CN112733346B - 一种电气操作间宜人化区域规划方法 - Google Patents
一种电气操作间宜人化区域规划方法 Download PDFInfo
- Publication number
- CN112733346B CN112733346B CN202011614784.9A CN202011614784A CN112733346B CN 112733346 B CN112733346 B CN 112733346B CN 202011614784 A CN202011614784 A CN 202011614784A CN 112733346 B CN112733346 B CN 112733346B
- Authority
- CN
- China
- Prior art keywords
- area
- bounding box
- shadow
- delightful
- cell
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
本发明公开了一种电气操作间宜人化区域规划方法,在auto CAD软件中导入电气间平面图,在电气间平面图区域利用绘图功能插入网格,将电气间平面图划分为若干单元格区域;在auto CAD软件中绘制电气间所有操作工人停留时间分布图;采用包围盒法设计宜人化区域吗,本方法较为简便地且科学地规划出电气间宜人区域,便于对室内环境作出合理的调节,在保障操作工人工作环境的同时,极大得减少了成本。
Description
技术领域
本发明涉及宜人化区域规划领域,尤其涉及电气操作间宜人化区域规划方法。
背景技术
电气操作间内部空间较大且大量空间被设备占据,操作工人活动范围较小,在电气操作间安装温度、湿度等环境调节设备的时候,通常会采用均匀式布置方案,这种布局形式会使得某些环境调节设备离操作工人实际工作区域较远,造成资源和设备的浪费。常用的宜人化区域规划方法主要是将电气操作间内所有活动区域进行合并,这种方式简单但是准确性不高,还存在大量操作工人利用率较低的活动区域,在实际规划过程中应该将该区域也进行排除。
发明内容
本发明的目的在于克服已有技术的缺点,提供一种可以提高空间利用效率、降低能源损耗、减少设备成本、改善室内环境的电气操作间宜人化区域规划方法。
本发明的一种电气操作间宜人化区域规划方法,包括以下步骤:
步骤一、在auto CAD软件中导入电气间平面图,在电气间平面图区域利用绘图功能插入网格,将电气间平面图划分为若干单元格区域,网格线分别与软件内全局坐标系的X轴、Y轴平行,网格线间距设置为L;
步骤二、在auto CAD软件中绘制电气间所有操作工人停留时间分布图,具体过程如下:
第三步,重复第一步、第二步直到完成对所有的电气间操作工人在每个单元格处的总停留时间的判断,得到所有操作工人在电气间的各个单元格处的停留时间的分布图;
步骤三、手动对停留时间分布图进行划分,将直接接触或者距离较近的阴影单元格划分到一起,划分为若干个独立阴影区域;
步骤四、利用C#编程语言对步骤三所得的若干个独立阴影区域创建矩形包围盒,具体过程如下:
第三步,重复第一步、第二步直至将所有独立阴影区域完成矩形包围盒创建;
步骤五、针对矩形包围盒进行宜人化区域确定,具体过程如下:
第三步,重复第一步至第二步,直至将所有独立阴影区域转化为宜人化区域,最终得到电气间宜人化区域分布图;
步骤六、根据步骤五所得的电气间宜人化区域分布图,将环境调节设备安装在宜人化区域内。
本发明的优点:可以针对实际工作中操作工人的主要活动区域进行规划,减少不必要的能源损耗;采用包围盒法设计宜人化区域,能够最大可能将操作工人的活动范围包含其中;采用较为简便的规划算法结合人工选择,使得规划结果更加具有科学性。较为简便地且科学地规划出电气间宜人区域,便于对室内环境作出合理的调节,在保障操作工人工作环境的同时,极大得减少了成本,是一种操作简单、结果可视、稳定可靠、适用性广的方法。
附图说明
图1是一种电气操作间宜人化区域规划方法流程图;
图2-1是电气操作间第一次独立阴影区域划分图;
图2-2是电气操作间第一次包围盒创建图;
图2-3是电气操作间第二次独立阴影区域划分图;
图2-4是电气操作间第二次包围盒创建图;
图2-5是电气操作间宜人化区域分布图。
具体实施方式
下面结合附图和具体实施例对本发明进行详细描述。
如附图所示,本发明的一种电气操作间宜人化区域规划方法,包括以下步骤:
步骤一、在auto CAD软件中导入电气间平面图,在电气间平面图区域利用绘图功能插入网格,将电气间平面图划分为若干单元格区域,网格线分别与软件内全局坐标系的X轴、Y轴平行,网格线间距设置为L,网格线间距L可根据实际电气操作间大小选取,一般取0.2-1米。
步骤二、在auto CAD软件中绘制电气间所有操作工人停留时间分布图,具体过程如下:
第三步,重复第一步、第二步直到完成对所有的电气间操作工人在每个单元格处的总停留时间的判断,得到所有操作工人在电气间的各个单元格处的停留时间的分布图;
步骤三、手动对停留时间分布图进行划分,将直接接触或者距离较近的阴影单元格划分到一起,划分为若干个独立阴影区域。
步骤四、利用C#编程语言对步骤三所得的若干个独立阴影区域创建矩形包围盒,具体过程如下:
第三步,重复第一步、第二步直至将所有独立阴影区域完成矩形包围盒创建,其中相邻的各包围盒之间可以彼此重叠。
步骤五、针对矩形包围盒进行宜人化区域确定,具体过程如下:
第三步,重复第一步至第二步,直至将所有独立阴影区域转化为宜人化区域,最终得到电气间宜人化区域分布图。
下面举例对本步骤加以说明:假设步骤三划分为两个独立阴影区域,步骤四创建了两个矩形包围盒,第一个包围盒计算满足面积条件,则第一个包围盒就是第一块宜人化区域;第二个包围盒不满足面积条件,则返回步骤三,把第二个包围盒内阴影区域分割成两块阴影区域,将这两块独立阴影区域再进行创建包围盒,满足面积条件的包围盒作为宜人化区域,不满足面积条件则再进行重新划分,直到所有的独立阴影区域转化为宜人化区域,得到电气间宜人化区域分布图。
步骤六、在电气间空调、加湿器等环境调节设备时,可根据步骤五所得的电气间宜人化区域分布图,将环境调节设备安装在宜人化区域内。
Claims (2)
1.一种电气操作间宜人化区域规划方法,其特征在于包括以下步骤:
步骤一、在auto CAD软件中导入电气间平面图,在电气间平面图区域利用绘图功能插入网格,将电气间平面图划分为若干单元格区域,网格线分别与软件内全局坐标系的X轴、Y轴平行,网格线间距设置为L;
步骤二、在auto CAD软件中绘制电气间所有操作工人停留时间分布图,具体过程如下:
第三步,重复第一步、第二步直到完成对所有的电气间操作工人在每个单元格处的总停留时间的判断,得到所有操作工人在电气间的各个单元格处的停留时间的分布图;
步骤三、手动对停留时间分布图进行划分,将直接接触或者距离较近的阴影单元格划分到一起,划分为若干个独立阴影区域;
步骤四、利用C#编程语言对步骤三所得的若干个独立阴影区域创建矩形包围盒,具体过程如下:
第三步,重复第一步、第二步直至将所有独立阴影区域完成矩形包围盒创建;
步骤五、针对矩形包围盒进行宜人化区域确定,具体过程如下:
第三步,重复第一步至第二步,直至将所有独立阴影区域转化为宜人化区域,最终得到电气间宜人化区域分布图;
步骤六、根据步骤五所得的电气间宜人化区域分布图,将环境调节设备安装在宜人化区域内。
2.根据权利要求1所述的电气操作间宜人化区域规划方法,其特征在于:网格线间距L取0.2-1米。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011614784.9A CN112733346B (zh) | 2020-12-31 | 2020-12-31 | 一种电气操作间宜人化区域规划方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011614784.9A CN112733346B (zh) | 2020-12-31 | 2020-12-31 | 一种电气操作间宜人化区域规划方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112733346A CN112733346A (zh) | 2021-04-30 |
CN112733346B true CN112733346B (zh) | 2022-08-09 |
Family
ID=75611819
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011614784.9A Active CN112733346B (zh) | 2020-12-31 | 2020-12-31 | 一种电气操作间宜人化区域规划方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112733346B (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106166525A (zh) * | 2016-05-04 | 2016-11-30 | 嘉兴敏惠汽车零部件有限公司 | 一种汽车部件全自动涂装生产线 |
CN108267752A (zh) * | 2016-12-15 | 2018-07-10 | 苏州宝时得电动工具有限公司 | 自移动设备的工作区域的分区方法、装置和电子设备 |
CN110329553A (zh) * | 2019-05-24 | 2019-10-15 | 北京卫星环境工程研究所 | 超大型载人航天器ait中心功能区域配置结构 |
CN111596662A (zh) * | 2020-05-26 | 2020-08-28 | 珠海市一微半导体有限公司 | 一种沿全局工作区域一圈的判断方法、芯片及视觉机器人 |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5428555A (en) * | 1993-04-20 | 1995-06-27 | Praxair, Inc. | Facility and gas management system |
US6334219B1 (en) * | 1994-09-26 | 2001-12-25 | Adc Telecommunications Inc. | Channel selection for a hybrid fiber coax network |
US7243001B2 (en) * | 2004-06-15 | 2007-07-10 | Amazon Technologies, Inc. | Time-based warehouse movement maps |
CN101414179B (zh) * | 2008-11-20 | 2010-08-18 | 上海交通大学 | 人机交互的装配工艺规划系统 |
JP5744510B2 (ja) * | 2010-12-28 | 2015-07-08 | キヤノン株式会社 | 画像処理方法 |
CN102821395A (zh) * | 2011-08-25 | 2012-12-12 | 北京迪特卡得通信设备有限公司 | 基于底层站建设模型对无线网络进行规划的方法和系统 |
CN102521443B (zh) * | 2011-12-06 | 2013-05-08 | 河海大学 | 基于计算机视觉的物流节点设施布局优化方法 |
CN102621886B (zh) * | 2012-02-15 | 2013-11-06 | 清华大学 | 根据建筑物内区域人数分布对能源设备进行控制的方法 |
CN103017757B (zh) * | 2012-12-06 | 2015-05-20 | 中联重科股份有限公司 | 工程机械入场路径规划方法和路径规划装置 |
CN104463948B (zh) * | 2014-09-22 | 2017-05-17 | 北京大学 | 三维虚拟现实系统与地理信息系统的无缝可视化方法 |
WO2017201490A1 (en) * | 2016-05-19 | 2017-11-23 | Simbe Robotics Inc. | Method for automatically generating a planogram that assigns products to shelving structures within a store |
CN105933589B (zh) * | 2016-06-28 | 2019-05-28 | Oppo广东移动通信有限公司 | 一种图像处理方法及终端 |
CN106779239A (zh) * | 2016-12-30 | 2017-05-31 | 天津博迈科海洋工程有限公司 | 电气柜搬运过程中的虚拟轨迹规划方法 |
CN107856309B (zh) * | 2017-11-06 | 2020-04-28 | 沈阳航空航天大学 | 一种增材制造与再制造快速路径规划方法 |
CN108280175A (zh) * | 2018-01-22 | 2018-07-13 | 大连大学 | 基于医疗服务区域划分的倒排空间索引方法 |
JP7101099B2 (ja) * | 2018-11-08 | 2022-07-14 | 株式会社日立製作所 | エリア利用計画システム、エリア利用計画方法、及びエリア利用計画装置 |
CN109800957B (zh) * | 2018-12-24 | 2023-02-03 | 武汉思路富邦工程咨询有限公司 | Bim工程项目规划路线快速生成的方法 |
CN109726964A (zh) * | 2019-01-04 | 2019-05-07 | 杭州卓凯科技有限公司 | 根据司机历史轨迹进行司机常驻点挖掘的方法 |
-
2020
- 2020-12-31 CN CN202011614784.9A patent/CN112733346B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106166525A (zh) * | 2016-05-04 | 2016-11-30 | 嘉兴敏惠汽车零部件有限公司 | 一种汽车部件全自动涂装生产线 |
CN108267752A (zh) * | 2016-12-15 | 2018-07-10 | 苏州宝时得电动工具有限公司 | 自移动设备的工作区域的分区方法、装置和电子设备 |
CN110329553A (zh) * | 2019-05-24 | 2019-10-15 | 北京卫星环境工程研究所 | 超大型载人航天器ait中心功能区域配置结构 |
CN111596662A (zh) * | 2020-05-26 | 2020-08-28 | 珠海市一微半导体有限公司 | 一种沿全局工作区域一圈的判断方法、芯片及视觉机器人 |
Also Published As
Publication number | Publication date |
---|---|
CN112733346A (zh) | 2021-04-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2022256088B2 (en) | Methods and systems for designing photovoltaic systems | |
Chen et al. | Impacts of building geometry modeling methods on the simulation results of urban building energy models | |
Shirazi et al. | Techno-economic BIPV evaluation method in urban areas | |
Amado et al. | Towards solar urban planning: A new step for better energy performance | |
Happle et al. | Impacts of diversity in commercial building occupancy profiles on district energy demand and supply | |
CN110851945A (zh) | 一种光伏阵列排布方法及光伏阵列排布方案自动生成系统 | |
Bajsanski et al. | Effect of tree location on mitigating parking lot insolation | |
WO2010127098A2 (en) | Method for determining and using a climate energy index | |
Zhu et al. | Solar accessibility in developing cities: A case study in Kowloon East, Hong Kong | |
CN110826231B (zh) | 一种气象站点多源数据整合方法 | |
CN104732038A (zh) | 一种基于gis的城市通风廊道计算方法及系统 | |
Liu et al. | A simulation-based tool for energy efficient building design for a class of manufacturing plants | |
Mahaya et al. | Solar access assessment in semi-arid urban context: An application study for ten urban forms of existing apartment buildings districts in Batna City, Algeria | |
CN111783298A (zh) | 一种智能光伏设计系统及设计方法 | |
CN110045440B (zh) | 一种大气雾霾数值预报的集合预报方法及系统 | |
CN112733346B (zh) | 一种电气操作间宜人化区域规划方法 | |
CN104167731A (zh) | 一种多区域多元电源协调规划方法 | |
Wang et al. | Dynamic building energy demand modelling at urban scale for the case of Switzerland | |
CN115983478A (zh) | 分布式光伏发电功率预测分析方法、系统、终端及介质 | |
Keitsch et al. | Input data analysis for optimized short term load forecasts | |
CN112883323B (zh) | 光伏发电系统及其面积确定方法、装置、介质及处理器 | |
Hossain et al. | Energy audit and base case simulation of Ryerson University buildings | |
Woo et al. | Building energy benchmarking with building information modeling and wireless sensor technologies for building retrofits | |
Gao et al. | Optimization design generation of the rural residential building towards energy saving by using “Digital intelligence” technology | |
Edtmayer et al. | High-resolution, spatial thermal energy demand analysis and workflow for a city district |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |