CN112850453B - Assembled integral type building composite floor slab assembling stable hoisting system - Google Patents

Assembled integral type building composite floor slab assembling stable hoisting system Download PDF

Info

Publication number
CN112850453B
CN112850453B CN202110012285.0A CN202110012285A CN112850453B CN 112850453 B CN112850453 B CN 112850453B CN 202110012285 A CN202110012285 A CN 202110012285A CN 112850453 B CN112850453 B CN 112850453B
Authority
CN
China
Prior art keywords
floor slab
composite floor
hollow pipe
thick bamboo
cross beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110012285.0A
Other languages
Chinese (zh)
Other versions
CN112850453A (en
Inventor
李成翠
廖瑜琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yiwu Shuangjianghu Development Group Co ltd
Original Assignee
Yiwu Shuangjianghu Development Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yiwu Shuangjianghu Development Group Co ltd filed Critical Yiwu Shuangjianghu Development Group Co ltd
Priority to CN202110012285.0A priority Critical patent/CN112850453B/en
Publication of CN112850453A publication Critical patent/CN112850453A/en
Application granted granted Critical
Publication of CN112850453B publication Critical patent/CN112850453B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/032Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Floor Finish (AREA)

Abstract

The invention relates to the technical field of assembled building, in particular to an assembled integrated building composite floor slab stable hoisting system, which comprises a cross beam, wherein a support plate is fixed in the middle of the lower surface of the cross beam, the support plate is vertically arranged with the cross beam, a T-shaped groove is formed in the lower surface of the support plate, a limiting plate with an adjustable position is arranged in the T-shaped groove, a hollow pipe which is vertically arranged is arranged on the lower surface of the limiting plate, a pull rod for connecting the composite floor slab is inserted in the hollow pipe, a rope penetrating hole for penetrating ropes is processed on the outer surface of the lower end of the pull rod, a rubber plug is fixedly connected at the upper end of the pull rod, and an ash removing component is arranged at one end of the pull rod in the hollow pipe. The stability of the relative position of the composite floor slab and the beam is convenient to keep, the composite floor slab is prevented from shaking relatively to the beam in the hoisting process, and the hoisting stability of the composite floor slab is improved.

Description

Assembled integral type building composite floor slab assembling stable hoisting system
Technical Field
The invention relates to an assembled integral building composite floor slab stable hoisting system, and belongs to the technical field of composite floor slab hoisting.
Background
The composite floor slab is an assembled integral building floor slab formed by superposing precast slabs and cast-in-situ reinforced concrete layers. The precast slab is one of the components of the floor slab structure, and is also a permanent template of a cast-in-situ reinforced concrete laminated layer, and horizontal equipment pipelines can be laid in the cast-in-situ laminated layer. The composite floor slab has good integrity, high rigidity, template saving, smooth upper and lower surfaces, convenient decoration of the facing layer, and suitability for high-rise buildings and large-bay buildings with high overall rigidity requirements.
At present, a composite floor slab is hoisted by a hoisting tool formed by a beam and an iron chain, but after the iron chain is connected with the composite floor slab and the beam, the composite floor slab is easy to shake in the hoisting process, so that the hoisting stability is affected.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a stable hoisting system for assembling an integral building composite floor slab, which solves the problems in the prior art.
In order to achieve the above object, the present invention is realized by the following technical scheme: the utility model provides an assemble steady hoist and mount system of integral building coincide floor dress, includes the crossbeam, crossbeam one end is fixed with two first iron chains, the one end that first iron chain was kept away from to the crossbeam is fixed with two second iron chains, crossbeam upper surface welding has two symmetrical arrangement's lug, crossbeam lower surface middle part position is fixed with the extension board, the extension board is arranged perpendicularly with the crossbeam, T type groove has been seted up to the extension board lower surface, but install the limiting plate of adjustable position in the T type groove, surface mounting has the hollow tube of vertical arrangement under the limiting plate, install the pull rod that is used for connecting coincide floor in the hollow tube, pull rod lower extreme surface processing has the rope penetrating hole that is used for alternate the rope, pull rod upper end fixedly connected with rubber buffer, rubber buffer slidable mounting is in the hollow tube and is laminated mutually with the hollow tube internal surface, the deashing subassembly is installed to the one end that the pull rod is in the hollow tube, the deashing subassembly sets up in the rubber buffer downside.
Specifically, the deashing subassembly includes a water storage section of thick bamboo, water storage section of thick bamboo cover is established on the pull rod and is laminated mutually with hollow tube internal surface, water storage section of thick bamboo lower extreme external surface is fixed with the cover, the cover is established on the pull rod and is taken out pull rod fixed connection, water storage section of thick bamboo downside is equipped with solid fixed ring, guy is established on the pull rod and is taken out pull rod fixed connection with the fixed ring cover, guy that solid fixed ring external surface installs and laminate mutually with hollow tube inner wall.
Specifically, the outer surface of the water storage cylinder is provided with an annular groove, and a sealing ring attached to the inner surface of the hollow pipe is arranged in the annular groove.
Specifically, be equipped with the rubber cover in the water storage section of thick bamboo, the rubber cover is established on the pull rod, rubber cover surface is pasted through glue and is had the sponge circle that plays the manger plate effect.
Specifically, the fixed ring lower surface is annular equidistance and has seted up a plurality of screw thread blind hole, screw thread blind hole internal thread is connected with half tooth screw rod.
Specifically, wear the jack has been seted up to a extension board side, it has the connecting rod to wear to insert in the jack, connecting rod one end and extension board fixed connection, the interlude hole outside is equipped with the first stock solution section of thick bamboo with extension board fixed connection, the one end that the extension board was kept away from to the connecting rod extends to in the first stock solution section of thick bamboo and installs first piston, first piston slidable mounting is in first stock solution section of thick bamboo, the through-hole has been seted up to one end surface lower part position that the extension board was kept away from to first stock solution section of thick bamboo, the through-hole downside is equipped with the second stock solution section of thick bamboo of vertical arrangement, second stock solution section of thick bamboo and first stock solution section of thick bamboo are arranged perpendicularly and fixed connection, second stock solution section of thick bamboo lower surface middle part position is fixed with the internal thread cover, internal thread cover internal thread connection has the screw post, screw post upper end extends to in the second stock solution section of thick bamboo and installs the second piston, second piston slidable mounting is in the second stock solution section of thick bamboo, screw post lower extreme surface mounting has the handle.
Specifically, the recess has been seted up to limiting plate lower surface middle part position, the recess internal fixation has an internal thread section of thick bamboo, hollow tube upper end surface processing has the external screw thread, the one end threaded connection of hollow tube processing external screw thread is in the internal thread section of thick bamboo.
Specifically, the surface mounting has the disc on the rubber piston, rubber piston lower surface is fixed with the ring, pull rod upper end runs through ring and rubber piston and disc fixed connection, ring and pull rod fixed connection.
Specifically, a plurality of reinforcing ribs are uniformly fixed at the intersection of the support plate and the cross beam, and the reinforcing ribs are fixedly connected with the cross beam.
The invention has the beneficial effects that:
1. according to the stable hoisting system for assembling the integral building composite floor slab, the limiting plate is inserted into the T-shaped groove on the supporting plate, so that the hollow pipe and the supporting plate are inserted, namely, the connection of the hollow pipe and the cross beam is completed, the first iron chain and the second iron chain are connected to the embedded steel bars, the drawing rod is drawn out of the hollow pipe, the drawing rod is connected with the embedded steel bars by the ropes, the hollow pipe and the drawing rod play a role of connecting the composite floor slab and the cross beam together, the stability of the relative positions of the composite floor slab and the cross beam is conveniently kept, the composite floor slab is prevented from shaking relatively to the cross beam by a large extent in the hoisting process, and the hoisting stability of the composite floor slab is improved.
2. According to the stable hoisting system for assembling the integral building composite floor slab, the positions of the limiting plates in the T-shaped grooves are adjusted until the pull rods correspond to the embedded bars, so that the embedded bars with different intervals can be matched conveniently, and the application range is enlarged.
3. According to the stable hoisting system for the assembled integral building composite floor slab, a proper amount of water is added into the water storage cylinder, so that the water in the water storage cylinder is in contact with the inner wall of the hollow pipe due to small shaking in the moving process of the pull rod, and the water is further adhered to the dust mixed water on the inner wall of the hollow pipe, so that dust on the inner wall of the hollow pipe is cleaned on line, and the sliding of the rubber plug is prevented from being influenced by dust accumulation.
4. According to the assembled integrated building composite floor slab stable hoisting system, the fixed ring is driven to move by the drawing rod in the moving process of the drawing rod, and the bristles of the fixed ring belt slide along the inner wall of the hollow pipe, so that the effect of loosening dust on the inner wall of the hollow pipe is achieved, and the effect of mixing the dust into water is improved.
5. According to the assembled integrated building composite floor slab stable hoisting system, after the rubber sleeve with the sponge ring is sleeved on the drawing rod, the water in the water storage cylinder is prevented from shaking to a large extent under the blocking of the sponge ring.
6. According to the stable hoisting system for assembling the integral building composite floor slab, when the position of the limiting plate in the T-shaped groove is required to be adjusted, the handle is utilized to rotate the threaded column, the threaded column drives the second piston to move in the second liquid storage cylinder, liquid in the second liquid storage cylinder flows into the first liquid storage cylinder through the through hole, the first piston is driven to slide after the liquid in the first liquid storage cylinder is increased, the first piston drives the limiting plate to slide in a direction away from the first liquid storage cylinder through the connecting rod, otherwise, when the threaded column is reversely screwed, the liquid in the first liquid storage cylinder flows into the second liquid storage cylinder, so that the limiting plate moves in a direction close to the first liquid storage cylinder, and the position of the limiting plate in the T-shaped groove is conveniently adjusted.
Drawings
Other features, objects and advantages of the present invention will become more apparent upon reading of the detailed description of non-limiting embodiments, given with reference to the accompanying drawings in which:
FIG. 1 is a schematic structural view of a stable hoisting system for assembling an integral building composite floor slab;
FIG. 2 is a schematic diagram of the assembly of hollow tubes, limiting plates and support plates of the stable hoisting system for assembling integrated building composite floor slabs;
FIG. 3 is a schematic diagram of the assembly of a rubber stopper, ash removal assembly and pull rod in a smooth hoisting system for assembling an integral building composite floor slab;
FIG. 4 is a schematic diagram of the assembly of a first liquid storage cylinder, a second liquid storage cylinder, a limiting plate and a support plate in the assembled integrated building composite floor slab assembly stable hoisting system;
FIG. 5 is a perspective view of a hollow tube of a stable hoisting system for assembling an integral building composite floor slab;
fig. 6 is a schematic structural view of a composite floor slab;
in the figure: 1. the steel bar storage device comprises a cross beam, 2, lifting lugs, 3, a support plate, 4, a first iron chain, 5, a T-shaped groove, 6, a hollow pipe, 7, a drawing rod, 8, a rope threading hole, 9, a second iron chain, 10, a limiting plate, 11, an internal thread cylinder, 12, a rubber plug, 13, a water storage cylinder, 14, a cylinder sleeve, 15, a fixed ring, 16, a half-tooth screw, 17, bristles, 18, a sponge ring, 19, a rubber sleeve, 20, a ring, 21, a disc, 22, a connecting rod, 23, a first liquid storage cylinder, 24, a first piston, 25, a through hole, 26, a second piston, 27, a second liquid storage cylinder, 28, a thread column, 29, an internal thread sleeve, 30, a handle, 31, a floor slab superposition, 32 and a pre-embedded steel bar.
Detailed Description
The invention is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the invention easy to understand.
Referring to fig. 1 to 6, the present invention provides a technical solution: the utility model provides an assemble steady hoist and mount system of integral building coincide floor dress, includes crossbeam 1, and crossbeam 1 one end is fixed with two first iron chains 4, and crossbeam 1 is kept away from the one end of first iron chain 4 and is fixed with two second iron chains 9, and the design of first iron chain 4 and second iron chain 9 is convenient for connect coincide floor 31 and crossbeam 1.
The upper surface welding of crossbeam 1 has two lug 2 of symmetrical arrangement, and the design of lug 2 is convenient for hoisting equipment to connect crossbeam 1.
The middle part of the lower surface of the beam 1 is fixedly provided with a support plate 3, the support plate 3 is vertically arranged with the beam 1, the lower surface of the support plate 3 is provided with a T-shaped groove 5, the T-shaped groove 5 is internally provided with a limiting plate 10 with an adjustable position, the lower surface of the limiting plate 10 is provided with a hollow pipe 6 which is vertically arranged, a pull rod 7 used for connecting the superposed floor 31 is inserted into the hollow pipe 6, the limiting plate 10 is inserted into the T-shaped groove 5 on the support plate 3, the hollow pipe 6 and the support plate 3 are inserted into each other, namely, the connection of the hollow pipe 6 and the beam 1 is completed, the first iron chain 4 and the second iron chain 9 are connected onto the embedded steel bars 32, the pull rod 7 is pulled out from the hollow pipe 6, the pull rod 7 is connected with the embedded steel bars 32 by ropes, the hollow pipe 6 and the pull rod 7 play a role of connecting the superposed floor 31 and the beam 1 together, the stability of the relative positions of the superposed floor 31 and the beam 1 is conveniently kept, the swing of the superposed floor 31 relative to the beam 1 is avoided in the hoisting process, the hoisting stability of the superposed floor 31 is improved, the position of the T-shaped groove 10 is adjusted until the position of the T-shaped groove 10 is not matched with the embedded steel bars 32, and the distance between the T-shaped groove and the embedded steel bars is not matched with the embedded steel bars 32.
The outer surface of the lower end of the drawing rod 7 is provided with a rope penetrating hole 8 for penetrating ropes, and the rope penetrating hole 8 is designed to facilitate penetrating ropes for connecting the drawing rod 7 and the embedded bars 32.
The upper end of the drawing rod 7 is fixedly connected with a rubber plug 12, the rubber plug 12 is slidably arranged in the hollow tube 6 and is attached to the inner surface of the hollow tube 6, and the rubber plug 12 is convenient for limiting the upper end of the drawing rod 7 in the hollow tube 6 and plays a role in supporting the upper end of the drawing rod 7.
The ash removal subassembly is installed to the one end that pull rod 7 is in hollow tube 6, and ash removal subassembly sets up in rubber buffer 12 downside, and the dust of adhesion on hollow tube 6 inner wall is convenient for clear up in the design of ash removal subassembly.
As an embodiment of the present invention: the ash removal subassembly includes water storage section of thick bamboo 13, and water storage section of thick bamboo 13 cover is established on pull rod 7 and is laminated mutually with hollow tube 6 internal surface, adds appropriate amount of moisture in water storage section of thick bamboo 13, and then pull rod 7 is at the removal in-process, and the moisture in the water storage section of thick bamboo 13 is contacted with hollow tube 6 inner wall because of rocking by a small margin, and then in the dust mixed moisture on hollow tube 6 inner wall, realizes the dust on the on-line clearance hollow tube 6 inner wall, and the dust accumulation is prevented and is influenced the slip of rubber buffer 12.
The outer surface of the lower end of the water storage cylinder 13 is fixedly provided with a cylinder sleeve 14, the cylinder sleeve 14 is sleeved on the drawing rod 7 and fixedly connected with the drawing rod 7, and the cylinder sleeve 14 realizes stable connection of the water storage cylinder 13 and the drawing rod 7.
The fixed ring 15 is arranged on the lower side of the water storage cylinder 13, the fixed ring 15 is sleeved on the pull rod 7 and is fixedly connected with the pull rod 7, bristles 17 attached to the inner wall of the hollow tube 6 are arranged on the outer surface of the fixed ring 15, the pull rod 7 drives the fixed ring 15 to move in the moving process of the pull rod 7, the fixed ring 15 carries the bristles 17 to slide along the inner wall of the hollow tube 6, the effect of loosening dust on the inner wall of the hollow tube 6 is achieved, and the effect of mixing the dust into moisture is improved.
As an embodiment of the present invention: an annular groove is formed in the outer surface of the water storage barrel 13, a sealing ring which is attached to the inner surface of the hollow pipe 6 is arranged in the annular groove, and the sealing ring is designed to prevent water in the water storage barrel 13 from being distributed to the lower side of the water storage barrel 13.
As an embodiment of the present invention: the water storage cylinder 13 is internally provided with a rubber sleeve 19, the rubber sleeve 19 is sleeved on the pull rod 7, a sponge ring 18 with a water retaining effect is stuck on the outer surface of the rubber sleeve 19 through glue, and after the rubber sleeve 19 with the sponge ring 18 is sleeved on the pull rod 7, the water in the water storage cylinder 13 is prevented from shaking greatly under the blocking of the sponge ring 18.
As an embodiment of the present invention: the lower surface of the fixed ring 15 is provided with a plurality of threaded blind holes at equal intervals in an annular shape, the threaded blind holes are internally connected with half-tooth screws 16 in a threaded mode, the half-tooth screws 16 are installed on the fixed ring 15, and then under the supporting effect of the half-tooth screws 16, bristles 17 are prevented from moving to the bottommost side of the hollow tube 6 and are extruded and deformed.
As an embodiment of the present invention: a penetrating hole is formed in one side surface of the support plate 3, a connecting rod 22 is inserted in the penetrating hole, one end of the connecting rod 22 is fixedly connected with the support plate 3, a first liquid storage cylinder 23 fixedly connected with the support plate 3 is arranged outside the penetrating hole, one end of the connecting rod 22, which is far away from the support plate 3, extends into the first liquid storage cylinder 23 and is provided with a first piston 24, the first piston 24 is slidably arranged in the first liquid storage cylinder 23, a through hole 25 is formed in the lower part of the outer surface of the first liquid storage cylinder 23, which is far away from the support plate 3, a second liquid storage cylinder 27 which is vertically arranged is arranged on the lower side of the through hole 25, the second liquid storage cylinder 27 is vertically arranged and fixedly connected with the first liquid storage cylinder 23, an inner thread sleeve 29 is fixedly arranged in the middle part of the lower surface of the second liquid storage cylinder 27, a thread post 28 is connected with the inner thread sleeve 29 in an inner thread way, the upper end of the thread post 28 extends into the second liquid storage cylinder 27 and is provided with a second piston 26, the second piston 26 is slidably mounted in the second liquid storage barrel 27, the handle 30 is mounted on the outer surface of the lower end of the threaded column 28, when the position of the limiting plate 10 in the T-shaped groove 5 needs to be adjusted, the threaded column 28 is rotated by the handle 30, and then the threaded column 28 drives the second piston 26 to move in the second liquid storage barrel 27, so that liquid in the second liquid storage barrel 27 flows into the first liquid storage barrel 23 through the through hole 25, the first piston 24 is driven to slide after the liquid in the first liquid storage barrel 23 increases, and then the first piston 24 drives the limiting plate 10 to slide in a direction away from the first liquid storage barrel 23 through the connecting rod 22, otherwise, when the threaded column 28 is reversely screwed, the liquid in the first liquid storage barrel 23 flows into the second liquid storage barrel 27, and the limiting plate 10 moves in a direction close to the first liquid storage barrel 23, so that the position of the limiting plate 10 in the T-shaped groove 5 is conveniently adjusted.
As an embodiment of the present invention: the middle part of the lower surface of the limiting plate 10 is provided with a groove, an internal thread cylinder 11 is fixed in the groove, an external thread is machined on the outer surface of the upper end of the hollow tube 6, one end of the hollow tube 6 for machining the external thread is connected with the internal thread cylinder 11 in a threaded manner, the internal thread cylinder 11 is fixed in the groove, the connection reliability of the internal thread cylinder 11 and the limiting plate 10 is improved, the hollow tube 6 is screwed into the internal thread cylinder 11, and the hollow tube 6 and the limiting plate 10 are convenient to assemble and disassemble.
As an embodiment of the present invention: the upper surface of the rubber plug 12 is provided with the disc 21, the lower surface of the rubber plug 12 is fixedly provided with the ring 20, the upper end of the drawing rod 7 penetrates through the ring 20 and the rubber plug 12 to be fixedly connected with the disc 21, the ring 20 is fixedly connected with the drawing rod 7, and the design of the disc 21 and the ring 20 improves the connection stability of the rubber plug 12 and the drawing rod 7.
As an embodiment of the present invention: the intersection of the support plate 3 and the cross beam 1 is uniformly fixed with a plurality of reinforcing ribs, the reinforcing ribs are fixedly connected with the cross beam 1, and the design of the reinforcing ribs improves the mechanical strength of the connection of the support plate 3 and the cross beam 1.
The specific embodiment is as follows: the limiting plate 10 is inserted into the T-shaped groove 5 on the support plate 3, the insertion of the hollow pipe 6 and the support plate 3 is realized, namely, the connection of the hollow pipe 6 and the cross beam 1 is completed, after the first iron chain 4 and the second iron chain 9 are connected to the embedded steel bars 32, the pull rod 7 is pulled out of the hollow pipe 6, and the pull rod 7 is connected with the embedded steel bars 32 by ropes, so that the hollow pipe 6 and the pull rod 7 play a role of connecting the laminated floor slab 31 and the cross beam 1 together, the stability of the relative positions of the laminated floor slab 31 and the cross beam 1 is conveniently maintained, the shaking of the laminated floor slab 31 relative to the cross beam 1 in the hoisting process is avoided, the hoisting stability of the laminated floor slab 31 is improved, the position of the limiting plate 10 in the T-shaped groove 5 is adjusted until the pull rod 7 corresponds to the embedded steel bars 32, the embedded steel bars 32 with different distances are matched, and the application range is enlarged.
Proper amount of water is added into the water storage barrel 13, and then the pull rod 7 is in the moving process, the water in the water storage barrel 13 is in contact with the inner wall of the hollow pipe 6 due to small shaking, and then the water is adhered to the dust mixed water on the inner wall of the hollow pipe 6, so that dust on the inner wall of the hollow pipe 6 is cleaned on line, the dust accumulation is prevented, the sliding of the rubber plug 12 is influenced, the pull rod 7 drives the fixing ring 15 to move in the moving process, the fixing ring 15 is provided with bristles 17 to slide along the inner wall of the hollow pipe 6, the effect of loosening dust on the inner wall of the hollow pipe 6 is achieved, the effect of dust mixing into the water is improved, and the rubber sleeve 19 with the sponge ring 18 is sleeved on the pull rod 7 to prevent the water in the water storage barrel 13 from shaking greatly under the blocking of the sponge ring 18.
When the position of the limiting plate 10 in the T-shaped groove 5 is required to be adjusted, the handle 30 is utilized to rotate the threaded column 28, the threaded column 28 drives the second piston 26 to move in the second liquid storage barrel 27, liquid in the second liquid storage barrel 27 flows into the first liquid storage barrel 23 through the through hole 25, the first piston 24 is driven to slide after the liquid in the first liquid storage barrel 23 is increased, the first piston 24 drives the limiting plate 10 to slide in a direction away from the first liquid storage barrel 23 through the connecting rod 22, and conversely, when the threaded column 28 is reversely screwed, the liquid in the first liquid storage barrel 23 flows into the second liquid storage barrel 27, so that the limiting plate 10 moves in a direction close to the first liquid storage barrel 23, and the position of the limiting plate 10 in the T-shaped groove 5 is conveniently adjusted.
While the fundamental and principal features of the invention and advantages of the invention have been shown and described, it will be apparent to those skilled in the art that the invention is not limited to the details of the foregoing exemplary embodiments, but may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (6)

1. The utility model provides an assemble steady hoist and mount system of integral building coincide floor dress, includes crossbeam (1), its characterized in that: two first iron chains (4) are fixed at one end of the cross beam (1), two second iron chains (9) are fixed at one end, far away from the first iron chains (4), of the cross beam (1), two lifting lugs (2) which are symmetrically arranged are welded on the upper surface of the cross beam (1), a support plate (3) is fixed at the middle position of the lower surface of the cross beam (1), the support plate (3) is vertically arranged with the cross beam (1), a T-shaped groove (5) is formed in the lower surface of the support plate (3), a limiting plate (10) with an adjustable position is arranged in the T-shaped groove (5), a hollow pipe (6) which is vertically arranged is arranged on the lower surface of the limiting plate (10), a rope penetrating hole (8) for connecting a superposed floor slab (31) is formed in the hollow pipe (6), a rubber plug (12) is fixedly connected to the upper end of the pull rod (7), the rubber plug (12) is slidably arranged in the hollow pipe (6) and is attached to the hollow pipe (6), and a dust removing component is arranged on one end of the hollow pipe (12) and is arranged on the lower surface of the hollow pipe (6).
The ash removal assembly comprises a water storage cylinder (13), the water storage cylinder (13) is sleeved on the drawing rod (7) and is attached to the inner surface of the hollow tube (6), a cylinder sleeve (14) is fixedly arranged on the outer surface of the lower end of the water storage cylinder (13), the cylinder sleeve (14) is sleeved on the drawing rod (7) and is fixedly connected with the drawing rod (7), a fixing ring (15) is arranged on the lower side of the water storage cylinder (13), the fixing ring (15) is sleeved on the drawing rod (7) and is fixedly connected with the drawing rod (7), and bristles (17) attached to the inner wall of the hollow tube (6) are arranged on the outer surface of the fixing ring (15);
an annular groove is formed in the outer surface of the water storage cylinder (13), and a sealing ring which is attached to the inner surface of the hollow pipe (6) is arranged in the annular groove;
the water storage barrel (13) is internally provided with a rubber sleeve (19), the rubber sleeve (19) is sleeved on the drawing rod (7), and a sponge ring (18) with a water retaining effect is stuck on the outer surface of the rubber sleeve (19) through glue.
2. The assembled monolithic building composite floor slab assembling stable hoisting system as claimed in claim 1, wherein: the lower surface of the fixed ring (15) is annular and is provided with a plurality of threaded blind holes at equal intervals, and the threaded blind holes are internally connected with half-tooth screws (16) in a threaded manner.
3. The assembled monolithic building composite floor slab assembling stable hoisting system as claimed in claim 1, wherein: the utility model discloses a handle, including extension board (3) and handle, wear jack has been seted up to extension board (3) side, install connecting rod (22) in wearing the jack, connecting rod (22) one end and limiting plate (10) fixed connection, the extension board (3) fixed connection's first stock solution section of thick bamboo (23) are equipped with in the interlude hole outside, connecting rod (22) are kept away from the one end of extension board (3) and are installed first piston (24) in first stock solution section of thick bamboo (23), first stock solution section of thick bamboo (23) are kept away from one end surface lower part of extension board (3) and have been seted up through-hole (25), through-hole (25) downside is equipped with second stock solution section of thick bamboo (27) of thick bamboo of vertical arrangement, second stock solution section of thick bamboo (27) and first stock solution section of thick bamboo (23) are arranged perpendicularly and fixed connection, second stock solution section of thick bamboo (27) lower surface middle part position is fixed with internal thread bush (29), internal thread bush (29) internal thread connection has screw thread post (28), screw thread end (26) are installed to second piston (26) and are installed in second piston (26) and are installed to second piston (30).
4. The assembled monolithic building composite floor slab assembling stable hoisting system as claimed in claim 1, wherein: the middle part of the lower surface of the limiting plate (10) is provided with a groove, an internal thread cylinder (11) is fixed in the groove, an external thread is machined on the outer surface of the upper end of the hollow tube (6), and one end of the hollow tube (6) for machining the external thread is connected with the internal thread cylinder (11) in a threaded manner.
5. The assembled monolithic building composite floor slab assembling stable hoisting system as claimed in claim 1, wherein: the rubber stopper (12) upper surface is installed disc (21), rubber stopper (12) lower surface is fixed with collar (20), take out pull rod (7) upper end and run through collar (20) and rubber stopper (12) and disc (21) fixed connection, collar (20) and take out pull rod (7) fixed connection.
6. The assembled monolithic building composite floor slab assembling stable hoisting system as claimed in claim 1, wherein: a plurality of reinforcing ribs are uniformly fixed at the intersection of the support plate (3) and the cross beam (1), and the reinforcing ribs are fixedly connected with the cross beam (1).
CN202110012285.0A 2021-01-06 2021-01-06 Assembled integral type building composite floor slab assembling stable hoisting system Active CN112850453B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110012285.0A CN112850453B (en) 2021-01-06 2021-01-06 Assembled integral type building composite floor slab assembling stable hoisting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110012285.0A CN112850453B (en) 2021-01-06 2021-01-06 Assembled integral type building composite floor slab assembling stable hoisting system

Publications (2)

Publication Number Publication Date
CN112850453A CN112850453A (en) 2021-05-28
CN112850453B true CN112850453B (en) 2023-11-10

Family

ID=76004162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110012285.0A Active CN112850453B (en) 2021-01-06 2021-01-06 Assembled integral type building composite floor slab assembling stable hoisting system

Country Status (1)

Country Link
CN (1) CN112850453B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ278192A3 (en) * 1991-09-10 1993-03-17 Peter Maschek Process of and apparatus for removing deposits from pipelines and the use of ultrasound for cleaning the installed pipelines
JPH05201688A (en) * 1992-01-29 1993-08-10 Ohbayashi Corp Suspended load rotation preventing device
CN2169495Y (en) * 1993-07-08 1994-06-22 广东省英德县英龙水泥厂 Ash cleaning device for horizontal pipe
GB0718265D0 (en) * 2007-09-20 2007-10-31 Ortlieb Johann F Tube cleaning apparatus
KR101642388B1 (en) * 2015-09-11 2016-07-27 손원호 Bore Cleaning Device by Manual Impact Force
CN209035035U (en) * 2018-10-17 2019-06-28 江苏华瑞制冷设备有限公司 A kind of water chiller of pipeline easy to clean
CN209275982U (en) * 2018-12-29 2019-08-20 深圳中天昊电子科技有限公司 A kind of mould lifting device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2627520C1 (en) * 2016-11-17 2017-08-08 Общество С Ограниченной Ответственностью "Илмасоник-Наука" Combined method for tubing cleaning and device for its implementation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ278192A3 (en) * 1991-09-10 1993-03-17 Peter Maschek Process of and apparatus for removing deposits from pipelines and the use of ultrasound for cleaning the installed pipelines
JPH05201688A (en) * 1992-01-29 1993-08-10 Ohbayashi Corp Suspended load rotation preventing device
CN2169495Y (en) * 1993-07-08 1994-06-22 广东省英德县英龙水泥厂 Ash cleaning device for horizontal pipe
GB0718265D0 (en) * 2007-09-20 2007-10-31 Ortlieb Johann F Tube cleaning apparatus
KR101642388B1 (en) * 2015-09-11 2016-07-27 손원호 Bore Cleaning Device by Manual Impact Force
CN209035035U (en) * 2018-10-17 2019-06-28 江苏华瑞制冷设备有限公司 A kind of water chiller of pipeline easy to clean
CN209275982U (en) * 2018-12-29 2019-08-20 深圳中天昊电子科技有限公司 A kind of mould lifting device

Also Published As

Publication number Publication date
CN112850453A (en) 2021-05-28

Similar Documents

Publication Publication Date Title
CN102900022A (en) Hydraulic climbing formwork construction method for leaning tower of cable-stayed bridge
CN106522374B (en) Connecting device for connecting modular steel frames and connecting method thereof
CN109837992A (en) A kind of assembly light steel frame building system
CN113789948A (en) Large-span house roof atrium side wall sliding rail hanging basket and construction method thereof
CN110984224A (en) Prefabricated rail top air duct of subway station and lifting installation method thereof
CN112850453B (en) Assembled integral type building composite floor slab assembling stable hoisting system
CN102535830B (en) Machine position adhesion device for monolithic climbing scaffold for constructing prefabricated building
CN217812334U (en) Prestressed steel pipe truss floor support plate
CN202595965U (en) Curtain wall stone corner system
CN212773578U (en) Independent support system of assembled building quick detach
CN216882520U (en) Welding construction device for pipe cage pipeline
CN112962885B (en) Assembled stair system
CN110607764B (en) Bridge rotation construction structure and construction method thereof
CN214614152U (en) Modular pipe jacking well construction equipment
CN210032102U (en) Support for mounting external hanging piece of building
CN217027703U (en) Honeycomb stone suspended ceiling keel system
CN112502178A (en) Modular pipe jacking well construction equipment and use method
CN201224924Y (en) Formwork structure of concrete ground arch
CN218091983U (en) Solid ribbed plastic extrusion molding building template and template connecting piece
CN214785321U (en) Prefabricated assembled concrete rectangular beam
CN217975556U (en) A building bearing diagonal structure for construction
CN219159714U (en) Water conservancy pipeline supporting connection structure
CN219711213U (en) Building steel structure convenient to dismantle
CN219060569U (en) Concrete prefabricated component convenient to installation
CN210766346U (en) Improve outer material structure that pastes of bridge seal anchor district durability

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20231017

Address after: 322000 West side of the intersection of Panlong Road and Hushan Road, Fotang Town, Yiwu City, Jinhua City, Zhejiang Province (self declared)

Applicant after: Yiwu Shuangjianghu Development Group Co.,Ltd.

Address before: 443002 Wanda Plaza, 168 Yanjiang Avenue, Yichang City, Hubei Province

Applicant before: Li Chengcui

GR01 Patent grant
GR01 Patent grant