CN112832274B - Construction method of cofferdam - Google Patents

Construction method of cofferdam Download PDF

Info

Publication number
CN112832274B
CN112832274B CN202011645053.0A CN202011645053A CN112832274B CN 112832274 B CN112832274 B CN 112832274B CN 202011645053 A CN202011645053 A CN 202011645053A CN 112832274 B CN112832274 B CN 112832274B
Authority
CN
China
Prior art keywords
curtain
construction method
rockfill
impervious wall
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011645053.0A
Other languages
Chinese (zh)
Other versions
CN112832274A (en
Inventor
陈洁波
李培源
张秋明
郑燕琼
赵雪君
李绵鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhongguanghe Energy Environmental Protection Technology Co ltd
Guangdong Dayu Water Conservancy Construction Co ltd
Original Assignee
Guangdong Zhongguanghe Energy Environmental Protection Technology Co ltd
Guangdong Dayu Water Conservancy Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhongguanghe Energy Environmental Protection Technology Co ltd, Guangdong Dayu Water Conservancy Construction Co ltd filed Critical Guangdong Zhongguanghe Energy Environmental Protection Technology Co ltd
Priority to CN202011645053.0A priority Critical patent/CN112832274B/en
Publication of CN112832274A publication Critical patent/CN112832274A/en
Application granted granted Critical
Publication of CN112832274B publication Critical patent/CN112832274B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The invention relates to the technical field of hydraulic and hydroelectric engineering construction, and discloses a cofferdam construction method, which comprises the following steps: removing impurities on the bottom of the river bed; filling the dike by adopting a mode of vertical plugging of upstream and downstream dual dikes, and laying a waterproof layer, a covering layer and a rockfill body from bottom to top; filling an impervious wall, wherein the impervious wall is filled in the rockfill body, and weathered rocks are embedded at the bottom of the impervious wall; grouting a curtain, wherein the top of the curtain extends out of the covering layer and is positioned inside the rockfill body, and the bottom of the curtain extends out of the waterproof layer and is positioned below the waterproof layer; the bottom end of the impervious wall is connected with the top end of the curtain; and paving a concrete protective surface on the slope surface of the rockfill body. The construction method of the invention has high efficiency and good seepage-proofing and water-stopping effects.

Description

Construction method of cofferdam
Technical Field
The invention relates to the technical field of hydraulic and hydroelectric engineering construction, in particular to a construction method of a cofferdam.
Background
The cofferdam is a necessary water retaining building for protecting dry construction of hydraulic buildings such as dams or plants and the like, generally belongs to temporary engineering, but can also be combined with main engineering to form a part of permanent engineering.
The seepage-proofing system of the cofferdam is in a central position and directly related to success or failure of engineering, and the existing cofferdam has the problems of long construction period and unsatisfactory seepage-proofing effect of the seepage-proofing wall.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: the cofferdam construction method has high construction efficiency and good seepage-proofing and water-stopping effects.
In order to solve the technical problem, the invention provides a cofferdam construction method, which comprises the following steps:
removing impurities on the bottom of the river bed;
filling the dike by adopting a mode of vertical plugging of upstream and downstream dual dikes, and laying a waterproof layer, a covering layer and a rockfill body from bottom to top;
filling an impervious wall, wherein the impervious wall is filled in the rockfill body, and weathered rocks are embedded at the bottom of the impervious wall;
grouting a curtain, wherein the top of the curtain extends out of the covering layer and is positioned inside the rockfill body, and the bottom of the curtain extends out of the waterproof layer and is positioned below the waterproof layer; the bottom end of the impervious wall is connected with the top end of the curtain;
and paving a concrete protective surface on the slope surface of the rockfill body.
Further, the step of filling the impervious wall in the rockfill comprises the following steps:
and slotting along the central axis of the upper end of the rockfill body, and filling self-setting mortar, wherein the self-setting mortar is embedded into the weathered rock.
Furthermore, a composite geomembrane is arranged in the impervious wall, self-setting mortar is filled on two sides of the composite geomembrane, and a protective layer for covering the impervious wall is arranged at the top end of the rockfill body.
Further, after the step of grooving along the central axis of the upper end of the rock-fill body and filling self-setting mortar, the construction method further comprises the following steps:
and (3) punching and smashing by using a heavy hammer to embed the self-setting mortar into the weathered rock.
Further, the step of curtain grouting follows the step of filling the impervious wall; before the curtain grouting step, the construction method further includes:
pre-embedding an insertion pipe for grouting the curtain, wherein the insertion pipe penetrates through the impervious wall;
and performing curtain grouting after the self-setting mortar is filled for 10 d.
Further, the step of filling the impervious wall in the rock pile comprises the following steps:
and drilling the rockfill body and simultaneously performing high-pressure spray irrigation to fill the impervious wall.
Further, the rock-fill body is drilled in a plum-blossom-shaped hole distribution mode.
Furthermore, the impervious wall is embedded into the concrete protective surface at the bend position of the dike.
Furthermore, a transverse buffer zone is arranged at the front end of the upstream face of the rockfill body.
Furthermore, the side of the overburden facing the water is equipped with the reinforcement muscle cage, be equipped with the stone in the reinforcement muscle cage.
Compared with the prior art, the cofferdam construction method provided by the technical scheme has the beneficial effects that:
the construction efficiency is accelerated by filling the dike in a mode of vertical plugging of upstream and downstream dual dikes, the lower side is prevented from seepage and water by using a curtain grouting mode, the upper side is prevented from seepage and water by using an anti-seepage wall, and the anti-seepage effect is good; weathered rocks are embedded at the bottom of the impervious wall, so that the stability and the impervious effect of the wall are improved; the slope surface of the rockfill body is paved with a concrete protective surface to effectively prevent water flow from scouring the rockfill body and prevent water pollution. The invention is especially suitable for construction with larger engineering quantity.
Drawings
FIG. 1 is a flowchart of a method of constructing a cofferdam according to an embodiment of the present invention;
fig. 2 is a schematic sectional view of a cofferdam structure obtained by the construction method of the embodiment of the present invention.
The concrete waterproof layer comprises 1-a waterproof layer, 2-a covering layer, 3-a rock-fill body, 4-a seepage-proof wall, 5-a curtain, 6-weathered rock, 7-a concrete facing, 8-a buffer belt, 9-a reinforcing rib cage, 10-a protective layer and 11-a composite geomembrane.
Detailed Description
The following detailed description of embodiments of the present invention is provided in connection with the accompanying drawings and examples. The following examples are intended to illustrate the invention but are not intended to limit the scope of the invention.
As shown in fig. 1 and 2, the present invention provides a cofferdam construction method, which comprises the following steps:
s1, removing impurities on the bottom of the river bed;
if sundries exist on the riverbed, the seepage-proofing effect of the cofferdam is affected, and the possibility that the cofferdam is easily damaged by water exists.
S2, filling the dike by adopting an upstream and downstream dual dike vertical plugging mode, and paving a waterproof layer 1, a covering layer 2 and a rockfill body 3 from bottom to top;
the upstream and downstream are under construction simultaneously, have increased the efficiency of construction, and water barrier 1 prevents that water from stretching into the weir body from the bottom, and overburden 2 improves the weir body height, and rockfill body 3 blocks the water inflow of top.
S3, filling a impervious wall 4, filling the impervious wall 4 in the rockfill body 3, and embedding weathered rocks 6 at the bottom of the impervious wall 4;
specifically, a cut-off wall 4 is filled after drilling a hole at the center of the rockfill 3;
s4, curtain grouting, wherein the top of a curtain 5 extends out of the covering layer 2 and is positioned inside the rockfill body 3, and the bottom of the curtain 5 extends out of the waterproof layer 1 and is positioned below the waterproof layer 1; the bottom end of the impervious wall 4 is connected with the top end of the curtain 5;
and S5, paving a concrete protective surface 7 on the slope surface of the rockfill body 3. Concrete protective surfaces 7 can be paved on the water-facing slope surface and the backwater slope surface respectively.
Based on the scheme, the construction efficiency is accelerated by filling the dike in a mode of vertical plugging of upstream and downstream dual dikes, the lower side is prevented from seepage and water by using a curtain grouting mode, the upper side is prevented from seepage and water by using the anti-seepage wall 4, and the anti-seepage effect is good; weathered rocks 6 are embedded at the bottom of the impervious wall 4, so that the stability and the impervious effect of the wall are improved; the slope laying concrete protective surface 7 of the rockfill body 3 effectively prevents water flow from scouring the rockfill body 3 and can also prevent water pollution.
In the present embodiment, as shown in fig. 2, the step of filling the cut-off wall 4 in the rock-fill body 3 includes: the rockfill 3 is grooved along the central axis of the upper end thereof and then filled with self-setting mortar, which is embedded in the weathered rock 6.
The self-setting mortar is prepared by using cement and bentonite as main raw materials and adding a retarder and a dispersant, and during the drilling process, the mortar is injected into the slotted hole, so that the mortar plays a role in wall fixing, is continuously mixed with sand in the stratum and is automatically set into the impervious wall 4. The wall body built by the self-setting mortar has good continuity, simple and convenient construction, high speed and low cost.
In this embodiment, the rock-fill body 3 is drilled in a lap-joint slot manner. The overlapped slotted holes, namely the adjacent slotted holes have overlapped parts, and the overlapping thickness can be specifically determined according to the field condition.
As shown in fig. 2, a composite geomembrane 11 is arranged in the impervious wall 4, the self-setting mortar is filled on both sides of the composite geomembrane 11, and a protective layer 10 for covering the impervious wall 4 is arranged on the top end of the rockfill 3. The composite geomembrane 11 has good waterproof performance, the seepage-proofing performance can be greatly improved by arranging the composite geomembrane 11 in the seepage-proofing wall 4, the composite geomembrane 11 is arranged in the groove before the self-setting mortar is filled, and then the self-setting mortar is filled on two sides of the composite geomembrane 11 simultaneously, so that the construction efficiency is improved.
Further, after the step of forming a groove along the center axis of the upper end of the rockfill body 3 and then filling the groove with self-setting mortar, the construction method further includes: and (3) punching and smashing by using a heavy hammer to embed the self-setting mortar into the weathered rock 6. Because the self-setting mortar has low self-setting wall building strength and is difficult to enter rocks, the density and the strength of the wall can be increased by punching and pounding with a heavy hammer, so that the wall is embedded into weathered rocks 6, and the anti-seepage effect is further increased.
Further, the step of curtain grouting is performed after the step of filling the cutoff wall 4; before the curtain grouting step, the construction method further includes: pre-embedding an insertion pipe for grouting the curtain, wherein the insertion pipe penetrates through the impervious wall 4; and performing curtain grouting after the self-setting mortar is filled for 10 d.
The method has the advantages that the inserting pipes for curtain grouting are pre-embedded in the self-setting mortar, so that the grouting and the self-setting mortar are not mutually influenced in condensation, the inserting pipes can also increase the strength of the impervious wall 4, and the problem of low strength of the impervious wall 4 formed by the self-setting mortar is well solved.
In other embodiments of the present invention, the step of filling the rock-fill body 3 with the impervious wall 4 comprises: and drilling the rockfill 3 and simultaneously carrying out high-pressure spray irrigation and filling the impervious wall 4.
And drilling and high-spray sprinkling irrigation filling are carried out simultaneously, so that the drilling and the sprinkling irrigation are carried out simultaneously, and the construction period is shortened.
Wherein, the rock-fill body 3 is drilled in a plum-blossom-shaped hole distribution mode. The quincunx cloth holes increase the connection strength between the wall body and the wall surface of the rockfill body 3 on one hand, and can increase the strength per se on the other hand, so that the thickness and the continuity of the wall body are guaranteed.
In addition, the impervious wall 4 is embedded into the concrete facing 7 at the bend of the dike. Because the diaphragm wall 4 is required to be connected with the concrete slope protection at the corner of the cofferdam, the end part is always difficult in diaphragm construction because two materials with different properties are connected and are positioned at the slope part which is difficult to construct. When the drill hole contacts the concrete slope surface, the feeding pressure is reduced, the drill hole is normally drilled after a small step is slowly formed on the slope surface, the hole inclination precision and the rock embedding depth can be ensured, and the anti-seepage effect can be ensured when the anti-seepage wall 4 is embedded into the concrete protective surface 7.
As shown in fig. 2, as an alternative embodiment, a transverse buffer zone 8 is arranged at the front end of the upstream surface of the rockfill body 3, and the buffer zone 8 can weaken the impact of water flow on the rockfill body 3, prevent the rockfill body 3 from being damaged, and prolong the service life of the cofferdam; especially in the water flow turning position, the water flow slowing has the function of protecting the weir body from being washed out.
As an alternative embodiment, as shown in fig. 2, the water-facing side of the cover layer 2 is provided with a reinforcement cage 9, said reinforcement cage 9 being provided with stones. When cofferdam, especially at the water flow turning place, the impact of the water flow to the weir body is very large, which easily causes the weir body to be damaged by being washed out at the water facing side, and brings the material of the covering layer 2 into the water to be washed away, thus damaging the weir body; the reinforcing reinforcement cage 9 is used for reinforcing the water-facing side of the covering layer 2, and the reinforcing reinforcement cage 9 can be a reinforcement cage, is internally provided with stones and is embedded into the covering layer 2 to resist the impact of water flow.
In summary, the embodiment of the invention provides a cofferdam construction method, the construction efficiency is accelerated by adopting the mode of vertical plugging of upstream and downstream dual prop, the lower side is used for seepage prevention and water stop in the mode of curtain grouting, the upper side is used for seepage prevention and water stop by the seepage-proof wall 4, and the seepage prevention effect is good; weathered rocks 6 are embedded at the bottom of the impervious wall 4, so that the stability and the impervious effect of the wall are improved; the slope laying concrete protective surface 7 of the rockfill body 3 effectively prevents water flow from scouring the rockfill body 3 and can also prevent water pollution.
The above description is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and substitutions can be made without departing from the technical principle of the present invention, and these modifications and substitutions should also be regarded as the protection scope of the present invention.

Claims (10)

1. The cofferdam construction method is characterized by comprising the following steps:
removing impurities on the bottom of the river bed;
filling the dike by adopting a mode of vertical plugging of upstream and downstream dual dikes, and laying a waterproof layer, a covering layer and a rockfill body from bottom to top;
filling an impervious wall, wherein the impervious wall is filled in the rockfill body, and weathered rocks are embedded at the bottom of the impervious wall;
grouting a curtain, wherein the top of the curtain extends out of the covering layer and is positioned inside the rockfill body, and the bottom of the curtain extends out of the waterproof layer and is positioned below the waterproof layer; the bottom end of the impervious wall is connected with the top end of the curtain; the joint of the bottom end of the impervious wall and the top end of the curtain is embedded into the weathered rock;
and paving a concrete protective surface on the slope surface of the rockfill body.
2. A method of constructing a cofferdam according to claim 1, wherein said step of filling a cut-off wall in said rockfill includes:
and slotting along the central axis of the upper end of the rockfill body, and filling self-setting mortar, wherein the self-setting mortar is embedded into the weathered rock.
3. The cofferdam construction method according to claim 2, wherein a composite geomembrane is installed inside the cutoff walls, the self-setting mortar is filled on both sides of the composite geomembrane, and a protective layer for covering the cutoff walls is installed on the top ends of the rockfill bodies.
4. The cofferdam construction method as claimed in claim 2, wherein after the step of slotting along the central axis of the upper end of the rockfill body and then filling self-setting mortar, the construction method further comprises:
and punching and smashing a heavy hammer to embed the self-setting mortar into the weathered rock.
5. The construction method of a cofferdam according to any one of claims 2 to 4, wherein said step of curtain grouting follows said step of filling up the impervious wall; before the curtain grouting step, the construction method further includes:
pre-embedding an insertion pipe for grouting the curtain, wherein the insertion pipe penetrates through the impervious wall;
and performing curtain grouting after the self-setting mortar is filled for 10 d.
6. A method of constructing a cofferdam according to claim 1, wherein said step of filling a cut-off wall in said rockfill includes:
and drilling the rockfill body and simultaneously carrying out high-pressure spray irrigation and filling the impervious wall.
7. The cofferdam construction method according to claim 6, wherein said rockfill body is drilled in a quincunx hole pattern.
8. The cofferdam construction method according to claim 1, wherein said impervious wall is embedded in said concrete facing at the hip bend.
9. The cofferdam construction method according to claim 1, wherein a lateral buffer strip is provided at the front end of the upstream face of the rockfill body.
10. The cofferdam construction method according to claim 1, wherein the water facing side of the covering layer is provided with a reinforcement cage, and stones are provided in the reinforcement cage.
CN202011645053.0A 2020-12-31 2020-12-31 Construction method of cofferdam Active CN112832274B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011645053.0A CN112832274B (en) 2020-12-31 2020-12-31 Construction method of cofferdam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011645053.0A CN112832274B (en) 2020-12-31 2020-12-31 Construction method of cofferdam

Publications (2)

Publication Number Publication Date
CN112832274A CN112832274A (en) 2021-05-25
CN112832274B true CN112832274B (en) 2022-07-12

Family

ID=75927178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011645053.0A Active CN112832274B (en) 2020-12-31 2020-12-31 Construction method of cofferdam

Country Status (1)

Country Link
CN (1) CN112832274B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153322B (en) * 2014-08-04 2016-02-03 河海大学 The method of attachment of film between thick backfill impervious wall and toe board on deep covering layer
CN107780424B (en) * 2017-12-07 2019-09-10 中铁二十局集团第六工程有限公司 A kind of mud riverbed earth rock cofferdam and its construction method
CN109629585B (en) * 2019-01-25 2024-03-12 三峡大学 Novel cofferdam structure under weak covering layer and construction method
CN110939104A (en) * 2019-12-27 2020-03-31 中水北方勘测设计研究有限责任公司 Mixed seepage-proofing dam
CN111733842A (en) * 2020-06-19 2020-10-02 三峡大学 Cofferdam construction method and cofferdam structure

Also Published As

Publication number Publication date
CN112832274A (en) 2021-05-25

Similar Documents

Publication Publication Date Title
US8974152B2 (en) Polymer grouting method for constructing vertical supporting system
CN102966072B (en) Construction method for treating widened and heightened engineering joint surfaces of dikes on soft clay foundation
CN104514216A (en) Fill channel anti-frost heaving and anti-seepage structure and construction method
CN109339079B (en) Foundation pit water stopping system adjacent to river permeable stratum and construction process thereof
CN102797241A (en) Resin panel earth-rock fill dam and panel construction method
CN212477607U (en) Shallow underground excavation tunnel top riverbed bottom reinforced structure that buries
JP6370295B2 (en) Embankment reinforcement structure and its construction method
CN111877397A (en) Rapid construction cutting retaining wall and construction method thereof
CN111455737A (en) Wading railway roadbed structure and construction method thereof
CN212837843U (en) IV-class and V-class surrounding rock tunnel concrete lining anti-cracking structure
CN203716064U (en) Roadbed sewer convenient for dredging
WO2023202455A1 (en) Single-layer well wall having jointed water-stop structure and grouting system, and construction method therefor
CN112832274B (en) Construction method of cofferdam
CN112195965A (en) Expansive soil cutting retaining wall
CN100359102C (en) Permeable soil keeping wall and its use
CN110777832A (en) Waterproof curtain at end of underwater channel foundation pit along two sides of water
CN105350557B (en) One kind is suitable for deeper soft clay area water-stop curtain method
CN210636441U (en) Guide partition wall
CN209891168U (en) Dredging engineering's floodgate case buried pipe formula outlet structure
CN111794183A (en) Shallow-buried underground tunnel top riverbed bottom reinforcing structure and method
KR20150021098A (en) Waterside structures reinforced method
CN219118223U (en) Gravity type anchor rod retaining wall
CN216515403U (en) Ecological joint body for river course slope protection for flood control and drainage
CN214116491U (en) Seepage-stopping drainage structure for inter-floor dislocation zone of underground workshop
CN112900364B (en) Anti-scouring and anti-sliding structure of diversion tunnel outlet opposite-bank road side slope and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant