CN112838621B - Electric power system frequency modulation capacity realization method considering new energy growth - Google Patents

Electric power system frequency modulation capacity realization method considering new energy growth Download PDF

Info

Publication number
CN112838621B
CN112838621B CN202110085995.6A CN202110085995A CN112838621B CN 112838621 B CN112838621 B CN 112838621B CN 202110085995 A CN202110085995 A CN 202110085995A CN 112838621 B CN112838621 B CN 112838621B
Authority
CN
China
Prior art keywords
frequency modulation
capacity
photovoltaic
normal distribution
condition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110085995.6A
Other languages
Chinese (zh)
Other versions
CN112838621A (en
Inventor
王梦圆
严正
王晗
徐潇源
黄晨洋
贠靖洋
程基峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiaotong University
Original Assignee
Shanghai Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiaotong University filed Critical Shanghai Jiaotong University
Priority to CN202110085995.6A priority Critical patent/CN112838621B/en
Publication of CN112838621A publication Critical patent/CN112838621A/en
Application granted granted Critical
Publication of CN112838621B publication Critical patent/CN112838621B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/48Controlling the sharing of the in-phase component
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/28The renewable source being wind energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A method for realizing the frequency modulation capacity of a power system considering the increase of new energy comprises the steps of respectively collecting upward and downward frequency modulation quantity data of a power grid and measuring and calculating to obtain the upward and downward frequency modulation quantities of a target time period; according to the upward frequency modulation amount, the downward frequency modulation amount, the fan and the photovoltaic increment megawatt of the target time interval, the power grid frequency modulation resource demand of the target time interval is measured and calculated, and according to the actual operation data of the power grid, CPS1 and CPS2 are used as evaluation indexes to dynamically adjust the frequency modulation resource demand of the target time interval of the power grid. The method obtains the frequency modulation capacity requirement by measuring and calculating the deviation between the node load and the economic dispatching point, and then dynamically corrects according to the actual running condition. The method is used for calculating the demand of system frequency modulation resources, has clear physical significance, can fully utilize the historical data of the power grid, gives consideration to the rapid development of new energy, calculates aiming at a specific time period and a target power grid, and has the advantages that the result is more in line with the actual situation and the accuracy is higher.

Description

Electric power system frequency modulation capacity realization method considering new energy growth
Technical Field
The invention relates to a technology in the field of power system control, in particular to a method for realizing frequency modulation capacity of a power system considering new energy increase.
Background
The frequency modulation auxiliary service is an important part in the dispatching operation of the power system, and the accurate calculation of the frequency modulation capacity required by the system is an important precondition for organizing the market transaction of the frequency modulation auxiliary service and ensuring the safe and stable operation of the system. In actual power grid operation, an operator often sets a required frequency modulation capacity to a certain value according to experience, but in recent years, as the installed capacity of new energy is rapidly increased, the fluctuation of new energy output increases the fluctuation of a system power supply side, and the new energy output is difficult to predict, so that the safety and the economy of power grid operation cannot be considered by using a certain fixed value as the frequency modulation capacity. In order to consider the fluctuation of new energy output, a plurality of methods for calculating the frequency modulation capacity of the power grid in a data-driven mode based on historical data are proposed, and compared with the method for setting the frequency modulation capacity to a certain value only by experience, the method can better consider the operation condition of the power grid. However, the installed quantity of new energy resources is greatly increased year by year, the current frequency modulation capacity is estimated only by the historical new energy data, and the frequency modulation capacity demand condition of the power grid in a future period of time (such as one year) cannot be reasonably reflected, so that the invention provides a method for realizing the frequency modulation capacity of the power system considering the increase of the new energy resources.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a method for realizing the frequency modulation capacity of the power system considering the increase of new energy, wherein a fan and photovoltaic increment megawatts are introduced, the frequency modulation capacity is obtained by measuring and calculating the deviation of node load and an economic dispatching point, and dynamic correction is carried out according to the actual operation condition. The method is used for calculating the frequency modulation capacity of the system, has clear physical significance, can fully consider the rapid development of new energy, calculates aiming at a specific time period and a target power grid, and has higher accuracy, and the result is more in line with the actual condition of the power grid in a future time period.
The invention is realized by the following technical scheme:
the invention relates to a method for realizing the frequency modulation capacity of a power system considering the increase of new energy, which comprises the steps of respectively collecting the data of upward and downward frequency modulation quantities of a power grid and measuring and calculating the data to obtain the upward and downward frequency modulation quantities of a target time interval; according to the upward frequency modulation amount, the downward frequency modulation amount, the fan and the photovoltaic increment megawatt of the target time interval, the power grid frequency modulation capacity required by the target time interval is measured and calculated, and according to the actual operation data of the power grid, CPS1 and CPS2 are used as evaluation indexes to dynamically adjust the frequency modulation capacity of the power grid in the target time interval.
The step of collecting the upward and downward frequency modulation data of the power grid is as follows: counting historical data of upward frequency modulation quantity deployed in the same month of the previous two years, fitting the data by using normal distribution according to data of 5min, recording the demand with the confidence coefficient of 95%, counting data with positive load change of nodes in the same month of the previous two years, fitting the data by using normal distribution, and recording the demand with the confidence coefficient of 95%.
The upward and downward frequency modulation data are as follows: taking the maximum value of the two as the upward frequency modulation amount of the target time interval
Figure GDA0003520583440000021
Taking the maximum value of the two as the negative frequency modulation quantity of the target time interval
Figure GDA0003520583440000022
Wherein: preg+Is the upward frequency modulation amount of the target time interval;
Figure GDA0003520583440000023
the mean value of normal distribution of upward frequency modulation quantity deployed in the same month in the previous two years;
Figure GDA0003520583440000024
the mean value of normal distribution that the node load change in the same month in the previous two years is positive;
Figure GDA0003520583440000025
is the confidence level; sigma1+Is the variance of the normal distribution of the upward frequency modulation deployed for the same month in the previous two years; sigma2+The variance of normal distribution is that the load change of the same-month node in the previous two years is positive; n is1+The number of samples of normal distribution of upward frequency modulation quantity deployed in the same month in the previous two years; n is2+The number of samples of normal distribution in which the node load change is positive in the same month in the previous two years; preg-Is the downward frequency modulation amount of the target time interval;
Figure GDA0003520583440000026
the mean value of normal distribution of downward frequency modulation quantity deployed in the same month in the previous two years;
Figure GDA0003520583440000027
the node load change in the same month of the previous two years is the average value of negative normal distribution;
Figure GDA0003520583440000028
are all confidence levels; sigma1-Is the variance of the normal distribution of the down-modulation variables deployed for the same month in the previous two years; sigma2-The variance of normal distribution is that the load change of the same-month node in the previous two years is negative; n is1-Is frontThe number of samples of normal distribution of downward frequency modulation quantity deployed in the same month in two years; n is2-The number of samples of normal distribution in which the node load change is negative in the same month in the previous two years.
The fan and photovoltaic increment megawatt are embodied in the frequency modulation capacity by using the fan and photovoltaic increment megawatt for the newly added fan and photovoltaic capacity, and the megawatt capacity is increased every time the installed capacity of 1000 megawatts is newly increased.
The megawatt increment of the fan and the photovoltaic is as follows: the sum of the fan, the photovoltaic incremental frequency modulation capacity and the additional fan adjustment of the previous year:
Figure GDA0003520583440000029
wherein:
Figure GDA00035205834400000210
increasing the frequency modulation capacity for the fan in the year;
Figure GDA00035205834400000211
the frequency modulation capacity is increased for the fan in the previous year; additional fan adjustment
Figure GDA00035205834400000212
Figure GDA00035205834400000213
The mean value of the normal distribution fitted by the smooth function under the condition of the current fan capacity;
Figure GDA00035205834400000214
the mean value of normal distribution fitted by a frequency modulation smooth function under the windless condition;
Figure GDA00035205834400000215
as a confidence, 98.8%; sigmawThe variance of the normal distribution fitted for the smoothing function under the condition of the current fan capacity; sigmanwThe variance of the normal distribution fitted to the smoothing function in the absence of wind; n iswThe number of samples of normal distribution fitted for a smooth function under the condition of current fan capacity; n isnwThe number of samples of normal distribution fitted for a smooth function in the absence of wind;
Figure GDA00035205834400000216
the photovoltaic increment frequency modulation capacity of the year;
Figure GDA00035205834400000221
the photovoltaic incremental frequency modulation capacity of the previous year; additional photovoltaic adjustment
Figure GDA00035205834400000217
Figure GDA00035205834400000218
A mean value of normal distribution fitted for a smooth function under the current photovoltaic capacity;
Figure GDA00035205834400000219
the mean value of normal distribution fitted for the frequency modulation smoothing function under the condition of no photovoltaic;
Figure GDA00035205834400000220
as a confidence, 98.8%; sigmasA variance of a normal distribution fitted to a smoothing function under a current photovoltaic capacity; sigmansThe variance of a normal distribution fitted to a smooth function in the absence of a photovoltaic; n issThe number of samples of normal distribution fitted to a smoothing function under the current photovoltaic capacity; n isnsNumber of samples of a normal distribution fitted to a smooth function without photovoltaic.
The smoothing function includes:
a first part: calculating an adjustment load component for a period corresponding to the target period using a rolling average method based on the history data;
a second part: calculating an adjustment load component of a corresponding time period of the previous month by using a rolling average method based on historical data;
and a third part: calculating an adjustment load component of a corresponding time period in a month subsequent to the month in which the target time period is located by using a rolling average method based on the historical data;
the fourth part: calculating the adjustment load component of the previous hour of the corresponding time period in the same month of the month in which the target time period is based on the historical data by using a rolling average method;
the fifth part is that: calculating an adjustment load component of a next hour of a corresponding period in the same month as the month in which the target period is based on the history data using a rolling average method,
the five parts of the calculation modes of the smoothing function are as follows: and rolling and averaging the values of the previous and the next load values of each load value in the time interval to obtain a smooth load curve, wherein the difference between the actual load and the average load at the target moment is an adjusting load component.
The expression of the smoothing function corresponding to the current fan capacity is
Figure GDA0003520583440000031
Figure GDA0003520583440000032
Wherein: pw is a smooth function under the condition of the current fan capacity;
Figure GDA0003520583440000033
the load component of the first part under the condition of the current fan capacity is adjusted;
Figure GDA0003520583440000034
the adjusted load component of the second part under the condition of the current fan capacity;
Figure GDA0003520583440000035
the adjustment load component of the third part under the condition of the current fan capacity;
Figure GDA0003520583440000036
the fourth part of the regulation load component under the condition of the current fan capacity;
Figure GDA0003520583440000037
is the fifth part under the condition of current fan capacityThe regulation load component of (1); corresponding to the expression in the absence of wind as
Figure GDA0003520583440000038
Figure GDA0003520583440000039
Wherein: pnw is a smoothing function in the absence of wind;
Figure GDA00035205834400000310
the adjustment load component of the first part under the windless condition;
Figure GDA00035205834400000311
the adjustment load component of the second part under the windless condition;
Figure GDA00035205834400000312
the regulation load component of the third part under the windless condition;
Figure GDA00035205834400000313
the fourth part is the regulation load component under the windless condition;
Figure GDA00035205834400000314
the adjustment load component of the fifth part in the windless situation.
The expression of the smoothing function corresponding to the current photovoltaic capacity is
Figure GDA00035205834400000315
Figure GDA00035205834400000316
Wherein: p issA smoothing function under the condition of the current photovoltaic capacity;
Figure GDA00035205834400000317
the regulation load component of the first part under the condition of the current photovoltaic capacity;
Figure GDA00035205834400000318
the regulated load component of the second part under the current photovoltaic capacity condition;
Figure GDA00035205834400000319
the regulation load component of the third part under the condition of the current photovoltaic capacity;
Figure GDA00035205834400000320
the adjustment load component of the fourth part under the condition of the current photovoltaic capacity;
Figure GDA00035205834400000321
the adjustment load component of the fifth part under the condition of the current photovoltaic capacity; corresponding to the expression in the absence of photovoltaic
Figure GDA00035205834400000322
Figure GDA00035205834400000323
Wherein: pnsA smoothing function in the absence of photovoltaic;
Figure GDA00035205834400000324
a regulated load component for the first portion in the absence of photovoltaic conditions;
Figure GDA00035205834400000325
a regulated load component for the second portion in the absence of photovoltaic conditions;
Figure GDA00035205834400000326
a third portion of the regulated load component in the absence of photovoltaic conditions;
Figure GDA00035205834400000327
the fourth part is the regulation load component under the condition of no photovoltaic;
Figure GDA00035205834400000328
the regulated load component of the fifth section in the absence of photovoltaic.
The upward and downward frequency modulation amount of the target time period refers to: demand for capacity of upward frequency modulation
Figure GDA00035205834400000329
Figure GDA0003520583440000041
Downward frequency modulation capacity demand
Figure GDA0003520583440000042
The evaluation indexes are as follows: the average of CPS1 scores per month and the rolling average of CPS1 over 12 months are used to adjust the capacity requirements of the AGC per hour over the month. CPS1 indexes mainly consider the relation between the average value of ACE and the average value of frequency deviation in a control area, and measure whether the root mean square value of the long-term (such as one month) frequency deviation of a power grid is in a limited range or not by taking the average value of 1min as a reference, so that the influence of the area ACE on the frequency deviation of the whole interconnected power grid in a period of time is evaluated, and the comprehensive control performance of the area is reflected. CPS2 index examines whether the average value of the ACE in the control area meets the requirement of a given threshold value, takes the average value of 10min as a reference, can minimize the number of times of unit adjustment when the CPS1 target is completed, plays a role in reducing the deviation plan trend and the deviation plan electric quantity among areas, and evaluates the frequency modulation capacity and the continuous adjustment capacity of the control area.
The dynamic adjustment of the frequency modulation capacity of the power grid in the target time period is as follows: when the average value of CPS1 in a month is lower than 140%, 10% of frequency modulation capacity is additionally added in each hour in the month. If the rolling average value of CPS1 in 12 months is lower than 140%, the next month is added with 10% of frequency modulation capacity per hour, and if the CPS1 score is lower than 100%, the next month is added with 20% of frequency modulation capacity.
Technical effects
Compared with the prior art, the method considers the influence of the new energy output increase on the frequency modulation capacity demand in a mode of fan increment megawatt and photovoltaic increment megawatt. The frequency modulation capacity is defined as the deviation between the node load and the economic dispatching point by combining the newly increased installed capacity of the new energy of the power grid, the historical data of the power grid is fully utilized, the targeted calculation is carried out on the future time period and the target power grid, the result is more in line with the actual situation, and the accuracy is higher. And finally, dynamic correction is carried out according to the actual operation condition, so that the reliability of the calculated required frequency modulation capacity is improved, and the system safety is better guaranteed.
Drawings
FIG. 1 is a flow chart of the present invention.
Fig. 2 is an information flow diagram of a power system frequency modulation capacity calculation system.
Detailed Description
The embodiment relates to a power system frequency modulation capacity calculation system for considering new energy growth, which comprises: collection module, frequency modulation amount calculation module, new forms of energy calculation module, frequency modulation demand module and dynamic adjustment module, wherein: the acquisition module is used for acquiring and recording the load value, the upward frequency modulation amount and the downward frequency modulation amount of each time period of the power system, and the CPS1 score and the CPS2 score of each month; the frequency modulation amount calculation module is used for calculating the upward frequency modulation amount and the downward frequency modulation amount of each target time interval of the power system according to historical data; the new energy calculating module is used for calculating fan increment megawatts and photovoltaic increment megawatts; the frequency modulation demand module is used for calculating an upward frequency modulation demand and a downward frequency modulation demand of a target time period according to the results calculated by the frequency modulation amount calculation module and the new energy calculation module; the dynamic adjustment module is used for dynamically correcting the upward frequency modulation requirement and the downward frequency modulation requirement of the power grid according to the time running condition of the power grid, namely CPS1 and CPS2 indexes; the acquisition module is connected with the frequency modulation amount calculation module and is used for transmitting historical data such as load values, upward frequency modulation amounts, downward frequency modulation amounts and the like of each time period of the power system; the acquisition module is connected with the new energy calculation module and is used for transmitting the fan, the photovoltaic increment megawatt and related historical data, and meanwhile, the fan and the photovoltaic increment megawatt calculated by the new energy calculation module are transmitted to the acquisition module for recording; the acquisition module is connected with the dynamic adjustment module and transmits data of CPS1 scores and CPS2 scores of each month in actual operation; the frequency modulation amount calculation module and the new energy calculation module are connected with the frequency modulation demand module and provide data required by calculating the frequency modulation demand; and the dynamic adjusting module is connected with the frequency modulation demand module to correct the frequency modulation demand.
The method for realizing the frequency modulation capacity of the power system considering the new energy increase based on the system comprises the following steps:
collecting upward frequency modulation data of a power grid, and calculating the upward frequency modulation of a target time period;
collecting downward frequency modulation data of a power grid, and calculating downward frequency modulation of a target time period;
for the newly added fan capacity, the fan increment megawatt is used for embodying in the frequency modulation capacity, the megawatt capacity is increased every time the installed capacity of 1000 megawatts is newly increased, and the fan increment megawatt in a target time period is calculated;
for the newly increased photovoltaic capacity, the photovoltaic increment megawatt is used for embodying in the frequency modulation capacity, the megawatt capacity is increased every time the installed capacity of 1000 megawatts is newly increased, and the fan increment megawatt in a target time period is calculated;
calculating the power grid frequency modulation capacity requirement of the target time period according to the upward frequency modulation amount, the downward frequency modulation amount, the fan increment megawatt and the photovoltaic increment megawatt of the target time period;
and correcting the frequency modulation capacity of the power grid in the target period by using CPS1 and CPS2 as evaluation indexes according to the actual operation data of the power grid.
Compared with the prior art, the method fully considers the increase of new energy in a period of time in the future, carries out targeted calculation on a specific time period and a target power grid, can meet the objective requirement of the annual increase of the installed capacity of the new energy in recent years and the demand of electric power marketization, has more practical results and higher accuracy, and is favorable for ensuring the system stability under the condition of vigorous development of the new energy.
The foregoing embodiments may be modified in many different ways by those skilled in the art without departing from the spirit and scope of the invention, which is defined by the appended claims and all changes that come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.

Claims (6)

1. A method for realizing the frequency modulation capacity of a power system considering the increase of new energy is characterized in that the upward and downward frequency modulation quantity of a target time period is obtained by respectively collecting the upward and downward frequency modulation quantity data of a power grid and measuring and calculating; according to the upward frequency modulation amount, the downward frequency modulation amount, the fan and the photovoltaic increment megawatt of the target time interval, measuring and calculating the power grid frequency modulation resource demand of the target time interval, and dynamically adjusting the frequency modulation resource demand of the power grid target time interval by using CPS1 and CPS2 as evaluation indexes according to the actual operation data of the power grid;
the step of collecting the upward and downward frequency modulation data of the power grid is as follows: counting historical data of upward frequency modulation quantity deployed in the same month of the previous two years, fitting the data by using normal distribution for one data in 5min, recording the demand quantity with the confidence coefficient of 95%, counting the data with the load change of nodes in the same month of the previous two years being positive, fitting the data by using normal distribution, and recording the demand quantity with the confidence coefficient of 95%;
the fan and photovoltaic increment megawatt is embodied by using the fan and photovoltaic increment megawatt in the frequency modulation capacity for the newly added fan and photovoltaic capacity, and the megawatt capacity is increased when the installed capacity of 1000 megawatt is newly increased;
the megawatt increment of the fan and the photovoltaic is as follows: the sum of the fan, the photovoltaic incremental frequency modulation capacity and the additional fan adjustment of the previous year:
Figure FDA0003520583430000011
wherein:
Figure FDA0003520583430000012
increasing the frequency modulation capacity for the fan in the year;
Figure FDA0003520583430000013
the frequency modulation capacity is increased for the fan in the previous year; additional fan adjustment
Figure FDA0003520583430000014
Figure FDA0003520583430000015
The mean value of the normal distribution fitted by the smooth function under the condition of the current fan capacity;
Figure FDA0003520583430000016
the mean value of normal distribution fitted by a frequency modulation smooth function under the windless condition;
Figure FDA0003520583430000017
as a confidence, 98.8%; sigmawThe variance of the normal distribution fitted for the smoothing function under the condition of the current fan capacity; sigmanwThe variance of the normal distribution fitted to the smoothing function in the absence of wind; n iswThe number of samples of normal distribution fitted for a smooth function under the condition of current fan capacity; n isnwThe number of samples of normal distribution fitted for the smooth function under windless conditions;
Figure FDA0003520583430000018
the photovoltaic increment frequency modulation capacity of the year;
Figure FDA0003520583430000019
the photovoltaic incremental frequency modulation capacity of the previous year; additional photovoltaic adjustment
Figure FDA00035205834300000110
Figure FDA00035205834300000111
A mean value of normal distribution fitted for a smooth function under the current photovoltaic capacity;
Figure FDA00035205834300000112
the mean value of normal distribution fitted for the frequency modulation smoothing function under the condition of no photovoltaic;
Figure FDA00035205834300000113
as a confidence, 98.8%; sigmasFor smoothing under the current photovoltaic capacityVariance of number-fitted normal distribution; sigmansThe variance of a normal distribution fitted to a smooth function in the absence of a photovoltaic; n issThe number of samples of normal distribution fitted to a smoothing function under the current photovoltaic capacity; n isnsThe number of samples of normal distribution fitted to a smooth function without photovoltaic;
the smoothing function includes:
1) a first part: calculating an adjustment load component for a period corresponding to the target period using a rolling average method based on the history data;
2) a second part: calculating an adjustment load component of a corresponding time period of the previous month by using a rolling average method based on historical data;
3) and a third part: calculating an adjustment load component of a corresponding time period in a month subsequent to the month in which the target time period is located by using a rolling average method based on the historical data;
4) the fourth part: calculating the adjustment load component of the previous hour of the corresponding time period in the same month of the month in which the target time period is based on the historical data by using a rolling average method;
5) the fifth part is that: calculating the adjustment load component of the next hour of the corresponding time period in the same month of the month in which the target time period is based on the historical data by using a rolling average method;
the five parts of the calculation modes of the smoothing function are as follows: rolling and averaging the values of the load values in the previous and next periods of the time interval to obtain a smooth load curve, wherein the difference between the actual load and the average load at the target moment is an adjusting load component;
the expression of the smoothing function corresponding to the current fan capacity is
Figure FDA0003520583430000021
Figure FDA0003520583430000022
Wherein: pwThe function is a smooth function under the condition of the current fan capacity;
Figure FDA0003520583430000023
the load component of the first part under the condition of the current fan capacity is adjusted;
Figure FDA0003520583430000024
the adjusted load component of the second part under the condition of the current fan capacity;
Figure FDA0003520583430000025
the adjustment load component of the third part under the condition of the current fan capacity;
Figure FDA0003520583430000026
the fourth part of the regulation load component under the condition of the current fan capacity;
Figure FDA0003520583430000027
the load component of the fifth part under the condition of the current fan capacity is adjusted; corresponding to the expression in the absence of wind as
Figure FDA0003520583430000028
Figure FDA0003520583430000029
Wherein: pnwThe function is a smooth function under the condition of no wind;
Figure FDA00035205834300000210
the adjustment load component of the first part under the windless condition;
Figure FDA00035205834300000211
the adjustment load component of the second part under the windless condition;
Figure FDA00035205834300000212
the regulation load component of the third part under the windless condition;
Figure FDA00035205834300000213
the fourth part is the regulation load component under the windless condition;
Figure FDA00035205834300000214
the adjustment load component of the fifth part under the windless condition;
the expression of the smoothing function corresponding to the current photovoltaic capacity is
Figure FDA00035205834300000215
Figure FDA00035205834300000216
Wherein: psA smoothing function under the condition of the current photovoltaic capacity;
Figure FDA00035205834300000217
the regulation load component of the first part under the condition of the current photovoltaic capacity;
Figure FDA00035205834300000218
the regulated load component of the second part under the current photovoltaic capacity condition;
Figure FDA00035205834300000219
the regulation load component of the third part under the condition of the current photovoltaic capacity;
Figure FDA00035205834300000220
the adjustment load component of the fourth part under the condition of the current photovoltaic capacity;
Figure FDA00035205834300000221
the regulation load component of the fifth part under the condition of the current photovoltaic capacity; corresponding to the expression in the absence of photovoltaic
Figure FDA00035205834300000222
Figure FDA00035205834300000223
Wherein: pnsA smoothing function in the absence of photovoltaic;
Figure FDA00035205834300000224
a regulated load component for the first portion in the absence of photovoltaic conditions;
Figure FDA00035205834300000225
a regulated load component for the second portion in the absence of photovoltaic conditions;
Figure FDA00035205834300000226
a third portion of the regulated load component in the absence of photovoltaic conditions;
Figure FDA00035205834300000227
the fourth part is the regulation load component under the condition of no photovoltaic;
Figure FDA00035205834300000228
the regulated load component of the fifth section in the absence of photovoltaic.
2. The method for realizing the frequency modulation capacity of the power system in consideration of the new energy increase as claimed in claim 1, wherein the upward and downward frequency modulation data are: taking the maximum value of the two as the upward frequency modulation amount of the target time interval
Figure FDA00035205834300000229
Figure FDA00035205834300000230
Taking the maximum value of the two as the negative frequency modulation quantity of the target time interval
Figure FDA00035205834300000231
Figure FDA0003520583430000031
Wherein:
Figure FDA0003520583430000032
is the upward frequency modulation amount of the target time interval;
Figure FDA0003520583430000033
the mean value of normal distribution of upward frequency modulation quantity deployed in the same month in the previous two years;
Figure FDA0003520583430000034
the mean value of normal distribution that the node load change in the same month in the previous two years is positive;
Figure FDA0003520583430000035
is the confidence level; sigma1+Is the variance of the normal distribution of the upward frequency modulation deployed for the same month in the previous two years; sigma2+The variance of normal distribution is that the load change of the same-month node in the previous two years is positive; n is1+The number of samples of normal distribution of upward modulation frequency deployed in the same month in the previous two years; n is2+The number of samples of normal distribution in which the node load change is positive in the same month in the previous two years; preg-Is the downward frequency modulation amount of the target time interval;
Figure FDA0003520583430000036
the mean value of normal distribution of downward frequency modulation quantity deployed in the same month in the previous two years;
Figure FDA0003520583430000037
the average value of normal distribution that the node load change of the same month in the previous two years is negative;
Figure FDA0003520583430000038
are all confidence levels; sigma1-Is the variance of the normal distribution of the down-modulation variables deployed for the same month in the previous two years; sigma2-The node load change of the same month in the previous two years is negativeThe variance of the normal distribution; n is1-The number of samples of normal distribution of downward frequency modulation quantity deployed in the same month in the previous two years; n is a radical of an alkyl radical2-The number of samples of normal distribution in which the node load change is negative in the same month in the previous two years.
3. The method as claimed in claim 2, wherein the upward and downward frequency modulation amounts of the target time period are: upward frequency modulated resource demand
Figure FDA0003520583430000039
Figure FDA00035205834300000310
Downward frequency modulated resource demand
Figure FDA00035205834300000311
4. The method for realizing the frequency modulation capacity of the power system considering the new energy increase as claimed in claim 1, wherein the evaluation index is: using an average of CPS1 scores per month and a rolling average of CPS1 over 12 months to adjust the capacity requirements of the AGC per hour over the month; the CPS1 index reflects the relation between the ACE average value and the frequency deviation average value of the control area, takes the average value of 1min as a reference, measures whether the root mean square value of the long-term frequency deviation of the power grid is in a limited range, is used for evaluating the influence of the area ACE on the frequency deviation of the whole interconnected power grid within a period of time and reflects the comprehensive control performance of the area; the CPS2 index reflects whether the average value of the ACE in the control area meets the requirement of a given threshold value, the average value of 10min is taken as a reference, the number of times of unit adjustment can be minimized when the CPS1 target is completed, the effects of reducing deviation plan power flow and deviation plan electric quantity among areas are achieved, and the frequency modulation capacity and continuous adjustment capacity of the control area are evaluated.
5. The method for realizing the frequency modulation capacity of the power system considering the new energy increase as claimed in claim 1, wherein the dynamically adjusting the demand of the frequency modulation resource in the target time period of the power grid is as follows: when the average value of CPS1 in a month is lower than 140%, 10% of frequency modulation capacity is additionally added in each hour in the month.
6. A system for realizing the method for realizing the power system frequency modulation capacity considering the new energy increase in any one of claims 1 to 5 is characterized by comprising the following steps: collection module, frequency modulation amount calculation module, new forms of energy calculation module, frequency modulation demand module and dynamic adjustment module, wherein: the acquisition module is used for acquiring and recording the load value, the upward frequency modulation amount and the downward frequency modulation amount of each time period of the power system, and the CPS1 score and the CPS2 score of each month; the frequency modulation amount calculation module is used for calculating the upward frequency modulation amount and the downward frequency modulation amount of each target time interval of the power system according to historical data; the new energy calculating module is used for calculating fan increment megawatts and photovoltaic increment megawatts; the frequency modulation demand module is used for calculating an upward frequency modulation demand and a downward frequency modulation demand of a target time period according to the results calculated by the frequency modulation amount calculation module and the new energy calculation module; the dynamic adjustment module is used for dynamically correcting the upward frequency modulation requirement and the downward frequency modulation requirement of the power grid according to the time running condition of the power grid, namely CPS1 and CPS2 indexes; the acquisition module is connected with the frequency modulation amount calculation module and is used for transmitting historical data such as load values, upward frequency modulation amounts, downward frequency modulation amounts and the like of each time period of the power system; the acquisition module is connected with the new energy calculation module and is used for transmitting the fan, the photovoltaic increment megawatt and related historical data, and meanwhile, the fan and the photovoltaic increment megawatt calculated by the new energy calculation module are transmitted to the acquisition module for recording; the acquisition module is connected with the dynamic adjustment module and transmits data of CPS1 scores and CPS2 scores of each month in actual operation; the frequency modulation amount calculation module and the new energy calculation module are connected with the frequency modulation demand module and provide data required by calculating the frequency modulation demand; and the dynamic adjusting module is connected with the frequency modulation demand module to correct the frequency modulation demand.
CN202110085995.6A 2021-01-22 2021-01-22 Electric power system frequency modulation capacity realization method considering new energy growth Active CN112838621B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110085995.6A CN112838621B (en) 2021-01-22 2021-01-22 Electric power system frequency modulation capacity realization method considering new energy growth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110085995.6A CN112838621B (en) 2021-01-22 2021-01-22 Electric power system frequency modulation capacity realization method considering new energy growth

Publications (2)

Publication Number Publication Date
CN112838621A CN112838621A (en) 2021-05-25
CN112838621B true CN112838621B (en) 2022-05-10

Family

ID=75929447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110085995.6A Active CN112838621B (en) 2021-01-22 2021-01-22 Electric power system frequency modulation capacity realization method considering new energy growth

Country Status (1)

Country Link
CN (1) CN112838621B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109490676A (en) * 2018-12-27 2019-03-19 国电南瑞科技股份有限公司 New energy unit fm capacity on-line monitoring method and system
CN110661285A (en) * 2019-08-27 2020-01-07 华北电力大学 Configuration method for primary frequency modulation rotation reserve capacity after new energy grid connection

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7660640B2 (en) * 2006-03-07 2010-02-09 Siemens Aktiengesellschaft Apparatus and method for predictive control of a power generation system
CN108832658B (en) * 2018-06-22 2021-06-04 三峡大学 Wind power penetration power limit calculation method considering frequency constraint and wind power frequency modulation
CN109936152B (en) * 2018-11-09 2023-12-22 国网甘肃省电力公司张掖供电公司 Grid frequency modulation control method after high-permeability wind power grid connection and wind driven generator
CN110994703B (en) * 2019-11-30 2023-05-23 江苏省电力有限公司电力科学研究院 Frequency modulation capacity demand allocation method considering multiple frequency modulation resources
CN111598388B (en) * 2020-04-09 2023-01-06 国家电网有限公司 Online evaluation method for frequency modulation resource demand of real-time market of power grid

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109490676A (en) * 2018-12-27 2019-03-19 国电南瑞科技股份有限公司 New energy unit fm capacity on-line monitoring method and system
CN110661285A (en) * 2019-08-27 2020-01-07 华北电力大学 Configuration method for primary frequency modulation rotation reserve capacity after new energy grid connection

Also Published As

Publication number Publication date
CN112838621A (en) 2021-05-25

Similar Documents

Publication Publication Date Title
US10833508B2 (en) Active power distribution network multi-time scale coordinated optimization scheduling method and storage medium
US20130038060A1 (en) Method for controlling a wind power park and a wind power park controlled by such method
CN104779631A (en) Method and system for tracking wind and electric output plans through energy storage based on predictive power of wind and electricity
CN110633864B (en) Wind speed numerical forecast correction method and system based on distance flat deviation
CN114282757A (en) Novel power system operation flexibility assessment method considering wind curtailment load means
CN110969342B (en) Method for balancing small-reservoir-capacity hydroelectric generation safety and flood control risk management and control
KR102324783B1 (en) Apparatus and method for Deep neural network based power demand prediction
CN109829624B (en) Wind power cooperative game climbing control method and device
CN112838621B (en) Electric power system frequency modulation capacity realization method considering new energy growth
CN112531773B (en) New energy power generation system and energy regulation and control method and device thereof
CN110429645B (en) Photovoltaic power station active power change rate control method, system and storage medium
CN108336767B (en) Method for evaluating reliability of output capacity of low-voltage grid-connected distributed power supply
CN108777481B (en) Method for setting frequency deviation coefficient of power grid control area
CN116706869A (en) Prediction method and device for supply and demand balance scene of regional power grid
CN115360756A (en) New energy incorporation balancing method based on credible capacity evaluation method
CN114301101B (en) Evaluation method for virtual inertia and primary frequency modulation coefficient of wind-solar energy storage station
CN107069836B (en) Method and system for measuring power generation demand capacity in automatic power generation control process
CN112943557B (en) Wind power plant, wind generating set and method and equipment for predicting operation state of wind generating set
CN110601267A (en) Reward and punishment mechanism for guiding wind power plant to participate in source-network coordination
CN113629745B (en) Energy storage capacity planning method for power auxiliary control outside new energy station
US11811236B1 (en) Counter-solar power plant
CN114188998B (en) New energy station line loss adaptive compensation method and system considering acquisition time delay
CN111030194B (en) Automatic power generation control method for interconnected power grid with wind turbine generator
CN114336590A (en) Wind power plant energy storage configuration method considering power index
CN117674168B (en) Regional power low-carbon adjustment method and system considering power demand response

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant