CN112700027B - 用于电功率预测模型的多精度指标综合评价方法及系统 - Google Patents
用于电功率预测模型的多精度指标综合评价方法及系统 Download PDFInfo
- Publication number
- CN112700027B CN112700027B CN201911115292.2A CN201911115292A CN112700027B CN 112700027 B CN112700027 B CN 112700027B CN 201911115292 A CN201911115292 A CN 201911115292A CN 112700027 B CN112700027 B CN 112700027B
- Authority
- CN
- China
- Prior art keywords
- model
- evaluated
- electric power
- prediction
- precision
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000011156 evaluation Methods 0.000 title claims abstract description 142
- 238000000034 method Methods 0.000 claims abstract description 45
- 238000005457 optimization Methods 0.000 claims abstract description 16
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 15
- 238000003786 synthesis reaction Methods 0.000 claims abstract description 15
- 239000011159 matrix material Substances 0.000 claims abstract description 13
- 238000013461 design Methods 0.000 claims abstract description 12
- 238000012545 processing Methods 0.000 claims description 18
- 238000004364 calculation method Methods 0.000 claims description 6
- 230000004927 fusion Effects 0.000 claims description 6
- 238000010248 power generation Methods 0.000 claims description 4
- 230000000694 effects Effects 0.000 description 3
- 101001095088 Homo sapiens Melanoma antigen preferentially expressed in tumors Proteins 0.000 description 2
- 102100037020 Melanoma antigen preferentially expressed in tumors Human genes 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012216 screening Methods 0.000 description 2
- 238000001308 synthesis method Methods 0.000 description 2
- 238000013528 artificial neural network Methods 0.000 description 1
- 238000007418 data mining Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012706 support-vector machine Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/067—Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (2)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2019110036727 | 2019-10-22 | ||
CN201911003672 | 2019-10-22 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112700027A CN112700027A (zh) | 2021-04-23 |
CN112700027B true CN112700027B (zh) | 2023-10-31 |
Family
ID=75505356
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911115292.2A Active CN112700027B (zh) | 2019-10-22 | 2019-11-14 | 用于电功率预测模型的多精度指标综合评价方法及系统 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN112700027B (zh) |
WO (1) | WO2021077646A1 (zh) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113269470A (zh) * | 2021-06-23 | 2021-08-17 | 云南电网有限责任公司电力科学研究院 | 一种电能替代能效综合评价方法 |
CN113469533A (zh) * | 2021-07-02 | 2021-10-01 | 河海大学 | 一种含综合能源系统的配电网运行评价方法 |
CN113506021A (zh) * | 2021-07-26 | 2021-10-15 | 云南电网有限责任公司电力科学研究院 | 一种用于综合评价的指标无量纲化处理方法 |
CN113705874B (zh) * | 2021-08-19 | 2024-03-15 | 国家电网有限公司 | 新能源电网演化预测方法、装置、计算机设备和存储介质 |
CN114118786A (zh) * | 2021-11-24 | 2022-03-01 | 国网山东省电力公司枣庄供电公司 | 综合能源系统能效评价方法、装置和终端设备 |
CN115859554B (zh) * | 2022-10-08 | 2024-04-26 | 常熟理工学院 | 基于大数据的民用天然气动态智能调配方法 |
CN116050725A (zh) * | 2022-11-08 | 2023-05-02 | 华北电力大学 | 一种综合能源系统运行调度的区块链共识机制构建方法 |
CN115866037A (zh) * | 2023-03-02 | 2023-03-28 | 江西昌大清科信息技术有限公司 | 多技术融合的水文站实时推流平台 |
CN116304606A (zh) * | 2023-05-22 | 2023-06-23 | 北京城建集团有限责任公司 | 一种岩土本构模型工程化推荐方法 |
CN116934274A (zh) * | 2023-09-14 | 2023-10-24 | 济南科金信息技术有限公司 | 一种基于人工智能的工程进度管理系统 |
CN117318052B (zh) * | 2023-11-28 | 2024-03-19 | 南方电网调峰调频发电有限公司检修试验分公司 | 发电机组进相试验无功功率预测方法、装置和计算机设备 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109657856A (zh) * | 2018-12-14 | 2019-04-19 | 中国科学院广州能源研究所 | 一种用于电功率预测模型评价的精度指标构建方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103822793B (zh) * | 2014-01-20 | 2016-05-11 | 北京邮电大学 | 一种复杂设备声学故障识别定位方法 |
CN104318339A (zh) * | 2014-09-15 | 2015-01-28 | 国家电网公司 | 一种基于综合赋权法的电网投资效益评价方法 |
CN104809532A (zh) * | 2015-05-25 | 2015-07-29 | 海南汉能薄膜太阳能有限公司 | 一种光伏系统发电量的预测方法 |
CN105447640A (zh) * | 2015-11-27 | 2016-03-30 | 国家电网公司 | 一种大电网建设经济型评估方法 |
CN105719023A (zh) * | 2016-01-24 | 2016-06-29 | 东北电力大学 | 一种基于混合高斯分布的风电功率实时预测误差分析方法 |
JP6797780B2 (ja) * | 2017-11-07 | 2020-12-09 | 株式会社東芝 | 情報処理装置、情報処理方法及びプログラム |
-
2019
- 2019-11-14 CN CN201911115292.2A patent/CN112700027B/zh active Active
-
2020
- 2020-02-17 WO PCT/CN2020/075474 patent/WO2021077646A1/zh active Application Filing
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109657856A (zh) * | 2018-12-14 | 2019-04-19 | 中国科学院广州能源研究所 | 一种用于电功率预测模型评价的精度指标构建方法 |
Non-Patent Citations (2)
Title |
---|
Blind Noisy Image Quality Assessment Using Sub-Band Kurtosis;Chenwei Deng et al.;IEEE Transactions on Cybernetics;第50卷(第3期);第1146 - 1156页 * |
基于多指标评价优选的风电功率融合预测;刘婷婷等;《计算机工程与设计》;20180516;第39卷(第05期);第1446-1449页 * |
Also Published As
Publication number | Publication date |
---|---|
WO2021077646A1 (zh) | 2021-04-29 |
CN112700027A (zh) | 2021-04-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112700027B (zh) | 用于电功率预测模型的多精度指标综合评价方法及系统 | |
CN103488869A (zh) | 一种最小二乘支持向量机的风力发电短期负荷预测方法 | |
CN102938093A (zh) | 一种风电功率预测的方法 | |
CN110413775A (zh) | 一种数据打标签分类方法、装置、终端及存储介质 | |
CN112884008B (zh) | 一种电力信息采集系统运行状态的预测评估方法及装置 | |
KR102296309B1 (ko) | 태양광 발전량 예측 장치 및 그 방법 | |
CN104102951A (zh) | 一种基于emd历史数据预处理的短期风电功率预测方法 | |
Qiao et al. | Maximizing profit of a wind genco considering geographical diversity of wind farms | |
CN115471362A (zh) | 深度特征指导两阶段迁移学习的综合能源源—荷预测方法 | |
CN109711715A (zh) | 电力通信网风险评估方法 | |
CN104504465A (zh) | 一种发电燃料供应预测方法 | |
CN112836876B (zh) | 一种基于深度学习的配电网线路负荷预测方法 | |
CN112801357B (zh) | 日照辐射量预测方法、装置、设备及存储介质 | |
CN113887809A (zh) | 双碳目标下配电网供需平衡方法、系统、介质及计算设备 | |
Tena-García et al. | Implementing data reduction strategies for the optimal design of renewable energy systems | |
CN115564310A (zh) | 一种基于卷积神经网络的新能源电力系统可靠性评估方法 | |
CN111832785A (zh) | 一种电能替代潜力的预测方法和系统 | |
Rizqi et al. | Green energy mix modeling under supply uncertainty: Hybrid system dynamics and adaptive PSO approach | |
CN115713027A (zh) | 一种变压器状态评估方法、装置及系统 | |
CN105260789A (zh) | 一种面向风电功率超短期预测的风电数据时间尺度优选方法 | |
CN103279896B (zh) | 一种优化编制检修票的方法 | |
CN112347695B (zh) | 一种变压器顶层油温的预测方法及系统 | |
CN116720662B (zh) | 基于集对分析的分布式能源系统适用性评估方法 | |
Liu et al. | Demand Based Bidding Strategies Under Interval Demand for Integrated Demand and Supply Management | |
CN118115045A (zh) | 一种新能源项目后评价方法、系统、设备和可读存储介质 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20230526 Address after: Guangzhou City, Guangdong province 510640 energy road No. 2 Tianhe District Wushan Applicant after: GUANGZHOU INSTITUTE OF ENERGY CONVERSION, CHINESE ACADEMY OF SCIENCES Applicant after: SOUTH CHINA University OF TECHNOLOGY Address before: Guangzhou City, Guangdong province 510640 energy road No. 2 Tianhe District Wushan Applicant before: GUANGZHOU INSTITUTE OF ENERGY CONVERSION, CHINESE ACADEMY OF SCIENCES |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Cui Qiong Inventor after: Shu Jie Inventor after: Zhu Jizhong Inventor after: Huang Lei Inventor after: Li Yixue Inventor before: Cui Qiong Inventor before: Shu Jie Inventor before: Huang Lei Inventor before: Li Yixue |