CN112900909A - Efficient positioning mechanism that rectifies of wall body for building engineering - Google Patents

Efficient positioning mechanism that rectifies of wall body for building engineering Download PDF

Info

Publication number
CN112900909A
CN112900909A CN202110060543.2A CN202110060543A CN112900909A CN 112900909 A CN112900909 A CN 112900909A CN 202110060543 A CN202110060543 A CN 202110060543A CN 112900909 A CN112900909 A CN 112900909A
Authority
CN
China
Prior art keywords
supporting
rod
pipe
screw rod
positioning mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110060543.2A
Other languages
Chinese (zh)
Other versions
CN112900909B (en
Inventor
郭凤娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jiawei Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110060543.2A priority Critical patent/CN112900909B/en
Publication of CN112900909A publication Critical patent/CN112900909A/en
Application granted granted Critical
Publication of CN112900909B publication Critical patent/CN112900909B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/04Propping of endangered or damaged buildings or building parts, e.g. with respect to air-raid action

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Prostheses (AREA)
  • Reciprocating Pumps (AREA)

Abstract

The invention discloses a high-efficiency wall body deviation rectifying and positioning mechanism for construction engineering, which comprises an installation plate, wherein supporting blocks are fixedly connected onto the installation plate, a screw rod is connected between the supporting blocks through a bearing, one end of the screw rod is connected with a rocker, the screw rod penetrates through a connecting block, the lower end of the connecting block is connected to the upper surface of the installation plate in a sliding mode, a supporting rod is connected to the side surface of the connecting block in a shaft mode and is connected to a supporting rod in a shaft mode, the supporting rod is connected to the upper surface of the installation plate through a supporting shaft bearing, and the supporting rod is connected to. This efficient positioning mechanism that rectifies for wall body for building engineering can guarantee the locating lever synchronous motion of wall body one side when using, and then is convenient for carry out stable extrusion to the wall body to can guarantee that the quick quilt of wall body is restoreed, help improving prosthetic efficiency, and this location structure is different from traditional cylinder drive, and then more energy-concerving and environment-protective.

Description

Efficient positioning mechanism that rectifies of wall body for building engineering
Technical Field
The invention relates to the technical field of building deviation correction, in particular to a high-efficiency wall deviation correction positioning mechanism for building engineering.
Background
In building engineering, often because the wall body is of a long time for the wall body slope, when the wall body slopes, cause the potential safety hazard easily, and if push away the wall body of slope to rebuild not only can consume the longer time, also will cause the damage of historical relic for ancient building in addition if the wall body, the wall body positioning mechanism that rectifies for building engineering is exactly a device that can right the slope wall body.
The existing wall body deviation rectifying and positioning mechanism for the construction engineering is not convenient for the synchronous movement of a plurality of members extruding a wall body, so that the stress of the wall body is uneven, the repair of the wall body is not facilitated, and the repair efficiency is not high.
Disclosure of Invention
The invention aims to provide a wall body deviation rectifying and positioning mechanism for building engineering with high efficiency, and aims to solve the problem that the existing wall body deviation rectifying and positioning mechanism for building engineering in the background art is low in repairing efficiency.
In order to achieve the purpose, the invention provides the following technical scheme: a high-efficiency wall body deviation rectifying and positioning mechanism for construction engineering comprises a mounting plate, wherein supporting blocks are fixedly connected onto the mounting plate, a screw rod is connected between the supporting blocks in a bearing mode, one end of the screw rod is connected with a rocker, the screw rod penetrates through a connecting block, the lower end of the connecting block is connected to the upper surface of the mounting plate in a sliding mode, a supporting rod is connected to the side surface of the connecting block in a shaft mode, the supporting rod is connected to the upper surface of the mounting plate through a supporting shaft bearing and is connected to one end of a piston rod, the other end of the piston rod extends into a main air pipe, the main air pipe is connected with a frame body pipe through a connecting pipe, a secondary air pipe is arranged on the frame body pipe and is connected with a liquid inlet channel, a piston block is arranged in the secondary air pipe and is connected with a labor-saving channel, and a one, and laborsaving passageway sets up on a supporting bench, laborsaving in-channel is connected with the one end of locating lever, and is provided with out oil pipe on the laborsaving passageway, be connected with into oil pipe on the inlet channel, and advance oil pipe and go out oil pipe and all set up on a supporting bench, advance oil pipe and go out oil pipe and be provided with into oil valve and go out oil valve door respectively.
Preferably, the screw rod is connected with the connecting blocks in a threaded connection mode, 2 connecting blocks are symmetrically arranged on the screw rod about the central line of the screw rod, and the thread directions of the screw rod on two sides of the central line of the screw rod are opposite.
Preferably, a V-shaped structure is formed between the supporting rods, and 2 supporting rods are connected with the supporting rod through the same shaft.
Preferably, the distance between the supporting wheel base supporting rod and one end of the supporting ejector rod is smaller than the distance between the supporting wheel base supporting rod and the other end of the supporting wheel base supporting rod, and the 2 supporting rods are overlapped up and down.
Preferably, the end of the piston rod extending into the main air pipe is connected with the inner side of the main air pipe in a seamless contact mode, and the axis of the piston rod and the axis of the main air pipe are arranged in a collinear mode.
Preferably, the frame body pipe is arranged in a C shape, and secondary air pipes are uniformly distributed on the frame body pipe.
Preferably, the inner diameter of the secondary air pipe is smaller than that of the labor-saving channel, and the secondary air pipe and the labor-saving channel are communicated through the liquid inlet channel.
Preferably, the locating lever is the I shape setting, and the even distribution of locating lever is on the brace table.
Compared with the prior art, the invention has the beneficial effects that: this efficient positioning mechanism that rectifies for wall body for building engineering can guarantee the locating lever synchronous motion of wall body one side when using, and then is convenient for carry out stable extrusion to the wall body to can guarantee that the quick quilt of wall body is restoreed, help improving prosthetic efficiency, and this location structure is different from traditional cylinder drive, and then more energy-concerving and environment-protective:
1. the piston rod gradually enters the main air pipe, so that the piston block gradually approaches the one-way valve, oil in the secondary air pipe can be gradually extruded into the labor-saving channel, the positioning rod synchronously extrudes the wall, the wall is ensured to be stressed uniformly, and the stability and the efficiency of repairing the wall are improved;
2. through the laborsaving structure that screw rod, connecting block and the vaulting pole constitute and the province apart from the structure that bracing piece and back shaft constitute, can be convenient for reduce the application range's of this mechanism restriction, and can be convenient for alleviate staff's intensity of labour, help improving people's availability factor.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is an enlarged view of point A of FIG. 1 according to the present invention;
FIG. 3 is an enlarged view of point B of FIG. 1 according to the present invention;
FIG. 4 is a schematic cross-sectional front view of the present invention;
FIG. 5 is an enlarged view of point C of FIG. 4 according to the present invention;
FIG. 6 is a schematic cross-sectional view of a flowline according to the present invention;
FIG. 7 is a schematic top view of the present invention.
In the figure: 1. mounting a plate; 2. a support block; 3. a screw; 4. a rocker; 5. connecting blocks; 6. supporting a top rod; 7. a support bar; 8. a support shaft; 9. a piston rod; 10. a main air pipe; 11. a connecting pipe; 12. a frame pipe; 13. a secondary trachea; 14. a support table; 15. a piston block; 16. a liquid inlet channel; 17. a one-way valve; 18. an oil inlet pipe; 19. an oil inlet valve; 20. a labor-saving channel; 21. positioning a rod; 22. an oil outlet pipe; 23. and an oil outlet valve.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides a technical solution: a high-efficiency wall body deviation rectifying and positioning mechanism for construction engineering comprises a mounting plate 1, supporting blocks 2, a screw rod 3, a rocker 4, a connecting block 5, a supporting top rod 6, a supporting rod 7, a supporting shaft 8, a piston rod 9, a main gas pipe 10, a connecting pipe 11, a frame pipe 12, a secondary gas pipe 13, a supporting table 14, a piston block 15, a liquid inlet channel 16, a check valve 17, an oil inlet pipe 18, an oil inlet valve 19, a labor-saving channel 20, a positioning rod 21, an oil outlet pipe 22 and an oil outlet valve 23, wherein the mounting plate 1 is fixedly connected with the supporting blocks 2, the supporting blocks 2 are connected with the screw rod 3 through bearings, one end of the screw rod 3 is connected with the rocker 4, the screw rod 3 penetrates through the connecting block 5, the lower end of the connecting block 5 is connected with the upper surface of the mounting plate 1 in a sliding manner, the side surface of the connecting block 5 is connected with the supporting top rod, and the bracing piece 7 axle is connected in the one end of piston rod 9, the other end of piston rod 9 stretches into the inside setting of main trachea 10, and main trachea 10 is connected with framework pipe 12 through connecting pipe 11, be provided with time trachea 13 on the framework pipe 12, and time trachea 13 connects inlet channel 16, be provided with piston block 15 in the time trachea 13, and time trachea 13 is connected with laborsaving passageway 20, be provided with check valve 17 between time trachea 13 and the laborsaving passageway 20, and laborsaving passageway 20 sets up on brace table 14, the one end of locating lever 21 is connected to laborsaving passageway 20, and be provided with out oil pipe 22 on the laborsaving passageway 20, be connected with into oil pipe 18 on the inlet channel 16, and advance oil pipe 18 and go out oil pipe 22 and all set up on brace table 14, advance oil pipe 18 and go out oil pipe 22 and be provided with into oil valve 19 and go out oil valve.
The screw rod 3 is connected with the connecting blocks 5 in a threaded connection mode, the screw rod 3 is symmetrically provided with 2 connecting blocks 5 about the central line of the screw rod, the thread turning directions of the screw rod 3 on two sides of the central line of the screw rod are opposite, and when the screw rod 3 rotates, the 2 connecting blocks 5 on the screw rod can move close to or away from each other.
Prop and constitute V font structure between the ejector pin 6, and 2 prop ejector pin 6 and be connected with bracing piece 7 through same axle, can prop the contained angle that ejector pin 6 constitutes V font structure through 2 and change for the one end of bracing piece 7 takes place to rotate.
The distance that back shaft 8 is less than the back shaft 7 other end apart from the distance that 6 one end of bracing pole is connected to bracing pole 7, and 2 bracing poles 7 coincide from top to bottom sets up, can connect 6 one ends of bracing pole to remove less distance at bracing pole 7, and the other end of bracing pole 7 removes great distance.
The end part of the piston rod 9 extending into the main air pipe 10 is connected with the inner side of the main air pipe 10 in a seamless contact manner, and the axes of the piston rod 9 and the main air pipe 10 are arranged in a collinear manner, so that the piston rod 9 can move conveniently, and the gas in the main air pipe 10, the connecting pipe 11 and the frame pipe 12 pushes the piston block 15 in the secondary air pipe 13 to move.
The frame body pipe 12 is C font setting, and the even distribution on the frame body pipe 12 has time trachea 13, can be convenient for on it even setting up the time trachea 13 that link up to make the piston block 15 synchronous motion in the time trachea 13.
The internal diameter of secondary trachea 13 is less than the internal diameter of laborsaving passageway 20, and secondary trachea 13 and laborsaving passageway 20 link up the setting through inlet channel 16, can be convenient for make the interior piston block 15 of secondary trachea 13 remove through less power, and locating lever 21 produces great power to the wall body.
The locating rod 21 is arranged in an I shape, and the locating rod 21 is uniformly distributed on the supporting platform 14, so that the contact surface between the locating rod 21 and the wall body can be conveniently improved.
The working principle is as follows: firstly, the deviation correcting mechanism is arranged on two sides of a wall body, and then the deviation correcting mechanism is used according to the following operation modes:
according to the figures 1-7, the other ends of the oil inlet valve 19 and the oil outlet valve 23 are connected with an external oil tank;
then the rocker 4 is rocked to enable the screw rod 3 to rotate, and further the 2 connecting blocks 5 on the screw rod 3 can move close to each other;
the connecting blocks 5 are close to each other, so that a V-shaped included angle formed by the 2 supporting and ejecting rods 6 is reduced, and the supporting rods 7 are extruded;
under the action of the supporting shaft 8, one end of the supporting shaft 8 is extruded, so that the other end of the supporting shaft 8 moves in the opposite direction, and the piston rod 9 gradually moves towards the main air pipe 10;
the gas in the main gas pipe 10 is extruded through the piston rod 9, so that the gas can enter the secondary gas pipe 13 through the connecting pipe 11 and the frame body pipe 12 in sequence;
the gas entering the secondary air pipe 13 extrudes the piston block 15, so that the piston block 15 moves towards the liquid inlet channel 16, and the oil liquid in the secondary air pipe 13 is further extruded into the labor-saving channel 20 through the liquid inlet channel 16;
the oil can be prevented from flowing back through the one-way valve 17;
then before the rocker 4 is rotated reversely, the oil inlet valve 19 can be opened, so that when the piston block 15 moves reversely, oil in the oil tank is sucked into the secondary air pipe 13;
finally, the positioning rods 21 in the labor-saving channel 20 are gradually close to the wall body through repeated operation in the process, and the wall body is pressurized, so that the two-way pressure is the same, and the wall body can be conveniently and rapidly righted;
after the wall is straightened, the oil outlet valve 23 is opened, so that the oil in the labor-saving channel 20 can flow into the external oil tank, and the mechanism for righting the two sides of the wall can be conveniently detached, and the content which is not described in detail in the specification belongs to the prior art which is well known to the skilled person.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides an efficient positioning mechanism that rectifies for wall body for building engineering, includes mounting panel (1), its characterized in that: the mounting plate is characterized in that the mounting plate (1) is fixedly connected with supporting blocks (2), a screw rod (3) is connected between the supporting blocks (2) through a bearing, one end of the screw rod (3) is connected with a rocker (4), the screw rod (3) penetrates through the connecting block (5) and is arranged, the lower end of the connecting block (5) is slidably connected with the upper surface of the mounting plate (1), the side surface of the connecting block (5) is connected with a supporting rod (6) through a shaft, the supporting rod (6) is connected onto a supporting rod (7) through a supporting shaft (8) bearing, the supporting rod (7) is connected onto the upper surface of the mounting plate (1) through a shaft, the supporting rod (7) is connected onto one end of a piston rod (9) through a shaft, the other end of the piston rod (9) extends into the main air pipe (10) and is connected with the frame body pipe (12) through a connecting pipe (11), the, and inlet channel (16) is connected in inferior trachea (13), be provided with piston block (15) in inferior trachea (13), and inferior trachea (13) is connected with laborsaving passageway (20), be provided with check valve (17) between inferior trachea (13) and laborsaving passageway (20), and laborsaving passageway (20) set up on brace table (14), the one end of locating lever (21) is connected in laborsaving passageway (20), and is provided with out oil pipe (22) on laborsaving passageway (20), be connected with on inlet channel (16) and advance oil pipe (18), and advance oil pipe (18) and go out oil pipe (22) and all set up on brace table (14), advance oil pipe (18) and go out oil pipe (22) and be provided with into oil valve (19) and go out oil valve (23) respectively.
2. The efficient wall deviation rectifying and positioning mechanism for the building engineering as claimed in claim 1, wherein: the screw rod (3) is connected with the connecting blocks (5) in a threaded connection mode, the screw rod (3) is symmetrically provided with 2 connecting blocks (5) about the central line of the screw rod, and the thread turning directions of the screw rod (3) on two sides of the central line of the screw rod are opposite.
3. The efficient wall deviation rectifying and positioning mechanism for the building engineering as claimed in claim 1, wherein: the supporting rods (6) form a V-shaped structure, and the 2 supporting rods (6) are connected with the supporting rod (7) through the same shaft.
4. The efficient wall deviation rectifying and positioning mechanism for the building engineering as claimed in claim 1, wherein: the distance between the supporting shaft (8) and one end, connected with the supporting rod (7), of the supporting rod (6) is smaller than the distance between the supporting shaft (8) and the other end of the supporting rod (7), and the 2 supporting rods (7) are overlapped up and down.
5. The efficient wall deviation rectifying and positioning mechanism for the building engineering as claimed in claim 1, wherein: the end part of the piston rod (9) extending into the main air pipe (10) is in seamless contact connection with the inner side of the main air pipe (10), and the axes of the piston rod (9) and the main air pipe (10) are arranged in a collinear way.
6. The efficient wall deviation rectifying and positioning mechanism for the building engineering as claimed in claim 1, wherein: the frame body pipe (12) is arranged in a C shape, and secondary air pipes (13) are uniformly distributed on the frame body pipe (12).
7. The efficient wall deviation rectifying and positioning mechanism for the building engineering as claimed in claim 1, wherein: the internal diameter of inferior trachea (13) is less than the internal diameter of laborsaving passageway (20), and sets up through feed liquor channel (16) inferior trachea (13) and laborsaving passageway (20).
8. The efficient wall deviation rectifying and positioning mechanism for the building engineering as claimed in claim 6, wherein: the positioning rods (21) are arranged in an I shape, and the positioning rods (21) are uniformly distributed on the supporting platform (14).
CN202110060543.2A 2021-01-18 2021-01-18 Efficient positioning mechanism that rectifies of wall body for building engineering Active CN112900909B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110060543.2A CN112900909B (en) 2021-01-18 2021-01-18 Efficient positioning mechanism that rectifies of wall body for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110060543.2A CN112900909B (en) 2021-01-18 2021-01-18 Efficient positioning mechanism that rectifies of wall body for building engineering

Publications (2)

Publication Number Publication Date
CN112900909A true CN112900909A (en) 2021-06-04
CN112900909B CN112900909B (en) 2022-08-23

Family

ID=76114331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110060543.2A Active CN112900909B (en) 2021-01-18 2021-01-18 Efficient positioning mechanism that rectifies of wall body for building engineering

Country Status (1)

Country Link
CN (1) CN112900909B (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB691076A (en) * 1950-11-30 1953-05-06 J & E Hall Ltd Improvements in and relating to the construction of artificial ice-rink floors
CN1262365A (en) * 1999-01-22 2000-08-09 高继良 Method for lifting building and device for using same
US20120204512A1 (en) * 2011-02-14 2012-08-16 Thomas Trinko Method of Straightening Foundational Walls
CN204624797U (en) * 2015-03-12 2015-09-09 淄博鲁工造粒装备科技有限公司 A kind of melting granulator rectifying device for steel belt
CN106088652A (en) * 2016-07-20 2016-11-09 叶香雄 The deviation rectification construction method of inclined building
CN108914999A (en) * 2018-07-28 2018-11-30 江苏地基工程有限公司 Structure is repaired in correction for tilting pile foundation
JP2019039236A (en) * 2017-08-25 2019-03-14 株式会社フジタ Building structure inspection method and inspection device
CN109736368A (en) * 2019-01-07 2019-05-10 南通理工学院 A kind of building translation quantifies deviation correcting device and its application method
CN210342755U (en) * 2019-06-19 2020-04-17 甘雨 Reinforcement of building structure of rectifying
CN211007758U (en) * 2019-10-22 2020-07-14 深圳市众安工程技术有限公司 Building translation quantitative deviation correcting device
CN211621727U (en) * 2019-12-02 2020-10-02 烟台飞龙集团有限公司 Shallow foundation building reinforced structure of rectifying
CN111809672A (en) * 2019-01-10 2020-10-23 江苏工程职业技术学院 Building quantitative deviation correcting device and protective layer thereof
CN111945798A (en) * 2020-08-28 2020-11-17 湖南城建职业技术学院 Structure is corrected with building slope to architectural remediation
CN212224720U (en) * 2020-04-03 2020-12-25 林杉秀 Fixing device is consolidated to building structure roof beam

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB691076A (en) * 1950-11-30 1953-05-06 J & E Hall Ltd Improvements in and relating to the construction of artificial ice-rink floors
CN1262365A (en) * 1999-01-22 2000-08-09 高继良 Method for lifting building and device for using same
US20120204512A1 (en) * 2011-02-14 2012-08-16 Thomas Trinko Method of Straightening Foundational Walls
CN204624797U (en) * 2015-03-12 2015-09-09 淄博鲁工造粒装备科技有限公司 A kind of melting granulator rectifying device for steel belt
CN106088652A (en) * 2016-07-20 2016-11-09 叶香雄 The deviation rectification construction method of inclined building
JP2019039236A (en) * 2017-08-25 2019-03-14 株式会社フジタ Building structure inspection method and inspection device
CN108914999A (en) * 2018-07-28 2018-11-30 江苏地基工程有限公司 Structure is repaired in correction for tilting pile foundation
CN109736368A (en) * 2019-01-07 2019-05-10 南通理工学院 A kind of building translation quantifies deviation correcting device and its application method
CN111809672A (en) * 2019-01-10 2020-10-23 江苏工程职业技术学院 Building quantitative deviation correcting device and protective layer thereof
CN210342755U (en) * 2019-06-19 2020-04-17 甘雨 Reinforcement of building structure of rectifying
CN211007758U (en) * 2019-10-22 2020-07-14 深圳市众安工程技术有限公司 Building translation quantitative deviation correcting device
CN211621727U (en) * 2019-12-02 2020-10-02 烟台飞龙集团有限公司 Shallow foundation building reinforced structure of rectifying
CN212224720U (en) * 2020-04-03 2020-12-25 林杉秀 Fixing device is consolidated to building structure roof beam
CN111945798A (en) * 2020-08-28 2020-11-17 湖南城建职业技术学院 Structure is corrected with building slope to architectural remediation

Also Published As

Publication number Publication date
CN112900909B (en) 2022-08-23

Similar Documents

Publication Publication Date Title
CN208137383U (en) A kind of liftable architectural engineering scaffold
CN207102982U (en) A kind of spray-painting plant of steel member
CN109723230B (en) Gap grouting device for energy-saving building
CN201102875Y (en) Combined hydraulic jack
CN206309053U (en) A kind of adjustable garden architecture support frame
CN205804939U (en) template assembly for subway station side wall
CN112900909B (en) Efficient positioning mechanism that rectifies of wall body for building engineering
CN202762775U (en) Simple pump shaft straightening device
CN206888490U (en) A kind of construction scaffold
CN203367900U (en) Cable head production support
CN104226775B (en) A kind of hydraulic expanding-forming machine
CN207209352U (en) A kind of steel band reinforced polyethylene spiral ripple pipe pusher
CN207206221U (en) A kind of horizontal brush roll forming machine
CN208663642U (en) A kind of detector for bogie wheels of circular cooler replacement operation tooling
CN208734093U (en) Watering device is used in a kind of construction of water-saving building
CN219882426U (en) Hydropower station penstock overhauls operation platform
CN110749534A (en) Window limit infiltration testing arrangement is used in engineering supervision
CN206860612U (en) A kind of adjustable pipe fixing holder
CN207102971U (en) A kind of municipal direction board spray-painting plant
CN206844787U (en) A kind of emergency electric power communication information tower
CN220599080U (en) Building construction frame
CN212948773U (en) SMC combined material water treatment facilities mould pressing structure
CN208120700U (en) A kind of industrial pipeline inspection platform
CN215714492U (en) Sprinkler is used in road bridge maintenance
CN209073059U (en) A kind of labour-saving greenhouse bracket lifting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220809

Address after: 239000 second floor, Shiba village cultural activity center, Shiba Town, Mingguang City, Chuzhou City, Anhui Province

Applicant after: Anhui Jiawei Construction Co.,Ltd.

Address before: 200000 guosu (Shanghai) Construction Engineering Co., Ltd., room 217, area C, 2 / F, building 2, 349 xicen street, Qingpu District, Shanghai

Applicant before: Guo Fengjuan

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant