CN112749401A - Supervision work management method, system, computer device and storage medium - Google Patents

Supervision work management method, system, computer device and storage medium Download PDF

Info

Publication number
CN112749401A
CN112749401A CN202011634670.0A CN202011634670A CN112749401A CN 112749401 A CN112749401 A CN 112749401A CN 202011634670 A CN202011634670 A CN 202011634670A CN 112749401 A CN112749401 A CN 112749401A
Authority
CN
China
Prior art keywords
data
tool
module
supervision
storage server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011634670.0A
Other languages
Chinese (zh)
Inventor
李智勇
赵慧珍
白赛妙
兰好飞
杨朝民
赵红松
李永亮
周伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Huabei Hydropower Engineering Supervision Co ltd
Original Assignee
Henan Huabei Hydropower Engineering Supervision Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Huabei Hydropower Engineering Supervision Co ltd filed Critical Henan Huabei Hydropower Engineering Supervision Co ltd
Priority to CN202011634670.0A priority Critical patent/CN112749401A/en
Publication of CN112749401A publication Critical patent/CN112749401A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/602Providing cryptographic facilities or services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/17Details of further file system functions
    • G06F16/1734Details of monitoring file system events, e.g. by the use of hooks, filter drivers, logs
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5083Techniques for rebalancing the load in a distributed system
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Business, Economics & Management (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Strategic Management (AREA)
  • Primary Health Care (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Bioethics (AREA)
  • Computer Hardware Design (AREA)
  • Computer Security & Cryptography (AREA)
  • Storage Device Security (AREA)

Abstract

The application relates to the field of project supervision, in particular to a supervision work management method, a supervision work management system, a computer device and a storage medium, wherein the supervision work management method comprises the following steps: compiling required supervision data of each construction node on site based on a user interface; storing the required supervision data based on the storage tool, and encrypting the storage tool based on the encryption tool; decrypting the storage tool based on the decryption tool, and extracting the required supervision data based on the data extraction tool; the required supervision data is converted into a model calling code based on a data conversion tool, a management model is built by identifying the model calling code based on a model building tool, and a management log file is generated based on the management model. This application has the effect that can promote the efficiency of proctoring.

Description

Supervision work management method, system, computer device and storage medium
Technical Field
The present application relates to the field of project supervision, and in particular, to a supervision work management method, system, computer device, and storage medium.
Background
Project supervision refers to a professional service activity that a building unit with related qualifications is entrusted by a party A, and the party A monitors the project construction of a party B according to the project construction documents of the national standard, laws and regulations related to the project construction, project construction supervision contracts and other project construction contracts.
In the related technology, in engineering construction supervision acceptance, recording and storing of detection data are mainly paper files, wherein when actual measurement is carried out on various data information by the paper files on an engineering construction site, due to various acceptance standards being complicated, the difficulty of mastering by an administrator is high, so that the administrator needs to check the acceptance standards one by one through the paper files to determine whether the engineering construction meets the acceptance standards, and therefore, a large amount of manpower and time are consumed for collecting, arranging and accepting various data information.
With respect to the related art in the above, the inventors consider that there is a drawback that the proctoring efficiency is low.
Disclosure of Invention
In order to improve the supervision efficiency, the application provides a supervision work management method, a supervision work management system, a computer device and a storage medium.
In a first aspect, the supervision work management method provided by the present application adopts the following technical scheme:
a supervision work management method comprises the following steps:
compiling required supervision data of each construction node on site based on a user interface;
storing the required supervision data based on the storage tool, and encrypting the storage tool based on the encryption tool;
decrypting the storage tool based on the decryption tool, and extracting the required supervision data based on the data extraction tool;
the required supervision data is converted into a model calling code based on a data conversion tool, a management model is built by identifying the model calling code based on a model building tool, and a management log file is generated based on the management model.
Through adopting above-mentioned technical scheme, the required data of managing of each construction node in scene is worked out through user interface, and through the required data of managing of storage instrument storage, and encrypt the storage instrument, through deciphering the storage instrument, and extract required data of managing from the storage instrument, through data conversion instrument with required data of managing convert the model into and call the sign indicating number, then, through model construction instrument discernment model call sign indicating number and establish the management model, finally, according to management model generation management log file, through the automatic acquisition and the storage to required data of managing, thereby, engineering efficiency of managing has been promoted.
Optionally, the storage tool includes a storage server, and the storage server supports server load balancing.
By adopting the technical scheme, the storage tool is set as the storage server, so that the storage server supports server load balancing, and further, the space expansion of the storage server is facilitated.
Optionally, the data to be managed in the storage server is set to obtain the data content of the key data item to be encrypted in each piece of data, and the data content is encrypted by using an encryption algorithm to generate a ciphertext for storage, so as to complete the encryption of the storage server.
By adopting the technical scheme, the required supervision data stored in the storage server is encrypted to generate a ciphertext for storage so as to complete the encryption of the storage server, and therefore, the safety of the required supervision data stored in the storage server can be stored.
Optionally, when the decryption tool is used to decrypt the storage server, the decryption tool is further used to generate a unique identifier of the storage server, and the unique identifier of the storage server and the authorization time are substituted into the authorization function, so as to generate a decryption authorization validity period of the storage server.
By adopting the technical scheme, the unique identification code of the storage server is generated through the decryption tool, the unique identification code and the authorization time of the storage server are substituted into the authorization function, the decryption authorization validity period of the storage server is generated, then the storage server can be decrypted if the unique identification code and the authorization time are within the decryption authorization validity period, and the storage server cannot be decrypted if the unique identification code and the authorization time are not within the decryption authorization validity period, so that the safety of the data to be monitored and stored in the storage server is further ensured.
Optionally, the unique identifier includes a physical serial number, a user identifier, a unit identifier, and an authorization level of the storage server.
By adopting the technical scheme, the unique identification code is set as the physical serial number, the user identification, the unit identification and the authorization level of the storage server, so that the calculation accuracy of the decryption authorization validity period is ensured.
In a second aspect, the supervision work management system provided by the application adopts the following technical scheme:
a proctoring work management system, applying the method of the first aspect, comprising:
the data acquisition module is used for acquiring supervision data required by each construction node on site;
the data compiling module is used for compiling the data to be managed and inputting the data to the system;
the database module is used for storing the data to be managed;
the encryption module is used for encrypting the database module by adopting an encryption algorithm;
the decryption module is used for decrypting the encrypted database module by adopting a decryption algorithm;
the data extraction module is used for extracting the data to be managed in the decrypted database module;
the data conversion module is used for converting the extracted data to be supervised into a model calling code;
and the model building module is used for building a management model according to the model calling code and generating a management log file based on the management model.
Through adopting above-mentioned technical scheme, gather the required data of managing of each construction node on-the-spot through the data acquisition module, then, it inputs required data of managing to the database module to compile through the data compilation module, then, carry out encryption process to the database module through encryption module, then, carry out decryption process to the database module through decryption module, and extract required data of managing from the database module through the data extraction module, the required data of managing that will extract through data conversion module converts the model into and calls the code, finally, call the code according to the model, construct the management model through the model construction module, and generate the management log file according to the management model, through the automatic acquisition and the storage to required data of managing, can promote the efficiency of managing.
In a third aspect, the present application provides a computer apparatus, which adopts the following technical solution:
a computer apparatus comprising a memory, a processor and a computer program stored in the memory and capable of running on the processor, when loaded with the computer program, performing the method of the first aspect.
By adopting the technical scheme, the computer program is generated based on the method of the first aspect and is stored in the memory so as to be loaded and executed by the processor, and therefore, the computer device is manufactured according to the memory and the processor and is convenient for a user to use.
In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solutions:
a computer-readable storage medium having stored thereon a computer program which, when loaded by a processor, performs the method of the first aspect.
By adopting the technical scheme, the computer program is generated based on the method of the first aspect and is stored in the computer readable storage medium to be loaded and executed by the processor, and the computer program can be conveniently read and stored through the computer readable storage medium, so that a user can conveniently call and use the computer program.
In summary, the present application includes at least one of the following beneficial technical effects:
1. by systematically inputting and storing the data to be managed and constructing a management model according to the stored data to be managed, a management log file is automatically generated according to the management model so as to be checked by a manager, and the project supervision efficiency can be improved;
2. the data to be supervised stored in the storage server is encrypted to generate a ciphertext for storage so as to complete the encryption of the storage server, so that the security of the data to be supervised stored in the storage server can be stored;
3. the security of the data to be managed stored in the storage server is further ensured by setting the decryption authorization validity period.
Drawings
FIG. 1 is a method flow diagram of a proctoring work management method of the present application.
FIG. 2 is a system framework diagram of the administrative work management system of the present application.
Description of reference numerals: 1. a data acquisition module; 2. a data compiling module; 3. a database module; 4. an encryption module; 5. a decryption module; 6. a data extraction module; 7. a data conversion module; 8. and a model building module.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, the present application is further described in detail below with reference to fig. 1-2 and the embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application.
The embodiment of the application discloses a supervision work management method. Referring to fig. 1, the method includes:
and compiling required supervision data of each construction node on the site based on the user interface.
Wherein, in this embodiment, regularly gather the reason data of each construction node on site, and compile the reason data of gathering through user interface, specifically, required reason data can include engineering construction data and engineering acceptance data etc., can install panoramic camera at the job site, and then, carry out real time monitoring to the reason data of each construction node through panoramic camera, and acquire required reason data, and compile the input with the reason data of acquireing through user interface, of course, in order to save the time of reason personnel, also can transmit required reason data to user interface through the data transmission interface, in this embodiment, user interface is human-computer interaction control panel.
Wherein, in order to save the quantity of installing the panoramic camera at scene, also can install the panoramic camera on unmanned aerial vehicle, and then, go round and patrol at the scene with the help of unmanned aerial vehicle to gather required management data, of course, for energy saving consumption, set up solar cell panel on unmanned aerial vehicle, and then, on sunny daytime, can charge solar cell panel through sunshine, in order to provide the electric energy for unmanned aerial vehicle.
And storing the required supervision data based on the storage tool, and encrypting the storage tool based on the encryption tool.
In this embodiment, the storage tool may be set as a storage Server (SLB), and then, the storage server is used to store the required supervision data, and the storage server supports server load balancing, and then, load balancing and space expansion of the storage server are facilitated, that is, the capacity of the storage server can be increased, so as to store more required supervision data, of course, according to actual use conditions, the storage tool may also be set as a database, in order to increase the capacity of the database, an expansion interface may be set on the database by using an interface expansion tool, and then, a plurality of memory boards are connected through the expansion interface, and thus, the purpose of expanding the capacity of the database is achieved.
Specifically, in this embodiment, the data to be supervised stored in the storage server is encrypted through an encryption algorithm to generate a ciphertext and stored, and more specifically, the data to be supervised stored in the storage server is set to obtain data content of a key data item to be encrypted in each piece of data, and the data content is encrypted by using a specific encryption algorithm to generate the ciphertext and stored, so that the encryption of the storage server is completed.
And decrypting the storage tool based on the decryption tool, and extracting the required proctoring data based on the data extraction tool.
The storage server is decrypted according to the decryption tool, specifically, the data to be proctored stored in the storage server is decrypted through a decryption algorithm to generate an analysis file.
In the embodiment, the decryption authority can be a unique identification code (UUID) of the storage server, and the unique identification code and the authorization time of the storage server are substituted into the authorization function, so that the decryption authorization validity period of the storage server can be generated, and further, if the decryption process is within the decryption authorization validity period, the storage server can be decrypted, otherwise, if the decryption process is not within the decryption authorization validity period, the storage server cannot be decrypted, so that the security of the required data stored in the storage server is further ensured.
Specifically, in this embodiment, the unique identification code includes a physical serial number, a user identifier, a unit identifier, an authorization level, and the like of the decryption authority, and further, the physical serial number, the user identifier, the unit identifier, the authorization level, and the authorization time of the authority connected to the decryption authority are extracted according to an authorization function, and the information is verified, so that the decryption authorization validity period of the storage server can be obtained.
After the storage server is successfully decrypted, the data extraction tool is used for extracting the required supervision data from the storage server, specifically, a data transmission interface is set on the storage server by using the interface construction tool, and then the required supervision data stored in the storage server is transmitted through the data transmission interface.
The required supervision data is converted into a model calling code based on a data conversion tool, a management model is built by identifying the model calling code based on a model building tool, and a management log file is generated based on the management model.
In the embodiment, the model calling code can be the date and the format of the data to be supervised, and further, the model calling code of the data to be supervised is identified and judged by means of the existing model construction tool, so that a management model is constructed, a management log file is correspondingly generated according to the management model, and the management log file is projected on a user interface or a display screen for the supervision personnel to view.
The implementation principle of the supervision work management method in the embodiment of the application is as follows: monitoring a site in real time through a panoramic camera arranged on the site to acquire required supervision data of each construction node on the site, compiling the required supervision data through a user interface, storing the compiled required supervision data in a storage server, encrypting the server to ensure the storage safety of the required supervision data, decrypting the storage server through a decryption tool when the required supervision data is required to be used, extracting the required supervision data from the storage server through a data extraction tool, converting the required supervision data into a model calling code through a data conversion tool according to the extracted required supervision data, identifying the model calling code through a model construction tool to construct a management model, and generating a management log file according to the management model; by means of the method, the data to be supervised are systematically input and stored, the management model is built according to the stored data to be supervised, and then the management log file is automatically generated according to the management model and is checked by the supervision personnel.
The embodiment of the application discloses supervision work management system, refer to fig. 2, this system includes data acquisition module 1, data establishment module 2, database module 3, encryption module 4, decryption module 5, data extraction module 6, data conversion module 7 and model construction module 8, wherein, data establishment module 2 communicates with data acquisition module 1 and database module 3 respectively, encryption module 4, decryption module 5 and data extraction module 6 communicate with database module 3 respectively, data conversion module 7 communicates with data extraction module 6 and model construction module 8 respectively.
Wherein, data acquisition module 1 is used for gathering the required data of managing of each construction node in scene, and, required data of managing includes engineering construction data and engineering acceptance data, in this embodiment, data acquisition module 1 can include panoramic camera, specifically, panoramic camera is established to each corner equipartition in scene, and then, adopt panoramic camera to carry out real time monitoring to the scene, with gather required data of managing, of course, according to actual in service behavior, in order to save the quantity of laying of panoramic camera, also can install panoramic camera on unmanned aerial vehicle, and then, adopt unmanned aerial vehicle to go on the scene and go on reciprocal patrol, in order to gather required data of managing.
Wherein, data establishment module 2 is used for managing data input to the system with needs managing, in this embodiment, data establishment module 2 can include keyboard or touch-sensitive screen, and then, can beat the data of needs managing to the system through the keyboard, also can input the data of needs managing to the system through the touch-sensitive screen, of course, according to actual in service behavior, also can adopt the interface to construct the instrument and set up the data transmission interface on the system, and then, data acquisition module 1 passes through the data transmission interface and communicates with data establishment module 2, in order to pass through the data transmission interface with the data of the needs managing data of gathering and directly transmit to the system, can save the time of data establishment.
Wherein, database module 3 is used for storing required supervision data, in this embodiment, database module 3 can include storage server, and, storage server supports server load balancing, and then, make things convenient for storage server's load balancing and space dilatation, also promptly, can increase storage server's capacity, with the more required supervision data of storage, of course, according to actual in service behavior, also can set up a plurality of extension interface on database module 3, and connect the memory board respectively through a plurality of extension interface, also can realize the purpose of expanding the capacity to database module 3.
The encryption module 4 is configured to encrypt the storage server by using an encryption algorithm, specifically, set data to be supervised in the storage server to obtain data content of a key data item to be encrypted in each piece of data, encrypt the data content by using a specific encryption algorithm, generate and store a ciphertext, and further complete encryption of the storage server.
The decryption module 5 is configured to collect a decryption algorithm to decrypt the encrypted storage server, where the decryption algorithm corresponds to the encryption algorithm, and further, the decryption algorithm is used to decrypt the storage server to convert the data to be monitored into an analysis file for use by the system.
The decryption module 5 is further configured to set a decryption authority validity period for the storage server, and specifically, generate the decryption authority of the storage server through the decryption module 5, in this embodiment, the decryption authority may be a unique identifier (UUID) of the storage server, and substitute the unique identifier and the authorization time of the storage server into the authorization function, so that the decryption authority validity period of the storage server may be generated, and further, if the decryption process is within the decryption authority validity period, the storage server may be decrypted, otherwise, if the decryption process is not within the decryption authority validity period, the storage server may not be decrypted, so that the security of the required supervision data stored in the storage server is further ensured.
Specifically, in this embodiment, the unique identification code includes a physical serial number, a user identifier, a unit identifier, an authorization level, and the like of the decryption authority, and further, the physical serial number, the user identifier, the unit identifier, the authorization level, and the authorization time of the authority connected to the decryption authority are extracted according to an authorization function, and the information is verified, so that the decryption authorization validity period of the storage server can be obtained.
The data extraction module 6 is used for extracting the required supervision data in the decrypted storage server, converting the extracted required supervision data into a model calling code through the data conversion module 7, then building a management model according to the model calling code through the model building module 8, and generating a management log file according to the built management model for supervision personnel to check.
Specifically, in this embodiment, the model calling code may include a date and a format of the data to be supervised, and the model calling code of the data to be supervised is identified and judged by using an existing model building tool to build the management model.
The implementation principle of the supervision work management system in the embodiment of the application is as follows: collecting required supervision data of each construction node on site through a data collecting module 1, compiling the required supervision data through a data compiling module 2, storing the compiled required supervision data in a database module 3, encrypting the database module 3 through an encrypting module 4 to ensure the storage safety of the required supervision data, decrypting the database module 3 through a decrypting module 5 when the required supervision data is required to be used, extracting the required supervision data from the database module 3 through a data extracting module 6, converting the required supervision data into a model calling code through a data converting module 7 according to the extracted required supervision data, identifying the model calling code through a model constructing module 8 to construct a management model, and generating a management log file according to the management model; through the setting of this system, carry out systematic input and storage to required supervision data to construct the management model according to the required supervision data of storage, and then, according to the automatic management log file that generates of management model for supervision personnel look over, compare in correlation technique, promoted project supervision efficiency.
The embodiment of the application discloses a computer device, which comprises a memory, a processor and a computer program which is stored in the memory and can run on the processor, wherein when the processor loads the computer program, the supervision work management method is executed.
The computer device may be a desktop computer, a notebook computer, or a cloud server, and the computer device includes but is not limited to a processor and a memory, for example, the computer device may further include an input/output device, a network access device, a bus, and the like.
The processor may be a Central Processing Unit (CPU), and of course, according to an actual use situation, other general processors, Digital Signal Processors (DSPs), Application Specific Integrated Circuits (ASICs), Field Programmable Gate Arrays (FPGAs) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, and the like may also be used, and the general processor may be a microprocessor or any conventional processor, and the present application does not limit the present invention.
The memory may be an internal storage unit of the computer apparatus, for example, a hard disk or a memory of the computer apparatus, or an external storage device of the computer apparatus, for example, a plug-in hard disk, a smart card (SMC), a secure digital card (SD) or a flash memory card (FC) equipped on the computer apparatus, and the memory may also be a combination of the internal storage unit of the computer apparatus and the external storage device, and the memory is used for storing a computer program and other programs and data required by the computer apparatus, and the memory may also be used for temporarily storing data that has been output or will be output, which is not limited in this application.
The supervision work management method of the embodiment is stored in a memory of the computer device through the computer device, and is loaded and executed on a processor of the computer device, so that the computer device is convenient for a user to use.
The embodiment of the application discloses a computer readable storage medium, and a computer program is stored in the computer readable storage medium, wherein when the computer program is loaded by a processor, the supervision work management method is executed.
The computer program may be stored in a computer readable medium, the computer program includes computer program code, the computer program code may be in a source code form, an object code form, an executable file or some intermediate form, and the like, the computer readable medium includes any entity or device capable of carrying the computer program code, a recording medium, a usb disk, a removable hard disk, a magnetic disk, an optical disk, a computer memory, a Read Only Memory (ROM), a Random Access Memory (RAM), an electrical carrier signal, a telecommunication signal, a software distribution medium, and the like, and the computer readable medium includes but is not limited to the above components.
The supervision work management method of the embodiment is stored in the computer readable storage medium through the computer readable storage medium, and is loaded and executed on the processor, so that the storage and the application of the supervision work management method are facilitated.
The foregoing is a preferred embodiment of the present application and is not intended to limit the scope of the application in any way, and any features disclosed in this specification (including the abstract and drawings) may be replaced by alternative features serving equivalent or similar purposes, unless expressly stated otherwise. That is, unless expressly stated otherwise, each feature is only an example of a generic series of equivalent or similar features.

Claims (8)

1. A supervision work management method is characterized by comprising the following steps:
compiling required supervision data of each construction node on site based on a user interface;
storing the required supervision data based on the storage tool, and encrypting the storage tool based on the encryption tool;
decrypting the storage tool based on the decryption tool, and extracting the required supervision data based on the data extraction tool;
the required supervision data is converted into a model calling code based on a data conversion tool, a management model is built by identifying the model calling code based on a model building tool, and a management log file is generated based on the management model.
2. The proctoring work management method as set forth in claim 1,
the storage tool includes a storage server that supports server load balancing.
3. The proctoring work management method as set forth in claim 2,
setting the data to be managed in the storage server to obtain the data content of the key data item to be encrypted in each piece of data, encrypting the data content by using an encryption algorithm, generating a ciphertext and storing the ciphertext to finish the encryption of the storage server.
4. The proctoring work management method as set forth in claim 3,
when the storage server is decrypted by using the decryption tool, the unique identification code of the storage server is generated by the decryption tool, and the unique identification code and the authorization time of the storage server are substituted into the authorization function to generate the decryption authorization validity period of the storage server.
5. The proctoring work management method as set forth in claim 4,
the unique identification code comprises a physical serial number, a user identification, a unit identification and an authorization level of the storage server.
6. A proctoring work management system, characterized in that a method according to any one of claims 1-5 is applied, which comprises:
the data acquisition module (1) is used for acquiring supervision data required by each construction node on site;
the data compiling module (2) is used for compiling the data to be managed and inputting the data to the system;
the database module (3) is used for storing the data to be managed;
the encryption module (4) is used for encrypting the database module (3) by adopting an encryption algorithm;
the decryption module (5) is used for decrypting the encrypted database module (3) by adopting a decryption algorithm;
the data extraction module (6) is used for extracting the data required to be managed in the decrypted database module (3);
the data conversion module (7) is used for converting the extracted data to be managed into a model calling code;
and the model building module (8) is used for building a management model according to the model calling code and generating a management log file based on the management model.
7. A computer arrangement comprising a memory, a processor and a computer program stored in the memory and being executable on the processor, wherein the processor, when loaded with the computer program, performs the method of any of claims 1-5.
8. A computer-readable storage medium, in which a computer program is stored which, when being loaded by a processor, is adapted to carry out the method of any one of claims 1 to 5.
CN202011634670.0A 2020-12-31 2020-12-31 Supervision work management method, system, computer device and storage medium Pending CN112749401A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011634670.0A CN112749401A (en) 2020-12-31 2020-12-31 Supervision work management method, system, computer device and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011634670.0A CN112749401A (en) 2020-12-31 2020-12-31 Supervision work management method, system, computer device and storage medium

Publications (1)

Publication Number Publication Date
CN112749401A true CN112749401A (en) 2021-05-04

Family

ID=75650973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011634670.0A Pending CN112749401A (en) 2020-12-31 2020-12-31 Supervision work management method, system, computer device and storage medium

Country Status (1)

Country Link
CN (1) CN112749401A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115033640A (en) * 2022-04-26 2022-09-09 广东创成建设监理咨询有限公司 Electric power construction engineering supervision experience uploading and consulting system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102880918A (en) * 2012-09-21 2013-01-16 上海隧道工程股份有限公司 Deep foundation pit risk assessment method based on data fusion analysis
CN105553662A (en) * 2014-10-29 2016-05-04 航天信息股份有限公司 Dynamic digital right management method and system based on identification password
CN107770153A (en) * 2017-09-14 2018-03-06 北京科东电力控制系统有限责任公司 A kind of general acquisition system of power information based on collaborative safety protection model
CN110334942A (en) * 2019-07-04 2019-10-15 四川元丰建设项目管理有限公司 Construction Supervision Work procedure information management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102880918A (en) * 2012-09-21 2013-01-16 上海隧道工程股份有限公司 Deep foundation pit risk assessment method based on data fusion analysis
CN105553662A (en) * 2014-10-29 2016-05-04 航天信息股份有限公司 Dynamic digital right management method and system based on identification password
CN107770153A (en) * 2017-09-14 2018-03-06 北京科东电力控制系统有限责任公司 A kind of general acquisition system of power information based on collaborative safety protection model
CN110334942A (en) * 2019-07-04 2019-10-15 四川元丰建设项目管理有限公司 Construction Supervision Work procedure information management system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115033640A (en) * 2022-04-26 2022-09-09 广东创成建设监理咨询有限公司 Electric power construction engineering supervision experience uploading and consulting system

Similar Documents

Publication Publication Date Title
CN112367246B (en) Message pushing method and device, electronic equipment and storage medium
CN112395361B (en) Electric power engineering construction block chain management system
CN110852374B (en) Data detection method, device, electronic equipment and storage medium
CN111815858A (en) Charging network control method, device, equipment and storage medium based on block chain
CN104240342A (en) Access control method and device
CN111323646A (en) System and method for reading ammeter
CN114389889B (en) File full life cycle management method and device based on block chain technology
CN114417258A (en) Carbon emission reduction accounting method and device
CN114969691A (en) Power data sharing system, method, device and medium based on artificial intelligence and block chain
CN112749401A (en) Supervision work management method, system, computer device and storage medium
CN113162763A (en) Data encryption and storage method and device, electronic equipment and storage medium
CN112163206A (en) Data permission setting method and device, computer equipment and storage medium
CN117972704A (en) Blockchain ecological safety collaborative supervision method
CN113240381B (en) Micro-grid electric power audit system
CN115378642A (en) Block chain-based electric power measurement data source tamper-proof verification system and method
CN113127109A (en) Interface calling method and device, electronic equipment and readable storage medium
CN114331661A (en) Data verification method and device, electronic equipment and storage medium
CN112348698A (en) Nuclear power plant group pile management method, device and system
CN112651709A (en) Block chain-based man-hour counting method, device, equipment and readable storage medium
CN112508707A (en) New energy data aggregation method and transaction system based on identification and block chain
CN116684077B (en) Carbon emission monitoring method and device based on carbon platform
CN115021980B (en) Quick login method and device, electronic equipment and storage medium
CN101866297A (en) Method and device for generating management platform
KR102717523B1 (en) Method, apparatus and computer-readable medium for automated facility supervision in apartment house
KR102717958B1 (en) System and method for conversion of energy consumption data into carbon emission and computer program for the same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication