CN107944731A - The method for building up and device of typical project cost template - Google Patents

The method for building up and device of typical project cost template Download PDF

Info

Publication number
CN107944731A
CN107944731A CN201711262363.2A CN201711262363A CN107944731A CN 107944731 A CN107944731 A CN 107944731A CN 201711262363 A CN201711262363 A CN 201711262363A CN 107944731 A CN107944731 A CN 107944731A
Authority
CN
China
Prior art keywords
data
typical
specialty
project cost
analysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711262363.2A
Other languages
Chinese (zh)
Inventor
王艳芹
董祯
刘光辉
王勇
杨宏伟
王冬超
周玉锁
赵贤
刘云
郭振新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711262363.2A priority Critical patent/CN107944731A/en
Publication of CN107944731A publication Critical patent/CN107944731A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The present invention is suitable for technical field of power systems, a kind of method for building up and device of typical project cost template provided by the invention, and method includes:Mode, the disassembly principle of default settlement data, tables of data are split according to preset data acquisition range, default engineering and make a report on rule, establishes the collection rule and basic data specification of analysis of prices data;According to each voltage class project cost is horizontal, each voltage class project analysis expense, each voltage class engineering cost accounting, projects all one's effort unit price, each voltage class engineering typical case, Data Analysis Model is established;According to professional monomer type, the collection rule of analysis of prices data and basic data specification, Data Analysis Model, professional monomer typical project cost template is worked out.Due to using professional monomer typical project cost template, the accuracy of electricity power engineering cost compilation is improved, improves the work efficiency of electricity power engineering cost compilation.

Description

The method for building up and device of typical project cost template
Technical field
The invention belongs to technical field of power systems, more particularly to a kind of method for building up and dress of typical project cost template Put.
Background technology
Electricity power engineering control of investment is the important foundation sex work of electricity power engineering implementation management, electricity power engineering cost template Foundation is the important step of electricity power engineering total investment processes management, be adapt to intelligent grid construction, realize project cost it is controllable, The support of the important technology of control and administrative decision, is the important means for lifting electricity power engineering Cost Management lean level.
Current existing typical project cost template is the template of the fixation used, and all monomer engineerings are all adopted With same template.But this mode cannot be directed to each monomer engineering, cause the accuracy of electricity power engineering cost compilation it is poor, Work efficiency is low.
The content of the invention
In view of this, can an embodiment of the present invention provides a kind of method for building up and device of typical project cost template The accuracy of electricity power engineering cost compilation is improved, improves the work efficiency of electricity power engineering cost compilation.
The first aspect of the embodiment of the present invention, there is provided a kind of method for building up of typical project cost template, including:
Mode, the disassembly principle of default settlement data, tables of data are split according to preset data acquisition range, default engineering to fill out Report rule, establishes the collection rule and basic data specification of analysis of prices data;
According to each voltage class project cost is horizontal, each voltage class project analysis expense, each voltage class engineering cost Accounting, projects all one's effort unit price, each voltage class engineering typical case, establish Data Analysis Model;
According to professional monomer type, the collection rule of the analysis of prices data and basic data specification, the data point Model is analysed, works out professional monomer typical project cost template.
The second aspect of the embodiment of the present invention, there is provided a kind of typical project cost template establishes device, including:
First establishes module, for splitting mode according to preset data acquisition range, default engineering, presetting settlement data Disassembly principle, tables of data make a report on rule, establish the collection rule and basic data specification of analysis of prices data;
Second establishes module, for according to each voltage class project cost is horizontal, each voltage class project analysis expense, each Voltage class engineering cost accounting, projects all one's effort unit price, each voltage class engineering typical case, establish data analysis mould Type;
Template compiling module, for according to professional monomer type, the collection rule of the analysis of prices data and basic number According to specification, the Data Analysis Model, professional monomer typical project cost template is worked out.
The third aspect of the embodiment of the present invention, there is provided a kind of terminal device, including memory, processor and be stored in In the memory and the computer program that can run on the processor, when the processor performs the computer program The step of realizing the method for building up of above-mentioned typical project cost template.
The fourth aspect of the embodiment of the present invention, there is provided a kind of computer-readable recording medium, it is described computer-readable to deposit Storage media is stored with computer program, and the computer program realizes above-mentioned typical project cost template when being executed by processor Method for building up the step of.
The beneficial effect of the embodiment of the present invention compared with prior art is:Typical project cost provided in an embodiment of the present invention The method for building up and device of template, by way of according to preset data acquisition range, default engineering fractionation, preset settlement data Disassembly principle, tables of data make a report on rule, establish the collection rule and basic data specification of analysis of prices data;According to each voltage etc. Level project cost is horizontal, each voltage class project analysis expense, each voltage class engineering cost accounting, projects all one's effort unit are made Valency, each voltage class engineering typical case, establish Data Analysis Model;Adopted according to professional monomer type, analysis of prices data Collection rule and basic data specification, Data Analysis Model, work out professional monomer typical project cost template.Due to single using specialty Body typical project cost template, improves the accuracy of electricity power engineering cost compilation, improves the work of electricity power engineering cost compilation Efficiency.
Brief description of the drawings
To describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, drawings in the following description be only the present invention some Embodiment, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is a kind of flow diagram of the method for building up for typical project cost template that one embodiment of the invention provides;
Fig. 2 is a kind of flow signal of the method for building up for typical project cost template that another embodiment of the present invention provides Figure;
Fig. 3 is a kind of flow signal of the method for building up for typical project cost template that yet another embodiment of the invention provides Figure;
Fig. 4 is a kind of flow signal of the method for building up for typical project cost template that further embodiment of this invention provides Figure;
Fig. 5 is a kind of structure diagram for establishing device for typical project cost template that one embodiment of the invention provides;
Fig. 6 is a kind of schematic block diagram for terminal device that one embodiment of the invention provides.
Embodiment
