CN112921761A - Integral paving method for single asphalt concrete pavement with thickness of more than 18m - Google Patents

Integral paving method for single asphalt concrete pavement with thickness of more than 18m Download PDF

Info

Publication number
CN112921761A
CN112921761A CN202110039492.5A CN202110039492A CN112921761A CN 112921761 A CN112921761 A CN 112921761A CN 202110039492 A CN202110039492 A CN 202110039492A CN 112921761 A CN112921761 A CN 112921761A
Authority
CN
China
Prior art keywords
paving
asphalt concrete
concrete pavement
pavement
amplitude
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110039492.5A
Other languages
Chinese (zh)
Inventor
刘慧�
周祥
王建华
韩飞
肖丰伟
代明宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jiaotou Construction Engineering Co ltd
Original Assignee
Sichuan Jiaotou Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jiaotou Construction Engineering Co ltd filed Critical Sichuan Jiaotou Construction Engineering Co ltd
Priority to CN202110039492.5A priority Critical patent/CN112921761A/en
Publication of CN112921761A publication Critical patent/CN112921761A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/48Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ
    • E01C19/4833Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ with tamping or vibrating means for consolidating or finishing, e.g. immersed vibrators, with or without non-vibratory or non-percussive pressing or smoothing means

Abstract

The invention relates to the technical field of pavement paving, in particular to an integral paving method of a single asphalt concrete pavement with the width of more than 18m, which comprises the following steps: the discharge amount of the spreader is adjusted. And (5) paving the road surface. And detecting the paving quality of the paved section. And finely adjusting the discharge amount of each paver according to the paving quality. The method for integrally paving the single asphalt concrete pavement with the thickness of more than 18m adjusts the discharge amount of the paver, so that the discharge amounts of a new road and an old road are different. After the pavement construction is finished and put into use, the new road side and the old road side are prevented from generating height difference due to the fact that the new road side is large in settlement amount. In addition, the paving quality was measured immediately after the paving was finished. Meanwhile, the discharging amount of the paver is finely adjusted according to the paving quality. The discharging amount of the rear paving is obtained according to the paving quality correction, so that the discharging amount of the rear paving is more accurate.

Description

Integral paving method for single asphalt concrete pavement with thickness of more than 18m
Technical Field
The invention relates to the technical field of pavement paving, in particular to an integral paving method for a single asphalt concrete pavement with the width of more than 18 m.
Background
With the development of economic society, the capacity of the expressway is gradually insufficient. Therefore, it is necessary to widen the original road. Generally, the pavement is paved by adopting a multi-machine splicing mode, and then the pavement of a wider pavement is completed at one time. The juncture of the two machines in the paving mode is easy to generate longitudinal seams, and the quality of the road surface is affected.
Content of application
The invention aims to provide a method for integrally paving a single asphalt concrete pavement with the width of more than 18 m.
The embodiment of the invention is realized by the following technical scheme:
the integral paving method for the single asphalt concrete pavement with the width of more than 18m comprises the following steps:
s1: adjusting the discharge amount of the spreader;
s2: paving a road surface;
s3: detecting the paving quality of the paved section;
s4: and finely adjusting the discharge amount of each paver according to the paving quality.
Further, in S1, it is also necessary to adjust the amplitude of the front vibrator and the amplitude of the rear vibrator.
Further, the paving quality comprises pavement evenness and pavement segregation degree; in step S4, the discharge amount of the spreader is adjusted according to the road surface flatness, and the vibration amplitude of the front vibrator and the vibration amplitude of the rear vibrator are adjusted according to the road surface segregation degree.
Further, the spreader is provided with a spiral conveying groove; a plurality of material level devices are arranged in the spiral conveying groove; the plurality of material level devices are connected to the controller; the controller adjusts the discharge amount of each part of the spiral conveying groove according to the data of the plurality of material level devices.
Further, the controller controls the blade diameter and the pitch of the spiral conveying groove at each position according to data of the plurality of material level indicators.
Further, the blade diameters at all positions in the spiral conveying groove have five gear positions of 480mm, 420mm, 360mm, 320mm and 280 mm; the screw pitch of each position in the spiral conveying groove has three gears of 280mm, 420mm and 560 mm.
Further, the amplitude of the front vibrator has five gears of 0, 3, 6, 9 and 12; the amplitude of the rear vibrator has five gears of 0, 3, 5, 7 and 9.
The technical scheme of the embodiment of the invention at least has the following advantages and beneficial effects:
the method for integrally paving the single asphalt concrete pavement with the thickness of more than 18m adjusts the discharge amount of the paver, so that the discharge amounts of a new road and an old road are different. The discharge capacity of the old road side is greater than that of the new road side, and therefore the problem that the new road side and the old road side generate height difference due to large settling amount of the new road side after pavement construction is completed and put into use is avoided. The quality of the pavement is ensured. Meanwhile, the discharge amount of each lane is also adjusted. The road surface unevenness caused by the fact that the heavy lanes, the traffic lanes and the emergency lanes are not settled uniformly is avoided.
In addition, the paving quality was measured immediately after the paving was finished. Meanwhile, the discharging amount of the spreader is finely adjusted according to the spreading quality. The discharging amount of the rear paving is obtained according to the paving quality correction, so that the discharging amount of the rear paving is more accurate. Meanwhile, the discharge amount is continuously finely adjusted, the paving amount of each part and the adjacent part after paving is finished is corresponding, and the continuity of longitudinal connection of the road surface is better. Avoid because of the road bed discrepancy in height and the volume of paving remain invariable throughout and lead to comparatively obvious discrepancy in height to appear around the road surface.
Detailed Description
Example (b):
the invention provides a method for integrally paving a single asphalt concrete pavement with the width of more than 18m, which comprises the following steps:
s1: the discharge amount of the spreader is adjusted. The spreader is provided with a spiral conveying groove, and a spiral shaft for conveying materials is arranged in the spreader. The diameter and pitch of the blades of the screw shaft affect the discharge amount. Therefore, the discharge amount of the spreader is controlled by adjusting the diameter and pitch of the blades of the screw shaft. The blade diameter at each position in the spiral conveying groove has five gears of 480mm, 420mm, 360mm, 320mm and 280 mm. The screw pitch of all positions in the spiral conveying groove has three gear positions of 280mm, 420mm and 560 mm.
The screw shaft can be divided into several sections, the diameter and pitch of the blades of each section are controlled separately, and the rotation speed of each section is controlled separately. This just can be effectual the discharge capacity of guaranteeing the paver everywhere different. And different paving thicknesses of different lanes are ensured.
S2: and (5) paving the road surface.
S3: and detecting the paving quality of the paved section. Paving quality includes pavement flatness and pavement segregation. And immediately detecting the paving quality after paving.
S4: and finely adjusting the discharge amount of each paver according to the paving quality. Specifically, the discharge amount of the paver is adjusted according to the pavement flatness. The blade diameter of each position in the spiral conveying groove is provided with five gears; the screw pitch of each position in the spiral conveying groove is provided with three gears. In practice, when fine adjustment is performed, the gear positions within the interval between the gear positions cannot be adjusted when the gear positions within the interval are required. And the adjustment can be carried out in a mode of matching adjacent gears. For example, currently it is desirable to adjust the blade diameter to 460mm, the blade diameter may be adjusted to 480mm for a certain period of time before being adjusted to 420mm for a certain period of time. The final discharge and the discharge when the blade diameter is 460mm can be ensured by adjusting the running time ratio of the two blade diameters.
The method for integrally paving the single asphalt concrete pavement with the thickness of more than 18m adjusts the discharge amount of the paver, so that the discharge amounts of a new road and an old road are different. The discharge capacity of the old road side is greater than that of the new road side, and therefore the problem that the new road side and the old road side generate height difference due to large settling amount of the new road side after pavement construction is completed and put into use is avoided. The quality of the pavement is ensured. Meanwhile, the discharge amount of each lane is also adjusted. The road surface unevenness caused by the fact that the heavy lanes, the traffic lanes and the emergency lanes are not settled uniformly is avoided.
In addition, the paving quality was measured immediately after the paving was finished. Meanwhile, the discharging amount of the spreader is finely adjusted according to the spreading quality. The discharging amount of the rear paving is obtained according to the paving quality correction, so that the discharging amount of the rear paving is more accurate. Meanwhile, the discharge amount is continuously finely adjusted, the paving amount of each part and the adjacent part after paving is finished is corresponding, and the continuity of longitudinal connection of the road surface is better. Avoid because of the road bed discrepancy in height and the volume of paving remain invariable throughout and lead to comparatively obvious discrepancy in height to appear around the road surface.
In step S1, the amplitude of the front vibrator and the amplitude of the rear vibrator need to be adjusted. In step S4, the amplitude of the front vibrator and the amplitude of the rear vibrator are adjusted according to the degree of pavement segregation. The amplitude of the front vibrator and the amplitude of the rear vibrator jointly determine the segregation degree of the materials. The amplitude of the front vibrator and the amplitude of the rear vibrator are corrected in time according to the detected pavement segregation degree, and further serious material segregation is avoided.
The amplitude of the front vibrator has five gears of 0, 3, 6, 9 and 12. The amplitude of the rear vibrator has five gears of 0, 3, 5, 7 and 9. In the adjustment, the gear position may be adjusted to an appropriate value as needed.
In this embodiment, a plurality of material level indicators are arranged in the spiral conveying chute. The plurality of material level devices are connected with the controller. The controller adjusts the discharge amount of each part of the spiral conveying chute according to the data of the plurality of material level devices. The plurality of material level devices monitor the discharge amount of each part in the spiral conveying groove together, so that the discharge amount of each part in the spiral conveying groove is kept at a proper value.
The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes may be made to the present invention by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

  1. The integral paving method for the single asphalt concrete pavement with the thickness of more than 1.18m is characterized by comprising the following steps of: the method comprises the following steps:
    s1: adjusting the discharge amount of the spreader;
    s2: paving a road surface;
    s3: detecting the paving quality of the paved section;
    s4: and finely adjusting the discharge amount of each paver according to the paving quality.
  2. 2. The method for integrally paving the single asphalt concrete pavement with the width of more than 18m as claimed in claim 1, which is characterized in that: in S1, the amplitude of the front vibrator and the amplitude of the rear vibrator need to be adjusted.
  3. 3. The method for integrally paving the single asphalt concrete pavement with the width of more than 18m as claimed in claim 2, which is characterized in that: the paving quality comprises pavement evenness and pavement segregation degree; in S4, the discharge amount of the spreader is adjusted according to the road surface flatness, and the amplitude of the front vibrator and the amplitude of the rear vibrator are adjusted according to the road surface segregation degree.
  4. 4. The method for integrally paving the single asphalt concrete pavement with the width of more than 18m as claimed in claim 3, which is characterized in that: the spreader is provided with a spiral conveying groove; a plurality of material level devices are arranged in the spiral conveying groove; the plurality of material level devices are connected to the controller; the controller adjusts the discharge amount of each part of the spiral conveying groove according to the data of the plurality of material level devices.
  5. 5. The method for integrally paving the single asphalt concrete pavement with the width of more than 18m as claimed in claim 4, which is characterized in that: the controller controls the blade diameter and the screw pitch at each position in the spiral conveying groove according to the data of the plurality of material level indicators.
  6. 6. The method for integrally paving the single asphalt concrete pavement with the width of more than 18m as claimed in claim 5, which is characterized in that: the blade diameter of each position in the spiral conveying groove has five gears of 480mm, 420mm, 360mm, 320mm and 280 mm; the screw pitch of each position in the spiral conveying groove has three gears of 280mm, 420mm and 560 mm.
  7. 7. The method for integrally paving the single asphalt concrete pavement with the width of more than 18m as claimed in claim 6, which is characterized in that: the amplitude of the front vibrator has five gears of 0, 3, 6, 9 and 12; the amplitude of the rear vibrator has five gears of 0, 3, 5, 7 and 9.
CN202110039492.5A 2021-01-12 2021-01-12 Integral paving method for single asphalt concrete pavement with thickness of more than 18m Pending CN112921761A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110039492.5A CN112921761A (en) 2021-01-12 2021-01-12 Integral paving method for single asphalt concrete pavement with thickness of more than 18m

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110039492.5A CN112921761A (en) 2021-01-12 2021-01-12 Integral paving method for single asphalt concrete pavement with thickness of more than 18m

Publications (1)

Publication Number Publication Date
CN112921761A true CN112921761A (en) 2021-06-08

Family

ID=76163742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110039492.5A Pending CN112921761A (en) 2021-01-12 2021-01-12 Integral paving method for single asphalt concrete pavement with thickness of more than 18m

Country Status (1)

Country Link
CN (1) CN112921761A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104562903A (en) * 2015-01-29 2015-04-29 戴纳派克(中国)压实摊铺设备有限公司 Leveling system, leveling method and road construction machine
CN107059573A (en) * 2017-03-24 2017-08-18 广东省建筑科学研究院集团股份有限公司 A kind of construction method solidified by the use of the soil body as road steady layer of water
CN111172849A (en) * 2020-01-19 2020-05-19 陕西中大力鼎科技有限公司 Full-width seamless integral forming asphalt paving method for old road extension
CN112144349A (en) * 2020-09-30 2020-12-29 湖南梅溪湖建设有限公司 High-precision paving construction method for asphalt concrete pavement

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104562903A (en) * 2015-01-29 2015-04-29 戴纳派克(中国)压实摊铺设备有限公司 Leveling system, leveling method and road construction machine
CN107059573A (en) * 2017-03-24 2017-08-18 广东省建筑科学研究院集团股份有限公司 A kind of construction method solidified by the use of the soil body as road steady layer of water
CN111172849A (en) * 2020-01-19 2020-05-19 陕西中大力鼎科技有限公司 Full-width seamless integral forming asphalt paving method for old road extension
CN112144349A (en) * 2020-09-30 2020-12-29 湖南梅溪湖建设有限公司 High-precision paving construction method for asphalt concrete pavement

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
李继斌等: "高速公路路面工程监理", 《中国高新技术企业》 *
王凤莲: "沥青路面施工技术及相关质量控制对策", 《山西建筑》 *
范靖: "高速公路沥青路面摊铺工艺的探讨", 《山西建筑》 *
袁国栋: "路面施工中沥青摊铺的施工技术探讨", 《黑龙江交通科技》 *

Similar Documents

Publication Publication Date Title
US11060249B2 (en) Adjustment of the leveling cylinder setting in a road finisher
US7172363B2 (en) Paving machine output monitoring system
CN1246563A (en) Paver
CN108867274B (en) Paver for paving concrete pavement
US5269626A (en) Machine utilizing road-making materials
WO2021052945A1 (en) Levelling system for a road construction machine
KR20170040129A (en) Device for spreading a bituminous coating from a film of determined width of the coating, and method for implementing same
CN208777134U (en) A kind of building road-metal spreading machine convenient to use
CN108867271A (en) With the road spreading machine and control method for turning to compensation
CN112921761A (en) Integral paving method for single asphalt concrete pavement with thickness of more than 18m
US6655870B1 (en) Narrow gauge road paving apparatus
EP1674617B1 (en) Adjustable-batter side plate for slip-form paver
CN112195707A (en) Large-thickness wide-width water-stabilized layer paving construction method
CN111074787A (en) Ultrahigh-performance concrete distributing device and application method thereof
CN211171515U (en) Automatic leveling structure of paver
CN211848978U (en) Ultrahigh-performance concrete distributing device
CN209836750U (en) Highway construction paver
CN102635046B (en) Method for controlling paving and segregation of asphalt macadam
CN209907163U (en) Bridge floor concrete paving evener
CN105803883A (en) Construction technology of pavement made from hot-mix asphalt mixture and large-grain-size crushed stone
CN208803342U (en) A kind of dome concrete spreader
DE19548555A1 (en) Road paver on mobile frame
CN111172849A (en) Full-width seamless integral forming asphalt paving method for old road extension
CN212000511U (en) Highway bituminous paving device that paves
CN219385920U (en) Spiral feed divider shaft, paver feed divider system and paver

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 610047 area a and B, 8th floor, Sichuan Expressway Building, No.90, West 1st section of 2nd Ring Road, Wuhou District, Chengdu City, Sichuan Province

Applicant after: Sichuan Communications Construction Group Co.,Ltd.

Address before: 610047 area a and B, 8th floor, Sichuan Expressway Building, No.90, West 1st section of 2nd Ring Road, Wuhou District, Chengdu City, Sichuan Province

Applicant before: SICHUAN JIAOTOU CONSTRUCTION ENGINEERING Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210608