CN112811298A - Construction method for hoisting block net rack by using steel carrying pole device - Google Patents

Construction method for hoisting block net rack by using steel carrying pole device Download PDF

Info

Publication number
CN112811298A
CN112811298A CN202110160140.5A CN202110160140A CN112811298A CN 112811298 A CN112811298 A CN 112811298A CN 202110160140 A CN202110160140 A CN 202110160140A CN 112811298 A CN112811298 A CN 112811298A
Authority
CN
China
Prior art keywords
steel
hoisting
net rack
carrying pole
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110160140.5A
Other languages
Chinese (zh)
Inventor
周观根
游桂模
周丽娜
耿士奇
谢董恩
戴君南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Southeast Space Frame Co Ltd
Original Assignee
Zhejiang Southeast Space Frame Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Southeast Space Frame Co Ltd filed Critical Zhejiang Southeast Space Frame Co Ltd
Priority to CN202110160140.5A priority Critical patent/CN112811298A/en
Publication of CN112811298A publication Critical patent/CN112811298A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a construction method for hoisting a partitioned net rack by using a steel carrying pole device, which belongs to the technical field of building structure engineering and comprises the following operation steps: the first step is as follows: firstly, the steel carrying pole connecting component is blanked, assembled and welded to form. The second step is that: and then, the H-shaped steel beam is adopted to pre-process short rectangular steel, supporting side rectangular steel and long rectangular steel. The third step: and the steel carrying pole connecting assembly, the short rectangular steel, the supporting edge rectangular steel and the long rectangular steel are transported to a construction site to be assembled into the steel carrying pole device. The fourth step: the roof rack is divided into a plurality of hoisting units, after assembly, the crane and the hoisting rack unit with hole site ear plates are connected by steel wire ropes, the connecting belt hole site ear plates are connected with the rack unit hoisted in blocks by steel wire ropes, and a steel carrying pole device is adopted between the crane and the rack unit for auxiliary hoisting. The device has the characteristics of simple structure, high efficiency, convenience in assembly and good safety and stability. Reduce the secondary transportation in the yard, saved manpower and materials.

Description

Construction method for hoisting block net rack by using steel carrying pole device
Technical Field
The invention relates to the technical field of building structure engineering, in particular to a construction method for hoisting a partitioned net rack by using a steel carrying pole device.
Background
Along with the development rapid advance of modern industrial economy, more and more industrial plants, especially the industrial plant of steel structure roofing is lighter because of the integral construction structure is compared with concrete structure, and construction period is short, can solve the great problem of many industrial plant spans moreover, obtains more and more generally using.
In order to ensure the purposes of high efficiency, rapidness and safety of hoisting a large-span net rack structure, the net rack needs to be assembled in blocks, then a method of hoisting by a crawler crane is adopted, and particularly when the construction site is narrow and uneven, the large crawler crane is utilized, and a steel carrying pole device is used for hoisting in blocks, so that the method is quicker and more economic.
Disclosure of Invention
The invention mainly solves the defects of low efficiency, high construction difficulty and poor safety and stability in the prior art, and provides a construction method for hoisting a partitioned net rack by using a steel carrying pole device, which has the characteristics of simple structure, high efficiency, convenience in assembly and good safety and stability. The problems of large span, heavy mass, high ground clearance and narrow construction site of the net rack steel structure roof are solved. Reduce the secondary transportation in the yard, saved manpower and materials.
The technical problem of the invention is mainly solved by the following technical scheme:
a construction method for hoisting a partitioned net rack by using a steel carrying pole device comprises the following operation steps:
the first step is as follows: the steel carrying pole connecting assembly is formed by assembling and welding two connecting band hole site ear plates, two side connecting plates, two connecting panels and an end sealing plate, and then the upper ends of the connecting panels are welded and hung on the ear plates with the hole sites.
The second step is that: and then, the H-shaped steel beam is adopted to pre-process short rectangular steel, supporting side rectangular steel and long rectangular steel.
The third step: and the steel carrying pole connecting assembly, the short rectangular steel, the supporting edge rectangular steel and the long rectangular steel are transported to a construction site to be assembled into the steel carrying pole device.
The fourth step: the roof rack is divided into a plurality of hoisting units, after assembly, the crane and the hoisting rack unit with hole site ear plates are connected by steel wire ropes, the connecting belt hole site ear plates are connected with the rack unit hoisted in blocks by steel wire ropes, and a steel carrying pole device is adopted between the crane and the rack unit for auxiliary hoisting.
Preferably, a plurality of triangular reinforcing rib plates are welded between the two ends of the lifting lug plate with the hole position and the connecting panel and between the connecting lug plate with the hole position and the side connecting panel, so that the strength of the structure is improved.
Preferably, the net racks are assembled on the ground in blocks according to the hoisting blocks, the whole assembling sequence is the same as the net rack hoisting sequence, and when the single net rack is assembled, the net racks are assembled from the center to the periphery of the net rack unit due to the avoidance of the generation of assembling accumulated errors.
Preferably, when the net rack is assembled, the lower chord grid of the middle grid is assembled, the upper chord ball, the upper chord rod and the web members are combined into a small unit with one sphere and three rods or one sphere and four rods, then the small unit is hoisted by a crane, each rod member is connected with the corresponding sphere in a butt joint mode by a worker, and after the net rack is assembled, subsequent purlin dragging and lower hanging installation are carried out.
The invention can achieve the following effects:
the invention provides a construction method for hoisting a partitioned net rack by using a steel carrying pole device, which has the characteristics of simple structure, high efficiency, convenience in assembly and good safety and stability compared with the prior art. The problems of large span, heavy mass, high ground clearance and narrow construction site of the net rack steel structure roof are solved. Reduce the secondary transportation in the yard, saved manpower and materials.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Fig. 2 is a schematic structural view of the steel shoulder pole connection assembly of the present invention.
Fig. 3 is a side view schematic of the steel shoulder pole attachment assembly of the present invention.
Fig. 4 is a structural cross-sectional view of the steel shoulder pole attachment assembly of the present invention.
In the figure: steel shoulder pole coupling assembling 1, short rectangular steel 2, support limit rectangular steel 3, long rectangular steel 4, connecting band hole site otic placode 5, side connecting plate 6, hoist and mount area hole site otic placode 7, end shrouding 8, connection panel 9, triangle deep floor 10.
Detailed Description
The technical scheme of the invention is further specifically described by the following embodiments and the accompanying drawings.
Example (b): as shown in the figure, the construction method for hoisting the partitioned net rack by using the steel carrying pole device comprises the following operation steps:
the first step is as follows: the steel carrying pole connecting assembly 1 is manufactured by blanking, assembling, welding and forming, the steel carrying pole connecting assembly 1 is formed by assembling and welding two connecting band hole position ear plates 5, two side connecting plates 6, two connecting panels 9 and an end head sealing plate 8, and then the upper ends of the connecting panels 9 are welded and hoisted to the ear plates 7 with hole positions.
A pair of triangular reinforcing rib plates 10 which are symmetrically distributed are welded between the two ends of the lifting lug plate with hole positions 7 and the connecting panel 9 and between the connecting lug plate with hole positions 5 and the side connecting plate 6, so that the strength of the structure is improved.
The second step is that: and then, the H-shaped steel beam is adopted to pre-process the short rectangular steel 2, the supporting side rectangular steel 3 and the long rectangular steel 4.
The third step: and (3) transporting the steel carrying pole connecting assembly 1, the short rectangular steel 2, the supporting side rectangular steel 3 and the long rectangular steel 4 to a construction site to be assembled into a steel carrying pole device.
The fourth step: the roof rack is divided into a plurality of hoisting units, after assembly, the crane and the hoisting belt hole position ear plate 7 are connected by a steel wire rope, the connecting belt hole position ear plate 5 is connected with the rack unit hoisted in blocks by the steel wire rope, and a steel carrying pole device is adopted between the crane and the rack unit for auxiliary hoisting.
The net racks are assembled on the ground in blocks according to the hoisting blocks, the whole assembling sequence is the same as the net rack hoisting sequence, and when a single net rack is assembled, the net rack is assembled from the center to the periphery of the net rack unit due to the avoidance of the generation of assembling accumulated errors. When the net rack is assembled, the lower chord grids of the middle grids are assembled, the upper chord balls, the upper chord rods and the web members are combined into small units of one sphere three-rod or one sphere four-rod, then the small units are hoisted by the crane, workers butt each rod member to be connected with the corresponding sphere, and after the net rack is assembled, subsequent purlin dragging and lower hanging installation are carried out.
In conclusion, the construction method for hoisting the partitioned net rack by using the steel carrying pole device has the characteristics of simple structure, high efficiency, convenience in assembly and good safety and stability. The problems of large span, heavy mass, high ground clearance and narrow construction site of the net rack steel structure roof are solved. Reduce the secondary transportation in the yard, saved manpower and materials.
The above description is only an embodiment of the present invention, but the structural features of the present invention are not limited thereto, and any changes or modifications within the scope of the present invention by those skilled in the art are covered by the present invention.

Claims (4)

1. A construction method for hoisting a partitioned net rack by using a steel carrying pole device is characterized in that: the method comprises the following operation steps:
the first step is as follows: firstly, blanking, assembling and welding a steel carrying pole connecting assembly (1) for forming, wherein the steel carrying pole connecting assembly (1) is formed by assembling and welding two connecting belt hole site lug plates (5), two side connecting plates (6), two connecting panels (9) and an end head sealing plate (8), and then the upper ends of the connecting panels (9) are welded with a hoisting belt hole site lug plate (7);
the second step is that: then, the H-shaped steel beam is adopted to pre-process the short rectangular steel (2), the supporting side rectangular steel (3) and the long rectangular steel (4);
the third step: transporting the steel carrying pole connecting assembly (1), the short rectangular steel (2), the supporting side rectangular steel (3) and the long rectangular steel (4) to a construction site to be assembled into a steel carrying pole device;
the fourth step: the roof net rack is divided into a plurality of hoisting units, after assembly, the crane and the hoisting net rack unit with hole position ear plates (7) are connected through steel wire ropes, the hole position ear plates (5) are connected with the net rack unit hoisted in blocks through the steel wire ropes, and a steel carrying pole device is adopted between the crane and the net rack unit for auxiliary hoisting.
2. The construction method for hoisting the partitioned net rack by using the steel carrying pole device according to claim 1, characterized in that: a plurality of triangular reinforcing rib plates (10) are welded between the two ends of the lifting lug plate (7) with the hole position and the connecting panel (9) and between the connecting lug plate (5) with the hole position and the side connecting plate (6), so that the strength of the structure is improved.
3. The construction method for hoisting the partitioned net rack by using the steel carrying pole device according to claim 1, characterized in that: the net racks are assembled on the ground in blocks according to the hoisting blocks, the whole assembling sequence is the same as the net rack hoisting sequence, and when a single net rack is assembled, the net rack is assembled from the center to the periphery of the net rack unit due to the avoidance of the generation of assembling accumulated errors.
4. The construction method for hoisting the partitioned net rack by using the steel carrying pole device as claimed in claim 3, wherein: when the net rack is assembled, the lower chord grids of the middle grids are assembled, the upper chord balls, the upper chord rods and the web members are combined into small units of one sphere three-rod or one sphere four-rod, then the small units are hoisted by the crane, workers butt each rod member to be connected with the corresponding sphere, and after the net rack is assembled, subsequent purlin dragging and lower hanging installation are carried out.
CN202110160140.5A 2021-02-05 2021-02-05 Construction method for hoisting block net rack by using steel carrying pole device Pending CN112811298A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110160140.5A CN112811298A (en) 2021-02-05 2021-02-05 Construction method for hoisting block net rack by using steel carrying pole device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110160140.5A CN112811298A (en) 2021-02-05 2021-02-05 Construction method for hoisting block net rack by using steel carrying pole device

Publications (1)

Publication Number Publication Date
CN112811298A true CN112811298A (en) 2021-05-18

Family

ID=75861666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110160140.5A Pending CN112811298A (en) 2021-02-05 2021-02-05 Construction method for hoisting block net rack by using steel carrying pole device

Country Status (1)

Country Link
CN (1) CN112811298A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102556829A (en) * 2012-02-08 2012-07-11 中国电力科学研究院 Hoisting rack for hoisting and mounting condenser shell module
CN202321968U (en) * 2011-12-06 2012-07-11 南京宝钢住商金属制品有限公司 Special lifting tool for sheet material
CN104671061A (en) * 2015-02-13 2015-06-03 广西桂冠电力股份有限公司大化水力发电总厂 Disassembling and assembling device of bolt of rotating wheel body overturning lifting tool and disassembling, assembling and installing method of bolt
CN206511801U (en) * 2017-03-09 2017-09-22 中国十七冶集团有限公司 The carrying pole device that ladle turret is lifted
CN107386460A (en) * 2017-07-18 2017-11-24 江苏绿色辉煌节能科技有限公司 A kind of large-span shell bolted spherical node installation method
CN208500108U (en) * 2018-06-15 2019-02-15 上海上安机械施工有限公司 A kind of balance hanging beam
CN209988942U (en) * 2019-05-24 2020-01-24 湖南省第四工程有限公司 Assembled building superimposed sheet lifting device
CN111099491A (en) * 2020-01-13 2020-05-05 中国五冶集团有限公司 Auxiliary device for hoisting large steel net frame structure
CN212222161U (en) * 2020-05-01 2020-12-25 重庆交通大学 Hoisting connection device for steel pipe pile with flange plate

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202321968U (en) * 2011-12-06 2012-07-11 南京宝钢住商金属制品有限公司 Special lifting tool for sheet material
CN102556829A (en) * 2012-02-08 2012-07-11 中国电力科学研究院 Hoisting rack for hoisting and mounting condenser shell module
CN104671061A (en) * 2015-02-13 2015-06-03 广西桂冠电力股份有限公司大化水力发电总厂 Disassembling and assembling device of bolt of rotating wheel body overturning lifting tool and disassembling, assembling and installing method of bolt
CN206511801U (en) * 2017-03-09 2017-09-22 中国十七冶集团有限公司 The carrying pole device that ladle turret is lifted
CN107386460A (en) * 2017-07-18 2017-11-24 江苏绿色辉煌节能科技有限公司 A kind of large-span shell bolted spherical node installation method
CN208500108U (en) * 2018-06-15 2019-02-15 上海上安机械施工有限公司 A kind of balance hanging beam
CN209988942U (en) * 2019-05-24 2020-01-24 湖南省第四工程有限公司 Assembled building superimposed sheet lifting device
CN111099491A (en) * 2020-01-13 2020-05-05 中国五冶集团有限公司 Auxiliary device for hoisting large steel net frame structure
CN212222161U (en) * 2020-05-01 2020-12-25 重庆交通大学 Hoisting connection device for steel pipe pile with flange plate

Similar Documents

Publication Publication Date Title
KR100634465B1 (en) Reinforcement Device for Tower Crane
CN105298099A (en) Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof
CN205134919U (en) Modularization suspension type steel tubes clamps scaffold operation platform
CN101967902B (en) Basic guide rail for helicopter assembly transmission line iron tower leg section
CN112811298A (en) Construction method for hoisting block net rack by using steel carrying pole device
CN110980500A (en) Balanced stress auxiliary hanging beam and roof structure integral hoisting method
CN212050135U (en) Hoisting carrying pole for hoisting prefabricated PC (polycarbonate) component
CN214003773U (en) Assembled multi-wing D-shaped lifting lug
CN113187298B (en) Layered assembly type anti-seismic staggered truss structure and assembly method
CN210340110U (en) Two T board hoisting structure of large-span assembled
CN212689234U (en) Steel structure support for industrial factory building
CN212669031U (en) Novel split type jib loading boom of tower machine
CN212129965U (en) Interim securing device is assembled in air to box steel construction post
CN204940131U (en) A kind of hanging basket device of Wavelike steel webplate parts
CN211775082U (en) Jig frame for large-span pipe truss
CN210150559U (en) Hoisting assembly in groups for reinforcing steel bar formwork integrated component
CN114482561A (en) Steel structure roof installation method
CN217201598U (en) Assembled hollow plate beam lifting appliance considering both box beam and hollow plate beam
CN112357743A (en) Manufacturing method of simple hoisting tool for purlines of factory building roof
CN207211778U (en) A kind of steel platform
CN215047928U (en) Steel shoulder pole device for net rack block hoisting
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN207194414U (en) A kind of foundation-free steel platform for temporary support
CN210766419U (en) Bridge hanger structure
CN211949509U (en) Structural steel cantilever supporting platform for high-altitude cantilever component construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210518

RJ01 Rejection of invention patent application after publication