In being described below, in order to illustrate rather than in order to limit, it is proposed that such as tool of particular system structure, technology etc Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that these are specific The present invention can also be realized in the other embodiments of details.In other situations, omit to well-known system, device, electricity Road and the detailed description of method, in case unnecessary details hinders description of the invention.
It should be appreciated that ought use in this specification and in the appended claims, term " comprising " and "comprising" instruction Described feature, entirety, step, operation, the presence of element and/or component, but it is not precluded from one or more of the other feature, whole Body, step, operation, element, component and/or its presence or addition for gathering.
It is also understood that the term used in this description of the invention is merely for the sake of the mesh for describing specific embodiment And be not intended to limit the present invention.As description of the invention and it is used in the attached claims, unless on Other situations are hereafter clearly indicated, otherwise " one " of singulative, "one" and "the" are intended to include plural form.
It will be further appreciated that the term "and/or" used in description of the invention and the appended claims is Refer to any combinations and all possible combinations of one or more of the associated item listed, and including these combinations.
As used in this specification and in the appended claims, term " if " can be according to context quilt Be construed to " when ... " or " once " or " in response to determining " or " in response to detecting ".Similarly, phrase " if it is determined that " or " if detecting [described condition or event] " can be interpreted to mean according to context " once it is determined that " or " in response to true It is fixed " or " once detecting [described condition or event] " or " in response to detecting [described condition or event] ".
In order to illustrate technical solutions according to the invention, illustrated below by specific embodiment.
With reference to figure 1, Fig. 1 is a kind of flow of the method for building up for typical project cost template that one embodiment of the invention provides Schematic diagram.This method can be applied to user terminal, such as mobile phone, PC (Personal Computer, PC), service Device or other-end equipment, details are as follows for the present embodiment:
S101:Mode is split according to preset data acquisition range, default engineering, presets disassembly principle, the number of settlement data Rule is made a report on according to table, establishes the collection rule and basic data specification of analysis of prices data.
S102:According to each voltage class project cost is horizontal, each voltage class project analysis expense, each voltage class engineering Expense accounting, projects all one's effort unit price, each voltage class engineering typical case, establish Data Analysis Model.
S103:According to professional monomer type, the collection rule of analysis of prices data and basic data specification, data analysis mould Type, works out professional monomer typical project cost template.
It was found from the present embodiment, due to using professional monomer typical project cost template, improving electricity power engineering cost volume The accuracy of system, improves the work efficiency of electricity power engineering cost compilation.
With reference to figure 2, Fig. 2 is a kind of stream of the method for building up for typical project cost template that another embodiment of the present invention provides Journey schematic diagram.Professional monomer type includes in the present embodiment:Transmission of electricity is professional, power transformation is professional, distribution is professional, relay protection is professional, Communication speciality and Automation Specialty.Above-mentioned steps S103 includes:
S201:It is special to obtain relevant first typical scenario of transmission of electricity specialty, relevant second typical scenario of power transformation specialty, distribution Relevant 5th typical case of relevant 3rd typical scenario of industry, relevant 4th typical scenario of relay protection body specialty, communication speciality Scheme and relevant 6th typical scenario of Automation Specialty.
S202:According to the first typical scenario, using the collection rule and basic data specification of analysis of prices data, data point Analyse model, the professional typical project cost template of establishment transmission of electricity.
S203:According to the second typical scenario, using the collection rule and basic data specification of analysis of prices data, data point Model is analysed, works out power transformation specialty typical project cost template.
S204:According to the 3rd typical scenario, using the collection rule and basic data specification of analysis of prices data, data point Model is analysed, works out distribution specialty typical project cost template.
S205:According to the 4th typical scenario, using the collection rule and basic data specification of analysis of prices data, data point Model is analysed, works out relay protection specialty typical project cost template.
S206:According to the 5th typical scenario, using the collection rule and basic data specification of analysis of prices data, data point Model is analysed, works out communication speciality typical project cost template.
S207:According to the 6th typical scenario, using the collection rule and basic data specification of analysis of prices data, data point Model is analysed, works out Automation Specialty typical project cost template.
It was found from the present embodiment, by obtaining the typical scenario of different majors monomer, using the collection of analysis of prices data Rule and basic data specification, Data Analysis Model, work out different majors typical project cost template, to improve project cost mould Professional, the accuracy of raising project cost establishment of plate.
With reference to figure 3, Fig. 3 is a kind of stream of the method for building up for typical project cost template that yet another embodiment of the invention provides Journey schematic diagram.On the basis of above-described embodiment, details are as follows for the present embodiment:
S301:Obtain engineering information and take charge information.
S302:According to consumption typing engineering information and take charge information.
S303:Target specialty monomer type is obtained according to engineering information.
S304:According to target specialty monomer type, target specialty monomer typical project cost template is obtained.
S305:According to the surcharge information for taking charge information and obtaining in advance, engineering total cost information is generated.
S306:According to journey total cost information and target specialty monomer typical project cost template, project cost report is generated.
It was found from the present embodiment, by the way that into project cost report, reference is provided for project cost.
With reference to figure 4, Fig. 4 is a kind of stream of the method for building up for typical project cost template that further embodiment of this invention provides Journey schematic diagram.On the basis of above-described embodiment, further included after step S306:
S401:Project name, specification, unit, quantity, the unit price of each in project cost report are audited.If examine Core is qualified, then performs step S402;If examination & verification is unqualified, step S403 is performed.
S402:Print project cost report.
S403:Re-execute the step of obtaining engineering information and taking charge information.
It was found from the present embodiment, by being audited to project cost report, to improve the accuracy of project cost report.
It is to be understood that the size of the sequence number of each step is not meant to the priority of execution sequence, each process in above-described embodiment Execution sequence should determine that the implementation process without tackling the embodiment of the present invention forms any limit with its function and internal logic It is fixed.
Corresponding to the method for building up of the typical project cost template of foregoing embodiments, Fig. 5 provides for one embodiment of the invention A kind of typical project cost template the structure diagram for establishing device.For convenience of description, it illustrate only and implement with the present invention The relevant part of example.With reference to Fig. 5, which includes:First establishes module 501, second establishes module 502 and template compiling module 503。
First establishes module 501, for splitting mode, default clearing number according to preset data acquisition range, default engineering According to disassembly principle, tables of data make a report on rule, establish the collection rule and basic data specification of analysis of prices data;
Second establishes module 502, for according to each voltage class project cost is horizontal, each voltage class project analysis expense With, each voltage class engineering cost accounting, projects all one's effort unit price, each voltage class engineering typical case, establish data Analysis model;
Template compiling module 503, for according to professional monomer type, the collection rule of the analysis of prices data and basis Data standard, the Data Analysis Model, work out professional monomer typical project cost template.
It was found from the present embodiment, by way of according to preset data acquisition range, default engineering fractionation, default settlement data Disassembly principle, tables of data make a report on rule, establish the collection rule and basic data specification of analysis of prices data;According to each voltage Grade project cost is horizontal, each voltage class project analysis expense, each voltage class engineering cost accounting, projects all one's effort unit Cost, each voltage class engineering typical case, establish Data Analysis Model;According to professional monomer type, analysis of prices data Collection rule and basic data specification, Data Analysis Model, work out professional monomer typical project cost template.Due to using specialty Monomer typical project cost template, improves the accuracy of electricity power engineering cost compilation, improves the work of electricity power engineering cost compilation Make efficiency.
With reference to figure 5, in one embodiment of the invention, the specialty monomer type includes:Transmission of electricity specialty, power transformation are special Industry, distribution specialty, relay protection specialty, communication speciality and Automation Specialty;
The template compiling module 503 includes:
Scheme acquiring unit 5031, for obtaining relevant first typical scenario of transmission of electricity specialty, power transformation specialty relevant the Two typical scenarios, relevant 3rd typical scenario of distribution specialty, relevant 4th typical scenario of relay protection body specialty, communication are special Relevant 5th typical scenario of industry and relevant 6th typical scenario of Automation Specialty;
First template planning unit 5032, for according to first typical scenario, using the collection of analysis of prices data Rule and basic data specification, Data Analysis Model, the professional typical project cost template of establishment transmission of electricity;
Second template planning unit 5033, for according to second typical scenario, using the collection of analysis of prices data Rule and basic data specification, Data Analysis Model, work out power transformation specialty typical project cost template;
3rd template planning unit 5034, for according to the 3rd typical scenario, using the collection of analysis of prices data Rule and basic data specification, Data Analysis Model, work out distribution specialty typical project cost template;
4th template planning unit 5035, for according to the 4th typical scenario, using the collection of analysis of prices data Rule and basic data specification, Data Analysis Model, work out relay protection specialty typical project cost template;
5th template planning unit 5036, for according to the 5th typical scenario, using the collection of analysis of prices data Rule and basic data specification, Data Analysis Model, work out communication speciality typical project cost template;
6th template planning unit 5037, for according to the 6th typical scenario, using the collection of analysis of prices data Rule and basic data specification, Data Analysis Model, work out Automation Specialty typical project cost template.
With reference to figure 5, in one embodiment of the invention, described device further includes:Data obtaining module 504, information record Enter module 505, professional monomer type acquisition module 506, template acquisition module 507,508 and of engineering total cost information generating module Project cost report generation module 509.
Data obtaining module 504, for obtaining engineering information and taking charge information;
Data input module 505, for the engineering information according to consumption typing and takes charge information;
Professional monomer type acquisition module 506, for obtaining target specialty monomer type according to the engineering information;
Template acquisition module 507, for according to target specialty monomer type, obtaining target specialty monomer typical project cost Template;
Engineering total cost information generating module 508, for the surcharge letter for taking charge information according to and obtaining in advance Breath, generates engineering total cost information;
Project cost report generation module 509, for according to the journey total cost information and target specialty monomer typical case's work Journey cost template, generates project cost report.
With reference to figure 5, in one embodiment of the invention, described device further includes:
Auditing module 510, for project cost report generation module afterwards to the item of each in the project cost report Mesh title, specification, unit, quantity, unit price are audited;
Print module 511, if qualified for auditing, prints the project cost report;
Described information acquisition module 504, if it is unqualified to be additionally operable to examination & verification, re-executes and obtains engineering information and take expense to believe The step of breath.
Referring to Fig. 6, Fig. 6 is a kind of schematic block diagram for terminal device that one embodiment of the invention provides.Sheet as shown in Figure 6 Terminal 600 in embodiment can include:One or more processors 601, one or more input equipments 602, one or more A then output equipment 603 and one or more memories 604.Above-mentioned processor 601, then input equipment 602, output equipment 603 And memory 604 completes mutual communication by communication bus 605.Memory 604 is used to store computer program, the meter Calculation machine program includes programmed instruction.Processor 601 is used for the programmed instruction for performing the storage of memory 604.Wherein, processor 601 It is arranged to call described program instruction to perform following operation:
Processor 601, for splitting mode according to preset data acquisition range, default engineering, presetting tearing open for settlement data Point principle, tables of data make a report on rule, establish the collection rule and basic data specification of analysis of prices data;According to each voltage class Project cost is horizontal, each voltage class project analysis expense, each voltage class engineering cost accounting, projects all one's effort unit are made Valency, each voltage class engineering typical case, establish Data Analysis Model;According to professional monomer type, the analysis of prices data Collection rule and basic data specification, the Data Analysis Model, work out professional monomer typical project cost template.
Further, the professional monomer type includes:Transmission of electricity specialty, power transformation specialty, distribution specialty, relay protection are special Industry, communication speciality and Automation Specialty, processor 601, it is special to be additionally operable to obtain relevant first typical scenario of transmission of electricity specialty, power transformation Relevant 4th typical case of relevant second typical scenario of industry, relevant 3rd typical scenario of distribution specialty, relay protection body specialty Relevant 5th typical scenario of scheme, communication speciality and relevant 6th typical scenario of Automation Specialty;According to first allusion quotation Type scheme, using the collection rule and basic data specification, Data Analysis Model of analysis of prices data, establishment transmission of electricity specialty typical case Project cost template;According to second typical scenario, using the collection rule and basic data specification, number of analysis of prices data According to analysis model, power transformation specialty typical project cost template is worked out;According to the 3rd typical scenario, using analysis of prices data Collection rule and basic data specification, Data Analysis Model, work out distribution specialty typical project cost template;According to described Four typical scenarios, using the collection rule and basic data specification, Data Analysis Model of analysis of prices data, work out relay protection Professional typical project cost template;According to the 5th typical scenario, collection rule and basic number using analysis of prices data According to specification, Data Analysis Model, communication speciality typical project cost template is worked out;According to the 6th typical scenario, using making Valency analyzes the collection rule and basic data specification, Data Analysis Model of data, works out Automation Specialty typical project cost mould Plate.
Further, processor 601, are additionally operable to obtain engineering information and take charge information;According to work described in consumption typing Journey information and take charge information;Target specialty monomer type is obtained according to the engineering information;According to target specialty monomer type, obtain Take target specialty monomer typical project cost template;According to the surcharge information for taking charge information and obtaining in advance, generation Engineering total cost information;According to the journey total cost information and target specialty monomer typical project cost template, generation engineering is made Valency report.
Further, processor 601, are additionally operable to after stating generation project cost report, in the project cost report Project name, specification, unit, quantity, the unit price of each are audited;If examination & verification is qualified, the project cost report is printed; If examination & verification is unqualified, the step of obtaining engineering information and taking charge information is re-executed.
It should be appreciated that in embodiments of the present invention, alleged processor 601 can be central processing unit (Central Processing Unit, CPU), which can also be other general processors, digital signal processor (Digital Signal Processor, DSP), application-specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-Programmable Gate Array, FPGA) or other programmable logic Device, discrete gate or transistor logic, discrete hardware components etc..General processor can be microprocessor or this at It can also be any conventional processor etc. to manage device.
Input equipment 602 can include Trackpad, fingerprint adopt sensor (finger print information that is used to gathering user and fingerprint Directional information), microphone etc., output equipment 603 can include display (LCD etc.), loudspeaker etc..
The memory 604 can include read-only storage and random access memory, and to processor 601 provide instruction and Data.The a part of of memory 604 can also include nonvolatile RAM.For example, memory 604 can also be deposited Store up the information of device type.
In the specific implementation, processor 601, input equipment 602, the output equipment 603 described in the embodiment of the present invention can The implementation described in the first embodiment and second embodiment of service request method provided in an embodiment of the present invention is performed, Also the implementation of the described terminal of the embodiment of the present invention is can perform, details are not described herein.
A kind of computer-readable recording medium, the computer-readable storage medium are provided in another embodiment of the invention Matter is stored with computer program, and the computer program includes programmed instruction, and described program instruction is realized when being executed by processor All or part of flow in above-described embodiment method, can also instruct relevant hardware to complete by computer program, The computer program can be stored in a computer-readable recording medium, the computer program when being executed by processor, The step of above-mentioned each embodiment of the method can be achieved..Wherein, the computer program includes computer program code, the meter Calculation machine program code can be source code form, object identification code form, executable file or some intermediate forms etc..The calculating Machine computer-readable recording medium can include:Any entity or device of the computer program code, recording medium, USB flash disk, shifting can be carried Dynamic hard disk, magnetic disc, CD, computer storage, read-only storage (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..Need what is illustrated It is that the content that the computer-readable medium includes can be fitted according to legislation in jurisdiction and the requirement of patent practice When increase and decrease, such as in some jurisdictions, according to legislation and patent practice, it is electric carrier wave that computer-readable medium, which does not include, Signal and telecommunication signal.
The computer-readable recording medium can be the internal storage unit of the terminal described in foregoing any embodiment, example Such as the hard disk or memory of terminal.The computer-readable recording medium can also be the External memory equipment of the terminal, such as The plug-in type hard disk being equipped with the terminal, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) etc..Further, the computer-readable recording medium can also be wrapped both Including the internal storage unit of the terminal also includes External memory equipment.The computer-readable recording medium is used to store described Other programs and data needed for computer program and the terminal.The computer-readable recording medium can be also used for temporarily The data that ground storage has been exported or will exported.
Those of ordinary skill in the art may realize that each exemplary list described with reference to the embodiments described herein Member and algorithm steps, can be realized with electronic hardware, computer software or the combination of the two, in order to clearly demonstrate hardware With the interchangeability of software, each exemplary composition and step are generally described according to function in the above description.This A little functions are performed with hardware or software mode actually, application-specific and design constraint depending on technical solution.Specially Industry technical staff can realize described function to each specific application using distinct methods, but this realization is not It is considered as beyond the scope of this invention.
It is apparent to those skilled in the art that for convenience of description and succinctly, the end of foregoing description End and the specific work process of unit, may be referred to the corresponding process in preceding method embodiment, details are not described herein.
In several embodiments provided herein, it should be understood that disclosed terminal and method, can pass through it Its mode is realized.For example, device embodiment described above is only schematical, for example, the division of the unit, only Only a kind of division of logic function, can there is other dividing mode when actually realizing, such as multiple units or component can be tied Another system is closed or is desirably integrated into, or some features can be ignored, or do not perform.In addition, shown or discussed phase Coupling, direct-coupling or communication connection between mutually can be INDIRECT COUPLING or the communication by some interfaces, device or unit Connection or electricity, the connection of mechanical or other forms.
The unit illustrated as separating component may or may not be physically separate, be shown as unit The component shown may or may not be physical location, you can with positioned at a place, or can also be distributed to multiple In network unit.Some or all of unit therein can be selected to realize the embodiment of the present invention according to the actual needs Purpose.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, can also It is that unit is individually physically present or two or more units integrate in a unit.It is above-mentioned integrated Unit can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.
The above description is merely a specific embodiment, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, various equivalent modifications can be readily occurred in or replaced Change, these modifications or substitutions should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with right It is required that protection domain subject to.

Claims (10)

  1. A kind of 1. method for building up of typical project cost template, it is characterised in that including:
    Mode, the disassembly principle of default settlement data, tables of data are split according to preset data acquisition range, default engineering and make a report on rule Then, the collection rule and basic data specification of analysis of prices data are established;
    According to each voltage class project cost is horizontal, each voltage class project analysis expense, each voltage class engineering cost accounting, Projects all one's effort unit price, each voltage class engineering typical case, establish Data Analysis Model;
    According to professional monomer type, the collection rule of the analysis of prices data and basic data specification, the data analysis mould Type, works out professional monomer typical project cost template.
  2. 2. the method for building up of typical project cost template according to claim 1, it is characterised in that the specialty monomer class Type includes:Transmission of electricity specialty, power transformation specialty, distribution specialty, relay protection specialty, communication speciality and Automation Specialty;
    It is described to be divided according to professional monomer type, the collection rule of the analysis of prices data and basic data specification, the data Model is analysed, works out professional monomer typical project cost template, including:
    It is relevant to obtain relevant first typical scenario of transmission of electricity specialty, relevant second typical scenario of power transformation specialty, distribution specialty 3rd typical scenario, relevant 4th typical scenario of relay protection body specialty, relevant 5th typical scenario of communication speciality and from Relevant 6th typical scenario of dynamicization specialty;
    According to first typical scenario, using collection rule and basic data specification, the data analysis mould of analysis of prices data Type, the professional typical project cost template of establishment transmission of electricity;
    According to second typical scenario, using collection rule and basic data specification, the data analysis mould of analysis of prices data Type, works out power transformation specialty typical project cost template;
    According to the 3rd typical scenario, using collection rule and basic data specification, the data analysis mould of analysis of prices data Type, works out distribution specialty typical project cost template;
    According to the 4th typical scenario, using collection rule and basic data specification, the data analysis mould of analysis of prices data Type, works out relay protection specialty typical project cost template;
    According to the 5th typical scenario, using collection rule and basic data specification, the data analysis mould of analysis of prices data Type, works out communication speciality typical project cost template;
    According to the 6th typical scenario, using collection rule and basic data specification, the data analysis mould of analysis of prices data Type, works out Automation Specialty typical project cost template.
  3. 3. the method for building up of typical project cost template according to claim 1, it is characterised in that further include:
    Obtain engineering information and take charge information;
    According to engineering information described in consumption typing and take charge information;
    Target specialty monomer type is obtained according to the engineering information;
    According to target specialty monomer type, target specialty monomer typical project cost template is obtained;
    According to the surcharge information for taking charge information and obtaining in advance, engineering total cost information is generated;
    According to the journey total cost information and target specialty monomer typical project cost template, project cost report is generated.
  4. 4. the method for building up of typical project cost template according to claim 3, it is characterised in that the generation engineering is made After valency report, further include:
    Project name, specification, unit, quantity, the unit price of each in the project cost report are audited;
    If examination & verification is qualified, the project cost report is printed;
    If examination & verification is unqualified, the step of obtaining engineering information and taking charge information is re-executed.
  5. 5. a kind of typical project cost template establishes device, it is characterised in that including:
    First establishes module, for splitting the fractionation of mode, default settlement data according to preset data acquisition range, default engineering Principle, tables of data make a report on rule, establish the collection rule and basic data specification of analysis of prices data;
    Second establishes module, for according to each voltage class project cost is horizontal, each voltage class project analysis expense, each voltage Grade engineering cost accounting, projects all one's effort unit price, each voltage class engineering typical case, establish Data Analysis Model;
    Template compiling module, for being advised according to professional monomer type, the collection rule of the analysis of prices data and basic data Model, the Data Analysis Model, work out professional monomer typical project cost template.
  6. 6. typical project cost template according to claim 5 establishes device, it is characterised in that the specialty monomer class Type includes:Transmission of electricity specialty, power transformation specialty, distribution specialty, relay protection specialty, communication speciality and Automation Specialty;The template Compiling module includes:
    Scheme acquiring unit, for obtaining relevant first typical scenario of transmission of electricity specialty, the relevant second typical case side of power transformation specialty Case, relevant 3rd typical scenario of distribution specialty, relevant 4th typical scenario of relay protection body specialty, communication speciality are relevant 5th typical scenario and relevant 6th typical scenario of Automation Specialty;
    First template planning unit, for according to first typical scenario, using the collection rule and base of analysis of prices data Plinth data standard, Data Analysis Model, the professional typical project cost template of establishment transmission of electricity;
    Second template planning unit, for according to second typical scenario, using the collection rule and base of analysis of prices data Plinth data standard, Data Analysis Model, work out power transformation specialty typical project cost template;
    3rd template planning unit, for according to the 3rd typical scenario, using the collection rule and base of analysis of prices data Plinth data standard, Data Analysis Model, work out distribution specialty typical project cost template;
    4th template planning unit, for according to the 4th typical scenario, using the collection rule and base of analysis of prices data Plinth data standard, Data Analysis Model, work out relay protection specialty typical project cost template;
    5th template planning unit, for according to the 5th typical scenario, using the collection rule and base of analysis of prices data Plinth data standard, Data Analysis Model, work out communication speciality typical project cost template;
    6th template planning unit, for according to the 6th typical scenario, using the collection rule and base of analysis of prices data Plinth data standard, Data Analysis Model, work out Automation Specialty typical project cost template.
  7. 7. typical project cost template according to claim 5 establishes device, it is characterised in that further includes:
    Data obtaining module, for obtaining engineering information and taking charge information;
    Data input module, for the engineering information according to consumption typing and takes charge information;
    Professional monomer type acquisition module, for obtaining target specialty monomer type according to the engineering information;
    Template acquisition module, for according to target specialty monomer type, obtaining target specialty monomer typical project cost template;
    Engineering total cost information generating module, for the surcharge information for taking charge information according to and obtaining in advance, generation Engineering total cost information;
    Project cost report generation module, for according to the journey total cost information and target specialty monomer typical project cost mould Plate, generates project cost report.
  8. 8. typical project cost template according to claim 7 establishes device, it is characterised in that further includes:
    Auditing module, for after project cost report generation module to the project name of each in the project cost report, Specification, unit, quantity, unit price are audited;
    Print module, if qualified for auditing, prints the project cost report;
    Described information acquisition module, if being additionally operable to, examination & verification is unqualified, re-executes the step for obtaining engineering information and taking charge information Suddenly.
  9. 9. a kind of terminal device, including memory, processor and it is stored in the memory and can be on the processor The computer program of operation, it is characterised in that the processor realizes such as Claims 1-4 when performing the computer program The step of method for building up of any one of them typical project cost template.
  10. 10. a kind of computer-readable recording medium, the computer-readable recording medium storage has computer program, its feature exists In realization such as Claims 1-4 any one of them typical project cost template when the computer program is executed by processor Method for building up the step of.
CN201711262363.2A 2017-12-04 2017-12-04 The method for building up and device of typical project cost template Pending CN107944731A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711262363.2A CN107944731A (en) 2017-12-04 2017-12-04 The method for building up and device of typical project cost template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711262363.2A CN107944731A (en) 2017-12-04 2017-12-04 The method for building up and device of typical project cost template

Publications (1)

Publication Number Publication Date
CN107944731A true CN107944731A (en) 2018-04-20

Family

ID=61944675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711262363.2A Pending CN107944731A (en) 2017-12-04 2017-12-04 The method for building up and device of typical project cost template

Country Status (1)

Country Link
CN (1) CN107944731A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109389330A (en) * 2018-11-21 2019-02-26 广州供电局有限公司 Power distribution network infrastructure project analysis of prices method, apparatus, computer equipment and storage medium
CN109615419A (en) * 2018-11-27 2019-04-12 建经投资咨询有限公司 A kind of method for building up, device, equipment and the storage medium of project cost template
CN109978514A (en) * 2019-04-17 2019-07-05 新地能源工程技术有限公司 Project design pricing method and device, project management equipment and storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104077665A (en) * 2014-07-10 2014-10-01 国家电网公司 Power grid project manufacturing cost analysis data collecting system and method
US20150142494A1 (en) * 2013-11-21 2015-05-21 Descisys Ltd. System and method for scheduling temporary resources
CN105608541A (en) * 2016-01-14 2016-05-25 国网山东省电力公司物资公司 Electric power material supply whole-course early-warning supervise system and method
CN106251092A (en) * 2016-08-16 2016-12-21 北京中油瑞飞信息技术有限责任公司 Field operation managing and control system based on operation template
CN106372781A (en) * 2016-08-26 2017-02-01 国家电网公司 Standard power grid project information provision template
CN106447528A (en) * 2016-08-26 2017-02-22 国家电网公司 Establishment of historical power grid typical engineering resource database
CN106910011A (en) * 2017-02-06 2017-06-30 广东华联软件科技有限公司 A kind of Cost Index analysis method and system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150142494A1 (en) * 2013-11-21 2015-05-21 Descisys Ltd. System and method for scheduling temporary resources
CN104077665A (en) * 2014-07-10 2014-10-01 国家电网公司 Power grid project manufacturing cost analysis data collecting system and method
CN105608541A (en) * 2016-01-14 2016-05-25 国网山东省电力公司物资公司 Electric power material supply whole-course early-warning supervise system and method
CN106251092A (en) * 2016-08-16 2016-12-21 北京中油瑞飞信息技术有限责任公司 Field operation managing and control system based on operation template
CN106372781A (en) * 2016-08-26 2017-02-01 国家电网公司 Standard power grid project information provision template
CN106447528A (en) * 2016-08-26 2017-02-22 国家电网公司 Establishment of historical power grid typical engineering resource database
CN106910011A (en) * 2017-02-06 2017-06-30 广东华联软件科技有限公司 A kind of Cost Index analysis method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李俊熙: "建筑工程造价管理信息系统的设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109389330A (en) * 2018-11-21 2019-02-26 广州供电局有限公司 Power distribution network infrastructure project analysis of prices method, apparatus, computer equipment and storage medium
CN109615419A (en) * 2018-11-27 2019-04-12 建经投资咨询有限公司 A kind of method for building up, device, equipment and the storage medium of project cost template
CN109615419B (en) * 2018-11-27 2021-07-16 建经投资咨询有限公司 Method, device, equipment and storage medium for establishing engineering cost template
CN109978514A (en) * 2019-04-17 2019-07-05 新地能源工程技术有限公司 Project design pricing method and device, project management equipment and storage medium

Similar Documents

Publication Publication Date Title
CN107944731A (en) The method for building up and device of typical project cost template
CN107360536A (en) Control method, terminal device and the computer-readable recording medium of terminal device
CN108090567A (en) Power communication system method for diagnosing faults and device
CN107392655A (en) Reward voucher method for pushing, system, storage medium, electronic equipment and shunt method
CN106027486A (en) Multimedia content transmission method and terminal
CN108038112A (en) Document handling method, mobile terminal and computer-readable recording medium
CN107734033A (en) A kind of method, terminal, system and computer-readable recording medium exempted from flow and download application program
CN113626766A (en) Method, device, equipment and storage medium for processing carbon emission data in geographic area
CN107491907A (en) Cost for Electric Power Engineering control and analysis and system
CN107665239A (en) Extraction of spatial information method and device, computer-readable recording medium are lived in a kind of duty
CN110225104A (en) Data capture method, device and terminal device
CN107730375B (en) Tax map management method, system and terminal equipment
CN109684311A (en) Abnormal deviation data examination method and device
CN107679222A (en) Image processing method, mobile terminal and computer-readable recording medium
CN107463767A (en) Cloud HIS medical insurances data processing method and system
CN107506494A (en) Document handling method, mobile terminal and computer-readable recording medium
CN111459932A (en) Block chain-based data evidence storage method and device and storage medium
CN110704519A (en) Business document conversion method and device, storage medium and computer equipment
CN109359938A (en) A kind of optimization method of flow chart of data processing, device and terminal device
CN110220639A (en) Pressure gauge meter register method, device and terminal device in substation
CN106156173A (en) A kind of cheating recognition methods, device and terminal
CN109766331A (en) Method for processing abnormal data and device
CN110290435A (en) Fiber optic network management method, device and terminal device
CN110133569A (en) Electric energy meter calibration method and device
CN109596894A (en) Ac capacitor on-line monitoring method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420