CN112950176A - Method, apparatus and storage medium for automatically determining power design index - Google Patents
Method, apparatus and storage medium for automatically determining power design index Download PDFInfo
- Publication number
- CN112950176A CN112950176A CN202110446683.3A CN202110446683A CN112950176A CN 112950176 A CN112950176 A CN 112950176A CN 202110446683 A CN202110446683 A CN 202110446683A CN 112950176 A CN112950176 A CN 112950176A
- Authority
- CN
- China
- Prior art keywords
- index
- rule
- project data
- engineering project
- judgment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 41
- 238000013461 design Methods 0.000 title claims abstract description 37
- 238000000605 extraction Methods 0.000 claims description 33
- 238000004590 computer program Methods 0.000 claims description 9
- 238000012552 review Methods 0.000 abstract description 7
- 230000001419 dependent effect Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 9
- 238000004364 calculation method Methods 0.000 description 6
- 238000011156 evaluation Methods 0.000 description 6
- 230000006870 function Effects 0.000 description 5
- 238000012545 processing Methods 0.000 description 3
- 238000012550 audit Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
The invention discloses an automatic judgment method, equipment and a storage medium for power design indexes, wherein the automatic judgment method for the power design indexes comprises the following steps: presetting an index judgment rule; acquiring engineering project data, and extracting index parameters of the engineering project data; and judging the index parameters of the engineering project data according to the index judgment rule, and giving corresponding prompts according to the judgment result. Through the mode, the problem that the design level of designers and reviewers is highly dependent in the prior art is solved, the index parameters of engineering project data can be automatically judged through the index judgment rule, the preliminary judgment result is quickly obtained, and the reviewers are assisted to quickly and accurately review.
Description
Technical Field
The present invention relates to the field of power design indicator technology, and in particular, to a method, an apparatus, and a storage medium for automatically determining a power design indicator.
Background
In order to realize intelligent automatic evaluation of electric power projects and ensure the normative and rationality of design, evaluation personnel are often required to perform manual judgment according to technical skills, so that the labor cost is consumed, and meanwhile, the accuracy cannot reach 100% accuracy. The condition that the index of a certain dimension is overlooked or wrongly evaluated often occurs, and the cost for subsequent correction is also doubled.
If the system can automatically judge whether the design of the power project meets the requirements according to the indexes and the configuration rules, great convenience is brought to the evaluation work, the working efficiency is improved, and the management cost is reduced. However, the prior art simply obtains the index data and does not compare and determine the index data with the standard library, so that a lot of work still stays on the body of the reviewer, and the real intelligent determination function cannot be achieved.
Disclosure of Invention
The invention provides an automatic judgment method, equipment and a storage medium for power design indexes, which aim to solve the problems that in the prior art, a review result is highly dependent and the working efficiency is low.
In order to solve the above technical problem, the present invention provides an automatic determination method for power design indicators, comprising: presetting an index judgment rule; acquiring engineering project data, and extracting index parameters of the engineering project data; and judging the index parameters of the engineering project data according to the index judgment rule, and giving corresponding prompts according to the judgment result.
Optionally, the preset index determination rule includes: defining an index judgment rule according to the standard of the power industry; and defining index parameters to be extracted and corresponding extraction rules according to the index judgment rules.
Optionally, the hint includes an auxiliary hint class and a canonical hint class; the auxiliary prompt class is used for prompting to modify or explain reasons when the prompt index parameters are not in accordance with the index judgment rules; and the standard prompt class is used for prompting to modify according to the index judgment rule when the prompt index parameter does not accord with the index judgment rule.
Optionally, the index decision rule includes a number comparison rule and a character string logic rule.
Optionally, the index determination rule includes: the extracted index parameter is compared with a specific numerical value or character string, the extracted index parameter is compared with another extracted index parameter, and the result of the operation of the extracted index parameter and the numerical value and the result of the operation of another extracted index parameter and the numerical value are compared.
Optionally, the digital comparison rule further includes an operation operator, and the operation operator is divided into a character string operator and a numeric operator; string-like operators include equal and not equal; numeric class operators include greater than, greater than or equal to, less than or equal to.
Optionally, the obtaining engineering project data and extracting index parameters of the engineering project data includes: and extracting the basic information of the engineering project data according to an extraction rule, wherein the extraction rule comprises a predefined index code, an index name, an index type and an extraction field.
Optionally, the obtaining engineering project data and extracting index parameters of the engineering project data includes: and analyzing and extracting the uploaded accessories of the engineering project data according to extraction rules, wherein the extraction rules comprise predefined index codes, index names, index types, extracted accessory types and index positions in the accessories.
In order to solve the above technical problem, the present invention provides an automatic determination device for power design indicators, which includes a memory and a processor, wherein the memory is connected to the processor, the memory stores a computer program, and the computer program implements the above method when executed by the processor.
To solve the above technical problem, the present invention provides a computer-readable storage medium storing a computer program, which when executed implements the above method.
The invention provides an automatic judgment method, equipment and a storage medium for power design indexes, wherein the automatic judgment method for the power design indexes comprises the following steps: presetting an index judgment rule; acquiring engineering project data, and extracting index parameters of the engineering project data; and judging the index parameters of the engineering project data according to the index judgment rule, and giving corresponding prompts according to the judgment result. Through the mode, the problem that the design level of designers and reviewers is highly dependent in the prior art is solved, the index parameters of engineering project data can be automatically judged through the index judgment rule, the preliminary judgment result is quickly obtained, and the reviewers are assisted to quickly and accurately review.
Drawings
In order to more clearly illustrate the technical solution of the present invention, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a flow chart illustrating an embodiment of a method for automatically determining an electrical design index according to the present invention;
FIG. 2 is a schematic interface diagram of an embodiment of a criteria determination rule;
FIG. 3 is a schematic interface diagram of another embodiment of a guideline determination rule;
FIG. 4 is a schematic interface diagram of yet another embodiment of a predicate rule;
FIG. 5 is a schematic diagram of an interface of an embodiment of a simple extraction;
FIG. 6 is a schematic interface diagram of an embodiment of a complex extraction;
FIG. 7 is a schematic structural diagram of an embodiment of an automatic determination apparatus for electrical design indicators according to the present invention;
FIG. 8 is a schematic structural diagram of an embodiment of a computer-readable storage medium of the present invention.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the following describes the method, device and storage medium for automatically determining power design index provided by the present invention in detail with reference to the accompanying drawings and the detailed description.
The prior art can only simply display the indexes and does not use the indexes to carry out system application, such as an automatic judgment function. The system has no function of a business judgment rule and a judgment standard, or only has simple rules, only carries out simple display, and does not carry out application of index judgment, so that the requirement of automatic evaluation cannot be met.
Based on the above, the invention provides an automatic judgment method for electric power design indexes, which can not only obtain the index data of the project, but also automatically judge according to the established configuration rule in the engineering data design and review stage to obtain the unreasonable data existing in the review. Such as: whether the single-kilometer manufacturing cost is excessive, whether the single-kilometer earth and stone volume is reasonable and the like are achieved, so that automatic evaluation is performed on the power grid engineering design result, evaluation quality and efficiency are improved, and designers are assisted to improve the design level.
Referring to fig. 1, fig. 1 is a schematic flow chart illustrating an embodiment of an automatic determination method for an electric power design indicator according to the present invention. In this embodiment, the method may specifically include the following steps:
s110: an index determination rule is set in advance.
The preset index judgment rule can define the index judgment rule according to the standard of the power industry; and defining index parameters to be extracted and corresponding extraction rules according to the index judgment rules.
And (5) carrying out rule input according to the standard of the power industry. For example, according to the industry rule that the cost of a single kilometer is not more than a plurality of elements, after the various rules are defined in the system, index judgment can be carried out according to actual data.
The index judgment rule comprises a number comparison rule and a character string logic rule, supports the operation rule of various numbers, and can greatly meet the operation requirement of the service.
Optionally, the index determination rule includes: the extracted index parameter is compared with a specific one of the numeric values or the character strings, the extracted index parameter is compared with another extracted index parameter, the result of the operation of the extracted index parameter with the numeric value and the result of the operation of another extracted index parameter with the numeric value are compared, as shown in fig. 2 to 4, respectively.
Optionally, the digital comparison rule further includes an operation operator, and the operation operator is divided into a character string operator and a numeric operator; string-like operators include equal and not equal; numeric class operators include greater than, greater than or equal to, less than or equal to.
S120: and acquiring engineering project data, and extracting index parameters of the engineering project data.
The engineering project data are obtained, index parameter extraction of the engineering project data can be divided into simple extraction and complex extraction, wherein the simple extraction is that basic information of the engineering project data is directly extracted, and the complex extraction is that uploading accessories of the engineering project data are analyzed and then extracted. The types of the uploaded attachments include, but are not limited to, word format, excel format, pdf format, and various picture formats.
The simple extraction comprises the following steps: extracting the basic information of the engineering project data according to an extraction rule, wherein the extraction rule comprises a predefined index code, an index name, an index type and an extraction field, as shown in fig. 5.
The complex extraction comprises: the uploaded attachment of the engineering project data is analyzed and extracted according to the extraction rule, wherein the extraction rule comprises a predefined index code, an index name, an index type, an extracted attachment type and an index position in the attachment, as shown in fig. 6.
The above are only reference index extraction methods, and the specific extraction methods may be various and do not belong to the scope of the present invention, so that they are not described in more detail.
The following are examples of several index parameters:
according to the index condition, the extraction rule of the index is defined by combining the actual index source mode in the project.
S130: and judging the index parameters of the engineering project data according to the index judgment rule, and giving corresponding prompts according to the judgment result.
Optionally, the hint includes an auxiliary hint class and a canonical hint class; the auxiliary prompt class is used for prompting to modify or explain reasons when the prompt index parameters are not in accordance with the index judgment rules; and the standard prompt class is used for prompting to modify according to the index judgment rule when the prompt index parameter does not accord with the index judgment rule.
The following are examples of several classes of auxiliary cues:
the following are examples of several specification hint classes:
based on the above prompt categories, when setting the index determination rule, it is necessary to additionally set a verification category (auxiliary prompt category and standard prompt category), a rule name, a rule comparison method, a comparison index, a content prompt, and the like, and it is necessary to manually enter the rule according to a specific power design rule.
The embodiment discloses an automatic judgment method for power design indexes, which presets index judgment rules; acquiring engineering project data, and extracting index parameters of the engineering project data; and judging the index parameters of the engineering project data according to the index judgment rule, and giving corresponding prompts according to the judgment result. In this way, the problem that the design level of designers and reviewers is highly relied on in the prior art is solved, the index parameters of engineering project data can be automatically judged through the index judgment rule, a preliminary judgment result is rapidly obtained, and the reviewers are assisted to rapidly and accurately audit.
In this embodiment, the calculation and rule determination can be automatically performed according to the configured rule definition and the index data of the actual project, and the determination result is recorded and displayed, so as to implement the automatic review function, which is further described in the following example:
1) and extracting the index value of the index parameter according to the index extraction rule defined in the last step, and storing the index value into an index library.
2) And calculating the calculation values of the left side and the right side of the operator of each comparison rule according to the index comparison rule defined in the first step.
2.1 if an error occurs in the calculation, for example, the index value of a character string class is required to be multiplied by 10000, and the explicit error will cause an error in the calculation, then the comparison rule will process the error according to the error report, still give a prompt that the index needs to pay close attention to, and display a prompt of the calculation error;
2.2 if no error is sent in the calculation process, then carrying out data comparison according to the operator. Enumerating each operational character to perform corresponding comparison processing according to the type of the operational character, and giving a corresponding prompt if the comparison is passed; if the comparison fails, no warning prompt needs to be given. For example, the item name in the item basic information and the item name in the overview book are extracted, and then the operator is found to be not equal, it is necessary to judge whether the two are equal, and if the two are equal, the comparison is not passed, it is unnecessary to give an early warning. On the contrary, if the two are not equal, the comparison is passed, and an early warning prompt needs to be given.
And 2.3, finally storing the processed early warning prompt result into an index judgment result base.
3) And displaying the page of the index judgment result library to enable a user to pay attention to key error-prone indexes, thereby providing an auxiliary review function.
Based on the above method for automatically determining the electric power design index, the present invention further provides an apparatus for automatically determining the electric power design index, as shown in fig. 7, fig. 7 is a schematic structural diagram of an embodiment of the apparatus for automatically determining the electric power design index of the present invention. The power design index automatic determination device 700 may include a memory 71 and a processor 72, the memory 71 is connected to the processor 72, a computer program is stored in the memory 71, and the computer program realizes the method of any of the above embodiments when executed by the processor 72. The steps and principles thereof have been described in detail in the above method and will not be described in detail herein.
In the present embodiment, the processor 72 may also be referred to as a Central Processing Unit (CPU). The processor 72 may be an integrated circuit chip having signal processing capabilities. The processor 72 may also be a general purpose processor, a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), a Field Programmable Gate Array (FPGA) or other programmable logic device, discrete gate or transistor logic, discrete hardware components. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like.
Based on the automatic determination method for the power design index, the invention also provides a computer readable storage medium. Referring to fig. 8, fig. 8 is a schematic structural diagram of a computer-readable storage medium according to an embodiment of the invention. The computer-readable storage medium 800 has stored thereon a computer program 81, which computer program 81, when being executed by a processor, implements the method of any of the above embodiments. The steps and principles thereof have been described in detail in the above method and will not be described in detail herein.
Further, the computer-readable storage medium 800 may also be various media that can store program codes, such as a usb disk, a removable hard disk, a read-only memory (ROM), a Random Access Memory (RAM), a magnetic tape, or an optical disk.
It is to be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting of the invention. In addition, for convenience of description, only a part of structures related to the present invention, not all of the structures, is shown in the drawings. The step numbers used herein are also for convenience of description only and are not intended as limitations on the order in which the steps are performed. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The terms "first", "second", and the like in the present invention are used for distinguishing different objects, not for describing a particular order. Furthermore, the terms "include" and "have," as well as any variations thereof, are intended to cover non-exclusive inclusions. For example, a process, method, system, article, or apparatus that comprises a list of steps or elements is not limited to only those steps or elements listed, but may alternatively include other steps or elements not listed, or inherent to such process, method, article, or apparatus.
Reference herein to "an embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the invention. The appearances of the phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. It is explicitly and implicitly understood by one skilled in the art that the embodiments described herein can be combined with other embodiments.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes performed by the present specification and drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.
Claims (10)
1. An automatic determination method for an electric power design index is characterized by comprising the following steps:
presetting an index judgment rule;
acquiring engineering project data, and extracting index parameters of the engineering project data;
and judging the index parameters of the engineering project data according to the index judgment rule, and giving corresponding prompts according to the judgment result.
2. The method according to claim 1, wherein the preset index determination rule includes:
defining the index judgment rule according to the standard of the power industry;
and defining index parameters to be extracted and corresponding extraction rules according to the index judgment rules.
3. The method for automatically determining an electric power design index according to claim 1,
the prompt comprises an auxiliary prompt class and a specification prompt class;
the auxiliary prompt class is used for prompting to modify or explain reasons when the index parameters are prompted to be inconsistent with the index judgment rules; and the standard prompt class is used for prompting to modify according to the index judgment rule when the index parameter is not in accordance with the index judgment rule.
4. The method for automatically determining an electric power design index according to claim 1,
the index decision rule includes a number comparison rule and a character string logic rule.
5. The method for automatically determining an electric power design index according to claim 4,
the index determination rule includes: the extracted index parameter is compared with a specific numerical value or character string, the extracted index parameter is compared with another extracted index parameter, and the result of the operation of the extracted index parameter and the numerical value and the result of the operation of another extracted index parameter and the numerical value are compared.
6. The method for automatically determining an electric power design index according to claim 5,
the digital comparison rule also comprises an operation operator which is divided into a character string operator and a digital operator;
the string-like operators include equal and unequal; the numeric class operators include greater than, greater than or equal to, less than or equal to.
7. The method of claim 2, wherein the obtaining engineering project data and performing index parameter extraction on the engineering project data comprises:
and extracting the basic information of the engineering project data according to the extraction rule, wherein the extraction rule comprises a predefined index code, an index name, an index type and an extraction field.
8. The method of claim 2, wherein the obtaining engineering project data and performing index parameter extraction on the engineering project data comprises:
and analyzing and extracting the uploaded accessories of the engineering project data according to the extraction rule, wherein the extraction rule comprises a predefined index code, an index name, an index type, an extracted accessory type and an index position in the accessory.
9. An electric power design index automatic determination device, characterized by comprising a memory and a processor, the memory being connected to the processor, the memory storing a computer program that, when executed by the processor, implements the method of any one of claims 1-8.
10. A computer-readable storage medium, characterized in that a computer program is stored which, when executed, implements the method of any one of claims 1-8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110446683.3A CN112950176A (en) | 2021-04-23 | 2021-04-23 | Method, apparatus and storage medium for automatically determining power design index |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110446683.3A CN112950176A (en) | 2021-04-23 | 2021-04-23 | Method, apparatus and storage medium for automatically determining power design index |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112950176A true CN112950176A (en) | 2021-06-11 |
Family
ID=76233443
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110446683.3A Pending CN112950176A (en) | 2021-04-23 | 2021-04-23 | Method, apparatus and storage medium for automatically determining power design index |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112950176A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116384939A (en) * | 2023-04-13 | 2023-07-04 | 华腾建信科技有限公司 | Engineering project safety management method, device, equipment and storage medium |
CN116797405A (en) * | 2023-06-29 | 2023-09-22 | 华腾建信科技有限公司 | Engineering data processing method and system based on data intercommunication of participating parties |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040243968A1 (en) * | 2003-05-27 | 2004-12-02 | Sun Microsystems, Inc. | System and method for software methodology evaluation and selection |
CN104299099A (en) * | 2014-10-21 | 2015-01-21 | 国网福建省电力有限公司经济技术研究院 | Electric power engineering design review and technical economy review information system |
CN110941910A (en) * | 2019-12-03 | 2020-03-31 | 国网江苏省电力有限公司 | Intelligent auxiliary method and system for power grid three-dimensional design review |
CN112381458A (en) * | 2020-12-08 | 2021-02-19 | 平安国际智慧城市科技股份有限公司 | Project evaluation method, project evaluation device, equipment and storage medium |
-
2021
- 2021-04-23 CN CN202110446683.3A patent/CN112950176A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040243968A1 (en) * | 2003-05-27 | 2004-12-02 | Sun Microsystems, Inc. | System and method for software methodology evaluation and selection |
CN104299099A (en) * | 2014-10-21 | 2015-01-21 | 国网福建省电力有限公司经济技术研究院 | Electric power engineering design review and technical economy review information system |
CN110941910A (en) * | 2019-12-03 | 2020-03-31 | 国网江苏省电力有限公司 | Intelligent auxiliary method and system for power grid three-dimensional design review |
CN112381458A (en) * | 2020-12-08 | 2021-02-19 | 平安国际智慧城市科技股份有限公司 | Project evaluation method, project evaluation device, equipment and storage medium |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116384939A (en) * | 2023-04-13 | 2023-07-04 | 华腾建信科技有限公司 | Engineering project safety management method, device, equipment and storage medium |
CN116384939B (en) * | 2023-04-13 | 2023-12-01 | 华腾建信科技有限公司 | Engineering project safety management method, device, equipment and storage medium |
CN116797405A (en) * | 2023-06-29 | 2023-09-22 | 华腾建信科技有限公司 | Engineering data processing method and system based on data intercommunication of participating parties |
CN116797405B (en) * | 2023-06-29 | 2023-12-19 | 华腾建信科技有限公司 | Engineering data processing method and system based on data intercommunication of participating parties |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112950176A (en) | Method, apparatus and storage medium for automatically determining power design index | |
CN109508352B (en) | Report data output method, device, equipment and storage medium | |
WO2008019832A1 (en) | Improved monte carlo simulation and display of results thereof | |
WO2019085095A1 (en) | Intelligent voice prompting method and apparatus, electronic device, and medium | |
CN111291025B (en) | Method for supporting multi-physical model conversion by logic model and storage device | |
CN111523815A (en) | Power grid engineering review method and device, electronic equipment and storage medium | |
CN113535931B (en) | Information processing method and device, electronic equipment and storage medium | |
CN115329556A (en) | Transformer substation CAD drawing auditing method and device | |
CN112786124B (en) | Problem troubleshooting method and device, storage medium and equipment | |
CN112486384B (en) | Picture examination processing method and related device | |
CN105608151A (en) | Financial statement analysis device and method | |
US8843818B2 (en) | Field correlation method and system, and program thereof | |
CN110796381A (en) | Method and device for processing evaluation indexes of modeling data, terminal equipment and medium | |
CN114943219A (en) | Method, device and equipment for generating bill of material test data and storage medium | |
Law et al. | Expertfit: total support for simulation input modeling | |
CN111488327B (en) | Data standard management method and system | |
CN112131841A (en) | Document quality evaluation method and system | |
CN115248970A (en) | Parameterized drawing frame construction method for AutoCAD | |
WO2020248506A1 (en) | Evaluation method and device for application program testing, and server and storage medium | |
CN112560952A (en) | Supplier assessment method and device, electronic equipment and storage medium | |
CN110020401B (en) | Method, device and equipment for calculating curve integral of arc length and storage medium | |
CN110647454A (en) | Method and device for determining system user access information | |
CN105095531B (en) | The implementation method and device of device analysis | |
CN116629980B (en) | Pricing method of software engineering, terminal equipment and storage medium | |
CN111858732B (en) | Data fusion method and terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210611 |