction and/or the alarm instruction to the environment monitoring module 50, and the environment monitoring module 50 responds to the environment processing instruction and/or the alarm instruction.
The video monitoring module 40 is a plurality of cameras arranged in a construction site, construction site scene images are collected in real time through the cameras, the construction site scene images are sent to the management platform 10, the management platform 10 can detect and identify the construction site scene images through a built-in image identification model, whether abnormal behaviors or illegal regulation behaviors exist in operators in the images is determined, for example, whether safety helmets are not worn or whether operation equipment in the images is abnormal is also determined, if abnormal, abnormal positions in the images are marked, and abnormal alarm is started.
The management platform 10 includes a processing unit and a display unit, and the processing unit receives the worker information, the work equipment information, the environmental data, and the site scene image respectively transmitted by the worker monitoring module 20, the equipment monitoring module 30, the environment monitoring module 50, and the video monitoring module 40, and then displays the worker information, the work equipment information, the environmental data, and the site scene image through the display unit.
In this embodiment, can realize the real-time supervision of site operation personnel, equipment and environment through wisdom building site management system, can in time discover abnormal conditions, realize automatic supervision facility joint action, improve the processing speed of emergency response speed and incident, effectively improve the management level and the managerial efficiency of job site, improve the security of construction simultaneously.
Further, the environment monitoring module 50 includes an environment monitoring unit 51, an environment processing unit 52 and an environment early warning unit 53; environmental monitoring unit 51 is connected with management platform 10, gather environmental data and send to management platform 10, it is specific, environmental monitoring unit 51 includes wind speed wind direction monitoring devices, humiture atmospheric pressure monitoring devices, PM2.5 monitoring devices, raise dust monitoring devices, one or more among noise monitoring module or the sewage monitoring devices, these detection device are connected with management platform 10 respectively, and the environmental data of the collection that corresponds includes wind speed wind direction, a temperature, humidity, atmospheric pressure, PM2.5, dust concentration, noise, discharge in the sewage in the concentration one or more of pollutant. The management platform 10 analyzes the environmental data according to the received environmental data, determines the environmental data which does not conform to the preset standard, correspondingly sends a processing instruction to the environmental processing unit 52 and/or sends an early warning instruction to the environmental early warning unit 53, specifically, the environmental processing unit 52 includes a dust removal device and/or a sewage treatment workstation, after receiving the environmental processing instruction sent by the management platform 10, the environmental processing unit 52 responds to the environmental processing instruction, reduces the environmental data which does not conform to the standard by adopting a preset method until the environmental data conforms to the preset standard, for example, when the management platform 10 determines that the dust concentration monitored by the dust raising monitoring device exceeds the concentration required by the national standard, the management platform issues a dust removal processing instruction to the dust removal device, and after receiving the dust removal processing instruction, the management platform starts dust removal work to reduce the dust concentration of the construction site, for example, the management platform 10 determines that the concentration of the nitrogen oxides in the current sewage to be discharged monitored by the current sewage monitoring device exceeds the standard, and sends a nitrogen oxide reducing instruction to the sewage treatment workstation, and the sewage treatment workstation receives the instruction and then starts to treat the sewage to be discharged so as to reduce the concentration of the nitrogen oxides in the sewage. After the early warning instruction sent by the management platform 10 is received by the environment early warning unit 53, the early warning can be sent in a sound form through the buzzer, for example, when the wind speed is monitored to be too high, the management platform 10 sends the early warning instruction to the environment early warning unit 53 to control the environment early warning unit 53 to send out the early warning, so as to remind the operators, especially the high-altitude operators, to pay attention.
Optionally, the operator information includes operator attendance information, and the personnel monitoring module 20 includes an attendance recording device 21 and an access control device 22 both connected to the management platform 10. The attendance recording device 21 may be a fingerprint-recognized attendance recording device 21, a face-recognized attendance recording device 21, or an attendance recording device 21 having both fingerprint recognition and face recognition, and the type of the attendance recording device 21 is not limited herein. The attendance recording device 21 generates attendance information of the operator and transmits the attendance information to the management platform 10. The access control device 22 collects the information of the visitor and transmits the information of the visitor to the management platform 10.
Further, the worker information may further include worker position information, the corresponding worker monitoring module 20 further includes a positioning unit 24 and a positioning base station 23, the positioning unit 24 is in wireless communication connection with the positioning base station 23, the positioning base station 23 is in wireless communication connection with the management platform 10, and the positioning unit 24 may be built in a safety helmet or wearable equipment such as an intelligent bracelet. The positioning base station 23 and the positioning unit 24 are in communication connection in real time or at preset intervals, and the distance and the direction of the positioning unit 24 relative to the positioning base station 23 can be calculated according to the communication situation, so that the positioning base station 23 can determine the position information of the positioning unit 24 according to the position of the positioning base station 23 and the distance and the direction of the positioning unit 24 relative to the positioning base station 23, the position information of the positioning unit 24 is the position information of an operator, the positioning base station 23 can send the position information of all the operators to the management platform 10, the management platform 10 can update the positions of the operators displayed on the display unit of the management platform 10 according to the position information of the operator sent by the positioning base station 23, and the operation tracks of the operators can be generated according to the position information of the operators received for multiple times.
It should be noted that, personnel monitoring module 20 still includes the danger warning unit (not shown) with management platform 10 wireless communication connection, this danger warning unit can be placed in the safety helmet or can wear the equipment, management platform 10 receives operating personnel positional information after, the distance of distance apart from the dangerous area in building site is calculated, when this distance is less than preset distance, management platform 10 is through sending warning instruction to danger warning unit, in order to control danger warning unit to send out the warning, can warn through vibrations, sound or several kinds of forms in the light scintillation.
Further, the worker information may further include the health data of the worker, and the worker monitoring module 20 further includes a health monitoring unit 26 connected to the management platform 10 in a wireless communication manner, and the health monitoring unit 26 may be embedded in the wearable device. Health monitoring unit 26 can gather the health data of operation personnel in real time, for example data such as operation personnel's rhythm of the heart, blood pressure, body temperature and oxygen saturation that needs, then sends operation personnel's health data to management platform 10, and management platform 10 can judge whether operation personnel's health state is normal according to operation personnel's health data, but can send out the early warning when certain index is unusual in operation personnel's health data.
Optionally, the intelligent worksite management system further comprises a mobile law enforcement terminal 60 in wireless communication with the management platform 10, and the mobile law enforcement terminal 60 may be a mobile terminal with a specific shooting function. The mobile law enforcement terminal 60 records the violating regulations, records the violating regulations by pictures, characters or videos, and sends the violating regulations to the management platform 10.
Optionally, the intelligent worksite management system further comprises an adjacent edge protection module 70, the adjacent edge protection module comprises a controller 71, a pressure sensor 72, a distance measuring sensor 73 and an alarm 74 which are arranged on the adjacent edge protection fence, the controller 71 is respectively connected with the pressure sensor 72, the distance measuring sensor 73 and the alarm 74, the controller 71 receives pressure data sent by the pressure sensor 72 and distance data sent by the distance measuring sensor 73, then judges whether a person approaches or leans against the adjacent edge protection fence according to the pressure data, judges whether a person exists in a preset range of the adjacent edge protection fence according to the distance data, when it is determined that a person leans against the adjacent edge protection fence or is closer to the adjacent edge protection fence, the controller 71 controls the alarm 74 to send an alarm, if no person leans against the adjacent edge protection fence or the person is farther from the adjacent edge protection fence, the alarm can be controlled to be closed and the alarm is stopped. The controller 71 may also be connected to the management platform 10.
It should be noted that the intelligent worksite management system further includes a warehousing platform (not shown) and a supply chain platform (not shown), and the management platform 10 is connected to the warehousing platform and the supply chain platform, respectively. Warehouse staff can regularly check the materials on the construction site and input the material data into the warehousing platform, and the warehousing platform can send the material data to the management platform 10 in real time or send the updated material data to the management platform 10 when the material data is updated. When the management platform 10 receives the material data sent by the warehousing platform, a material supply schedule is generated according to the current material data, and then the material supply schedule is issued to the supply chain platform, so that the purchasing personnel can purchase according to the material supply schedule.
The intelligent worksite management system further includes a storage platform (not shown), which may be a local storage platform or a cloud storage platform, the storage platform is in communication connection with the management platform 10, the management platform 10 may store the visitor information, the worker information, the operating equipment information, the environment data, and the worksite scene image in the storage platform, and may also store the behavior violating the regulations in the storage platform.
Intelligent building site management system still includes the fire control emergency module (not shown) of being connected with management platform, fire control emergency module includes smoke transducer, temperature sensor and fire sprinkler, smoke transducer and temperature sensor can send the smog concentration and the temperature data that detect to management platform 10, management platform 10 is according to smog concentration and temperature data, and the video image in smoke transducer and temperature sensor place region, whether the conflagration takes place for comprehensive judgement, can start the regional fire sprinkler of conflagration taking place to spray when the conflagration takes place and put out a fire, management platform 10 still can send fire alarm simultaneously.
The above description is only an alternative embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (10)

1. The intelligent construction site management system is characterized by comprising a personnel monitoring module, an environment monitoring module, an equipment monitoring module, a video monitoring module and a management platform;
the personnel monitoring module is connected with the management platform and used for acquiring the information of the operating personnel and the information of the visiting personnel and sending the information of the operating personnel and the information of the visiting personnel to the management platform;
the equipment monitoring module is connected with the management platform and used for acquiring operation equipment information and sending the operation equipment information to the management platform;
the environment monitoring module is connected with the management platform and used for acquiring environment data and sending the environment data to the management platform so that the management platform generates and sends an environment processing instruction and/or an alarm instruction to the environment monitoring module according to the environment data;
the video monitoring module is connected with the management platform and used for acquiring a construction site scene image in real time and sending the construction site scene image to the management platform;
the management platform is further used for displaying operator information, operating equipment information, environment data and a construction site scene image.
2. The intelligent construction site management system according to claim 1, wherein the equipment monitoring module comprises a tower crane monitoring platform, a tower crane safety control component arranged on a tower crane and a tower crane sensing component arranged on the tower crane;
the tower crane sensing assembly is connected with the tower crane monitoring platform and used for detecting state data of a tower crane and sending the state data of the tower crane to the tower crane monitoring platform, wherein the state data comprises the height of a tower body, the rotation angle of a suspension arm, the elevation angle of the suspension arm and the position of a hoisting trolley;
the tower crane monitoring platform is connected with the tower crane safety control assembly and used for determining a tower crane entering a safety mode according to state data of each tower crane, and sending a safety control instruction to the tower crane safety control assembly corresponding to the tower crane entering the safety mode so that the tower crane safety control assembly corresponding to the tower crane entering the safety mode is determined to control the tower crane to enter the safety mode.
3. The intelligent worksite management system of claim 2, wherein the environment monitoring module comprises an environment monitoring unit, an environment processing unit and an environment early warning unit;
the environment monitoring unit is connected with the management platform and used for acquiring environment data and sending the environment data to the management platform;
the environment processing unit is connected with the management platform and used for receiving an environment processing instruction sent by the management platform and responding to the environment processing instruction;
and the environment early warning unit is connected with the management platform and used for receiving the early warning instruction sent by the management platform and sending out early warning.
4. The intelligent worksite management system of claim 3, wherein the environment monitoring unit comprises one or more of a wind speed and direction monitoring device, a temperature, humidity and air pressure monitoring device, a PM2.5 monitoring device, a dust emission monitoring device, a noise monitoring module or a sewage monitoring device.
5. The intelligent worksite management system of claim 4, wherein the environmental treatment unit comprises a dust removal device and/or a sewage treatment workstation.
6. The intelligent worksite management system according to any one of claims 1 to 5, wherein the worker information includes worker attendance information, and the personnel monitoring module includes an attendance recording device and an entrance guard device;
the attendance recording device is connected with the management platform and used for generating the attendance information of the operating personnel and sending the attendance information of the operating personnel to the management platform;
the access control device is connected with the management platform and used for collecting the information of the personnel visiting the outside and sending the information of the personnel visiting the outside to the management platform.
7. The intelligent worksite management system of claim 6, wherein the operator information further comprises operator position information, the personnel monitoring module further comprises a positioning unit and a positioning base station, and the positioning unit is built in a safety helmet or wearable equipment;
and the positioning base station is respectively in communication connection with the management platform and the positioning unit and is used for calculating the position information of the operating personnel and sending the position information of the operating personnel to the management platform.
8. The intelligent worksite management system of claim 7, wherein said worker information further includes worker physical health data, said personnel monitoring module further including a health monitoring unit;
the health monitoring unit is connected with the management platform and used for collecting physical health data of the operating personnel and sending the physical health data of the operating personnel to the management platform.
9. The intelligent worksite management system of claim 8, further comprising a mobile law enforcement terminal;
the mobile law enforcement terminal is connected with the management platform and used for recording illegal behaviors violating safety management regulations of a construction site and sending the illegal behaviors to the management platform.
10. The intelligent worksite management system of claim 9, further comprising an edge-facing protection module, wherein the edge-facing protection module comprises a controller, a pressure sensor, a distance measuring sensor and an alarm arranged on an edge-facing protection fence; the controller is respectively connected with the pressure sensor, the distance measuring sensor and the alarm and is used for receiving pressure data sent by the pressure sensor and distance data sent by the distance measuring sensor and controlling the alarm to be started or closed according to the pressure data and/or the distance data.
CN202110305437.6A 2021-03-23 2021-03-23 Intelligent construction site management system Pending CN112954071A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110305437.6A CN112954071A (en) 2021-03-23 2021-03-23 Intelligent construction site management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110305437.6A CN112954071A (en) 2021-03-23 2021-03-23 Intelligent construction site management system

Publications (1)

Publication Number Publication Date
CN112954071A true CN112954071A (en) 2021-06-11

Family

ID=76227879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110305437.6A Pending CN112954071A (en) 2021-03-23 2021-03-23 Intelligent construction site management system

Country Status (1)

Country Link
CN (1) CN112954071A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113480122A (en) * 2021-07-29 2021-10-08 四川葵清环保科技有限公司 Sludge treatment method and system based on environmental protection
CN113885414A (en) * 2021-09-10 2022-01-04 中建三局集团有限公司 Wisdom building site environmental monitoring system
CN113988647A (en) * 2021-10-29 2022-01-28 上海市浦东新区建设(集团)有限公司 Municipal works wisdom building site management system based on BIM
CN114023048A (en) * 2021-11-27 2022-02-08 安徽博达项目管理咨询有限公司 Engineering supervision system based on artificial intelligence data processing and visual analysis
CN114070985A (en) * 2021-11-16 2022-02-18 西安热工研究院有限公司 Wisdom power plant safety monitored control system
CN114693158A (en) * 2022-04-19 2022-07-01 深圳市深安企业有限公司 Intelligent construction site management method and system based on BIM technology and storage medium
CN115240362A (en) * 2022-06-30 2022-10-25 江西大正智能信息技术有限公司 Monitoring alarm system and method of intelligent construction site management and control platform
CN115303946A (en) * 2022-09-16 2022-11-08 江苏省特种设备安全监督检验研究院 Digital twin-based tower crane work monitoring method and system
CN115497268A (en) * 2022-09-19 2022-12-20 中铁第四勘察设计院集团有限公司 Personnel positioning management system based on intelligent construction site and application
CN115767008A (en) * 2022-10-22 2023-03-07 国网湖北省电力有限公司黄冈供电公司 Intelligent display system for intelligent substation construction site

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113480122A (en) * 2021-07-29 2021-10-08 四川葵清环保科技有限公司 Sludge treatment method and system based on environmental protection
CN113885414A (en) * 2021-09-10 2022-01-04 中建三局集团有限公司 Wisdom building site environmental monitoring system
CN113988647A (en) * 2021-10-29 2022-01-28 上海市浦东新区建设(集团)有限公司 Municipal works wisdom building site management system based on BIM
CN114070985A (en) * 2021-11-16 2022-02-18 西安热工研究院有限公司 Wisdom power plant safety monitored control system
CN114023048A (en) * 2021-11-27 2022-02-08 安徽博达项目管理咨询有限公司 Engineering supervision system based on artificial intelligence data processing and visual analysis
CN114693158A (en) * 2022-04-19 2022-07-01 深圳市深安企业有限公司 Intelligent construction site management method and system based on BIM technology and storage medium
CN115240362A (en) * 2022-06-30 2022-10-25 江西大正智能信息技术有限公司 Monitoring alarm system and method of intelligent construction site management and control platform
CN115303946A (en) * 2022-09-16 2022-11-08 江苏省特种设备安全监督检验研究院 Digital twin-based tower crane work monitoring method and system
CN115497268A (en) * 2022-09-19 2022-12-20 中铁第四勘察设计院集团有限公司 Personnel positioning management system based on intelligent construction site and application
CN115767008A (en) * 2022-10-22 2023-03-07 国网湖北省电力有限公司黄冈供电公司 Intelligent display system for intelligent substation construction site

Similar Documents

Publication Publication Date Title
CN112954071A (en) Intelligent construction site management system
CN111552216A (en) Construction site intelligent supervision system based on 5G
CN205281207U (en) Building site management system
CN110620906A (en) Electric power construction safety management system based on thing networking
CN106779447A (en) Builder's intelligent management system and method for a kind of RFID of fusion BIM
CN111784280A (en) Intelligent management system for construction site of building engineering
CN211877114U (en) Construction site supervisory system based on 5G
CN214799539U (en) Intelligent construction site management system
CN110566280A (en) Mining multi-parameter mobile inspection device and detection method
CN112070941A (en) Wisdom building site is environment supervisory systems for construction
CN212624219U (en) Electronic fence identification system based on artificial intelligence
CN114314389A (en) Tower crane safety operation monitoring system and method
CN207902455U (en) Yard circuit O&M safe and intelligent early warning system under the conditions of a kind of station reconstruction
KR102332818B1 (en) Risk notification system and the method thereof using virtual proxy sensor and virtual space-based danger zone setting with rtls sensor
CN113547500A (en) Inspection robot, inspection robot system and inspection method of inspection robot
CN113593177B (en) Video alarm linkage implementation method based on high-precision positioning and image recognition
CN213424017U (en) Intelligent construction site system
CN112288380A (en) Information system for monitoring state of operating personnel in real time
CN109819407B (en) Management system for carrying out safety management on construction site of maritime works and ocean engineering
CN116739343A (en) Safety evaluation method and system for power grid construction project site
CN114973477A (en) Man-machine interaction ship personnel management system
KR20230140616A (en) Safety management system through worker location tracking
CN115240362A (en) Monitoring alarm system and method of intelligent construction site management and control platform
CN113803105A (en) Intelligent emergency escape guarantee system and method for urban tunnel
CN112150827A (en) Tunnel monitoring system of wisdom building site management and control platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination