CN112926939A - Intelligent system integration platform based on BIM integrated management service - Google Patents
Intelligent system integration platform based on BIM integrated management service Download PDFInfo
- Publication number
- CN112926939A CN112926939A CN202110232541.7A CN202110232541A CN112926939A CN 112926939 A CN112926939 A CN 112926939A CN 202110232541 A CN202110232541 A CN 202110232541A CN 112926939 A CN112926939 A CN 112926939A
- Authority
- CN
- China
- Prior art keywords
- unit
- information
- information elements
- integrated management
- management service
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000010354 integration Effects 0.000 title claims abstract description 31
- 238000007726 management method Methods 0.000 description 11
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/245—Query processing
- G06F16/2457—Query processing with adaptation to user needs
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The invention relates to the technical field of integrated management, in particular to an intelligent system integration platform based on BIM integrated management service, which consists of a collection unit, a disassembly unit, a classification unit, a storage unit, a calling unit and an integration unit, wherein a user inputs working information into the platform firstly; the system is disassembled into single information elements through a system disassembling unit, and attribute definition is carried out on each information element; then, classifying, collecting and storing the information elements with different attributes through a classifying unit; finally, when the user needs to call the information, the information elements corresponding to the attributes are extracted through the calling unit, and are reasonably spliced into the information through the integration unit and the result is output.
Description
Technical Field
The invention relates to the technical field of integrated management, in particular to an intelligent system integration platform based on BIM integrated management service.
Background
BIM is based on various relevant information data of construction engineering projects, and functions of project supervision, property management, equipment management, digital processing, engineering management and the like are realized through a three-dimensional building model. The method has eight characteristics of information completeness, information relevance, information consistency, visualization, coordination, simulation, optimization and graphing.
In the existing information integration platform, each user can only call out the resource information of the department to which the user belongs, and the information exchange of each user is troublesome due to the lack of automatic planning management, so that the use efficiency of the integration platform is not high.
Disclosure of Invention
The invention aims to solve the defect that the BIM intelligent system integration platform in the prior art is low in use efficiency, and provides an intelligent system integration platform based on BIM comprehensive management service.
In order to achieve the purpose, the invention adopts the following technical scheme:
an intelligent system integration platform based on BIM integrated management service is composed of a collecting unit, a disassembling unit, a classifying unit, a storage unit, a calling unit and an integrating unit, wherein a platform user inputs own working content into a system through the collecting unit; then, the working content is disassembled into single information elements through a disassembling unit of the system, and attribute definition is carried out on each information element; then, classifying and collecting the information elements with different attributes through a classifying unit, and storing the information elements in a single chip microcomputer storage center of the integrated platform; finally, when the user needs to call the information, the information elements corresponding to the attributes are extracted through the call unit, reasonably spliced into the information through the integration unit and output the result.
Preferably, the collecting unit sequentially transmits the various collected information to the disassembling unit according to priority.
Preferably, the classifying unit sets the decomposed information elements at the bottom of the tower and the information elements at the top of the tower according to a pyramid structure, and performs attribute definition on the sorted information elements, and divides a plurality of identical information element storage areas in each hierarchy of the pyramid according to different attributes.
Preferably, the sorted information elements are stored in the singlechip database in order through the storage unit.
Preferably, when the information needs to be called, the information elements of each layer are sequentially called from bottom to top according to the retrieval needs, the structural needs of the pyramid and the information attributes.
Preferably, the integrated unit is used for re-assembling and combining the extracted information elements to finally form the required information and output the information.
Preferably, the information assembled in the second time is finally displayed through a display device.
The invention has the beneficial effects that: through the platform that this scheme provided, solved the not high problem of availability factor of BIM intelligent system integration platform, this application platform's proposition, each side user can easily be transferred the information that needs according to the use needs of self, makes things convenient for the execution of work, and exchange between each side collaborator is more convenient, and the contact is inseparable, finally can promote this BIM integration platform's availability factor greatly.
Drawings
Fig. 1 is a system diagram of an intelligent system integration platform based on BIM integrated management service according to the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In this embodiment, referring to fig. 1, an intelligent system integration platform based on BIM integrated management service is composed of a collection unit, a disassembly unit, a classification unit, a storage unit, a retrieval unit, and an integration unit, and a platform user inputs his/her work content into the system through the collection unit; then, the working content is disassembled into single information elements through a disassembling unit of the system, and attribute definition is carried out on each information element; then, classifying and collecting the information elements with different attributes through a classifying unit, and storing the information elements in a single chip microcomputer storage center of the integrated platform; finally, when the user needs to call the information, the information elements corresponding to the attributes are extracted through the call unit, reasonably spliced into the information through the integration unit and output the result.
The collecting unit sequentially transmits various collected information to the disassembling unit according to priority, the classifying unit arranges the most basic information element at the bottom of the tower and the most advanced information at the top of the tower according to the pyramid structure, and the classification unit will perform attribute definition on the information elements in the sequence, according to different attributes, a plurality of same information element storage areas are distinguished in each hierarchy of the pyramid, the classified information elements are orderly stored in the singlechip database through the storage unit, when the information is required to be called, the information elements of each layer are called from bottom to top in sequence according to the retrieval requirement, the structure requirement of the pyramid and the information attribute, the integrated unit is used for re-assembling and combining the information elements which are taken out after modulation, and the information which is formed by secondary assembling is finally displayed through the display equipment.
The specific working principle is as follows: each working department uploads part of working data of the working department to the platform through the collection unit; the information is disassembled into a most basic information element by utilizing a disassembling unit of the integrated platform; then, the information elements are classified through a classification unit of the integration platform, before the information elements are classified, the attribute of each information element is defined, and after the information elements are classified, the attribute definition of a set of each information element is required, so that the information element set can be stored in each hierarchy of a pyramid of the storage unit in a reasonable form; when a certain department needs to call data, the department needs to position the appointed information element set of the pyramid by using the information attribute, and calls the appointed information element by using the information element attribute; when all the required information elements are called out, the information elements are assembled into complete information through the integration unit and then output.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.
Claims (7)
1. An intelligent system integration platform based on BIM integrated management service is characterized in that the integration platform consists of a collection unit, a disassembly unit, a classification unit, a storage unit, a calling unit and an integration unit, and a platform user inputs own working content into a system through the collection unit; then, the working content is disassembled into single information elements through a disassembling unit of the system, and attribute definition is carried out on each information element; then, classifying and collecting the information elements with different attributes through a classifying unit, and storing the information elements in a single chip microcomputer storage center of the integrated platform; finally, when the user needs to call the information, the information elements corresponding to the attributes are extracted through the call unit, reasonably spliced into the information through the integration unit and output the result.
2. The BIM integrated management service-based intelligent system integration platform of claim 1, wherein the collection unit sequentially transmits various collected information to the dismantling unit according to priority.
3. The BIM integrated management service-based intelligent system integration platform as claimed in claim 2, wherein the classification unit sets the disassembled information elements at the bottom of the tower and the highest level information at the top of the tower according to a pyramid structure, and performs attribute definition on the sorted information elements, and distinguishes a plurality of same information element storage areas at each level of the pyramid according to different attributes.
4. The BIM integrated management service-based intelligent system integration platform as claimed in claim 1, wherein the classified information elements are sequentially stored in the single chip microcomputer database through the storage unit.
5. The BIM integrated management service-based intelligent system integration platform of claim 1, wherein when information is required to be retrieved, information elements of each layer are sequentially retrieved from bottom to top according to retrieval requirements, structural requirements of a pyramid and information attributes.
6. The BIM integrated management service-based intelligent system integration platform of claim 5, wherein the integration unit is used for re-assembling and combining the extracted information elements.
7. The BIM integrated management service-based intelligent system integration platform of claim 6, wherein the information obtained by secondary assembly is finally displayed through a display device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110232541.7A CN112926939A (en) | 2021-03-03 | 2021-03-03 | Intelligent system integration platform based on BIM integrated management service |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110232541.7A CN112926939A (en) | 2021-03-03 | 2021-03-03 | Intelligent system integration platform based on BIM integrated management service |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112926939A true CN112926939A (en) | 2021-06-08 |
Family
ID=76173104
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110232541.7A Pending CN112926939A (en) | 2021-03-03 | 2021-03-03 | Intelligent system integration platform based on BIM integrated management service |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112926939A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110307281A1 (en) * | 2010-06-11 | 2011-12-15 | Satterfield & Pontikes Construction, Inc. | Model inventory manager |
CN108615143A (en) * | 2018-06-12 | 2018-10-02 | 湖南建工集团有限公司 | Device and method based on BIM models Yu O&M information exchange in intelligent building management |
CN111968017A (en) * | 2020-09-03 | 2020-11-20 | 厦门城市职业学院(厦门市广播电视大学) | College scientific research management information sharing system |
-
2021
- 2021-03-03 CN CN202110232541.7A patent/CN112926939A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110307281A1 (en) * | 2010-06-11 | 2011-12-15 | Satterfield & Pontikes Construction, Inc. | Model inventory manager |
CN108615143A (en) * | 2018-06-12 | 2018-10-02 | 湖南建工集团有限公司 | Device and method based on BIM models Yu O&M information exchange in intelligent building management |
CN111968017A (en) * | 2020-09-03 | 2020-11-20 | 厦门城市职业学院(厦门市广播电视大学) | College scientific research management information sharing system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107402976B (en) | Power grid multi-source data fusion method and system based on multi-element heterogeneous model | |
CN105045820B (en) | Method for processing video image information of high-level data and database system | |
CN107506393B (en) | Agricultural big data model and application thereof in agriculture | |
CN108446293A (en) | A method of based on urban multi-source isomeric data structure city portrait | |
CN107945086A (en) | A kind of big data resource management system applied to smart city | |
CN101599146A (en) | A kind of management method of die manufacturing information and system | |
CN109214068A (en) | Bottom assembled architecture information extracting method based on BIM | |
CN105045869A (en) | Multi-data center based natural resource geospatial data organization method and system | |
CN101826100A (en) | Automatic integrated system and method of wide area network (WAN)-oriented multisource emergency information | |
CN112182077B (en) | Intelligent operation and maintenance system based on data middling platform technology | |
CN102855332A (en) | Graphic configuration management database based on graphic database | |
CN112540975B (en) | Multi-source heterogeneous data quality detection method and system based on petri net | |
CN113642299A (en) | One-key generation method based on power grid statistical form | |
CN110287508A (en) | A kind of visualization emerging system of multi-source D Urban model | |
CN111861825A (en) | Construction method and system of rail transit industry vocational training system model | |
CN114707948A (en) | Management method, device and storage medium for large surveying and mapping production project | |
CN111784192A (en) | Industrial park emergency plan executable system based on dynamic evolution | |
CN114218291A (en) | Portrait generation method, apparatus, device and storage medium based on target object | |
CN105574204B (en) | Retrieval method and system for distributed power grid regulation and control operation data | |
CN117151424A (en) | Artificial intelligence power scheduling decision-making system based on big data | |
CN112926939A (en) | Intelligent system integration platform based on BIM integrated management service | |
CN111581302A (en) | Decision-making assisting system based on data warehouse | |
CN112241428A (en) | Digital decision-making method and system | |
CN109657958B (en) | Modeling method of digital information system and digital information system | |
CN113807573A (en) | Construction prediction analysis method and system based on data management and three-dimensional search |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210608 |
|
RJ01 | Rejection of invention patent application after publication |