CN112729232B - Method for predicting surface settlement outside pit and considering whole process of foundation pit excavation in soft soil area - Google Patents

Method for predicting surface settlement outside pit and considering whole process of foundation pit excavation in soft soil area Download PDF

Info

Publication number
CN112729232B
CN112729232B CN202110040831.1A CN202110040831A CN112729232B CN 112729232 B CN112729232 B CN 112729232B CN 202110040831 A CN202110040831 A CN 202110040831A CN 112729232 B CN112729232 B CN 112729232B
Authority
CN
China
Prior art keywords
pit
settlement
foundation pit
excavation
subsidence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110040831.1A
Other languages
Chinese (zh)
Other versions
CN112729232A (en
Inventor
程康
张旭东
唐达昆
夏明锬
胡小银
梅灿
徐日庆
甘晓露
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
China Railway 11th Bureau Group Co Ltd
Original Assignee
Zhejiang University ZJU
China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU, China Railway 11th Bureau Group Co Ltd filed Critical Zhejiang University ZJU
Priority to CN202110040831.1A priority Critical patent/CN112729232B/en
Publication of CN112729232A publication Critical patent/CN112729232A/en
Application granted granted Critical
Publication of CN112729232B publication Critical patent/CN112729232B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/15Correlation function computation including computation of convolution operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Pure & Applied Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Mathematical Physics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Mathematical Analysis (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Computational Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Soil Sciences (AREA)
  • Structural Engineering (AREA)
  • Analytical Chemistry (AREA)
  • Computing Systems (AREA)
  • Remote Sensing (AREA)
  • Radar, Positioning & Navigation (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Algebra (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)

Abstract

The invention relates to a method for predicting surface subsidence outside a pit in a soft soil area by considering the whole process of foundation pit excavation, which comprises the following steps: monitoring the surface subsidence of the whole process of the foundation pit excavation, obtaining a first relation function of the transverse maximum subsidence value of the surface outside the pit and the excavation depth and a second relation function of the transverse maximum subsidence position of the surface outside the pit and the excavation depth based on monitoring data, and obtaining a prediction function of the transverse subsidence of the surface outside the pit considering the whole process of the foundation pit excavation based on the first relation function and the second relation function; obtaining a longitudinal settlement prediction function of the earth surface and the earth surface in consideration of the whole process of foundation pit excavation based on the complementary error function and the transverse maximum settlement value of the earth surface and the earth surface; and obtaining the settlement value of any point outside the pit at any excavation stage based on the curve of the transverse settlement prediction function of the surface outside the pit and the curve of the longitudinal settlement prediction function of the surface outside the pit. The method can dynamically predict the settlement of the ground surface outside the pit in the whole process of excavation of the foundation pit based on the deformation monitoring data of the foundation pit and by combining theoretical analysis, and can also evaluate the reliability of monitoring of the foundation pit.

Description

Method for predicting surface settlement outside pit and considering whole process of foundation pit excavation in soft soil area
Technical Field
The invention relates to the field of surface subsidence prediction, in particular to a method for predicting surface subsidence outside a foundation pit by considering the whole process of foundation pit excavation in a soft soil area.
Background
Along with the vigorous development of urban engineering construction activities, the demand of cities for land resources is increasing day by day, and more foundation pit projects are close to buildings, subway stations, underground pipelines and the like. The foundation pit construction operation along the subway tunnel is difficult to avoid, and the foundation pit excavation in a soft soil area with dense buildings and pipelines inevitably brings disturbance to the adjacent environment, such as uneven settlement of the road surface and deformation of underground pipelines, and even cracks and damages of the structure can be caused by serious people. Therefore, it is very important to accurately, quickly and simply predict the surface settlement outside the pit induced in the whole process of excavation of the foundation pit.
The method for predicting foundation pit excavation induced pit external surface settlement in the prior art comprises the following steps: theoretical analysis and numerical simulation.
In the aspect of theoretical analysis method research, firstly, the problem that foundation pit excavation induces pit foreign surface settlement is converted into the problem that deformation of a foundation pit retaining wall induces pit foreign surface settlement; then, by means of an elastic mechanics means, assuming that the soil body is an isotropic elastomer, and then deducing different displacement modes of the foundation pit retaining wall from the problem of elastic edge values: and (3) performing settlement analysis on the rear earth surface of the wall under the working conditions of rigid translation, rotation around the toe of the wall, rotation around the top of the wall and the like. However, the above analysis is mainly based on the assumption that the foundation soil is an elastomer, and the foundation soil in actual engineering practice may not be satisfied; meanwhile, the method can further give a predicted value of the surface subsidence outside the pit only by knowing the deformation of the foundation pit retaining wall. In actual engineering, the predicted value of the ground surface settlement of the foundation pit at each excavation stage can be preliminarily predicted before the foundation pit is not worked, and then corresponding engineering measures are taken in advance. Obviously, this is not considered by the above theoretical approach.
Compared with a theoretical analysis method, the numerical method can consider the deformation characteristics of the soil body and the complexity of deep foundation pit engineering in the foundation pit excavation process, and can be combined with the foundation pit excavation and the construction sequence of the supporting structure for simulation, so that the method is widely applied to the foundation pit engineering, but the soil layer parameters and the boundary conditions need to be accurately determined to obtain a satisfactory result. However, numerical methods generally achieve better accuracy in predicting lateral movement of the enclosure wall, but tend to be less effective in predicting surface subsidence behind the wall.
Disclosure of Invention
The invention provides a prediction method for pit and earth surface settlement in a soft soil area by considering the whole process of foundation pit excavation aiming at the technical problems in the prior art, and solves the problem of poor prediction effect in the prior art.
The technical scheme for solving the technical problems is as follows: a method for predicting surface subsidence outside a foundation pit considering the whole process of foundation pit excavation in a soft soil area comprises the following steps:
step 1, performing surface subsidence monitoring on the whole process of foundation pit excavation, obtaining a relation function I of a lateral maximum subsidence value of a surface outside the pit and the excavation depth and a relation function II of a lateral maximum subsidence position of the surface outside the pit and the excavation depth based on monitoring data, and obtaining a lateral subsidence prediction function of the surface outside the pit considering the whole process of the foundation pit excavation based on the relation function I and the relation function II, wherein the lateral direction is perpendicular to the long side direction of the foundation pit;
step 2, obtaining a longitudinal settlement prediction function of the pit and foreign surface in consideration of the whole excavation process of the foundation pit, wherein the longitudinal direction is parallel to the long side direction of the foundation pit, based on the complementary error function and the maximum horizontal settlement value of the pit and foreign surface given by the prediction function of the horizontal settlement of the pit and foreign surface;
and 3, obtaining the settlement value of any point outside the pit at any excavation stage based on the curve of the transverse settlement prediction function of the surface outside the pit and the curve of the longitudinal settlement prediction function of the surface outside the pit.
On the basis of the technical scheme, the invention can be further improved as follows.
Further, the process of obtaining the first relation function and the second relation function in the step 1 includes:
taking a perpendicular bisector of the long side of the foundation pit as a ground surface settlement observation line ll, taking the direction of the perpendicular bisector as an x-axis direction, and taking the intersection point of the perpendicular bisector and the long side of the foundation pit as an x-axis zero point;
recording the transverse maximum settlement value delta on the earth surface settlement observation line ll under different excavation depths H of the foundation pitvmaxAnd the distance S between the position of the transverse maximum settlement point P and the long edge of the foundation pitmax
Drawing delta under each excavation stage of foundation pitvmaxThe distribution curve of the/H along with the excavation depth H is fitted based on the distribution curve to obtain a relation function I; drawing S in each excavation stage of foundation pitmaxAnd fitting the distribution curve along with the excavation depth H to obtain a second relation function based on the distribution curve.
Further, the first relation function is:
δvmax/H=0.01H2-0.17H+1.179。
further, the relationship function two is:
smax=-0.072H2+2.23H-7.40。
further, the prediction function of the lateral settlement of the surface outside the pit is as follows:
Figure GDA0002987527680000031
wherein, deltavAnd (4) representing the lateral settlement predicted value of the surface outside the pit, and s represents the vertical distance from the long edge of the foundation pit.
Further, in step 2, the lateral maximum sedimentation value δ of the off-pit table is given based on the complementary error function erfc () and the lateral sedimentation prediction function of the off-pit tablevmaxAnd the obtained prediction function of the longitudinal settlement of the earth surface outside the pit is as follows:
Figure GDA0002987527680000032
wherein, δ: (x) represents a settlement predicted value with a vertical distance x from the end point of the foundation pit on a longitudinal settlement observation line selected on the outer side of the foundation pit, L is the length of the long edge of the foundation pit, and deltavmaxIs the maximum sedimentation value on the longitudinal sedimentation observation line, and the sedimentation value on the longitudinal sedimentation observation line is selected to be deltavmaxAnd/2, wherein A is the vertical distance from the point to the foundation pit adjacent to one end.
Further, the process of determining the vertical distance A between the reverse bending point and the short side of the near foundation pit comprises the following steps:
selecting a line segment which is at any vertical distance s from the long edge of the foundation pit and has the length equal to that of the long edge L of the foundation pit and is parallel to the y direction as a longitudinal settlement observation line L 'L' of the earth surface by taking the direction of the long edge of the foundation pit as the y direction;
recording settlement values of all points on a ground surface longitudinal settlement observation line l 'l' under different excavation depths H of the foundation pit;
the intersection point of the observation line l ' l ' of the longitudinal subsidence of the earth surface and the x axis is the maximum subsidence point P ' on l ' l ', and the subsidence value is wvmaxFinding out the settlement amount of 0.5w on the observation line l 'l' of the longitudinal settlement on the ground surfacevmaxThe settlement point is marked as a recurved point P on an earth surface longitudinal settlement observation line l ' l ', and then the distance from the recurved point P ' to the end point of the nearby end of the earth surface longitudinal settlement observation line l ' l ' is recorded as A;
and taking the distance A from a recurved point of the foundation pit under different excavation depths H to the end point close to the ground surface longitudinal settlement observation line L 'L' as a data point, drawing a distribution curve of 2A/L along with H/L under each excavation depth H of the foundation pit, and fitting based on the distribution curve to obtain a relation function of the 2A/L and the H/L.
Further, the fitted relation function of 2A/L and H/L is as follows:
Figure GDA0002987527680000041
the prediction function of the vertical settlement of the earth surface outside the pit is obtained as follows:
Figure GDA0002987527680000042
the invention has the beneficial effects that: the invention provides a method for predicting the settlement of the surface outside the pit in the whole process of foundation pit excavation, which can dynamically predict the settlement of the surface outside the pit in the whole process of foundation pit excavation on the one hand and evaluate the reliability of foundation pit monitoring on the other hand on the basis of the deformation monitoring data of the foundation pit and theoretical analysis, thereby providing an effective basis for the evaluation and optimization of the construction influence of the foundation pit and verifying and supplementing the monitoring data in the process of foundation pit excavation. The method is simple, convenient and practical, and has the following three advantages: 1. compared with the existing method which only can consider the lateral settlement of the surface outside the pit when the foundation pit is excavated to the bottom of the pit, the proposed method can consider the settlement of the surface outside the pit when the excavation depth is arbitrary in the excavation process of the foundation pit; 2. the method can predict the horizontal settlement of any earth surface outside the pit and can also predict the longitudinal settlement of any earth surface outside the pit; 3. by using the prediction method, the settlement of any earth surface outside the pit can be predicted in advance without excavating the foundation pit, and meanwhile, according to the settlement, the method is beneficial to taking corresponding engineering measures in advance.
Compared with the simplified calculation method which mainly focuses on the final stage of excavation in the existing research, the simplified semi-analytical engine provided by the invention has the advantages of stronger applicability and wider application range.
Drawings
FIG. 1 is a flow chart of a method for predicting the settlement of the surface outside a foundation pit in a soft soil area in consideration of the whole process of foundation pit excavation;
FIG. 2 shows the excavation depth H and the maximum surface subsidence δ of the foundation pit according to the embodiment of the present inventionvmaxA plot of the/H relationship;
FIG. 3 shows the excavation depth H of the foundation pit and the maximum settlement position S of the ground surface according to the embodiment of the present inventionmaxA graph of the relationship;
fig. 4 is a schematic diagram illustrating a surface subsidence analytic solution comparison under different excavation depths H of a foundation pit according to an embodiment of the present invention;
FIG. 5 is a schematic diagram of a complementary error function provided in accordance with an embodiment of the present invention;
fig. 6 is a schematic diagram of longitudinal settlement parameters of an external surface of a foundation pit provided by the embodiment of the invention;
FIG. 7 is a graph showing a relationship between a distance A between a recurved point and a short side, a half L/2 of the length of a long side of a foundation pit, and a excavation depth H of the foundation pit, and the length L of the long side of the foundation pit, according to an embodiment of the present invention;
fig. 8(a) is a schematic diagram illustrating a comparison of surface longitudinal settlement solutions for different excavation depths at a distance of 5 m according to an embodiment of the present invention;
fig. 8(b) is a schematic diagram illustrating a comparison of surface longitudinal settlement solutions for different excavation depths at a distance of 10 meters according to an embodiment of the present invention;
fig. 8(c) is a schematic diagram illustrating a comparison of surface longitudinal settlement solutions for different excavation depths at a distance of 15 meters according to an embodiment of the present invention;
fig. 8(d) is a schematic diagram illustrating a comparison of surface longitudinal settlement solutions for different excavation depths at a distance of 20 meters according to an embodiment of the present invention.
Detailed Description
The principles and features of this invention are described below in conjunction with the following drawings, which are set forth by way of illustration only and are not intended to limit the scope of the invention.
The method for predicting the subsidence of the surface outside the pit in the soft soil area considering the whole process of the excavation of the foundation pit is based on actual measurement analysis and prediction, the actual measurement analysis and prediction adopts a method combining theory and actual measurement, and the relationship between the surface subsidence form and the subsidence quantity and the relevant physical and mechanical parameters of the foundation pit is discussed by utilizing a statistical analysis method based on the actual measurement data of the foundation pit which can better reflect the comprehensive conditions of an engineering field. The method has better guiding function for understanding the deformation character of the earth surface behind the wall, predicting the earth surface settlement behind the wall and verifying the numerical analysis result. Theoretical analysis can better summarize and reconcile the law reflected by the actual measurement data and add mathematical expression, thereby facilitating popularization and application.
At present, most of methods based on actual measurement or theoretical analysis are focused on exploring the prediction of longitudinal settlement of the ground surface outside the pit during the final excavation stage of the foundation pit, neglecting the transverse settlement of the ground surface outside the pit, and cannot consider the dynamic process of the whole excavation of the foundation pit.
As shown in fig. 1, the present invention provides a flowchart of a method for predicting surface subsidence outside a pit in a soft soil area in consideration of the whole process of excavation of a foundation pit, and as can be seen from fig. 1, the method for predicting surface subsidence outside a pit in a soft soil area in consideration of the whole process of excavation of a foundation pit includes:
step 1, performing surface subsidence monitoring on the whole process of foundation pit excavation, obtaining a relation function I of a lateral maximum subsidence value of a surface outside the pit and the excavation depth and a relation function II of a lateral maximum subsidence position of the surface outside the pit and the excavation depth based on monitoring data, and obtaining a prediction function of lateral subsidence of the surface outside the pit considering the whole process of the foundation pit excavation based on the relation function I and the relation function II, wherein the lateral direction is perpendicular to the long side direction of the foundation pit.
And 2, obtaining a longitudinal settlement prediction function of the off-pit surface in consideration of the whole excavation process of the foundation pit, wherein the longitudinal direction is parallel to the long side direction of the foundation pit, based on the complementary error function and the maximum horizontal settlement value of the off-pit surface given by the off-pit surface horizontal settlement prediction function.
And 3, obtaining the settlement value of any point outside the pit at any excavation stage based on the curve of the transverse settlement prediction function of the surface outside the pit and the curve of the longitudinal settlement prediction function of the surface outside the pit.
The invention provides a method for predicting the settlement of the surface outside the pit in the whole process of foundation pit excavation, which can dynamically predict the settlement of the surface outside the pit in the whole process of foundation pit excavation on the one hand and evaluate the reliability of foundation pit monitoring on the other hand on the basis of the deformation monitoring data of the foundation pit and theoretical analysis, thereby providing an effective basis for the evaluation and optimization of the construction influence of the foundation pit and verifying and supplementing the monitoring data in the process of foundation pit excavation. The method is simple, convenient and practical, and has the following three advantages: 1. compared with the existing method which only can consider the lateral settlement of the surface outside the pit when the foundation pit is excavated to the bottom of the pit, the proposed method can consider the settlement of the surface outside the pit when the excavation depth is arbitrary in the excavation process of the foundation pit; 2. the method can predict the horizontal settlement of any earth surface outside the pit and can also predict the longitudinal settlement of any earth surface outside the pit; 3. by using the prediction method, the settlement of any earth surface outside the pit can be predicted in advance without excavating the foundation pit, and meanwhile, according to the settlement, the method is beneficial to taking corresponding engineering measures in advance.
Compared with the simplified calculation method which mainly focuses on the final stage of excavation in the existing research, the simplified semi-analytical engine provided by the invention has the advantages of stronger applicability and wider application range.
Example 1
The embodiment 1 provided by the invention is an embodiment of a method for predicting the subsidence of the surface outside a pit in a soft soil area in consideration of the whole process of foundation pit excavation, and the embodiment comprises the following steps:
step 1, performing surface subsidence monitoring on the whole process of foundation pit excavation, obtaining a relation function I of a lateral maximum subsidence value of a surface outside the pit and the excavation depth and a relation function II of a lateral maximum subsidence position of the surface outside the pit and the excavation depth based on monitoring data, and obtaining a prediction function of lateral subsidence of the surface outside the pit considering the whole process of the foundation pit excavation based on the relation function I and the relation function II, wherein the lateral direction is perpendicular to the long side direction of the foundation pit.
Preferably, the process of obtaining the first relation function and the second relation function includes:
and monitoring the surface subsidence of the subway foundation pit in the whole excavation process, and analyzing the surface subsidence displacement characteristics.
And taking the perpendicular bisector of the long side of the foundation pit as a ground surface settlement observation line ll, taking the direction of the perpendicular bisector as the x-axis direction, and taking the intersection point of the perpendicular bisector and the long side of the foundation pit as an x-axis zero point o.
Recording the transverse maximum settlement value delta on the earth surface settlement observation line ll under different excavation depths H of the foundation pitvmaxAnd the distance S between the position of the transverse maximum settlement point P and the long edge of the foundation pitmax
And (4) taking the monitoring data of the maximum settlement point of the foundation pit under different excavation depths H as data points, and drawing delta under each excavation stage of the foundation pitvmaxThe method comprises the following steps that A, a distribution curve of/H along with the excavation depth H is obtained, and a relation function I is obtained on the basis of the distribution curve; drawing S in each excavation stage of foundation pitmaxAnd fitting the distribution curve along with the excavation depth H to obtain a second relation function based on the distribution curve.
Specifically, in the embodiment of the present invention, as shown in fig. 2, the excavation depth H of the foundation pit and the maximum surface subsidence δ provided by the embodiment of the present invention are shownvmaxGraph of the relationship of/H, baseThe distribution curve in this fig. 2 can be found: the relation function one is deltavmax/H=0.01H2-0.17H+1.179。
As shown in fig. 3, the excavation depth H of the foundation pit and the maximum surface subsidence position S according to the embodiment of the present inventionmaxThe relationship graph can be obtained based on the distribution curve in fig. 3: the second relation function is smax=-0.072H2+2.23H-7.40。
According to deltavmax/H、SmaxFurther, the prediction formula of the lateral settlement of the ground surface outside the pit, which can consider the whole process of the excavation of the foundation pit, is provided as follows:
Figure GDA0002987527680000081
wherein, deltavAnd (4) representing the lateral settlement predicted value of the surface outside the pit, and s represents the vertical distance from the long edge of the foundation pit.
After a prediction result is obtained based on the prediction function of the lateral settlement of the external surface of the pit, the measured lateral settlement of the external surface of the pit under different excavation depths H and the lateral settlement distribution curve of the external surface of the pit given by the prediction function of the lateral settlement of the external surface of the pit can be drawn; and calculating a prediction error and evaluating the prediction effect. Fig. 4 is a schematic diagram illustrating a comparison of surface subsidence analytic solutions under different excavation depths H of the foundation pit according to an embodiment of the present invention.
And 2, obtaining a longitudinal settlement prediction function of the off-pit surface in consideration of the whole excavation process of the foundation pit, wherein the longitudinal direction is parallel to the long side direction of the foundation pit, based on the complementary error function and the maximum horizontal settlement value of the off-pit surface given by the off-pit surface horizontal settlement prediction function.
As shown in fig. 5, which is a schematic diagram of the complementary error function provided by the embodiment of the present invention, the complementary error function erfc () is defined as:
Figure GDA0002987527680000082
where u is the normalization variable of the normalization gaussian function, erf (0) ═ 0, and erf (∞) ═ 1.
The general formula based on the complementary error function deformation curve is: y ═ C · erfc [ (x-a)/B ] + D.
As shown in fig. 6, which is a schematic view of a longitudinal settlement parameter of the ground surface outside the foundation pit according to an embodiment of the present invention, it can be known from fig. 5 and 6 that, on a longitudinal settlement observation line selected on the outer side of the foundation pit, x represents a vertical distance to an end point of the foundation pit, and δ representsvmaxIs the maximum sedimentation value on the longitudinal sedimentation observation line, and the sedimentation value on the longitudinal sedimentation observation line is selected to be deltavmaxAnd/2, wherein A is the vertical distance from the point to the foundation pit at the adjacent end, namely the distance from the recurved point of the complementary error function to the corner of the foundation pit, B is the shape parameter of the slope at the recurved point, C is the amplitude parameter, and D is the vertical offset parameter.
According to the complementary error function form and the excavation-induced surface subsidence distribution relation, the following steps are known:
D=δvmax,C=-D/2。
for conventional foundation pit excavation, the analysis side is the long side of the foundation pit with the length of L, and the middle position of the foundation pit is not difficult to find, namely the position which is delta from the L/2 position of the cornervmaxIs at, i.e. y(x=L/2)Substituting D into a general equation based on a complementary error function deformation curve to obtain:
Figure GDA0002987527680000091
when x increases to infinity, the complementary error function goes to zero and a reasonable truncation must be performed to compute the function. Finding that the complementary error function is approximately zero based on least squares fit, the following condition may be taken:
B≈[(L/2)-A]/2.8。
based on the formula, the longitudinal settlement prediction function of the surface outside the pit can be obtained as follows:
Figure GDA0002987527680000092
from this formula, it can be seen that only A and δ need be obtainedvmaxThe control equation of the deformation curve can be obtained.
For different excavation depths H of the foundation pit, the different back-bending points of the settlement curve are obviously corresponded.
Preferably, the process of determining the vertical distance a between the inflection point and the short side of the foundation pit closer comprises the following steps:
and selecting any vertical distance s from the long edge of the foundation pit by taking the direction of the long edge of the foundation pit as the y direction, wherein the length of the line segment which is equal to the long edge L of the foundation pit and is parallel to the y direction is taken as a longitudinal settlement observation line L ' L ' of the earth's surface.
And recording settlement values of all points on a longitudinal settlement observation line l 'l' on the ground surface under different excavation depths H of the foundation pit.
According to the symmetry, the intersection point of the longitudinal surface settlement observation line l ' l ' and the x axis is the maximum settlement point P ' on l ' l ', and the settlement value is wvmaxFinding out the settlement amount of 0.5w on the observation line l 'l' of the longitudinal settlement on the ground surfacevmaxAnd recording the distance from the inflection point P ' to the end point of the nearby end of the longitudinal surface settlement observation line l ' l ' as A.
And taking the distance A from a recurved point of the foundation pit under different excavation depths H to the end point close to the ground surface longitudinal settlement observation line L 'L' as a data point, drawing a distribution curve of 2A/L along with H/L under each excavation depth H of the foundation pit, and fitting based on the distribution curve to obtain a relation function of the 2A/L and the H/L.
In the embodiment provided by the present invention, as shown in fig. 7, a graph of a relationship between a distance a between a recurved point and a short side, a half L/2 of a long side length of a foundation pit, and an excavation depth H/a long side length L of the foundation pit provided by the embodiment of the present invention is shown, and a relationship function between 2A/L and H/L, which can be obtained by fitting according to a distribution curve in fig. 7, is:
Figure GDA0002987527680000101
the prediction function of the longitudinal settlement of the surface outside the pit considering the whole process of the excavation of the foundation pit can be obtained as follows:
Figure GDA0002987527680000102
and delta (x) represents a settlement predicted value with a vertical distance of x from the end point of the foundation pit on a longitudinal settlement observation line selected on the outer side of the foundation pit. After a prediction result is obtained based on the prediction function of the longitudinal settlement of the foreign surface of the pit outside the pit, the actual measurement longitudinal settlement of the foreign surface of the pit under different excavation depths H and the transverse settlement distribution curve of the foreign surface of the pit given by the prediction function of the transverse settlement of the foreign surface of the pit can be drawn; and calculating a prediction error and evaluating the prediction effect. Fig. 8(a) -8 (d) are schematic diagrams illustrating the analysis and comparison of the longitudinal subsidence of the ground surface at different excavation depths at distances of 5 m, 10 m, 15 m and 20 m according to the embodiment of the present invention.
And 3, obtaining the settlement value of any point outside the pit at any excavation stage based on the curve of the transverse settlement prediction function of the surface outside the pit and the curve of the longitudinal settlement prediction function of the surface outside the pit.
When any point on the curve of the horizontal settlement prediction function outside the pit is taken, the corresponding horizontal maximum settlement value delta can be obtainedvmaxWill deltavmaxAnd (4) carrying the longitudinal settlement prediction function of the surface outside the pit into the pit, and obtaining the longitudinal settlement distribution curve of the arbitrary point. Namely: and (4) combining the steps 1-3 to obtain the settlement value of any point outside the pit at any excavation stage (excavation depth H).
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (8)

1. A method for predicting the settlement of the surface outside a pit in a soft soil area by considering the whole process of foundation pit excavation is characterized by comprising the following steps:
step 1, performing surface subsidence monitoring on the whole process of foundation pit excavation, obtaining a relation function I of a lateral maximum subsidence value of a surface outside the pit and the excavation depth and a relation function II of a lateral maximum subsidence position of the surface outside the pit and the excavation depth based on monitoring data, and obtaining a lateral subsidence prediction function of the surface outside the pit considering the whole process of the foundation pit excavation based on the relation function I and the relation function II, wherein the lateral direction is the direction vertical to the long side of the foundation pit;
step 2, obtaining a longitudinal settlement prediction function of the pit and foreign surface in consideration of the whole excavation process of the foundation pit, wherein the longitudinal direction is parallel to the long side direction of the foundation pit, on the basis of the complementary error function and the maximum horizontal settlement value of the pit and foreign surface obtained by the prediction function;
and 3, obtaining the settlement value of any point outside the pit at any excavation stage based on the curve of the transverse settlement prediction function of the surface outside the pit and the curve of the longitudinal settlement prediction function of the surface outside the pit.
2. The method for predicting subsidence of an underground surface according to claim 1, wherein the step 1 of obtaining the first relation function and the second relation function comprises:
taking a perpendicular bisector of a long side of the foundation pit as a ground surface settlement observation line ll, taking the direction of the perpendicular bisector as an x-axis direction, and taking the intersection point of the perpendicular bisector and the long side of the foundation pit as an x-axis zero point;
recording the transverse maximum settlement value delta on the earth surface settlement observation line ll under different excavation depths H of the foundation pitvmaxAnd the distance S between the position of the transverse maximum settlement point P and the long edge of the foundation pitmax
Drawing delta of foundation pit at each excavation stagevmaxThe distribution curve of the/H along with the excavation depth H is fitted based on the distribution curve to obtain the first relation function; drawing S in each excavation stage of foundation pitmaxAnd fitting the distribution curve along with the excavation depth H to obtain the second relation function based on the distribution curve.
3. The method of predicting subsidence of an out-of-pit surface according to claim 2, wherein the first relation function is:
δvmax/H=0.01H2-0.17H+1.179。
4. the method of predicting subsidence of an out-of-pit surface according to claim 2, wherein the second relation function is:
smax=-0.072H2+2.23H-7.40。
5. the method of claim 2, wherein the off-pit surface lateral subsidence prediction function is:
Figure FDA0003565146000000021
wherein, deltavAnd (4) representing the lateral settlement predicted value of the surface outside the pit, and s represents the vertical distance from the long edge of the foundation pit.
6. Method for prediction of the subsidence of a foreign table from a pit according to claim 1, wherein in step 2, the lateral maximum subsidence value δ of a foreign table from a pit based on the complementary error function erfc () and the lateral maximum subsidence value δ of a foreign table from a pit given by the lateral subsidence prediction function of the foreign table from a pitvmaxAnd the obtained prediction function of the longitudinal settlement of the surface outside the pit is as follows:
Figure FDA0003565146000000022
wherein, delta (x) represents a settlement predicted value with a vertical distance of x from the end point of the foundation pit on a longitudinal settlement observation line selected at the outer side of the foundation pit, L is the length of the long edge of the foundation pit, and delta (x) represents the settlement predicted valuevmaxIs the maximum sedimentation value on the longitudinal sedimentation observation line, and the sedimentation value on the longitudinal sedimentation observation line is selected to be deltavmaxAnd/2, wherein A is the vertical distance from the point to the foundation pit adjacent to one end.
7. Method for the prediction of foreign surface subsidence according to claim 6, wherein the process of determining the vertical distance A comprises:
selecting a line segment which is at any vertical distance s from the long edge of the foundation pit and has the length equal to that of the long edge L of the foundation pit and is parallel to the y direction as a longitudinal settlement observation line L 'L' of the earth surface by taking the direction of the long edge of the foundation pit as the y direction;
recording settlement values of all points on the longitudinal settlement observation line l 'l' of the ground surface under different excavation depths H of the foundation pit;
the above-mentionedThe intersection point of the observation line l ' l ' of the longitudinal subsidence of the earth surface and the x axis is the maximum subsidence point P ' on l ' l ', and the subsidence value is wvmaxFinding out the settlement amount of 0.5w on the observation line l 'l' of the longitudinal settlement on the earth surfacevmaxThe settlement point is marked as a recurved point P 'on the longitudinal settlement observation line l' l 'on the earth surface, and then the distance from the recurved point P' to the end point of the nearby end of the longitudinal settlement observation line l 'l' on the earth surface is recorded as A;
and taking the distance A from a recurved point of the foundation pit under different excavation depths H to the end point of the near end of the ground surface longitudinal settlement observation line L 'L' as a data point, drawing a distribution curve of 2A/L along with H/L under each excavation depth H of the foundation pit, and fitting based on the distribution curve to obtain a relation function of the 2A/L and the H/L.
8. The method of predicting subsidence of an extra-excavation surface according to claim 7, wherein the fitted 2A/L to H/L relation function is:
Figure FDA0003565146000000031
the prediction function of the longitudinal settlement of the surface outside the pit is obtained as follows:
Figure FDA0003565146000000032
CN202110040831.1A 2021-01-13 2021-01-13 Method for predicting surface settlement outside pit and considering whole process of foundation pit excavation in soft soil area Active CN112729232B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110040831.1A CN112729232B (en) 2021-01-13 2021-01-13 Method for predicting surface settlement outside pit and considering whole process of foundation pit excavation in soft soil area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110040831.1A CN112729232B (en) 2021-01-13 2021-01-13 Method for predicting surface settlement outside pit and considering whole process of foundation pit excavation in soft soil area

Publications (2)

Publication Number Publication Date
CN112729232A CN112729232A (en) 2021-04-30
CN112729232B true CN112729232B (en) 2022-05-17

Family

ID=75592810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110040831.1A Active CN112729232B (en) 2021-01-13 2021-01-13 Method for predicting surface settlement outside pit and considering whole process of foundation pit excavation in soft soil area

Country Status (1)

Country Link
CN (1) CN112729232B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113806843B (en) * 2021-09-01 2024-05-31 北京住总集团有限责任公司 Deformation analysis system and method based on dynamic fluctuation of sedimentation tank bottom
CN114383568B (en) * 2022-03-24 2022-06-28 山东省物化探勘查院 Method and system for determining railway settlement based on comparison theory

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103205972A (en) * 2013-03-19 2013-07-17 辽宁工程技术大学 Method for analyzing relationship between deformation of foundation pit and ground subsidence outside of foundation pit
CN107025333A (en) * 2017-03-08 2017-08-08 广西建工集团第五建筑工程有限责任公司 Deformation estimation method for deep foundation pit support structure in soft soil stratum
CN109680733A (en) * 2019-01-27 2019-04-26 浙江大学 The displacement of foundation pit rigid retaining walls induces the model test apparatus and operating method for cheating outer ground surface soil body sedimentation
CN110727985A (en) * 2019-09-30 2020-01-24 天津大学 Method for predicting vertical deformation of existing subway tunnel adjacent to foundation pit engineering
CN112035941A (en) * 2020-09-17 2020-12-04 辽宁工程技术大学 Prediction method for surface subsidence of deep foundation pit excavation based on BAS-BP model

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103205972A (en) * 2013-03-19 2013-07-17 辽宁工程技术大学 Method for analyzing relationship between deformation of foundation pit and ground subsidence outside of foundation pit
CN107025333A (en) * 2017-03-08 2017-08-08 广西建工集团第五建筑工程有限责任公司 Deformation estimation method for deep foundation pit support structure in soft soil stratum
CN109680733A (en) * 2019-01-27 2019-04-26 浙江大学 The displacement of foundation pit rigid retaining walls induces the model test apparatus and operating method for cheating outer ground surface soil body sedimentation
CN110727985A (en) * 2019-09-30 2020-01-24 天津大学 Method for predicting vertical deformation of existing subway tunnel adjacent to foundation pit engineering
CN112035941A (en) * 2020-09-17 2020-12-04 辽宁工程技术大学 Prediction method for surface subsidence of deep foundation pit excavation based on BAS-BP model

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
软土地区基坑开挖对邻近高铁路基变形影响及保护距离研究;方浩;《中国优秀博硕士学位论文全文数据库(硕士)工程科技Ⅱ辑》;20180415;第57-66页 *
软土隧道盾构法施工引起的纵向地面变形预测;魏纲;《岩石工程学报》;20050930;第1077-1081页 *
软岩地层盾构隧道施工引起的地层沉降预测;王海涛 等;《岩石力学与工程学报》;20201231;第3549-3556页 *

Also Published As

Publication number Publication date
CN112729232A (en) 2021-04-30

Similar Documents

Publication Publication Date Title
CN112945139B (en) Shield engineering auxiliary system combining three-dimensional scanning with BIM technology
CN112729232B (en) Method for predicting surface settlement outside pit and considering whole process of foundation pit excavation in soft soil area
Kilic et al. Neural network based inspection of voids and karst conduits in hydro–electric power station tunnels using GPR
CN110617796B (en) System for settlement monitoring based on laser three-dimensional modeling
CN105426619A (en) Analysis method for determining longitudinal bending rigidity of shield tunnel
CN102590874B (en) Method for detecting ground surface crack of upland coal-mining subsidence paddy field
Goh et al. Building damage assessment for deep excavations in Singapore and the influence of building stiffness
CN111119902B (en) Tunnel dynamic construction method based on BP neural network
CN110275204B (en) Quantitative analysis method for horizontal slip distance of underground slip fracture
Zhou et al. Effect of relative density on settlements above tunnels in sands
Karaman et al. A comparative assessment of rock mass deformation modulus
CN111101941A (en) Boundary optimization-based shallow advanced treatment method for excavation depth pad of high-diving-level coal mining subsidence area
CN112146588A (en) Method for rapidly judging blasting quality of mine roadway excavation
CN113792369A (en) Soil deformation prediction method, system, equipment and readable storage medium
CN209838413U (en) Test device for sharp bending tunnel model
CN113722663B (en) Method for evaluating underwater dredging and mud throwing of limited space
Sarabia Hypoplastic constitutive law adapted to simulate excavations in Chicago glacial clays
CN102288144A (en) Quantitative method for determining average thickness of water-bearing bed
CN116305416A (en) Stratum tunnel construction settlement prediction method and system
CN115758067A (en) Pile foundation impact drilling geological layering method
Wang et al. Accurate detection technology of super long bored cast-in-place pile concrete pouring thickness based on ultrasonic inclined plane reflection measurement
CN112069225A (en) Data mining method for correlation relation of multisource heterogeneous monitoring data in subway construction
Sainea-Vargas et al. Assessing and updating damage probabilities for a deep excavation in Mexico City soft soils
Su et al. Construction settlement prediction of shield tunnel in soft-soil area
CN113970784B (en) Method and system for updating seismic anisotropy parameters

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant