CN112727505B - Treatment method for mine drilling through abandoned roadway - Google Patents

Treatment method for mine drilling through abandoned roadway Download PDF

Info

Publication number
CN112727505B
CN112727505B CN202110128104.0A CN202110128104A CN112727505B CN 112727505 B CN112727505 B CN 112727505B CN 202110128104 A CN202110128104 A CN 202110128104A CN 112727505 B CN112727505 B CN 112727505B
Authority
CN
China
Prior art keywords
drilling
template
roadway
abandoned
cylindrical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110128104.0A
Other languages
Chinese (zh)
Other versions
CN112727505A (en
Inventor
张利
张亮琦
陈茜
张建发
马柯
韩小磊
苟文敬
王鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Co Ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN202110128104.0A priority Critical patent/CN112727505B/en
Publication of CN112727505A publication Critical patent/CN112727505A/en
Application granted granted Critical
Publication of CN112727505B publication Critical patent/CN112727505B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • E21D11/22Clamps or other yieldable means for interconnecting adjacent arch members either rigidly, or allowing arch member parts to slide when subjected to excessive pressure

Abstract

The invention discloses a processing method for drilling a mine hole through a abandoned roadway, after drilling the mine hole into the abandoned roadway, manufacturing a plurality of cylinder templates, conveying the cylinder templates into the abandoned roadway, splicing the cylinder templates into a vertical template, and wrapping the drill hole of a roadway top plate in the center of the cylinder template; then, supporting devices are arranged between the left side and the right side of the cylinder template and the left side and the right side of the abandoned roadway, and the position of the cylinder template is fixed; pouring concrete into the template through the grouting pipe in the drilling hole until concrete slurry flows out of the overflow hole at the top of the cylindrical template, so that a closed space for connecting the top plate and the bottom plate is formed at the position where the drilling hole penetrates through the tunnel; and after the concrete is solidified, continuing the drilling operation according to the original route. When the original drilling hole penetrates through the abandoned roadway, the drilling hole can only be subjected to abandoned treatment; by the treatment method, the drilling hole penetrating through the abandoned roadway can be saved, so that the drilling hole can continue drilling along a given line, and the loss caused by scrapping of the drilling hole is avoided.

Description

Treatment method for mine drilling through abandoned roadway
Technical Field
The invention belongs to the technical field of mine construction, and particularly relates to a treatment method for a mine drilling through abandoned roadway.
Background
Drilling engineering is very ubiquitous in underground mines, drilling is generally vertical engineering or approximately vertical engineering, underground mine plane engineering is complicated, when drilling is carried out downwards from an upper roadway, plane scrapped roadway engineering can be sometimes penetrated, cement slurry leaks into scrapped roadway during drilling construction, so that a drill bit cannot be lubricated, rock slag cannot be discharged, drilling cannot be carried out, drilling scrapping is even caused, and huge economic loss is caused.
Disclosure of Invention
The invention provides a treatment method for drilling through abandoned roadway in mine, and aims to solve the technical problems.
Therefore, the invention adopts the following technical scheme:
a processing method for drilling through abandoned roadway in mine comprises the following steps:
1) After drilling to the abandoned roadway, stopping drilling operation firstly, and then determining the position of the abandoned roadway and the position of the drilled hole;
2) Cleaning sundries such as broken stones and the like below the drill holes in the abandoned roadway, so as to clean up a construction space; leveling on the bottom plate of the abandoned roadway, facilitating subsequent operation, and finally measuring the distance from the bottom plate to the top plate of the abandoned roadway;
3) Manufacturing a plurality of cylinder templates, wherein the heights of the cylinder templates after being spliced are equal to the distance measured in the step (2);
4) The cylindrical templates in the step 3) are conveyed into a abandoned roadway, a plurality of cylindrical templates are spliced into a vertical template, the cylindrical template at the bottom is placed at the leveling position of a bottom plate, and a drilling hole of a top plate is wrapped at the center of the cylindrical template; then, supporting devices are arranged between the left side and the right side of the cylinder template and the left side and the right side of the abandoned roadway, and the position of the cylinder template is fixed;
5) The joints between the templates and the top plate and the bottom plate of the abandoned roadway are smeared by using concrete, so that a closed space is formed between the templates and the top plate and the bottom plate; then, setting at least one grouting pipe and at least one overflow hole at the top of the cylinder template;
6) Pouring concrete into the template through the grouting pipe until concrete slurry flows out of the overflow holes at the top of the cylindrical template, so that a closed space for connecting the top plate and the bottom plate is formed at the position where the drilling and the tunnel are drilled; and after the concrete is solidified, the drilling operation can be continued along the original routing.
Further, the diameter of the cylindrical template is 1.5-2.5 m.
Further, the height of the cylindrical template is 1m.
Further, the cylinder template consists of four arc-shaped steel plates, and the four arc-shaped steel plates can be spliced into a circle; the left end and the right end of the arc-shaped steel plate are welded with vertical angle steel which stretches outwards along the edge line, the upper end and the lower end of the arc-shaped steel plate are welded with arc-shaped angle steel which stretches outwards, and bolt holes are formed in the vertical angle steel and the arc-shaped angle steel.
The invention has the beneficial effects that: when the original drilling hole penetrates through the abandoned roadway, the drilling hole can only be subjected to abandoned treatment; by the treatment method, the drilling holes penetrating through the abandoned roadway can be saved, so that the drilling holes continue to drill along the established line, loss caused by scrapping of the drilling holes is avoided, and the treatment method has great economic value in mine drilling construction; the cylinder template can be prefabricated standard parts, is produced in a factory and then transported to a construction site for installation, so that maintenance operation is convenient, the drilling time is reduced, and the processing efficiency is further improved.
Drawings
FIG. 1 is a schematic front view of the treatment process of the present invention;
FIG. 2 is a schematic top view of the treatment process of the present invention;
FIG. 3 is a front view of the construction of the cylinder form of the present invention;
FIG. 4 is a top plan view of the construction of the cylindrical form of the present invention;
in the figure: 1-drilling, 2-cylinder templates, 3-overflow holes, 4-supporting devices, 5-arc angle steel, 6-vertical angle steel, 7-bolt holes, 8-drilling opening roadways, 9-abandoned roadway and 10-arc steel plates.
Detailed Description
The invention is further described below with reference to the accompanying drawings:
as shown in fig. 1-2, a treatment method for mine drilling through abandoned roadway comprises the following steps:
1) Drilling downwards along the drilling opening roadway 8, after drilling to the abandoned roadway 9, stopping the drilling operation firstly, and then determining the position of the abandoned roadway 9 and the position of drilling.
2) Debris such as broken stones and the like below the drilled holes in the abandoned roadway 9 are cleaned, so that a construction space is cleaned, and subsequent construction operation is facilitated; and then casting concrete on the bottom plate of the abandoned roadway 9 for leveling, enabling the leveling layer to be parallel to the horizontal plane, and finally measuring the distance from the bottom plate to the top plate of the abandoned roadway 9.
3) Manufacturing a plurality of cylinder templates 2, wherein the heights of the cylinder templates 2 after being spliced are equal to the distance measured in the step (2); the cylindrical template 2 (shown in fig. 3-4) is composed of four arc-shaped steel plates 10, the four arc-shaped steel plates 10 can be spliced into a circle, vertical angle steels 6 extending outwards are welded at the left end and the right end of each arc-shaped steel plate 10 along the edge line, arc-shaped angle steels 5 extending outwards are welded at the upper end and the lower end of each arc-shaped steel plate, bolt holes 7 are formed in the vertical angle steels 6 and the arc-shaped angle steels 5, the adjacent arc-shaped steel plates 10 are fixed through connecting bolts between the vertical angle steels 6, and the adjacent cylindrical template 2 is fixed through connecting bolts between the arc-shaped angle steels 5. Wherein the diameter of the cylindrical template 2 is 1.5-2.5 m, and the height of the cylindrical template 2 is 1m.
4) The cylindrical templates 2 in the step 3) are transported to a abandoned roadway 9, the cylindrical templates 2 are assembled on site, and a plurality of cylindrical templates 2 are assembled into a vertical template. The cylindrical template 2 at the bottom is placed at the leveling position of the bottom plate, and the drilling holes 1 of the top plate are wrapped at the center of the cylindrical template 2. And then, a supporting device 4 is arranged between the left side and the right side of the cylinder template 2 and the left side and the right side of the abandoned roadway 9, the position of the cylinder template 2 is fixed, a wood pile can be selected as the supporting device 4, one end of the wood pile is abutted against the abandoned roadway 9, and the other end is abutted against the cylinder template 2.
5) And the joints between the templates and the top plate and the bottom plate of the abandoned roadway 9 are smeared by using concrete, so that a closed space is formed between the templates and the top plate and the bottom plate. Then, at the top of the cylindrical die plate 2, not less than one grouting pipe and not less than one overflow hole 3 are provided.
6) Pouring concrete into the template through the grouting pipe until concrete slurry flows out of the overflow holes 3 at the top of the cylindrical template 2, so that a closed space for connecting the top plate and the bottom plate is formed at the position where the drilling and the tunnel are drilled; after the concrete is solidified, the drilling operation can be continued along the original routing, the concrete in the template can prevent cement slurry from leaking out of the scrapped roadway, and the construction requirement is met.
It should be noted that the above is only a part of embodiments of the present invention, and it should be noted that it will be apparent to those skilled in the art that several modifications and substitutions can be made without departing from the technical principles of the present invention, and these modifications and substitutions should also be considered as the protection scope of the present invention.

Claims (4)

1. The treatment method for the mine drilling through the abandoned roadway is characterized by comprising the following steps of:
1) After drilling to the abandoned roadway (9), firstly stopping drilling operation, and then determining the position of the abandoned roadway (9) and the position of the drilling;
2) Debris such as broken stones and the like below the drilled holes in the abandoned roadway (9) are cleaned, so that a construction space is cleaned; leveling on the bottom plate of the abandoned roadway (9), facilitating subsequent operation, and finally measuring the distance from the bottom plate to the top plate of the abandoned roadway (9);
3) Manufacturing a plurality of cylindrical templates (2), wherein the heights of the cylindrical templates (2) after being spliced are equal to the distances measured in the step (2);
4) The cylindrical templates (2) in the step 3) are conveyed into a abandoned roadway (9), a plurality of cylindrical templates (2) are spliced into a vertical template, the cylindrical templates (2) at the bottom are placed at the leveling position of a bottom plate, and a drilling hole of a top plate is wrapped at the center of the cylindrical templates (2); then, a supporting device (4) is arranged between the left side and the right side of the cylindrical template (2) and the left side and the right side of the abandoned roadway (9), and the position of the cylindrical template (2) is fixed;
5) The joints between the cylinder templates (2) and the top plate and the bottom plate of the abandoned roadway (9) are smeared by concrete, so that a closed space is formed between the templates and the top plate and the bottom plate; then, setting at least one grouting pipe and at least one overflow hole (3) at the top of the cylinder template (2);
6) Pouring concrete into the template through the grouting pipe until concrete slurry flows out of the overflow holes (3) at the top of the cylindrical template (2), so that a closed space for connecting the top plate and the bottom plate is formed at the position where the drilling hole penetrates through the roadway; and after the concrete is solidified, the drilling operation can be continued along the original routing.
2. The method for treating mine drilling through abandoned roadway according to claim 1, wherein the diameter of the cylindrical template (2) is 1.5-2.5 m.
3. The method for treating mine drilling through abandoned roadway according to claim 2, characterized in that the height of the cylindrical template (2) is 1m.
4. A method of treating mine drilling through abandoned roadway according to claim 3, wherein the cylindrical template (2) is composed of four arc-shaped steel plates (10), and the four arc-shaped steel plates (10) can be spliced into a circle; the left end and the right end of the arc-shaped steel plate (10) are welded with vertical angle steel (6) which stretches outwards along the edge line, the upper end and the lower end of the arc-shaped steel plate are welded with arc-shaped angle steel (5) which stretches outwards, and bolt holes (7) are formed in the vertical angle steel (6) and the arc-shaped angle steel (5).
CN202110128104.0A 2021-01-29 2021-01-29 Treatment method for mine drilling through abandoned roadway Active CN112727505B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110128104.0A CN112727505B (en) 2021-01-29 2021-01-29 Treatment method for mine drilling through abandoned roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110128104.0A CN112727505B (en) 2021-01-29 2021-01-29 Treatment method for mine drilling through abandoned roadway

Publications (2)

Publication Number Publication Date
CN112727505A CN112727505A (en) 2021-04-30
CN112727505B true CN112727505B (en) 2023-05-23

Family

ID=75594756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110128104.0A Active CN112727505B (en) 2021-01-29 2021-01-29 Treatment method for mine drilling through abandoned roadway

Country Status (1)

Country Link
CN (1) CN112727505B (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881015B (en) * 2010-05-31 2011-06-15 长江水利委员会长江勘测规划设计研究院 Method for blocking underground pit water by pneumatically casting granular materials
CN104405404B (en) * 2014-11-14 2016-06-08 山东科技大学 A kind of gas in mine stay roadway method
CN105114029B (en) * 2015-08-19 2017-06-13 中煤科工集团西安研究院有限公司 A kind of shutoff method of the bad drilling of mine laneway inner sealing
CN105351001B (en) * 2015-11-16 2017-09-05 中国矿业大学 A kind of method based on gob side entry retaining region reinforcement gas pumping
CN207048781U (en) * 2017-10-30 2018-02-27 中国煤炭地质总局水文地质局 A kind of hanging sleeve pipe of deep hole
CN108798678B (en) * 2018-05-30 2019-11-26 中煤第一建设有限公司 Wear tunnel freezing hole construction technique
CN109578070B (en) * 2018-12-14 2020-04-14 安徽马钢罗河矿业有限责任公司 Method for filling hole-finding at bottom of drill hole
CN110374680B (en) * 2019-07-18 2021-05-11 长沙矿山研究院有限责任公司 Construction process of retaining wall of surrounding rock crushing water burst roadway

Also Published As

Publication number Publication date
CN112727505A (en) 2021-04-30

Similar Documents

Publication Publication Date Title
CN207777770U (en) A kind of precast spliced pipe fitting jacking system
AU2021106928A4 (en) Construction method for excavation of deep pit with triaxial mixing pile waterstop curtains and rotary bored cast-in-place pile supports
WO2018133740A1 (en) Underground building and construction method for same
CN107524141B (en) Construction method of cast-in-situ bored pile of rock soil foundation
CN104947690A (en) Grooving construction method for embedding underground continuous wall into rock
CN106761765A (en) One kind is applied to Frozen Shaft and safely and fast excavates by huge thick big expanded clay layer construction method
CN111395330A (en) Construction method for concrete cast-in-situ bored pile complete steel casing penetrating through underground gallery
CN111733827A (en) Station yard deep foundation pit protection construction method under adjacent high-speed rail complex environment silt geology
CN112727470B (en) Construction reinforcing method for shield tunnel at overlapped section
CN204533812U (en) A kind of slurry-water balance type jacking construction system
CN103147435A (en) Method for treating construction engineering foundation in gob
CN112727505B (en) Treatment method for mine drilling through abandoned roadway
CN114045854A (en) Bridge pile foundation composite construction method under complex geological condition
CN112412467A (en) Construction method of ventilation vertical shaft of 200-600 m for super-long road tunnel by' reverse shaft method
CN107604904B (en) Rotary digging pile construction method
CN103669347B (en) Underwater anchor rod construction method
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN110593258A (en) Existing building pile foundation steel sleeve pile reinforcing construction method and reinforcing structure
CN110565634A (en) Method for repeatedly constructing and utilizing ultra-long steel casing
CN115584722A (en) Construction method of secant pile in water-rich rock-filling layer-containing soft soil area
CN114837209A (en) Construction method of deep sand layer large-diameter pile foundation in karst development area
CN113266019A (en) Construction method of foundation pit steel pipe support system
AU2021104357A4 (en) A constructuion method for safe and fast excavation of freezing shaft through thick and large bloating layer
CN114016500B (en) Advanced reinforcement construction method for steel pile casing bored pile in sensitive environment
CN116398701B (en) Improved large-diameter main water pipe traversing foundation pit protection structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant