CN112925511A - Big data-based software development scheme generation method and system - Google Patents
Big data-based software development scheme generation method and system Download PDFInfo
- Publication number
- CN112925511A CN112925511A CN202110265795.9A CN202110265795A CN112925511A CN 112925511 A CN112925511 A CN 112925511A CN 202110265795 A CN202110265795 A CN 202110265795A CN 112925511 A CN112925511 A CN 112925511A
- Authority
- CN
- China
- Prior art keywords
- data
- unit
- output end
- input end
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/20—Software design
- G06F8/24—Object-oriented
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/30—Creation or generation of source code
- G06F8/33—Intelligent editors
Abstract
The invention discloses a method for generating a software development scheme based on big data, which specifically comprises the following steps: s1, the data acquisition unit transmits the data to the storage unit through the wireless communication module; s2: the data filtering module filters the data, the judging module detects and judges the data, and the central processing unit controls the classifying unit to classify the data; s3: analyzing the software requirement through an analysis unit, and writing the required software requirement into command language data; s4: performing test operation through an operation module; s5: the analysis unit monitors the operation effect of the operation module on the command language data until the scheme is generated. The invention improves the accuracy of the acquired data, and is beneficial to the subsequent accurate analysis; the final analysis result is more accurate, accurate software requirements can be obtained, the analysis unit can monitor the operation effect of the operation module on the command language data, and the scheme generation efficiency is improved.
Description
Technical Field
The invention belongs to the technical field of generation of software development schemes, and particularly relates to a method and a system for generating a software development scheme based on big data.
Background
The existing software development process is mainly to determine a scheme according to the ground according to the requirements of customers, and then develop a corresponding module according to the date and the personnel composition of a project, the specific process of the project and the like. In the process of main software development, the software development method is an important factor related to success or failure of software development. However, in the early stage, data collection is not in place, and customer requirements cannot be accurately analyzed based on big data, so that an accurate software development scheme cannot be obtained, and the software development efficiency is reduced.
Disclosure of Invention
The invention aims to provide a method and a system for generating a software development scheme based on big data, so as to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a method for generating a software development scheme based on big data specifically comprises the following steps:
s1, the data acquisition unit acquires data stored in the cloud service platform, and then the data are transmitted to the storage unit through the wireless communication module;
s2: the data filtering module extracts the data stored in the storage unit and filters the data, the judging module detects and judges the filtered data, and the central processing unit controls the classifying unit to classify the filtered data after the data are filtered;
s3: analyzing the software requirement through an analysis unit, writing the required software requirement into command language data, inputting the command language data into a program chip, and storing the command language data through a storage unit;
s4: transmitting the command language data stored in the storage unit to the central processing unit, starting the operation module when the central processing unit receives the command language data, and performing trial operation through the operation module;
s5: and the analysis unit monitors the operation effect of the operation module on the command language data, judges that the scheme is generated if the software requirement can be met, and repeats the steps S3, S4 and S5 until the scheme is generated if the software requirement cannot be met.
Preferably, after the data is classified in step S2, the detection unit is further required to determine whether each classified data is complete, and the data processing unit is further required to process the incomplete data until the data has integrity.
Preferably, after the detecting unit determines that each classified data is complete, the scheme managing unit calls different analysis rules, and then the weight distributing unit distributes the weights to the data of different classifications under the classification based on the analysis rules.
Preferably, the cloud service platform needs to log in through the internet, an identity card and a fixed password are logged in a login mode, and keywords input after logging in are intelligently screened to obtain corresponding data.
A generation system of a generation method of a software development scheme based on big data comprises the following steps:
the input end of the data acquisition unit is connected to the output end of the cloud service platform, the output end of the data acquisition unit is connected to the input end of the wireless communication unit, the output end of the wireless communication unit is connected to the input end of the storage unit, and the output end of the storage unit is connected to the input end of the data filtering module;
the output end of the data filtering module is connected with the input end of the judging module, the output end of the judging module is connected with the input end of the central processing unit, and the output end of the central processing unit is respectively connected with the input ends of the classifying unit and the operation module;
the output end of the analysis unit is respectively connected with the output ends of the central processing unit and the program chip, and the input end of the analysis unit is connected with the output ends of the scheme management unit, the weight distribution unit and the operation module;
the input end of the scheme management unit is connected to the output end of the detection unit, the input end of the detection unit is connected to the output end of the classification unit, and the detection unit is in bidirectional connection with the data processing unit.
The output end of the program chip is connected with the input end of the storage unit, and the output end of the storage unit is also connected with the input end of the central processing unit.
Compared with the prior art, the invention has the beneficial effects that: according to the method and the system for generating the software development scheme based on the big data, the data are processed more comprehensively, so that the accuracy of the acquired data is improved, and the subsequent accurate analysis is facilitated; by carrying out weight distribution on the data of different classifications, the final analysis result is more accurate, accurate software requirements can be obtained, the method is favorable for compiling the required software requirements into command language data and then running the command language data more accurately, and meanwhile, the analysis unit can monitor the running effect of the running module on the command language data, so that whether the scheme can meet the software requirements or not can be judged, and the scheme generation efficiency is improved.
Drawings
FIG. 1 is a schematic diagram of the system of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the embodiment is as follows: a method for generating a software development scheme based on big data specifically comprises the following steps:
s1, the data acquisition unit acquires data stored in the cloud service platform, and then the data are transmitted to the storage unit through the wireless communication module;
s2: the data filtering module extracts the data stored in the storage unit and filters the data, the judging module detects and judges the filtered data, and the central processing unit controls the classifying unit to classify the filtered data after the data are filtered;
s3: analyzing the software requirement through an analysis unit, writing the required software requirement into command language data, inputting the command language data into a program chip, and storing the command language data through a storage unit;
s4: transmitting the command language data stored in the storage unit to the central processing unit, starting the operation module when the central processing unit receives the command language data, and performing trial operation through the operation module;
s5: and the analysis unit monitors the operation effect of the operation module on the command language data, judges that the scheme is generated if the software requirement can be met, and repeats the steps S3, S4 and S5 until the scheme is generated if the software requirement cannot be met.
Specifically, after the data is classified in step S2, the detection unit is further required to determine whether each classified data is complete, and the data processing unit processes the incomplete data until the data has integrity.
Specifically, after the detection unit judges that each classified data is complete, different analysis rules are called through the scheme management unit, and then based on the analysis rules, the weight distribution unit is used for carrying out weight distribution on the data of different classifications under the classification.
Specifically, the cloud service platform needs to log in through the internet, an identity card and a fixed password are used for logging in, and keywords input after logging in are intelligently screened to obtain corresponding data.
A generation system of a generation method of a software development scheme based on big data comprises the following steps:
the input end of the data acquisition unit is connected to the output end of the cloud service platform, the output end of the data acquisition unit is connected to the input end of the wireless communication unit, the output end of the wireless communication unit is connected to the input end of the storage unit, and the output end of the storage unit is connected to the input end of the data filtering module;
the output end of the data filtering module is connected with the input end of the judging module, the output end of the judging module is connected with the input end of the central processing unit, and the output end of the central processing unit is respectively connected with the input ends of the classifying unit and the operation module;
the output end of the analysis unit is respectively connected with the output ends of the central processing unit and the program chip, and the input end of the analysis unit is connected with the output ends of the scheme management unit, the weight distribution unit and the operation module;
the input end of the scheme management unit is connected to the output end of the detection unit, the input end of the detection unit is connected to the output end of the classification unit, and the detection unit is in bidirectional connection with the data processing unit.
The output end of the program chip is connected with the input end of the storage unit, and the output end of the storage unit is also connected with the input end of the central processing unit.
In conclusion, compared with the prior art, the method has the advantages that the data are processed more comprehensively, so that the accuracy of the acquired data is improved, and the subsequent accurate analysis is facilitated; by carrying out weight distribution on the data of different classifications, the final analysis result is more accurate, accurate software requirements can be obtained, the method is favorable for compiling the required software requirements into command language data and then running the command language data more accurately, and meanwhile, the analysis unit can monitor the running effect of the running module on the command language data, so that whether the scheme can meet the software requirements or not can be judged, and the scheme generation efficiency is improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.
Claims (5)
1. A generation method of a software development scheme based on big data is characterized in that: the method specifically comprises the following steps:
s1, the data acquisition unit acquires data stored in the cloud service platform, and then the data are transmitted to the storage unit through the wireless communication module;
s2: the data filtering module extracts the data stored in the storage unit and filters the data, the judging module detects and judges the filtered data, and the central processing unit controls the classifying unit to classify the filtered data after the data are filtered;
s3: analyzing the software requirement through an analysis unit, writing the required software requirement into command language data, inputting the command language data into a program chip, and storing the command language data through a storage unit;
s4: transmitting the command language data stored in the storage unit to the central processing unit, starting the operation module when the central processing unit receives the command language data, and performing trial operation through the operation module;
s5: and the analysis unit monitors the operation effect of the operation module on the command language data, judges that the scheme is generated if the software requirement can be met, and repeats the steps S3, S4 and S5 until the scheme is generated if the software requirement cannot be met.
2. The method for generating a big data-based software development scheme according to claim 1, wherein: after the data is classified in step S2, the detection unit is further required to determine whether each classified data is complete, and the data processing unit processes the incomplete data until the data has integrity.
3. The method for generating a big data-based software development scheme according to claim 2, wherein: after the detection unit judges that the classified data are complete, different analysis rules are called through the scheme management unit, and then based on the analysis rules, the weight distribution unit is used for carrying out weight distribution on the classified data.
4. The method for generating a big data-based software development scheme according to claim 1, wherein: the cloud service platform needs to log in through the Internet, an identity card and a fixed password are used for logging in a logging mode, and keywords which can be input after logging in are intelligently screened to obtain corresponding data.
5. A generation system of the big data based software development scheme generation method according to claim 1, comprising:
the input end of the data acquisition unit is connected to the output end of the cloud service platform, the output end of the data acquisition unit is connected to the input end of the wireless communication unit, the output end of the wireless communication unit is connected to the input end of the storage unit, and the output end of the storage unit is connected to the input end of the data filtering module;
the output end of the data filtering module is connected with the input end of the judging module, the output end of the judging module is connected with the input end of the central processing unit, and the output end of the central processing unit is respectively connected with the input ends of the classifying unit and the operation module;
the output end of the analysis unit is respectively connected with the output ends of the central processing unit and the program chip, and the input end of the analysis unit is connected with the output ends of the scheme management unit, the weight distribution unit and the operation module;
the input end of the scheme management unit is connected with the output end of the detection unit, the input end of the detection unit is connected with the output end of the classification unit, and the detection unit is bidirectionally connected with the data processing unit;
the output end of the program chip is connected with the input end of the storage unit, and the output end of the storage unit is also connected with the input end of the central processing unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110265795.9A CN112925511A (en) | 2021-03-11 | 2021-03-11 | Big data-based software development scheme generation method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110265795.9A CN112925511A (en) | 2021-03-11 | 2021-03-11 | Big data-based software development scheme generation method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112925511A true CN112925511A (en) | 2021-06-08 |
Family
ID=76172664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110265795.9A Pending CN112925511A (en) | 2021-03-11 | 2021-03-11 | Big data-based software development scheme generation method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112925511A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105975282A (en) * | 2016-05-28 | 2016-09-28 | 徐志勇 | Software development system based on big data platform |
CN108762734A (en) * | 2018-06-19 | 2018-11-06 | 驿涛科技股份有限公司 | A kind of generation method and system of the software development scheme based on big data |
CN110007905A (en) * | 2019-04-17 | 2019-07-12 | 安徽省希灵科技服务有限公司 | A kind of generation method and system of the software development scheme based on big data |
CN110851365A (en) * | 2019-11-13 | 2020-02-28 | 苏州捷凯信息科技有限公司 | Software development cloud platform based on big data |
JP2020091860A (en) * | 2018-12-07 | 2020-06-11 | 株式会社トゥービーソフトTobesoft Co., Ltd. | Device and method for providing software development service |
-
2021
- 2021-03-11 CN CN202110265795.9A patent/CN112925511A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105975282A (en) * | 2016-05-28 | 2016-09-28 | 徐志勇 | Software development system based on big data platform |
CN108762734A (en) * | 2018-06-19 | 2018-11-06 | 驿涛科技股份有限公司 | A kind of generation method and system of the software development scheme based on big data |
JP2020091860A (en) * | 2018-12-07 | 2020-06-11 | 株式会社トゥービーソフトTobesoft Co., Ltd. | Device and method for providing software development service |
CN110007905A (en) * | 2019-04-17 | 2019-07-12 | 安徽省希灵科技服务有限公司 | A kind of generation method and system of the software development scheme based on big data |
CN110851365A (en) * | 2019-11-13 | 2020-02-28 | 苏州捷凯信息科技有限公司 | Software development cloud platform based on big data |
Non-Patent Citations (1)
Title |
---|
黄玲: "基于大数据环境软件工程专业课程建设的协同创新研究", 《电脑知识与技术》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106209405B (en) | Method for diagnosing faults and device | |
CN110852894A (en) | Insurance underwriting method and device, computer storage medium and electronic equipment | |
CN112052109B (en) | Cloud service platform event anomaly detection method based on log analysis | |
CN111557011A (en) | Enterprise yield-breaking prediction system and operation method thereof | |
CN108108445A (en) | A kind of data intelligence processing method and system | |
CN106897779A (en) | A kind of processing method of data center's operational system event | |
CN114880312B (en) | Flexibly-set application system service data auditing method | |
CN115982012A (en) | Evaluation model and method for interface management capability maturity | |
CN117112336B (en) | Intelligent communication equipment abnormality detection method, equipment, storage medium and device | |
CN111899138A (en) | Teaching behavior analysis system and method based on big data | |
CN109766239A (en) | Log output control method, system and computer readable storage medium | |
CN116561542B (en) | Model optimization training system, method and related device | |
CN112925511A (en) | Big data-based software development scheme generation method and system | |
CN116452154A (en) | Project management system suitable for communication operators | |
CN109558887A (en) | A kind of method and apparatus of predictive behavior | |
CN106610964A (en) | Abnormal reimbursement data analysis method and server | |
CN115952098A (en) | Performance test tuning scheme recommendation method and system | |
CN106547913B (en) | Page information collection and classification feedback method, device and system | |
US20060253336A1 (en) | Data collection system and method | |
CN109542414A (en) | A kind of autonomous compiling system of volume production software | |
CN111858291B (en) | Root cause determination method, equipment and system for data abnormity in charging system migration test | |
CN112749990B (en) | Data analysis method and system based on tourist identity | |
KR102529653B1 (en) | System and method for segmentating obstacle type of ami device based on artificial intelligence | |
CN116257404A (en) | Log analysis method and computing device | |
CN117634878A (en) | Business risk processing method and device, electronic equipment and medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |