CN112681789A - Building waterproof construction method - Google Patents

Building waterproof construction method Download PDF

Info

Publication number
CN112681789A
CN112681789A CN202011467951.1A CN202011467951A CN112681789A CN 112681789 A CN112681789 A CN 112681789A CN 202011467951 A CN202011467951 A CN 202011467951A CN 112681789 A CN112681789 A CN 112681789A
Authority
CN
China
Prior art keywords
box
bevel gear
mounting box
rotating rod
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011467951.1A
Other languages
Chinese (zh)
Inventor
胡瀚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202011467951.1A priority Critical patent/CN112681789A/en
Publication of CN112681789A publication Critical patent/CN112681789A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a building waterproof construction method, which adopts the following construction equipment, wherein the building waterproof construction equipment comprises an installation box, a cutting mechanism, a cleaning mechanism and a glue supplementing mechanism. The building waterproof construction method by adopting the building waterproof construction equipment comprises the following steps: s1, equipment installation; s2, building a slot; s3, cleaning the inside of the groove; and S4, filling glue solution. The invention adopts the method of slotting in the cracks and gaps of the building, the slotting can effectively clear up the dust, soil and various stains permeating in the cracks and the gaps for a long time, and waterproof substances are injected into the cleaned cracks and the gaps, so that the waterproof effect and the waterproof service life are greatly improved.

Description

Building waterproof construction method
Technical Field
The invention relates to the technical field of building waterproofing, in particular to a building waterproofing construction method.
Background
The waterproof structure is a defense measure taken at the positions of an outer enclosure structure, a basement and the like in order to avoid the damage of water to the structure. Including waterproofing construction treatments and selection of waterproofing materials. Commonly used waterproofing construction methods are both construction waterproofing and material waterproofing. The structural waterproofing is realized by utilizing the shape of the components and mutual lap joint, and is mainly used for the joints of the components such as waterproof roofs and assembled building external wall panels. The waterproof material is used for covering and sealing the components and the gaps by utilizing the water impermeability of the material. It is commonly used for water-proof of roofs, outer walls, basements and the like. The waterproof materials are various, and mainly include asphalt, plastics, rubber and waterproof concrete. Bitumen waterproofing membranes are commonly used in underground, hydraulic, industrial and other buildings. The plastic and rubber waterproof materials comprise films, coatings, waterproof agents, caulking sealing materials and the like. The waterproof concrete is mainly used for underground hydraulic construction, roofing engineering and the like. The cracks and gaps generated on the building ground are enlarged, the waterproofness of the building ground is greatly reduced, the building ground needs to be repaired, the structural waterproofness is difficult to adopt, and the cracks and gaps generated on the building are generally repaired by using a material waterproofing method.
However, the existing construction equipment for building waterproofing has the following problems when repairing and waterproofing cracks and gaps on the building ground: the existing construction equipment for building waterproofing usually adopts manual work to coat substances for waterproofing such as asphalt, plastics, rubbers, waterproof concrete and the like on cracks and gaps for self-permeation when repairing and waterproofing cracks and gaps on the ground of a building, and the waterproof substances are difficult to effectively permeate due to the fact that a large amount of dust soil and various stains permeate in the long-term cracks, so that the problems of poor waterproofing effect and short waterproofing service life are caused.
Disclosure of Invention
In order to solve the above problems, the present invention provides a waterproof construction method for a building, which can solve the above-mentioned problems.
In order to achieve the purpose, the invention adopts the following technical scheme to realize the purpose: the utility model provides a building waterproof construction method, this building waterproof construction method adopts following construction equipment, and this building waterproof construction equipment includes install bin, cutting mechanism, cleans mechanism and mends gluey mechanism, the install bin is front end and lower extreme open-ended box structure, installs cutting mechanism in the install bin, cleans the mechanism and installs on cutting mechanism and install bin, and the top and the rear side of install bin are provided with mends gluey mechanism, and the walking wheel is all installed to both sides around the both ends face about the install bin, wherein:
the cutting mechanism comprises a hinged frame, a hydraulic cylinder, a driving box, a double-shaft driving motor, a driving bevel gear, a first mounting column, a mounting box, a first rotating rod, a first driven bevel gear, a second driven bevel gear and a cutting branch chain, wherein the hinged frame is hinged on the rear side wall in the mounting box, one end of the hydraulic cylinder is hinged on the upper side wall in the mounting box, the other end of the hydraulic cylinder is hinged on the upper end of the front side of the hinged frame, the driving box is mounted at the front end of the hinged frame, the double-shaft driving motor is mounted in the middle of the driving box, the driving bevel gear is mounted on the output shaft of the double-shaft driving motor, the first mounting column is symmetrically mounted on the front end surface of the driving box, the mounting box is mounted at the front end of the first mounting column, communication holes which enable the interior of the driving box to be communicated with the interior of the mounting box, one end of the first rotating rod in the driving box is provided with a first driven bevel gear, the first driven bevel gear is meshed with the driving gear, and one end of the first rotating rod in the mounting box is provided with a second driven bevel gear;
the cutting branch chain comprises a threaded extrusion rod, a second rotating rod, a third driven bevel gear and a cutting wheel, the threaded extrusion rod is screwed on the opposite outer side wall of the mounting box, one end of the second rotating rod is connected with one end of the threaded extrusion rod in the mounting box in a rotating fit manner, the other end of the second rotating rod penetrates through the side wall of the opposite surface of the mounting box, the third driven bevel gear is mounted on one side of the second rotating rod in the mounting box, the third driven bevel gear and the second driven bevel gear are meshed with each other, butt-joint grooves are formed in the middle parts of the left side wall and the right side wall of the cutting wheel, one ends of the two second rotating rods outside the mounting box are matched with the butt-joint grooves, and the outer wall of the;
the building waterproof construction method by adopting the building waterproof construction equipment comprises the following steps:
s1, equipment installation: mounting a cutting wheel on the apparatus;
s2, building slotting: a repairing groove is formed in a place needing water proofing through a cutting mechanism;
s3, cleaning in the groove: removing cement slag left in the slotted groove out of the repairing groove through a cleaning mechanism;
s4, glue solution filling: and filling the waterproof glue solution into the repairing groove through the glue supplementing mechanism, then leveling the repairing groove, and waiting for the waterproof glue solution to solidify to finish the waterproof work.
As a preferred technical scheme of the invention, the cleaning mechanism comprises a blower, a communicating air hole, a connector, an air cavity, an air blowing hole and a dust collector, the blower is arranged on the right side wall of the installation box, a communicating air hole is arranged between the right threaded extrusion rod and the second rotating rod, the right end surface of the threaded extrusion rod is communicated with the left end surface of the second rotating rod, the right end of the threaded extrusion rod is provided with a connector which is communicated with the communicating air hole, the connector is connected with a blast port of the air blower through a connecting pipe, a circular air cavity is arranged in the middle of the cutting wheel and communicated with the butt joint groove on the right side of the cutting wheel, air blowing holes communicated with the outer wall of the cutting wheel are uniformly arranged on the inner wall of the circular air cavity along the circumferential direction, and the air blowing holes and the tooth-shaped structures on the outer wall of the cutting wheel are mutually staggered, a dust collector is arranged on the lower side wall of the driving box, and a dust suction port of the dust collector faces the lower side.
As a preferred technical scheme, the glue supplementing mechanism comprises a glue storage box, a glue supply pump, a glue suction pipe, a glue supply pipe, a scraping plate, a fixing rod and a top extension spring rod, wherein the glue storage box is arranged at the upper end of the installation box, the glue supply pump is arranged on the installation box at one side of the glue storage box, the glue suction pipe of the glue supply pump is connected to the glue storage box, the glue supply pipe of the glue supply pump downwards penetrates through the rear side wall of the installation box and downwards extends to the bottom, the scraping plate is hinged to the rear side wall of the installation box, the fixing rod is arranged on the side wall of the installation box at the upper side of the scraping plate, and two ends of the top extension spring rod are respectively hinged to the fixing rod and the scraping plate.
As a preferable technical scheme of the invention, the rubber supply pipe is a rubber hose.
As a preferable technical scheme of the invention, a hand-push frame is arranged on the upper side of the rear side wall of the installation box.
As a preferred technical scheme, an extrusion ring is arranged on the outer wall of one side of the second rotating rod outside the mounting box, clamping protrusions are uniformly arranged on the opposite surface of the extrusion ring along the circumferential direction of the extrusion ring, and clamping grooves matched with the clamping protrusions are formed in the left side wall and the right side wall of the corresponding cutting wheel.
The invention has the beneficial effects that:
1. the invention can solve the problems of the existing construction equipment for building waterproof equipment in repairing and waterproofing cracks and gaps on the building ground: the existing construction equipment for building waterproofing usually adopts manual work to coat substances for waterproofing such as asphalt, plastics, rubbers, waterproof concrete and the like on cracks and gaps for self-permeation when repairing and waterproofing cracks and gaps on the ground of a building, and the waterproof substances are difficult to effectively permeate due to the fact that a large amount of dust soil and various stains permeate in the long-term cracks, so that the problems of poor waterproofing effect and short waterproofing service life are caused. The invention adopts the method of slotting in the cracks and gaps of the building, the slotting can effectively clear up the dust, soil and various stains permeating in the cracks and the gaps for a long time, and waterproof substances are injected into the cleaned cracks and the gaps, so that the waterproof effect and the waterproof service life are greatly improved.
2. When the cutting wheel is used for cutting the cement ground, the air blower works, air enters the air cavity through the connecting pipe by the air blower along the communicating air holes formed between the connecting head and the threaded extrusion rod as well as the second rotating rod, the air is blown into the repairing groove through the air blowing holes, so that cement and other broken slag in the repairing groove is blown out of the repairing groove, meanwhile, the dust collector works to suck the broken slag such as cement dust and the like blown out of the repairing groove, so that the repairing groove is free of dust and other sundry shadows, the permeation effect of subsequent filling of waterproof glue solution is increased, and excessive smoke and dust can be prevented from being generated in the working process.
Drawings
The invention is further illustrated with reference to the following figures and examples.
FIG. 1 is a flow chart of the present invention;
FIG. 2 is a schematic structural view of the present invention;
FIG. 3 is an end view taken from A-A of FIG. 2 in accordance with the present invention;
FIG. 4 is an enlarged view of a portion of FIG. 3B in accordance with the present invention;
FIG. 5 is an enlarged view of a portion of the invention at C of FIG. 3;
FIG. 6 is an enlarged view of a portion of FIG. 5 in accordance with the present invention;
FIG. 7 is a schematic view of the cutting wheel of the present invention;
fig. 8 is a schematic view of the mounting structure of the mounting box, the road wheels and the hand push frame of the invention.
Detailed Description
The embodiments of the invention will be described in detail below with reference to the drawings, but the invention can be implemented in many different ways as defined and covered by the claims.
As shown in fig. 1 to 8, a building waterproof construction method adopts the following construction equipment, and the building waterproof construction equipment comprises an installation box 1, a cutting mechanism 2, a cleaning mechanism 3 and a glue supplementing mechanism 4, wherein the installation box 1 is a box-shaped structure with an opening at the front end and the lower end, the cutting mechanism 2 is installed in the installation box 1, the cleaning mechanism 3 is installed on the cutting mechanism 2 and the installation box 1, the glue supplementing mechanism 4 is arranged at the top and the rear side of the installation box 1, walking wheels 11 are installed at the front side and the rear side of the left end face and the right end face of the installation box 1, and a hand-push frame 12 is installed at the upper side of the rear side wall of the installation box 1, wherein:
the cutting mechanism 2 comprises a hinged frame 21, a hydraulic cylinder 22, a driving box 23, a double-shaft driving motor 24, a driving bevel gear 25, a first mounting column 26, a mounting box 27, a first rotating rod 29, a first driven bevel gear 210, a second driven bevel gear 211 and a cutting branch 212, the hinged frame 21 is hinged on the rear side wall in the mounting box 1, one end of the hydraulic cylinder 22 is hinged on the upper side wall in the mounting box 1, the other end of the hydraulic cylinder 22 is hinged on the upper end of the front side of the hinged frame 21, the driving box 23 is mounted at the front end of the hinged frame 21, the double-shaft driving motor 24 is mounted in the middle of the driving box 23, the driving bevel gear 25 is mounted on the output shaft of the double-shaft driving motor 24, the first mounting column 26 is symmetrically mounted on the front end face of the driving box 23, the mounting box 27 is mounted at the front end of the first mounting column 26, communication holes which enable the interior of the driving box 23 to be communicated with the interior, the first rotating rod 29 is installed in the communicating hole in a rotating fit mode, one end of the first rotating rod 29 in the driving box 23 is provided with a first driven bevel gear 210, the first driven bevel gear 210 is meshed with the driving gear, and one end of the first rotating rod 29 in the mounting box 27 is provided with a second driven bevel gear 211;
the cutting branched chain 212 comprises a threaded extrusion rod 2121, a second rotating rod 2122, a third driven bevel gear 2123 and a cutting wheel 2124, the threaded extrusion rod 2121 is screwed on the opposite outer side wall of the mounting box 27, one end of the second rotating rod 2122 is connected with one end of the threaded extrusion rod 2121 in the mounting box 27 in a rotating fit manner, the other end of the second rotating rod 2122 penetrates through the side wall of the opposite surface of the mounting box 27, the third driven bevel gear 2123 is installed on one side of the second rotating rod 2122 in the mounting box 27, the third driven bevel gear 2123 is meshed with the second driven bevel gear 211, the middle parts of the left side wall and the right side wall of the cutting wheel 2124 are provided with abutting grooves, one end of the two second rotating rods 2122 outside the mounting box 27 is matched with the abutting grooves, the outer wall of the cutting wheel 2124 is in a toothed structure, an extrusion ring 2125 is installed on the outer wall of one side of the second rotating rod 2122 outside the mounting box 27, the extrusion ring 2125 is evenly provided with clamping protrusions, clamping grooves 2127 matched with the clamping protrusions 2126 are formed on the left side wall and the right side wall of the corresponding cutting wheel 2124.
During specific work, the cutting wheel 2124 is placed between the two second rotating rods 2122, the butt joint groove corresponds to the end of the second rotating rod 2122, the two threaded extrusion rods 2121 are simultaneously screwed to enable the two second rotating rods 2122 to be close to each other, the end of the second rotating rod 2122 extends into the butt joint groove and extrudes the bottom of the butt joint groove, so that the cutting wheel 2124 is fixed between the two second rotating rods 2122, the extrusion ring 2125 extrudes the side wall of the cutting wheel 2124, and the clamping protrusion 2126 on the extrusion ring 2125 and the clamping groove 2127 on the cutting wheel 2124 are matched and clamped with each other, so that the cutting wheel 2124 can be further fixed, and the cutting wheel 2124 is prevented from rotating relatively when cutting a cement ground; the double-shaft driving motor 24 works, an output shaft of the double-shaft driving motor 24 rotates to drive the driving bevel gear 25 to rotate, the driving bevel gear 25 rotates to drive the first driven bevel gear to rotate, the first driven bevel gear 210 drives the second driven bevel gear 211 to rotate through the first rotating rod 29, the second driven bevel gear 211 rotates to drive the third driven bevel gear 2123 to rotate, the second rotating rod 2122 rotates along with the third driven bevel gear 2123 to drive the cutting wheel 2124 to rotate, the hydraulic cylinder 22 works, a piston rod of the hydraulic cylinder 22 extends out to drive the cutting wheel 2124 to rotate downwards around a hinged part of the hinged frame 21 and the installation box 1, so that the toothed structure on the outer wall of the cutting wheel 2124 gradually cuts the cement ground, when the cutting wheel 2124 cuts the cement ground to a proper depth, the hydraulic cylinder 22 stops working, the equipment is pushed forwards through the hand push frame 12, so that the cutting wheel 2124 linearly cuts a repairing groove on the cement ground, foreign materials such as dust and soil infiltrated into the inside of the water leakage crack are removed by the cutter wheel 2124 together with cement.
The cleaning mechanism 3 comprises an air blower 31, a communicating air hole 32, a connector 33, an air cavity 34, a blowing hole 35 and a dust collector 36, the air blower 31 is installed on the right side wall of the installation box 1, the communicating air hole 32 is formed between the right threaded extrusion rod 2121 and the second rotating rod 2122, so that the right end surface of the threaded extrusion rod 2121 and the left end surface of the second rotating rod 2122 are communicated with each other, the connector 33 is installed at the right end of the threaded extrusion rod 2121, the connector 33 is communicated with the communicating air hole 32, the connector 33 is connected with a blowing port of the air blower 31 through a connecting pipe, the circular air cavity 34 is formed in the middle of the cutting wheel 2124, the circular air cavity 34 is communicated with the butt joint groove on the right side of the cutting wheel 2124, the inner wall of the circular air cavity 34 is uniformly provided with the blowing hole 35 communicated with the outer wall of the cutting wheel 2124 along the circumferential direction, the blowing hole 35, the suction opening of the vacuum cleaner 36 faces downward.
When the concrete during operation, when cutting wheel 2124 is cutting cement ground, air-blower 31 works, air-blower 31 gets into air cavity 34 through the UNICOM gas pocket 32 that the connecting pipe was seted up with the air along between connector 33 and screw extrusion rod 2121 and the second dwang 2122 in, the air blows in the repair inslot through gas hole 35, make the disintegrating slag such as cement of repairing the inslot blown out and repair the groove, 36 work of dust catcher simultaneously, the disintegrating slag such as the cement dust that will blow out and repair the groove absorbs, make the interior debris shadow that does not have dust etc. of repairing the inslot, the infiltration effect of follow-up waterproof glue solution of filling has been increased, can prevent that the course of work from producing too much smoke and dust simultaneously.
Mend gluey mechanism 4 including storing up gluey case 41, supply gluey pump 42, inhale the glued membrane 43, supply glued membrane 44, scraping plate 45, dead lever 46 and top extension spring beam 47, store up gluey case 41 and install in install bin 1 upper end, store up and install on the install bin 1 of gluey case 41 one side and supply glued membrane 42, supply glued membrane 43 of inhaling of pump 42 to connect on storing up gluey case 41, supply the glued membrane 44 of glue pump 42 to wear to establish the back lateral wall of install bin 1 downwards and downwardly extending to the bottom, supply glued membrane 44 to be rubber hose, scraping plate 45 articulates on the back lateral wall of install bin 1, installs dead lever 46 on the install bin 1 lateral wall of scraping plate 45 upside, and the both ends that the spring beam 47 was stretched in the top articulate respectively on dead lever 46 and scraping plate 45.
During specific work, the glue supply pipe 44 naturally droops to the repairing groove behind the cutting wheel 2124, the glue supply pump 42 works, the glue supply pump 42 supplies glue to the bottom of the opened repairing groove through the glue supply pipe 44, the repairing groove can be effectively filled with glue and excessive bubbles are not generated, the scraping plate 45 is pushed by the spring rod 47 when the scraping plate 45 passes through the repairing groove, the front end of the scraping plate 45 rotates around the hinged position of the scraping plate and the installation box 1, the rear end of the scraping plate 45 supports and presses the ground, and when the device continuously moves forwards, the rear end of the scraping plate 45 continuously scrapes part of glue overflowing from the repairing groove to keep the construction ground smooth.
The method for constructing the building waterproof by adopting the building waterproof construction equipment comprises the following steps:
s1, equipment installation: mounting the cutting wheel 2124 on the apparatus;
s2, building slotting: a repairing groove is formed in a place needing water proofing through the cutting mechanism 2;
s3, cleaning in the groove: removing cement slag left in the slotted groove out of the repairing groove through the cleaning mechanism 3;
s4, glue solution filling: and filling the waterproof glue solution into the repairing groove through the glue supplementing mechanism 4, then leveling the repairing groove, and waiting for the waterproof glue solution to solidify to finish the waterproof work.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are given by way of illustration of the principles of the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the invention as defined by the appended claims. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The building waterproof construction method adopts the following construction equipment, and the building waterproof construction equipment comprises an installation box (1), a cutting mechanism (2), a cleaning mechanism (3) and a glue supplementing mechanism (4), and is characterized in that: install cutting mechanism (2) in install installation box (1) for front end and lower extreme open-ended box structure, clean mechanism (3) and install on cutting mechanism (2) and installation box (1), the top and the rear side of installation box (1) are provided with mends gluey mechanism (4), and walking wheel (11) are all installed to both sides around the both ends face about installation box (1), wherein:
the cutting mechanism (2) comprises a hinged frame (21), a hydraulic cylinder (22), a driving box (23), a double-shaft driving motor (24), a driving bevel gear (25), a first mounting column (26), a mounting box (27), a first rotating rod (29), a first driven bevel gear (210), a second driven bevel gear (211) and a cutting branch chain (212), the hinged frame (21) is hinged on the rear side wall in the mounting box (1), one end of the hydraulic cylinder (22) is hinged on the upper side wall in the mounting box (1), the other end of the hydraulic cylinder (22) is hinged on the upper end of the front side of the hinged frame (21), the driving box (23) is mounted at the front end of the hinged frame (21), the double-shaft driving motor (24) is mounted in the middle in the driving box (23), the driving bevel gear (25) is mounted on the output shaft of the double-shaft driving motor (24), the first mounting column (26) is symmetrically mounted on the front end face of, a mounting box (27) is mounted at the front end of the first mounting column (26), a communicating hole which enables the interior of the driving box (23) to be communicated with the interior of the mounting box (27) is formed among the driving box (23), the first mounting column (26) and the mounting box (27), a first rotating rod (29) is mounted in the communicating hole in a rotating fit mode, a first driven bevel gear (210) is mounted at one end of the first rotating rod (29) in the driving box (23), the first driven bevel gear (210) is meshed with a driving gear, and a second driven bevel gear (211) is mounted at one end of the first rotating rod (29) in the mounting box (27);
the cutting branched chain (212) comprises a threaded extrusion rod (2121), a second rotating rod (2122), a third driven bevel gear (2123) and a cutting wheel (2124), the threaded extrusion rod (2121) is in threaded connection with the opposite outer side wall of the mounting box (27), one end of the second rotating rod (2122) is connected with one end of the threaded extrusion rod (2121) in the mounting box (27) in a rotating fit manner, the other end of the second rotating rod (2122) penetrates through the side wall of the opposite surface of the mounting box (27), the third driven bevel gear (2123) is mounted on one side of the second rotating rod (2122) in the mounting box (27), the third driven bevel gear (2123) and the second driven bevel gear (211) are meshed with each other, butt joint grooves are formed in the middles of the left side wall and the right side wall of the cutting wheel (2124), and one ends of the two second rotating rods (2122) outside the mounting box (27) are matched with the butt joint grooves, the outer wall of the cutting wheel (2124) is of a toothed structure;
the building waterproof construction method by adopting the building waterproof construction equipment comprises the following steps:
s1, equipment installation: mounting a cutting wheel (2124) on the apparatus;
s2, building slotting: a repairing groove is formed in a place needing water proofing through a cutting mechanism (2);
s3, cleaning in the groove: removing cement slag left in the slotted groove out of the repairing groove through a cleaning mechanism (3);
s4, glue solution filling: and filling the waterproof glue solution into the repairing groove through the glue supplementing mechanism (4), and then leveling the waterproof glue solution until the waterproof glue solution is solidified to finish the waterproof work.
2. The waterproof construction method for buildings according to claim 1, characterized in that: the cleaning mechanism (3) comprises an air blower (31), a communicating air hole (32), a connector (33), an air cavity (34), an air blowing hole (35) and a dust collector (36), the air blower (31) is installed on the right side wall of the installation box (1), the communicating air hole (32) is formed between the threaded extrusion rod (2121) and the second rotating rod (2122) on the right side, so that the right end face of the threaded extrusion rod (2121) and the left end face of the second rotating rod (2122) are communicated with each other, the connector (33) is installed at the right end of the threaded extrusion rod (2121), the connector (33) is communicated with the communicating air hole (32), the connector (33) is connected with an air blowing port of the air blower (31) through a connecting pipe, the circular air cavity (34) is formed in the middle of the cutting wheel (2124), the circular air cavity (34) is communicated with the butt joint groove on the right side of the cutting wheel (2124), the air blowing hole (35) which is formed in the, the air blowing holes (35) and the tooth-shaped structures on the outer wall of the cutting wheel (2124) are mutually staggered, a dust collector (36) is installed on the lower side wall of the driving box (23), and a dust suction opening of the dust collector (36) faces to the lower side.
3. The waterproof construction method for buildings according to claim 1, characterized in that: mend gluey mechanism (4) including storing up gluey case (41), supply gluey pump (42), rubber suction pipe (43), supply rubber tube (44), scrape flat board (45), dead lever (46) and top and stretch spring beam (47), store up gluey case (41) and install in install bin (1) upper end, store up and install on installing bin (1) of gluey case (41) one side and supply gluey pump (42), supply rubber tube (43) of gluey pump (42) to connect on storing up gluey case (41), supply rubber tube (44) of gluey pump (42) to wear to establish the back lateral wall of installing bin (1) downwards and extend to the bottom, scrape flat board (45) and articulate on the back lateral wall of installing bin (1), install dead lever (46) on installing bin (1) lateral wall of scraping flat board (45) upside, the both ends that spring beam (47) were stretched on top articulate respectively on dead lever (46) and scrape flat board (45).
4. The waterproof construction method for buildings according to claim 3, characterized in that: the rubber supply pipe (44) is a rubber hose.
5. The waterproof construction method for buildings according to claim 1, characterized in that: and a hand-push frame (12) is arranged on the upper side of the rear side wall of the mounting box (1).
6. The waterproof construction method for buildings according to claim 1, characterized in that: no. two dwang (2122) install extrusion ring (2125) on the one side outer wall in mounting box (27) outside, extrusion ring (2125) opposite face evenly is provided with joint protruding (2126) along its circumference, offers joint recess (2127) mutually supporting with joint protruding (2126) on the wall of the corresponding cutting wheel (2124) left and right sides.
CN202011467951.1A 2020-12-14 2020-12-14 Building waterproof construction method Withdrawn CN112681789A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011467951.1A CN112681789A (en) 2020-12-14 2020-12-14 Building waterproof construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011467951.1A CN112681789A (en) 2020-12-14 2020-12-14 Building waterproof construction method

Publications (1)

Publication Number Publication Date
CN112681789A true CN112681789A (en) 2021-04-20

Family

ID=75447614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011467951.1A Withdrawn CN112681789A (en) 2020-12-14 2020-12-14 Building waterproof construction method

Country Status (1)

Country Link
CN (1) CN112681789A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114607163A (en) * 2022-02-25 2022-06-10 山东海川建设有限公司 Multifunctional crack repairing equipment for constructional engineering

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105386400A (en) * 2015-12-08 2016-03-09 浙江海洋学院 Ground gap filling machine
CN207484253U (en) * 2017-08-30 2018-06-12 陈勤士 A kind of town road cuts joint filling device
CN108374564A (en) * 2018-01-25 2018-08-07 庄银灿 A kind of novel ground caulking machine
CN108570916A (en) * 2018-07-28 2018-09-25 河南东润电子有限公司 A kind of cement pavement cracks joint filling U.S. seam device
CN211395281U (en) * 2019-08-02 2020-09-01 徐州卓驰企业管理有限公司 Crack prosthetic devices is used in town road maintenance
CN111745841A (en) * 2020-07-10 2020-10-09 山东交通学院 Seam beautifying and slotting dust collection mechanism and seam beautifying machine
CN111778828A (en) * 2020-07-31 2020-10-16 青岛德旭机械有限公司 Concrete asphalt ground trencher

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105386400A (en) * 2015-12-08 2016-03-09 浙江海洋学院 Ground gap filling machine
CN207484253U (en) * 2017-08-30 2018-06-12 陈勤士 A kind of town road cuts joint filling device
CN108374564A (en) * 2018-01-25 2018-08-07 庄银灿 A kind of novel ground caulking machine
CN108570916A (en) * 2018-07-28 2018-09-25 河南东润电子有限公司 A kind of cement pavement cracks joint filling U.S. seam device
CN211395281U (en) * 2019-08-02 2020-09-01 徐州卓驰企业管理有限公司 Crack prosthetic devices is used in town road maintenance
CN111745841A (en) * 2020-07-10 2020-10-09 山东交通学院 Seam beautifying and slotting dust collection mechanism and seam beautifying machine
CN111778828A (en) * 2020-07-31 2020-10-16 青岛德旭机械有限公司 Concrete asphalt ground trencher

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114607163A (en) * 2022-02-25 2022-06-10 山东海川建设有限公司 Multifunctional crack repairing equipment for constructional engineering
CN114607163B (en) * 2022-02-25 2024-01-23 山东海川建设有限公司 Multifunctional crack repairing equipment for constructional engineering

Similar Documents

Publication Publication Date Title
CN112922378B (en) Method for repairing leakage of building exterior wall
CN112681789A (en) Building waterproof construction method
CN112627323A (en) A pipeline desilting pull throughs for municipal works
KR101935402B1 (en) Pipeline repairing method
CN112554020B (en) Intelligent robot and method capable of automatically repairing cracks
CN111997208A (en) Wall body coupling joint rubber coating device for assembly type building construction
CN113186999A (en) Underwater concrete bottom plate leakage detection and repair equipment
CN210946652U (en) Environmental protection scarfing cinder device for civil engineering
CN111648573A (en) Vertical automatic wall tile sticking device for building construction
CN114892544B (en) Bridge expansion joint repairing device and repairing method thereof
CN111335269B (en) Hydraulic engineering vertical water stop structure and construction method thereof
CN212535096U (en) Brick wetting device for building construction
CN212714742U (en) Spraying device for road and bridge
CN217779624U (en) Building rubbish mixes system conveyer for environmental protection sand
CN216949700U (en) Storage silo that daylighting nature is good
CN217380624U (en) A ventilation unit for construction of highway tunnel
CN110565710A (en) foundation ring loosening and reinforcing treatment scheme
CN219528517U (en) Grouting leakage maintenance equipment
CN114382304B (en) Construction device based on BIM masonry engineering and construction method thereof
CN114990946B (en) Skylight point caulking construction equipment and construction method thereof
CN116464057B (en) Reinforced concrete grouting device for hydraulic engineering construction
CN212834930U (en) Road bridge cement mortar joint filling device
CN117127701B (en) Temporary drainage structure for building engineering construction
CN219151033U (en) Deep tunnel pipeline detection dredging robot
CN216703780U (en) Environmental protection dust collecting equipment of building engineering construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20210420