CN112921984A - Foundation pit supporting device for railway engineering - Google Patents

Foundation pit supporting device for railway engineering Download PDF

Info

Publication number
CN112921984A
CN112921984A CN202110141167.XA CN202110141167A CN112921984A CN 112921984 A CN112921984 A CN 112921984A CN 202110141167 A CN202110141167 A CN 202110141167A CN 112921984 A CN112921984 A CN 112921984A
Authority
CN
China
Prior art keywords
sheath
supporting
supporting sheath
fixedly connected
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110141167.XA
Other languages
Chinese (zh)
Other versions
CN112921984B (en
Inventor
王茂龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110141167.XA priority Critical patent/CN112921984B/en
Publication of CN112921984A publication Critical patent/CN112921984A/en
Application granted granted Critical
Publication of CN112921984B publication Critical patent/CN112921984B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)
  • Housings And Mounting Of Transformers (AREA)

Abstract

The invention discloses a foundation pit supporting device for railway engineering, which relates to the field of railway construction and comprises a base, wherein the top end of the base is connected with a lower supporting sheath, the top of the lower supporting sheath is connected with a middle supporting sheath, the middle supporting sheath is sleeved with a plurality of sequentially connected supporting sheaths, the top of the middle supporting sheath positioned at the top is connected with an upper supporting sheath, four sides of the top of the upper supporting sheath are provided with top placing grooves, a lifting moving mechanism is arranged in the base, and a partition device is arranged in an isolation sleeve. The device has strong flexibility and is convenient to use.

Description

Foundation pit supporting device for railway engineering
Technical Field
The invention relates to the field of railway construction, in particular to a foundation pit supporting device for railway engineering.
Background
In railway engineering, a foundation pit is often used, and the foundation pit inevitably causes deformation of surrounding soil bodies in the excavation process, so that surrounding buildings and underground pipelines are affected. The normal use or safety of the foundation pit is seriously threatened, and in order to avoid the condition, a supporting system is added in the deep foundation design and pit construction to stabilize the safety of the foundation pit.
Along with the continuous development of building trade, different types of excavation supporting devices have appeared in the market, and the excavation is strutted to the mode of strutting that often adopts campshed, campshed with the stock or through cast in situ reinforced concrete supporting construction at present, and this kind of mode has following problem in the use: the existing foundation pit supporting device generally adopts the modes of screws or welding and the like to fix all the supporting rods, so that the installation is complicated, the construction period is long, and the fixing effect is poor. When the project is finished, all parts cannot be recycled, and the parts cannot be reused, so that resource waste is caused.
Therefore, in chinese utility model patent document with publication number CN211113660U, a foundation pit supporting device for railway engineering is disclosed, the device is through installing the stand, the crossbeam, the right dead lever, the left dead lever, first locating piece and second locating piece use of mutually supporting, replace traditional screw and welded fastening with similar tenon fourth of the twelve earthly branches structure fixed method, through the tip installation carrying handle at first locating piece, be convenient for dismantle the installation to whole device, can recycle, but also have certain defect, because it is great to strut pressure of receiving, the device is higher to the kind and the characteristic restriction of supporting material, and with high costs, and receive external environment factor's influence easily and cause supporting structure's not hard up, consequently, have many weak points, treat near-step improvement.
Disclosure of Invention
The invention provides a foundation pit supporting device for railway engineering, which solves the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides a foundation ditch supporting device for railway engineering, which comprises a base, the top of base is connected with down the sheath, the sheath is propped in the middle of the top connection of sheath down, the middle sheath of strutting is equipped with a plurality ofly and connects gradually, the top that is located the middle sheath of the top is connected with the upper sheath, the top standing groove has all been seted up to four sides in the top of upper sheath, the collateral branch pillar has been placed on the top standing groove, be equipped with lift moving mechanism in the base, go up between sheath and the middle sheath of propping up, between middle sheath and the middle sheath of propping up, it all is equipped with the spacer sleeve to go up between sheath and the lower sheath, be equipped with cut-off device in the spacer sleeve, go up the outside between sheath and the middle sheath of propping up, the outside between sheath and the lower sheath.
As a preferred technical solution of the present invention, the quick connection device includes a first upper plug bush fixedly disposed at the lower portion of the outer side of the upper branch sheath and the middle branch sheath, and a first lower plug bush fixedly disposed at the upper portion of the outer side of the middle branch sheath and the lower branch sheath, a first plug rod is inserted into the first upper plug bush and the corresponding first lower plug bush, and the top end of the first plug rod is fixedly connected to the first top cap.
As a preferred technical scheme of the present invention, the top end of the base is fixedly connected with a plurality of second lower plug bushes, the lower side of the exterior of the lower protective sleeve is fixedly connected with second upper plug bushes corresponding to the second lower plug bushes, a second plug rod is inserted between the second upper plug bushes and the second lower plug bushes, and the top end of the second plug rod is fixedly connected with a second top cap.
As a preferred technical scheme, the partition device comprises a closed groove transversely formed in the isolation sleeve, the closed groove penetrates through one side of the isolation sleeve, an isolation inserting plate is connected in the closed groove in a sliding mode, one side, located outside the closed groove, of the isolation inserting plate is fixedly connected with the handle, and a plurality of communication holes are formed in the isolation sleeve in a vertically penetrating mode, and the closed groove is communicated with the communication holes.
As a preferable technical scheme of the invention, three sides of the isolation sleeve are vertically penetrated and provided with side discharge grooves which are communicated with the closed groove, the top end and the bottom end of the isolation sleeve are fixedly connected with square insertion plates, and the bottom end of the upper supporting sheath, the top end and the bottom end of the middle supporting sheath and the top end of the lower supporting sheath are provided with square insertion grooves corresponding to the square insertion plates.
As a preferable technical scheme, the lifting moving mechanism comprises an inner cavity arranged in the base, an installation frame is arranged at the bottom end in the inner cavity, the bottom end of the installation frame is rotatably connected with a plurality of moving wheels, a lifting block is fixedly connected to the center of the top end of the installation frame, the top end of the lifting block is rotatably connected with a connecting rod, one end, far away from the lifting block, of the connecting rod is rotatably connected with a rotating head, the rotating head is rotatably connected with a screw rod, the screw rod penetrates through the base and is fixedly connected with a rotating handle, and the screw rod is in.
As a preferable technical scheme of the invention, the center of the top of the upper supporting sleeve is fixedly connected with a middle seat, the center of the middle seat is provided with an injection port, and the tops of the side supporting columns are fixedly connected with a plurality of bearing blocks.
The invention has the following advantages: the device can be assembled, molded and supported by arranging the base, the lower support sleeve, the middle support sleeve, the upper support sleeve and the isolation sleeve, can be stably supported by pouring cement, can realize quick separation in the isolation sleeve after the cement is poured by arranging the partition device, is convenient for later-stage disassembly, transportation, recovery and application, can be stably placed or conveniently moved by arranging the lifting moving mechanism, and has stronger flexibility and convenient use.
Drawings
Fig. 1 is a schematic structural view of a foundation pit supporting device for railway engineering.
Fig. 2 is a schematic structural view of a partition device in the foundation pit supporting device for railway engineering.
Fig. 3 is a plan view of an upper support sheath in the foundation pit supporting apparatus for railway work.
Fig. 4 is a schematic structural view of a lifting and moving mechanism in the foundation pit supporting device for railway engineering.
In the figure: 1. a base; 2. a lower protective sleeve; 3. a middle branch sheath; 4. an upper supporting sheath; 5. an isolation sleeve; 6. a partition device; 7. a first lower insert sleeve; 8. a first upper insert sleeve; 9. a first top cap; 10. a first plunger; 11. a second lower plug bush; 12. a second upper plug bush; 13. a second plunger; 14. a second top cap; 15. a top placement groove; 16. side support columns; 17. a pressure-bearing block; 18. a square plugboard; 19. closing the groove; 20. a communicating hole; 21. a discharge-side groove; 22. isolating the plugboard; 23. a handle; 24. a middle seat; 25. an injection port; 26. rotating the handle; 27. a screw; 28. rotating the head; 29. a connecting rod; 30. a lifting block; 31. a mounting frame; 32. the wheel is moved.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
It should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience in describing the present invention and simplifying the description, but do not indicate or imply that the referred devices or elements must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
Example 1
Referring to fig. 1-4, a foundation pit supporting device for railway engineering comprises a base 1, a lower supporting sheath 2 connected to the top end of the base 1, a middle supporting sheath 3 connected to the top end of the lower supporting sheath 2, a plurality of middle supporting sheaths 3 connected in sequence, an upper supporting sheath 4 connected to the top end of the middle supporting sheath 3 positioned at the top, top placing grooves 15 respectively arranged on four sides of the top end of the upper supporting sheath 4, side supporting columns 16 placed on the top placing grooves 15, a lifting moving mechanism arranged in the base 1, isolation sleeves 5 respectively arranged between the upper supporting sheath 4 and the middle supporting sheath 3, between the middle supporting sheath 3 and the middle supporting sheath 3, and between the upper supporting sheath 4 and the lower supporting sheath 2, and a partition device 6 arranged in the isolation sleeves 5, the quick connecting devices are connected to the outer part between the upper supporting sheath 4 and the middle supporting sheath 3, the outer part between the middle supporting sheath 3 and the outer part between the upper supporting sheath 4 and the lower supporting sheath 2.
The quick connecting device comprises a first upper inserting sleeve 8 fixedly arranged on the lower portion of the outer side of an upper supporting sheath 4 and a middle supporting sheath 3 and a first lower inserting sleeve 7 fixedly arranged on the upper portion of the outer side of the middle supporting sheath 3 and the upper portion of the outer side of a lower supporting sheath 2, a first inserting rod 10 is inserted into the first upper inserting sleeve 8 and the corresponding first lower inserting sleeve 7, and the top end of the first inserting rod 10 is fixedly connected with a first top cap 9.
The top end of the base 1 is fixedly connected with a plurality of second lower plug bushes 11, the lower side of the outer portion of the lower protective sleeve 2 is fixedly connected with a second upper plug bush 12 corresponding to the second lower plug bush 11, a second plug rod 13 is inserted between the second upper plug bush 12 and the second lower plug bush 11, and the top end of the second plug rod 13 is fixedly connected with a second top cap 14.
The partition device 6 comprises a closed groove 19 transversely arranged in the isolation sleeve 5, the closed groove 19 penetrates through one side of the isolation sleeve 5, an isolation inserting plate 22 is connected in the closed groove 19 in a sliding mode, the isolation inserting plate 22 is fixedly connected with a handle 23 on one side outside the closed groove 19, and a plurality of communicating holes 20 are vertically formed in the isolation sleeve 5 in a penetrating mode, wherein the closed groove 19 is communicated with the communicating holes 20.
Three sides on the isolating sleeve 5 vertically penetrate through and are provided with side discharge grooves, the side discharge grooves are communicated with a closed groove 19, the top end and the bottom end of the isolating sleeve 5 are fixedly connected with square insertion plates 18, and square insertion grooves corresponding to the square insertion plates 18 are formed in the bottom end of the upper supporting sheath 4, the top end and the bottom end of the middle supporting sheath 3 and the top end of the lower supporting sheath 2.
The middle seat 24 is fixedly connected to the center of the top of the upper supporting sleeve 4, the injection port 25 is formed in the center of the middle seat 24, and the plurality of bearing blocks 17 are fixedly connected to the tops of the side supporting columns 16.
Example 2
Referring to fig. 1 to 4, the other contents of the present embodiment are the same as embodiment 1, except that: lifting movement mechanism is including setting up the inner chamber in base 1, and the bottom in the inner chamber is equipped with mounting bracket 31, and a plurality of removal wheels 32 are connected in the rotation of the bottom of mounting bracket 31, and mounting bracket 31's top central authorities fixed connection elevator 30, and elevator 30's top is rotated and is connected connecting rod 29, and connecting rod 29 keeps away from elevator 30's one end and rotates and connect and rotate head 28, rotates head 28 and rotates connecting screw 27, and screw 27 passes base 1 and fixed connection twist grip 26, screw 27 and base 1 threaded connection.
In the implementation process of the invention, firstly, the device needs to be assembled, a base 1 is arranged on the ground, then a lower supporting sheath 2, a middle supporting sheath 3 and an upper supporting sheath 4 are sequentially assembled from bottom to top, a separation sleeve 5 is arranged between every two adjacent supporting sheaths, after the assembly is finished, the first inserted rod 10 and the second inserted rod 13 are used for realizing the connection among the upper supporting sheath 4, the middle supporting sheath 3 and the lower supporting sheath 2, so that the supporting sheaths form a whole, then concrete is injected downwards from an injection opening 25 on a middle seat 24 so that the lower supporting sheath 2, the middle supporting sheath 3 and the upper supporting sheath 4 are fully filled with the concrete, then the separation inserted plate 22 is inserted into a closed groove 19 to realize the separation among the lower supporting sheath 2, the middle supporting sheath 3 and the upper supporting sheath 4, when the device needs to move, a rotating handle 26 is rotated so as to drive a screw 27 to advance, the pushing link 29 moves the lifting block 30, the mounting bracket 31 and the moving wheel 32 downward, thereby achieving the movement of the device.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. A foundation pit supporting device for railway engineering comprises a base (1), wherein the top end of the base (1) is connected with a lower supporting sheath (2), and is characterized in that the top of the lower supporting sheath (2) is connected with a middle supporting sheath (3), the middle supporting sheath (3) is provided with a plurality of supporting sleeves which are connected in sequence, the top of the middle supporting sheath (3) positioned at the top is connected with an upper supporting sheath (4), four sides of the top of the upper supporting sheath (4) are respectively provided with a top placing groove (15), side supporting columns (16) are placed on the top placing grooves (15), a lifting moving mechanism is arranged in the base (1), a partition device (6) is arranged between the upper supporting sheath (4) and the middle supporting sheath (3), a middle supporting sheath (3) and a middle supporting sheath (3), an isolation sleeve (5) is arranged between the upper supporting sheath (4) and the lower supporting sheath (2), and a partition device (, the outer part between the upper supporting sheath (4) and the middle supporting sheath (3), the outer part between the middle supporting sheath (3) and the outer part between the upper supporting sheath (4) and the lower supporting sheath (2) are all connected with a quick connecting device.
2. The foundation pit supporting device for railway engineering, according to claim 1, wherein the quick connection device comprises a first upper plug bush (8) fixedly arranged at the lower part of the outer side of the upper supporting sheath (4) and the middle supporting sheath (3), and a first lower plug bush (7) fixedly arranged at the upper part of the outer side of the middle supporting sheath (3) and the lower supporting sheath (2), a first plug rod (10) is inserted into the first upper plug bush (8) and the corresponding first lower plug bush (7), and the top end of the first plug rod (10) is fixedly connected with the first top cap (9).
3. The foundation pit supporting device for railway engineering according to claim 2, wherein the top end of the base (1) is fixedly connected with a plurality of second lower plug bushes (11), the outer lower side of the lower support jacket (2) is fixedly connected with second upper plug bushes (12) corresponding to the second lower plug bushes (11), second plug rods (13) are inserted between the second upper plug bushes (12) and the second lower plug bushes (11), and the top ends of the second plug rods (13) are fixedly connected with second top caps (14).
4. The foundation pit supporting device for railway engineering, according to claim 1, wherein the partition device (6) comprises a closed groove (19) transversely formed in the isolation sleeve (5), the closed groove (19) penetrates through one side of the isolation sleeve (5), an isolation inserting plate (22) is connected in the closed groove (19) in a sliding mode, the isolation inserting plate (22) is fixedly connected with a handle (23) on one side outside the closed groove (19), and a plurality of communicating holes (20) are vertically formed in the isolation sleeve (5) in a penetrating mode, and the closed groove (19) is communicated with the communicating holes (20).
5. The foundation pit supporting device for railway engineering as claimed in claim 4, wherein three sides of the isolation sleeve (5) vertically penetrate through and are provided with side discharge grooves, the side discharge grooves are communicated with the closed groove (19), the top end and the bottom end of the isolation sleeve (5) are fixedly connected with a square insertion plate (18), the bottom end of the upper supporting sheath (4), the top end and the bottom end of the middle supporting sheath (3), and the top end of the lower supporting sheath (2) are provided with square insertion grooves corresponding to the square insertion plate (18).
6. The foundation pit supporting device for railway engineering according to claim 1, wherein the lifting moving mechanism comprises an inner cavity arranged in the base (1), a mounting frame (31) is arranged at the bottom end in the inner cavity, the bottom end of the mounting frame (31) is rotatably connected with a plurality of moving wheels (32), a lifting block (30) is fixedly connected to the center of the top end of the mounting frame (31), a connecting rod (29) is rotatably connected to the top end of the lifting block (30), one end, far away from the lifting block (30), of the connecting rod (29) is rotatably connected with a rotating head (28), the rotating head (28) is rotatably connected with a screw rod (27), the screw rod (27) penetrates through the base (1) and is fixedly connected with a rotating handle (26), and the screw rod (27) is in threaded connection with.
7. The foundation pit supporting device for railway engineering according to claim 1, wherein the top center of the upper supporting sheath (4) is fixedly connected with a middle seat (24), an injection port (25) is formed in the center of the middle seat (24), and a plurality of bearing blocks (17) are fixedly connected to the tops of the side supporting columns (16).
CN202110141167.XA 2021-02-02 2021-02-02 Foundation pit supporting device for railway engineering Expired - Fee Related CN112921984B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110141167.XA CN112921984B (en) 2021-02-02 2021-02-02 Foundation pit supporting device for railway engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110141167.XA CN112921984B (en) 2021-02-02 2021-02-02 Foundation pit supporting device for railway engineering

Publications (2)

Publication Number Publication Date
CN112921984A true CN112921984A (en) 2021-06-08
CN112921984B CN112921984B (en) 2022-03-01

Family

ID=76169476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110141167.XA Expired - Fee Related CN112921984B (en) 2021-02-02 2021-02-02 Foundation pit supporting device for railway engineering

Country Status (1)

Country Link
CN (1) CN112921984B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103233474A (en) * 2013-05-08 2013-08-07 周正海 Column structure and foundation pit supporting system comprising same
CN104358262A (en) * 2014-09-29 2015-02-18 中国建筑第八工程局有限公司 Detachable tool type deep foundation pit inner support guide pillar and construction method
CN105133787A (en) * 2015-09-29 2015-12-09 天津二建建筑工程有限公司 Latticed column for supporting post-pouring belt
KR20170116887A (en) * 2016-04-12 2017-10-20 한국교통대학교산학협력단 Structure for underground vertical extension in the building
CN208733643U (en) * 2018-07-20 2019-04-12 上海市建设工程监理咨询有限公司 A kind of support construction of foundation pit
CN210507468U (en) * 2019-08-28 2020-05-12 武汉乾威钢结构有限公司 Lattice column convenient to equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103233474A (en) * 2013-05-08 2013-08-07 周正海 Column structure and foundation pit supporting system comprising same
CN104358262A (en) * 2014-09-29 2015-02-18 中国建筑第八工程局有限公司 Detachable tool type deep foundation pit inner support guide pillar and construction method
CN105133787A (en) * 2015-09-29 2015-12-09 天津二建建筑工程有限公司 Latticed column for supporting post-pouring belt
KR20170116887A (en) * 2016-04-12 2017-10-20 한국교통대학교산학협력단 Structure for underground vertical extension in the building
CN208733643U (en) * 2018-07-20 2019-04-12 上海市建设工程监理咨询有限公司 A kind of support construction of foundation pit
CN210507468U (en) * 2019-08-28 2020-05-12 武汉乾威钢结构有限公司 Lattice column convenient to equipment

Also Published As

Publication number Publication date
CN112921984B (en) 2022-03-01

Similar Documents

Publication Publication Date Title
CN212716621U (en) Assembly system of assembled pipe jacking working well
CN112921984B (en) Foundation pit supporting device for railway engineering
CN113235654B (en) Permanent steel pipe column positioning device for cover-excavation top-down construction method and construction method
CN108222063B (en) Integral underground frame structure of assembly of shear force cotter bolt connection inner column
CN117779753A (en) Full pile casing follow-up process for hole-forming cast-in-place pile of rotary pile digger
CN210597354U (en) Assembled cavity rim of a cup foundation structure
CN210684727U (en) Construction safety supporting construction
CN110185058B (en) Assembled cavity rim of a cup foundation structure
CN214460340U (en) Concrete pile for bridge construction
CN216109890U (en) Earthquake resistance ancient building foundation strengthening mechanism
CN214194562U (en) Bearing structure for foundation ditch
CN212428329U (en) Building construction rail guard
CN111058472B (en) Tower crane foundation and reinforcement construction installation method thereof
CN215761730U (en) Adjustable tunnel supporting structure
CN208792943U (en) A kind of excavating device of Quick-moving type electric pole foundation pit
CN221920006U (en) Prefabricated post of assembled
CN219410880U (en) Supporting structure in half reverse construction method foundation ditch
CN220620184U (en) Pile foundation applied to complex geological conditions
CN221096609U (en) Roadway filling support system
CN220815689U (en) Colliery tunnel is consolidated and is supported tight supporting mechanism in lane
CN221567124U (en) Spliced structure of prefabricated column
CN219992480U (en) Foundation pit supporting protection structure for rock-soil investigation test
CN220467491U (en) Novel lifting device
CN111720134B (en) Method for replacing TBM cutter head in hole without enlarging hole
CN215208211U (en) Whole rack of factory building is with high-efficient jacking device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220301

CF01 Termination of patent right due to non-payment of annual fee