CN112702435A - Intelligent management system for sewage treatment of thermal power plant - Google Patents

Intelligent management system for sewage treatment of thermal power plant Download PDF

Info

Publication number
CN112702435A
CN112702435A CN202011586203.5A CN202011586203A CN112702435A CN 112702435 A CN112702435 A CN 112702435A CN 202011586203 A CN202011586203 A CN 202011586203A CN 112702435 A CN112702435 A CN 112702435A
Authority
CN
China
Prior art keywords
data
sewage treatment
module
sending
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011586203.5A
Other languages
Chinese (zh)
Inventor
高燕宁
杨鹏
刘克成
莫宗宝
王颖楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd, State Grid Hebei Energy Technology Service Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202011586203.5A priority Critical patent/CN112702435A/en
Publication of CN112702435A publication Critical patent/CN112702435A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • H04L67/125Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks involving control of end-device applications over a network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/30Services specially adapted for particular environments, situations or purposes
    • H04W4/38Services specially adapted for particular environments, situations or purposes for collecting sensor information

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an intelligent management system for sewage treatment of a thermal power plant, which comprises a monitoring end, an intelligent management server, a cloud processing platform and an intelligent operating platform, wherein the monitoring end is used for acquiring detection data of each detection sensor arranged in the sewage treatment system of the thermal power plant and sending the detection data to the intelligent operating platform; receiving and executing a user instruction sent by a cloud processing platform, wherein the cloud processing platform is used for receiving display content sent by an intelligent operation platform and sending the display content to mobile equipment of a user; and receiving a user instruction sent by a user, and sending the user instruction to the intelligent operation platform. The invention improves the monitoring efficiency of sewage treatment plants and reduces the labor cost.

Description

Intelligent management system for sewage treatment of thermal power plant
Technical Field
The invention relates to the technical field of sewage treatment, in particular to an intelligent management system for sewage treatment of a thermal power plant.
Background
Sewage treatment is a process of purifying sewage to meet the water quality requirement of discharging the sewage into a certain water body or reusing the sewage. The sewage treatment is widely applied to various fields such as buildings, agriculture, traffic, energy, petrifaction, environmental protection, urban landscape, medical treatment, catering and the like, and is increasingly carried into the daily life of common people
The sewage treatment system of the thermal power plant in the prior art has the defects of large equipment quantity, difficult management and incapability of accurately monitoring various sewage treatment data in real time, and an intelligent management system for sewage treatment of the thermal power plant is urgently needed to be developed aiming at the current situation so as to overcome the defects in the current practical application.
Disclosure of Invention
The invention aims to provide an intelligent management system for sewage treatment of a thermal power plant, so as to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides an intelligent management system for sewage treatment of thermal power plant, includes monitoring end, intelligent management server, cloud processing platform and intelligent operation platform, wherein:
the monitoring end is used for acquiring detection data of each detection sensor arranged in the sewage treatment system of the thermal power plant and sending the detection data to the intelligent operation platform;
the intelligent operation platform is used for receiving the detection data sent by the monitoring end, performing data processing on the detection data, displaying the detection data, and wirelessly transmitting the display content to the cloud processing platform; receiving and executing a user instruction sent by a cloud processing platform;
the cloud processing platform is used for receiving the display content sent by the intelligent operation platform and sending the display content to the mobile equipment of the user; receiving a user instruction sent by a user, and sending the user instruction to an intelligent operation platform;
and the intelligent management server is used for acquiring transmission information among the monitoring end, the intelligent operation platform and the cloud processing platform and executing an information transmission instruction.
As a further scheme of the invention: the monitoring end includes sewage volume monitoring module, water quality monitoring module, equipment monitoring module and data receiving and dispatching end, and sewage volume monitoring module, water quality monitoring module, equipment monitoring module all are connected with data receiving and dispatching end, wherein:
the sewage quantity monitoring module is a flow velocity sensor which is arranged in a sewage treatment system of a thermal power plant and is used for monitoring sewage quantity, and is used for acquiring sewage quantity detection data and sending the detection data to a data receiving and sending end;
the water quality monitoring module is a water quality sensor which is arranged in a sewage treatment system of a thermal power plant and is used for detecting the quality of sewage, acquiring sewage quality detection data and sending the detection data to a data transceiving end;
the equipment monitoring module is used for acquiring working state data of electric equipment installed in a sewage treatment system of a thermal power plant and sending the working state data to the data transceiving end;
and the data receiving and transmitting end is connected with the intelligent operating platform and used for receiving the data sent by the sewage quantity monitoring module, the water quality monitoring module and the equipment monitoring module and sending the data to the intelligent operating platform.
As a further scheme of the invention: the monitoring end also comprises a personnel monitoring module, and the personnel monitoring module is connected with the data transceiving end.
And the personnel monitoring module is used for acquiring attendance information of workers in the sewage treatment system of the thermal power plant, sending the attendance information to the data receiving and sending end, and sending the attendance information to the intelligent operation platform by the data receiving and sending end.
As a further scheme of the invention: the intelligent operation platform comprises an operation instruction input module, an operation detection module, a feedback module and a display module, wherein:
the operation instruction input module is used for acquiring an operation instruction for the operation instruction and sending the operation instruction to the operation detection module;
the operation detection module is used for receiving the operation instruction sent by the operation instruction input module; detecting the running state of the intelligent operating platform; acquiring various detection data sent by a data receiving and sending end, obtaining a state analysis result of the sewage treatment system of the thermal power plant, and sending the analysis result to a feedback module;
the feedback module is also connected with the mobile equipment of the user, and is used for receiving the analysis result sent by the operation detection module and sending the analysis result to the mobile equipment and the display module of the user;
and the display module is used for displaying the analysis result sent by the feedback module.
As a further scheme of the invention: the method for obtaining the state analysis result of the thermal power plant sewage treatment system by the operation detection module comprises the following steps: and comparing the acquired detection data with data indexes preset by a user, calculating a data expectation, and judging the sewage treatment state of the sewage treatment system of the thermal power plant according to the data expectation.
As a further scheme of the invention: the display module comprises a data receiving end, a data processing end and a data display end, the data receiving end, the data processing end and the data display end are connected in sequence, wherein,
the data receiving end is used for receiving the analysis result sent by the intelligent operation platform and sending the analysis result to the data processing end;
the data processing end is used for receiving the analysis results sent by the data receiving end, unifying the data types of all the analysis results and sending the processed data to the data display end;
and the data display end is used for receiving the processed data sent by the data processing end and displaying the processed data to a user.
As a further scheme of the invention: still including the internet access end, the internet access end is connected with data display end, wherein:
and the internet access end is used for connecting the data display end, and allowing a user to call the sewage treatment data in the internet database and send the sewage treatment data to the data display end for display.
Compared with the prior art, the invention has the beneficial effects that:
in summary, the intelligent management system is provided with a monitoring end, an intelligent management server, a cloud processing platform and an intelligent operation platform, wherein the monitoring end is used for acquiring detection data of each detection sensor installed in a sewage treatment system of a thermal power plant and sending the detection data to the intelligent operation platform, and the intelligent operation platform is used for receiving the detection data sent by the monitoring end, performing data processing on the detection data, displaying the detection data, and wirelessly transmitting display content to the cloud processing platform; receiving and executing a user instruction sent by a cloud processing platform, wherein the cloud processing platform is used for receiving display content sent by an intelligent operation platform and sending the display content to mobile equipment of a user; the user instruction sent by the user is received and sent to the intelligent operation platform, so that the monitoring efficiency of sewage treatment of the sewage treatment plant is improved, and the labor cost is reduced.
Drawings
Fig. 1 is a block diagram of an intelligent management system for thermal power plant sewage treatment.
Fig. 2 is a structural block diagram of a monitoring end in an intelligent management system for sewage treatment of a thermal power plant.
FIG. 3 is a block diagram of an intelligent operation platform in an intelligent management system for thermal power plant sewage treatment.
FIG. 4 is a block diagram of a display module in an intelligent management system for thermal power plant sewage treatment.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
Example 1
Referring to fig. 1 to 3, an intelligent management system for sewage treatment of a thermal power plant includes a monitoring end, an intelligent management server, a cloud processing platform and an intelligent operation platform, wherein:
the monitoring end is used for acquiring detection data of each detection sensor arranged in the sewage treatment system of the thermal power plant and sending the detection data to the intelligent operation platform;
the intelligent operation platform is used for receiving the detection data sent by the monitoring end, performing data processing on the detection data, displaying the detection data, and wirelessly transmitting the display content to the cloud processing platform; receiving and executing a user instruction sent by a cloud processing platform;
the cloud processing platform is used for receiving the display content sent by the intelligent operation platform and sending the display content to the mobile equipment of the user; receiving a user instruction sent by a user, and sending the user instruction to an intelligent operation platform;
and the intelligent management server is used for acquiring transmission information among the monitoring end, the intelligent operation platform and the cloud processing platform and executing an information transmission instruction.
In the embodiment of the present invention, the monitoring end includes a sewage monitoring module, a water quality monitoring module, an equipment monitoring module and a data transceiving end, the sewage monitoring module, the water quality monitoring module and the equipment monitoring module are all connected to the data transceiving end, wherein:
the sewage quantity monitoring module is a flow velocity sensor which is arranged in a sewage treatment system of a thermal power plant and is used for monitoring sewage quantity, and is used for acquiring sewage quantity detection data and sending the detection data to a data receiving and sending end;
the water quality monitoring module is a water quality sensor which is arranged in a sewage treatment system of a thermal power plant and is used for detecting the quality of sewage, acquiring sewage quality detection data and sending the detection data to a data transceiving end;
the equipment monitoring module is used for acquiring working state data of electric equipment installed in a sewage treatment system of a thermal power plant and sending the working state data to the data transceiving end;
and the data receiving and transmitting end is connected with the intelligent operating platform and used for receiving the data sent by the sewage quantity monitoring module, the water quality monitoring module and the equipment monitoring module and sending the data to the intelligent operating platform.
In the embodiment of the present invention, the monitoring end further includes a personnel monitoring module, the personnel monitoring module is connected with the data transceiving end, wherein:
and the personnel monitoring module is used for acquiring attendance information of workers in the sewage treatment system of the thermal power plant, sending the attendance information to the data receiving and sending end, and sending the attendance information to the intelligent operating platform by the data receiving and sending end.
In the embodiment of the present invention, the intelligent operation platform includes an operation instruction input module, an operation detection module, a feedback module, and a display module, wherein:
the operation instruction input module is used for acquiring an operation instruction for the operation instruction and sending the operation instruction to the operation detection module;
the operation detection module is used for receiving the operation instruction sent by the operation instruction input module; detecting the running state of the intelligent operating platform; acquiring various detection data sent by a data receiving and sending end, obtaining a state analysis result of the sewage treatment system of the thermal power plant, and sending the analysis result to a feedback module;
the feedback module is also connected with the mobile equipment of the user, and is used for receiving the analysis result sent by the operation detection module and sending the analysis result to the mobile equipment and the display module of the user;
and the display module is used for displaying the analysis result sent by the feedback module.
In the embodiment of the present invention, the method for obtaining the state analysis result of the thermal power plant sewage treatment system by the operation detection module includes: and comparing the acquired detection data with data indexes preset by a user, calculating a data expectation, and judging the sewage treatment state of the sewage treatment system of the thermal power plant according to the data expectation.
Example 2
Referring to fig. 1-4, an intelligent management system for sewage treatment of a thermal power plant comprises a monitoring end, an intelligent management server, a cloud processing platform and an intelligent operation platform, wherein:
the monitoring end is used for acquiring detection data of each detection sensor arranged in the sewage treatment system of the thermal power plant and sending the detection data to the intelligent operation platform;
the intelligent operation platform is used for receiving the detection data sent by the monitoring end, performing data processing on the detection data, displaying the detection data, and wirelessly transmitting the display content to the cloud processing platform; receiving and executing a user instruction sent by a cloud processing platform;
the cloud processing platform is used for receiving the display content sent by the intelligent operation platform and sending the display content to the mobile equipment of the user; receiving a user instruction sent by a user, and sending the user instruction to an intelligent operation platform;
and the intelligent management server is used for acquiring transmission information among the monitoring end, the intelligent operation platform and the cloud processing platform and executing an information transmission instruction.
In the embodiment of the present invention, the monitoring end includes a sewage monitoring module, a water quality monitoring module, an equipment monitoring module and a data transceiving end, the sewage monitoring module, the water quality monitoring module and the equipment monitoring module are all connected to the data transceiving end, wherein:
the sewage quantity monitoring module is a flow velocity sensor which is arranged in a sewage treatment system of a thermal power plant and is used for monitoring sewage quantity, and is used for acquiring sewage quantity detection data and sending the detection data to a data receiving and sending end;
the water quality monitoring module is a water quality sensor which is arranged in a sewage treatment system of a thermal power plant and is used for detecting the quality of sewage, acquiring sewage quality detection data and sending the detection data to a data transceiving end;
the equipment monitoring module is used for acquiring working state data of electric equipment installed in a sewage treatment system of a thermal power plant and sending the working state data to the data transceiving end;
and the data receiving and transmitting end is connected with the intelligent operating platform and used for receiving the data sent by the sewage quantity monitoring module, the water quality monitoring module and the equipment monitoring module and sending the data to the intelligent operating platform.
In the embodiment of the present invention, the monitoring end further includes a personnel monitoring module, the personnel monitoring module is connected with the data transceiving end, wherein:
and the personnel monitoring module is used for acquiring attendance information of workers in the sewage treatment system of the thermal power plant, sending the attendance information to the data receiving and sending end, and sending the attendance information to the intelligent operating platform by the data receiving and sending end.
In the embodiment of the present invention, the intelligent operation platform includes an operation instruction input module, an operation detection module, a feedback module, and a display module, wherein:
the operation instruction input module is used for acquiring an operation instruction for the operation instruction and sending the operation instruction to the operation detection module;
the operation detection module is used for receiving the operation instruction sent by the operation instruction input module; detecting the running state of the intelligent operating platform; acquiring various detection data sent by a data receiving and sending end, obtaining a state analysis result of the sewage treatment system of the thermal power plant, and sending the analysis result to a feedback module;
the feedback module is also connected with the mobile equipment of the user, and is used for receiving the analysis result sent by the operation detection module and sending the analysis result to the mobile equipment and the display module of the user;
and the display module is used for displaying the analysis result sent by the feedback module.
In the embodiment of the present invention, the method for obtaining the state analysis result of the thermal power plant sewage treatment system by the operation detection module includes: and comparing the acquired detection data with data indexes preset by a user, calculating a data expectation, and judging the sewage treatment state of the sewage treatment system of the thermal power plant according to the data expectation.
Referring to fig. 4, the difference between the present embodiment and embodiment 1 is:
the display module comprises a data receiving end, a data processing end and a data display end, the data receiving end, the data processing end and the data display end are connected in sequence, wherein,
the data receiving end is used for receiving the analysis result sent by the intelligent operation platform and sending the analysis result to the data processing end;
the data processing end is used for receiving the analysis results sent by the data receiving end, unifying the data types of all the analysis results and sending the processed data to the data display end;
and the data display end is used for receiving the processed data sent by the data processing end and displaying the processed data to a user.
Example 3
Referring to fig. 1 to 3, an intelligent management system for sewage treatment of a thermal power plant includes a monitoring end, an intelligent management server, a cloud processing platform and an intelligent operation platform, wherein:
the monitoring end is used for acquiring detection data of each detection sensor arranged in the sewage treatment system of the thermal power plant and sending the detection data to the intelligent operation platform;
the intelligent operation platform is used for receiving the detection data sent by the monitoring end, performing data processing on the detection data, displaying the detection data, and wirelessly transmitting the display content to the cloud processing platform; receiving and executing a user instruction sent by a cloud processing platform;
the cloud processing platform is used for receiving the display content sent by the intelligent operation platform and sending the display content to the mobile equipment of the user; receiving a user instruction sent by a user, and sending the user instruction to an intelligent operation platform;
and the intelligent management server is used for acquiring transmission information among the monitoring end, the intelligent operation platform and the cloud processing platform and executing an information transmission instruction.
In the embodiment of the present invention, the monitoring end includes a sewage monitoring module, a water quality monitoring module, an equipment monitoring module and a data transceiving end, the sewage monitoring module, the water quality monitoring module and the equipment monitoring module are all connected to the data transceiving end, wherein:
the sewage quantity monitoring module is a flow velocity sensor which is arranged in a sewage treatment system of a thermal power plant and is used for monitoring sewage quantity, and is used for acquiring sewage quantity detection data and sending the detection data to a data receiving and sending end;
the water quality monitoring module is a water quality sensor which is arranged in a sewage treatment system of a thermal power plant and is used for detecting the quality of sewage, acquiring sewage quality detection data and sending the detection data to a data transceiving end;
the equipment monitoring module is used for acquiring working state data of electric equipment installed in a sewage treatment system of a thermal power plant and sending the working state data to the data transceiving end;
and the data receiving and transmitting end is connected with the intelligent operating platform and used for receiving the data sent by the sewage quantity monitoring module, the water quality monitoring module and the equipment monitoring module and sending the data to the intelligent operating platform.
In the embodiment of the present invention, the monitoring end further includes a personnel monitoring module, the personnel monitoring module is connected with the data transceiving end, wherein:
and the personnel monitoring module is used for acquiring attendance information of workers in the sewage treatment system of the thermal power plant, sending the attendance information to the data receiving and sending end, and sending the attendance information to the intelligent operating platform by the data receiving and sending end.
In the embodiment of the present invention, the intelligent operation platform includes an operation instruction input module, an operation detection module, a feedback module, and a display module, wherein:
the operation instruction input module is used for acquiring an operation instruction for the operation instruction and sending the operation instruction to the operation detection module;
the operation detection module is used for receiving the operation instruction sent by the operation instruction input module; detecting the running state of the intelligent operating platform; acquiring various detection data sent by a data receiving and sending end, obtaining a state analysis result of the sewage treatment system of the thermal power plant, and sending the analysis result to a feedback module;
the feedback module is also connected with the mobile equipment of the user, and is used for receiving the analysis result sent by the operation detection module and sending the analysis result to the mobile equipment and the display module of the user;
and the display module is used for displaying the analysis result sent by the feedback module.
In the embodiment of the present invention, the method for obtaining the state analysis result of the thermal power plant sewage treatment system by the operation detection module includes: and comparing the acquired detection data with data indexes preset by a user, calculating a data expectation, and judging the sewage treatment state of the sewage treatment system of the thermal power plant according to the data expectation.
Referring to fig. 4, the difference between the present embodiment and embodiment 1 is:
the display module comprises a data receiving end, a data processing end and a data display end, the data receiving end, the data processing end and the data display end are connected in sequence, wherein,
the data receiving end is used for receiving the analysis result sent by the intelligent operation platform and sending the analysis result to the data processing end;
the data processing end is used for receiving the analysis results sent by the data receiving end, unifying the data types of all the analysis results and sending the processed data to the data display end;
and the data display end is used for receiving the processed data sent by the data processing end and displaying the processed data to a user.
This example differs from examples 1-2 in that:
still including the internet access end, the internet access end is connected with data display end, wherein:
and the internet access end is used for connecting the data display end, and allowing a user to call the sewage treatment data in the internet database and send the sewage treatment data to the data display end for display.
The above is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, it is possible to make several variations and modifications without departing from the concept of the present invention, and these should be considered as the protection scope of the present invention, which will not affect the effect of the implementation of the present invention and the utility of the patent.

Claims (10)

1. The utility model provides an intelligent management system for sewage treatment of thermal power plant which characterized in that, includes monitoring end, intelligent management server, cloud processing platform and intelligent operation platform, wherein:
the monitoring end is used for acquiring detection data of each detection sensor arranged in the sewage treatment system of the thermal power plant and sending the detection data to the intelligent operation platform;
the intelligent operation platform is used for receiving the detection data sent by the monitoring end, performing data processing on the detection data, displaying the detection data, and wirelessly transmitting the display content to the cloud processing platform; receiving and executing a user instruction sent by a cloud processing platform;
the cloud processing platform is used for receiving the display content sent by the intelligent operation platform and sending the display content to the mobile equipment of the user; receiving a user instruction sent by a user, and sending the user instruction to an intelligent operation platform;
and the intelligent management server is used for acquiring transmission information among the monitoring end, the intelligent operation platform and the cloud processing platform and executing an information transmission instruction.
2. The intelligent management system for sewage treatment of thermal power plant according to claim 1, wherein the monitoring end comprises a sewage amount monitoring module, a water quality monitoring module, an equipment monitoring module and a data transceiving end, the sewage amount monitoring module, the water quality monitoring module and the equipment monitoring module are all connected with the data transceiving end, wherein:
the sewage quantity monitoring module is a flow velocity sensor which is arranged in a sewage treatment system of a thermal power plant and is used for monitoring sewage quantity, and is used for acquiring sewage quantity detection data and sending the detection data to a data receiving and sending end;
the water quality monitoring module is a water quality sensor which is arranged in a sewage treatment system of a thermal power plant and is used for detecting the quality of sewage, acquiring sewage quality detection data and sending the detection data to a data transceiving end;
and the equipment monitoring module is used for acquiring working state data of the electric power equipment installed in the sewage treatment system of the thermal power plant and sending the working state data to the data transceiving end.
3. The intelligent management system for sewage treatment of the thermal power plant according to claim 2, wherein the data transceiver is connected to the intelligent operation platform, and is configured to receive data sent by the sewage amount monitoring module, the water quality monitoring module and the equipment monitoring module, and send the data to the intelligent operation platform.
4. The intelligent management system for sewage treatment of thermal power plant according to claim 3, wherein the monitoring end further comprises a personnel monitoring module, the personnel monitoring module is connected with the data transceiving end, wherein:
and the personnel monitoring module is used for acquiring attendance information of workers in the sewage treatment system of the thermal power plant, sending the attendance information to the data receiving and sending end, and sending the attendance information to the intelligent operating platform by the data receiving and sending end.
5. The intelligent management system for sewage treatment of thermal power plant according to claim 4, wherein the intelligent operation platform comprises an operation instruction input module, an operation detection module, a feedback module and a display module, wherein:
the operation instruction input module is used for acquiring an operation instruction for the operation instruction and sending the operation instruction to the operation detection module;
the operation detection module is used for receiving the operation instruction sent by the operation instruction input module; detecting the running state of the intelligent operating platform; and acquiring various detection data sent by the data receiving and sending end, obtaining a state analysis result of the sewage treatment system of the thermal power plant, and sending the analysis result to the feedback module.
6. The intelligent management system for sewage treatment of a thermal power plant according to claim 6, wherein the feedback module is further connected with a mobile device of a user, and is configured to receive the analysis result sent by the operation detection module, and send the analysis result to the mobile device of the user and the display module, and the display module is configured to display the analysis result sent by the feedback module.
7. The intelligent management system for the sewage treatment of the thermal power plant according to claim 7, wherein the method for obtaining the state analysis result of the sewage treatment system of the thermal power plant by the operation detection module comprises the following steps: and comparing the acquired detection data with data indexes preset by a user, calculating a data expectation, and judging the sewage treatment state of the sewage treatment system of the thermal power plant according to the data expectation.
8. The intelligent management system for sewage treatment of a thermal power plant according to claim 7, wherein the display module comprises a data receiving end, a data processing end and a data display end, and the data receiving end, the data processing end and the data display end are connected in sequence.
9. The intelligent management system for sewage treatment of the thermal power plant according to claim 8, wherein the data receiving end is configured to receive an analysis result sent by the intelligent operating platform and send the analysis result to the data processing end; the data processing terminal is used for receiving the analysis results sent by the data receiving terminal, unifying the data types of all the analysis results and sending the processed data to the data display terminal; and the data display end is used for receiving the processed data sent by the data processing end and displaying the processed data to a user.
10. The intelligent management system for sewage treatment of a thermal power plant of any one of claims 1-0, further comprising an internet access connected to the data display, wherein:
and the internet access end is used for connecting the data display end, and allowing a user to call the sewage treatment data in the internet database and send the sewage treatment data to the data display end for display.
CN202011586203.5A 2020-12-29 2020-12-29 Intelligent management system for sewage treatment of thermal power plant Pending CN112702435A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011586203.5A CN112702435A (en) 2020-12-29 2020-12-29 Intelligent management system for sewage treatment of thermal power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011586203.5A CN112702435A (en) 2020-12-29 2020-12-29 Intelligent management system for sewage treatment of thermal power plant

Publications (1)

Publication Number Publication Date
CN112702435A true CN112702435A (en) 2021-04-23

Family

ID=75511355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011586203.5A Pending CN112702435A (en) 2020-12-29 2020-12-29 Intelligent management system for sewage treatment of thermal power plant

Country Status (1)

Country Link
CN (1) CN112702435A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114314757A (en) * 2022-01-24 2022-04-12 国网河北省电力有限公司电力科学研究院 Monitoring system for reverse osmosis concentrated water desulfurization process
CN114751584A (en) * 2022-03-17 2022-07-15 国网河北省电力有限公司电力科学研究院 Thermal power plant wastewater zero-discharge nonlinear mathematical programming system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104536403A (en) * 2014-12-15 2015-04-22 沈鹏 Water quality purification device intelligent monitoring and management system based on cloud
WO2017214917A1 (en) * 2016-06-16 2017-12-21 武克易 Intelligent water quality monitoring system
CN109905644A (en) * 2017-12-08 2019-06-18 孟思宏 A kind of sewage treatment plant's monitor video intellectual analysis early warning platform
CN111355813A (en) * 2020-03-24 2020-06-30 四川光和兴科技有限公司 Intelligent remote monitoring and data analysis system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104536403A (en) * 2014-12-15 2015-04-22 沈鹏 Water quality purification device intelligent monitoring and management system based on cloud
WO2017214917A1 (en) * 2016-06-16 2017-12-21 武克易 Intelligent water quality monitoring system
CN109905644A (en) * 2017-12-08 2019-06-18 孟思宏 A kind of sewage treatment plant's monitor video intellectual analysis early warning platform
CN111355813A (en) * 2020-03-24 2020-06-30 四川光和兴科技有限公司 Intelligent remote monitoring and data analysis system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114314757A (en) * 2022-01-24 2022-04-12 国网河北省电力有限公司电力科学研究院 Monitoring system for reverse osmosis concentrated water desulfurization process
CN114751584A (en) * 2022-03-17 2022-07-15 国网河北省电力有限公司电力科学研究院 Thermal power plant wastewater zero-discharge nonlinear mathematical programming system and method
WO2023173449A1 (en) * 2022-03-17 2023-09-21 国网河北省电力有限公司电力科学研究院 Thermal power plant wastewater zero-discharge nonlinear mathematical programming system and method

Similar Documents

Publication Publication Date Title
CN104820072B (en) Based on the monitoring method of the Electronic Nose air-quality monitoring system of cloud computing
CN112702435A (en) Intelligent management system for sewage treatment of thermal power plant
CN202837985U (en) GPRS-communication based remote online monitoring system for sewage treatment equipment
CN204964493U (en) Wireless remote sea water quality of water environment measuring equipment
CN202870570U (en) Industrial sewage monitoring system based on cloud computing
CN105243499A (en) Order distribution method and system
CN110988294A (en) Small watershed water environment intelligent monitoring system
CN107423826A (en) A kind of method for inspecting of multi-reservoir, device and system
CN110737231A (en) piping lane monitoring system based on internet of things and three-dimensional visualization technology
CN105279932A (en) Centralized monitoring internet of things platform for operation conditions of village sewage treatment facilities
CN104639636A (en) Mobile vehicle-based intelligent information management system
CN110933598A (en) Drainage pipe network monitoring device, system and monitoring method
CN201425574Y (en) On-line flue gas monitoring system based on wireless GPRS
CN206331274U (en) A kind of equipment long-distance service system
CN201134040Y (en) Remote flux monitoring system device
CN207440635U (en) Real-time level monitoring system based on Internet of Things
CN111490593A (en) Urban cable prevents external damage risk assessment early warning platform
CN110599618A (en) Underground pipeline data monitoring method, device and system
CN104967680A (en) On-site device remote wireless upgrading system and on-site device remote wireless upgrading method
CN211577147U (en) Small watershed water environment intelligent monitoring system
CN114314757A (en) Monitoring system for reverse osmosis concentrated water desulfurization process
CN206640613U (en) A kind of equipment runs intelligent and safe monitoring system
CN206270750U (en) Product oil mechanized production system
CN207611243U (en) Engineering equipment monitoring device
CN205121303U (en) Remote monitering system based on internet + intelligent storage oil tank

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210423

RJ01 Rejection of invention patent application after publication