CN112664054A CN202110223543.XA CN202110223543A CN112664054A CN 112664054 A CN112664054 A CN 112664054A CN 202110223543 A CN202110223543 A CN 202110223543A CN 112664054 A CN112664054 A CN 112664054A
Authority
CN
China
Prior art keywords
fixedly connected
piston
arc
wall
fence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110223543.XA
Other languages
Chinese (zh)
Other versions
CN112664054B (en
Inventor
赵文庆
楚宁
韩清辉
李朝阳
刘杨
高恒亮
杨毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110223543.XA priority Critical patent/CN112664054B/en
Publication of CN112664054A publication Critical patent/CN112664054A/en
Application granted granted Critical
Publication of CN112664054B publication Critical patent/CN112664054B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a fence for highway bridge construction, which comprises a construction fence, wherein a socket device is arranged on the right side surface of the construction fence; the weight of the bearing device is increased through the cooperation of the releasing device and the reinforcing device, the gravity center of the construction fence is enabled to shift downwards, the stability is improved, the force arm length between the bearing device and the ground is increased through the reinforcing device, the capacity of the construction fence for resisting external force is further increased, the stability is better, the construction fence is enabled to pass through the socket device, the lower locking device is arranged, the upper locking device is arranged, the cooperation of the control device is realized, the construction fence which directly bears force can be automatically separated from the adjacent construction fence, the construction fence which directly bears force can not be taken down by the adjacent construction fence, the subsequent maintenance work is facilitated to be simplified, the external force applied to the construction fence through the bearing device is buffered and absorbed, the difficulty of deformation of construction under the action of the external force is increased, and the service life of the construction fence is prolonged.

Description

Be used for public road bridge roof beam construction to use rail
Technical Field
The invention relates to the field of highway bridge construction protection equipment, in particular to a fence for highway bridge construction.
Background
The rail for construction is also called as construction guardrail, is a finished product of iron pipes, is manufactured by processing seamless iron pipes through bending, welding, grinding and polishing, high-pressure paint baking, film pasting and other layer-by-layer processes, is generally commonly used for common roads, expressways, intersections of various highways, toll stations, bridges, parking lots, stations, wharfs, dangerous areas, road construction sections, temporary barriers at gathering places and other places, and is used for road separation, area enclosure safety isolation, diversion and guidance, or is used for the order maintenance of some celebration activities of books, or sports and entertainment and other competitive performance occasions, and can also be used for the protection and protection of equipment and facilities in factories, workshops, warehouses, parking lots, commercial districts, public places and other places, thereby playing the roles of isolation and warning.
The prior fence for highway bridge construction mainly comprises a construction fence, a bearing base, L-shaped bent rods, an insertion pipe and the like, wherein the bearing base is directly placed on the ground around a construction site, the construction fence is fixedly arranged on the bearing base, the L-shaped bent rods are arranged on one side of the construction fence, the insertion pipe is fixedly arranged on the other side of the construction fence, when in installation, two adjacent construction fences are movably connected together through the insertion action of the L-shaped bent rods and the insertion pipe, but the construction fence with the structure has poor stability and is easy to topple under the action of external force, and the toppling of one construction fence can drive the adjacent construction fences to topple together, so that the construction fences are easy to topple greatly under the action of external force, the subsequent maintenance work is troublesome, and meanwhile, an energy-absorbing structure is not arranged, and the construction fence directly stressed is easy to deform under the action of, particularly, the L-shaped bent rod is very easy to bend and deform under the action of external force, and the service life is short, so that the fence for highway bridge construction needs to be designed urgently.
Disclosure of Invention
1. Technical problem to be solved
Aiming at the prior fence for the construction of highway bridges in the prior art, which mainly comprises a construction fence, a bearing base, an L-shaped bent rod, an insertion pipe and the like, wherein the bearing base is directly placed on the ground around a construction site, the construction fence is fixedly arranged on the bearing base, the L-shaped bent rod is arranged at one side of the construction fence, the insertion pipe is fixedly arranged at the other side of the construction fence, when in installation, two adjacent construction fences are movably connected together through the insertion action of the L-shaped bent rod and the insertion pipe, but the construction fence with the structure has poor stability and is easy to topple under the action of external force, and the toppling of one construction fence can drive the adjacent construction fences to topple together, which can lead the construction fences to easily topple over under the action of external force, so that the subsequent maintenance work is troublesome, and meanwhile, the fence structure, the invention aims to provide a fence for highway and bridge construction, which can well solve the problems in the background art.
2. Technical scheme
In order to solve the above problems, the present invention adopts the following technical solutions.
The utility model provides a be used for public road bridge roof beam construction to use rail, includes the construction rail, be equipped with socket joint device on the right flank of construction rail.
Preferably, the construction rail includes U type warning frame, be equipped with down locking device and go up locking device on the left surface of U type warning frame, the tip of U type warning frame is equipped with bears the device, fixedly connected with is located the warning horizontal pole at its top on the inner wall of U type warning frame, fixedly connected with warning montant between the top surface of warning horizontal pole and U type warning frame inner chamber, fixedly connected with is located the warning anchor strut of its bottom on the inner wall of U type warning frame, fixedly connected with warning board between warning anchor strut and the warning horizontal pole, the tip of warning board and the inner wall fixed connection of U type warning frame, the spraying has the slope reflection of light area on the surface of warning board, the fixed warning slogan subsides that paste on the surface of warning board.
Preferably, the socket joint device includes the switching piece, and the left end face of switching piece and the right flank fixed connection of U type warning frame, the quantity of switching piece is two, has all seted up the toper recess on two faces that two switching pieces kept away from each other, and the contained angle between the inner wall of toper recess and the horizontal plane is forty-five degrees.
Preferably, lower locking device is including a lower locking section of thick bamboo, the right flank and the U type warning frame left surface fixed connection of a lower locking section of thick bamboo, the bottom surface of a lower locking section of thick bamboo inner chamber is connected with the jacking piston board through jacking spring transmission, the inner wall sliding connection of jacking piston board and a lower locking section of thick bamboo, fixedly connected with jacking post on the top surface of jacking piston board, the activity of jacking post is pegged graft on the top surface of a lower locking section of thick bamboo, the top of jacking post extends to the outside and the fixedly connected with toper jacking head of a lower locking section of thick bamboo, toper jacking head and the conical groove looks adaptation on the switching piece.
Preferably, the upper locking device comprises an upper locking cylinder, the right side surface of the upper locking cylinder is fixedly connected to the left side surface of the U-shaped warning frame, the upper locking cylinder is positioned above the lower locking cylinder, a through hole is formed in the bottom surface of the upper locking cylinder, the bottom surface of the inner cavity of the upper locking cylinder is connected with a reset piston through a reset spring in a transmission manner, the reset piston is connected with the inner wall of the upper locking cylinder in a sliding manner, a pressure spring is fixedly connected to the top surface of the reset piston, a control device is fixedly connected to the top end of the pressure spring, a pressure application column is fixedly connected to the bottom surface of the reset piston, the bottom end of the pressure application column penetrates through the reset spring and is fixedly connected with a conical pressure application head, the pressure application column and the conical pressure application head are matched with the through hole, the conical pressure application head is matched with a conical groove on the other adapter, the inner wall of the upper locking barrel is fixedly connected with an upper limiting check ring positioned above the reset piston, the lower limiting check ring and the upper limiting check ring are matched with the reset piston, and the inner wall of the upper locking barrel is provided with a ratchet type groove positioned above the upper limiting check ring.
Preferably, the control device comprises a displacement piston, the bottom surface of the displacement piston is fixedly connected with the top end of a pressure spring, the side surface of the displacement piston is slidably connected with the inner wall of an upper locking cylinder, a buffer cavity is formed inside the displacement piston, two fixed partition plates are fixedly connected to the inner wall of the buffer cavity, the side surfaces of the fixed partition plates are connected with guide pistons through transmission of compression springs, ratchet type clamping joints are fixedly connected to the other side surfaces of the guide pistons, the other ends of the ratchet type clamping joints extend to the outside of the displacement piston and are in one-way meshing with the ratchet type grooves, the ratchet type clamping joints are movably inserted into the side surfaces of the displacement piston, the number of the guide pistons is two, a linkage rope is fixedly connected between the two guide pistons, the linkage rope is movably inserted into the fixed partition plates, a pressure pipe is fixedly connected to the top surface of the displacement piston, the top end of the pressure pipe extends to, the pressure pipe has the advantages that the guide hole is formed in the side face of the pressure pipe, the linkage piston is inserted into the inside of the pressure pipe in a sliding mode, the linkage line is fixedly connected to the bottom face of the linkage piston, the other end of the linkage line extends to the inside of the buffer cavity and is fixedly connected to the middle position of the linkage rope, the linkage wing plate is fixedly connected to the side face of the linkage piston, the other end of the linkage wing plate penetrates through the guide hole and is fixedly connected with the lifting ring, and the lifting ring is movably sleeved on the outside of the pressure pipe.
Preferably, it includes a curved cylinder to bear the device, be equipped with release on the medial surface of a curved cylinder, the tip of a curved cylinder is equipped with reinforcing apparatus, the curved displacement hole that is located its left end is seted up on the curved cylinder's the surface, the external fixation of a curved cylinder has cup jointed the location retaining ring that is located curved displacement hole right side, the right flank of a curved cylinder inner chamber is connected with the tractive piston through tractive spring drive, the inner wall sliding connection of tractive piston and a curved cylinder, the fixed connection has the tractive pterygoid lamina on the surface of tractive piston, the other end of tractive pterygoid lamina passes curved displacement hole and fixedly connected with arc tractive sleeve pipe, the activity of arc tractive sleeve pipe is cup jointed in the outside of a curved cylinder, the construction rail is vertical state when arc tractive sleeve pipe is connected with the contact of location retaining ring, the equal fixed connection of bottom surface of the tip of.
Preferably, the releasing device comprises an arc panel, the arc surface on the arc panel is fixedly connected with the inner side surface of the arc cylinder, the arc traction sleeve is slidably buckled outside the arc panel, two cylindrical cavities are formed in the arc panel, a rotating shaft is movably sleeved on the inner wall of each cylindrical cavity, a take-up pulley is fixedly sleeved on the outside of the rotating shaft, a limiting ratchet is formed on the take-up pulley, a torsion spring is movably sleeved on the outside of the rotating shaft, one end of the torsion spring is fixedly connected with the inner wall of each cylindrical cavity, the other end of the torsion spring is fixedly connected with the take-up pulley, an oval cavity between the two cylindrical cavities is formed in the arc panel, a partition strip is fixedly connected on the inner wall of the oval cavity, a fixed cavity is formed in the partition strip, a fixed displacement hole fixedly communicated with the fixed cavity is formed in the surface of the partition strip, and two displacement blocks are, fixedly connected with driving rope between two displacement pieces, the middle part fixedly connected with pulling rope of driving rope, the other end of pulling rope extends to cambered plate's outside and fixedly connected with pulling ring, two displacement pieces keep away from each other on two sides equal one-way joint of fixedly connected with, the other end of one-way joint extend to the inside in cylindrical cavity and with spacing ratchet one-way meshing, the inside in fixed displacement hole slides and pegs graft and has the elasticity steel ring, two displacement pieces all activity cup joint the outside at the elasticity steel ring.
Preferably, the reinforcing device comprises a reinforcing flat tube, the end surface of the arc-shaped tube is fixedly connected to the top surface of the reinforcing flat tube, the bottom surface of the arc-shaped panel is fixedly connected to the top surface of the reinforcing flat tube, an expansion strip is movably inserted into the reinforcing flat tube, an installation cavity is formed in the expansion strip, the inner wall of the installation cavity is connected with a piston column through a spreading spring in a transmission manner, the piston column is in sliding connection with the inner wall of the installation cavity, a limiting tube is fixedly connected to the other side of the piston column, the other end of the limiting tube extends to the outside of the expansion strip and is fixedly connected with a fixing plate, the bottom end of the fixing plate is fixedly connected to the bottom surface of the inner cavity of the reinforcing flat tube, a wire guide wheel is fixedly connected to the top end of the side surface of the fixing plate, a limiting wire is fixedly connected to the inner wall of the installation cavity, the opening spring, the piston column, the limiting pipe and the fixing plate are movably sleeved outside the limiting line.
3. Advantageous effects
Compared with the prior art, the invention has the advantages that:
the weight of the bearing device is increased through the matching of the releasing device and the reinforcing device, so that the gravity center of the fence for highway bridge construction is downwards deviated, the stability of the fence for construction is increased, the length of the force arm between the bearing device and the ground is increased through the reinforcing device, further, the capacity of the construction fence for resisting external force is improved, the stability is better, the directly stressed construction fence can be automatically separated from the adjacent construction fence through the matching of the socket device, the lower locking device, the upper locking device and the control device, the adjacent construction fence can not be taken down by the directly stressed construction fence, the subsequent maintenance work can be simplified, the maintenance workload can be reduced, the external force applied to the construction fence through the bearing device is buffered and absorbed, the deformation difficulty of the construction fence under the action of the external force is increased, and the service life of the construction fence is prolonged.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the internal structure of the socket device of FIG. 1 according to the present invention;
FIG. 3 is a schematic view of the internal structure of the lower locking device of FIG. 1 according to the present invention;
FIG. 4 is a schematic view of the internal structure of the upper locking device of FIG. 1 according to the present invention;
FIG. 5 is a schematic diagram of an internal structure of the manipulating device shown in FIG. 4 according to the present invention;
FIG. 6 is a right side view of the carrier of FIG. 1 in accordance with the present invention;
FIG. 7 is a schematic top view of the inner structure of the arc-shaped cylinder of FIG. 6 according to the present invention;
FIG. 8 is a schematic view of the internal structure of the releasing device of FIG. 6 according to the present invention;
fig. 9 is a schematic view of the internal structure of the reinforcing apparatus shown in fig. 6 according to the present invention.
The reference numbers in the figures illustrate:
1. constructing a fence; 11. a U-shaped warning frame; 12. a warning cross bar; 13. warning vertical rods; 14. a warning reinforcing rod; 15. a warning board; 16. an oblique reflective band; 17. a warning slogan label; 2. a socket device; 21. a transfer block; 22. a tapered recess; 3. a lower locking device; 31. a lower locking cylinder; 32. a jacking spring; 33. a jacking piston plate; 34. jacking the column; 35. a conical jacking head; 4. an upper locking device; 40. a ratchet type groove; 41. an upper locking cylinder; 42. a through hole; 43. a return spring; 44. resetting the piston; 45. a pressure applying spring; 46. applying a pressure column; 47. a conical pressure applying head; 48. a lower limiting retainer ring; 49. an upper limiting retainer ring; 5. an operating device; 501. a displacement piston; 502. a buffer chamber; 503. fixing the partition board; 504. a compression spring; 505. a pilot piston; 506. a ratchet type bayonet joint; 507. a linkage rope; 508. pressing a pipe; 509. pressing the cap; 510. a guide hole; 511. a linked piston; 512. a linkage line; 513. a linkage wing plate; 514. a lifting ring; 6. a carrying device; 61. an arc-shaped cylinder; 62. an arc-shaped displacement hole; 63. positioning a retainer ring; 64. a tension spring; 65. pulling the piston; 66. pulling wing plates; 67. an arc-shaped traction sleeve; 7. a release device; 701. a cambered plate; 702. a cylindrical cavity; 703. a rotating shaft; 704. a take-up pulley; 705. limiting ratchets; 706. a torsion spring; 707. an elliptical cavity; 708. partition bars; 709. a fixed cavity; 710. a fixed displacement bore; 711. a displacement block; 712. a drive rope; 713. a pulling rope; 714. a traction ring; 715. a one-way bayonet joint; 716. an elastic steel ring; 8. a reinforcement device; 81. reinforcing flat tubes; 82. an extension bar; 83. a mounting cavity; 84. a spring is expanded; 85. a piston post; 86. a limiting pipe; 87. a fixing plate; 88. a wire guide wheel; 89. and a limiting line.
Detailed Description
The drawings in the embodiments of the invention will be combined; the technical scheme in the embodiment of the invention is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the invention; rather than all embodiments. Based on the embodiments of the invention; all other embodiments obtained by a person skilled in the art without making any inventive step; all fall within the scope of protection of the present invention.
Referring to fig. 1 to 9, a fence for highway bridge construction includes a construction fence 1, and a socket device 2 is disposed on a right side surface of the construction fence 1.
Construction rail 1 includes U type warning frame 11, be equipped with down locking device 3 and locking device 4 on the left surface of U type warning frame 11, the tip of U type warning frame 11 is equipped with bears device 6, fixedly connected with is located the warning horizontal pole 12 at its top on the inner wall of U type warning frame 11, fixedly connected with warning montant 13 between the top surface of warning horizontal pole 12 and U type warning frame 11 inner chamber, fixedly connected with is located the warning anchor strut 14 of its bottom on the inner wall of U type warning frame 11, fixedly connected with warning board 15 between warning anchor strut 14 and the warning horizontal pole 12, the tip of warning board 15 and the inner wall fixed connection of U type warning frame 11, the spraying has slope reflective tape 16 on the surface of warning board 15, warning board 15's fixed pasting has warning poster 17 on the surface.
Socket and spigot device 2 is including changeing the piece 21, and the left end face of changeing piece 21 and the right flank fixed connection of U type warning frame 11, and the quantity of changeing the piece 21 is two, has all seted up tapered groove 22 on two faces that two changeing the piece 21 kept away from each other, and the contained angle between the inner wall of tapered groove 22 and the horizontal plane is forty-five degrees.
Locking device 3 includes a lower locking section of thick bamboo 31, the right flank and the 11 left flank fixed connection of U type warning frame of a lower locking section of thick bamboo 31, the bottom surface of a lower locking section of thick bamboo 31 inner chamber is connected with jacking piston plate 33 through the transmission of jacking spring 32, the inner wall sliding connection of jacking piston plate 33 and a lower locking section of thick bamboo 31, fixedly connected with jacking post 34 on the top surface of jacking piston plate 33, jacking post 34 activity is pegged graft on the top surface of a lower locking section of thick bamboo 31, the top of jacking post 34 extends to the outside and the fixedly connected with toper jacking head 35 of a lower locking section of thick bamboo 31, toper jacking head 35 and the tapered groove 22 looks adaptation on a switching piece 21.
The upper locking device 4 comprises an upper locking cylinder 41, the right side surface of the upper locking cylinder 41 is fixedly connected to the left side surface of the U-shaped warning frame 11, the upper locking cylinder 41 is positioned above the lower locking cylinder 31, a through hole 42 is formed in the bottom surface of the upper locking cylinder 41, the bottom surface of the inner cavity of the upper locking cylinder 41 is in transmission connection with a reset piston 44 through a reset spring 43, the reset piston 44 is in sliding connection with the inner wall of the upper locking cylinder 41, a pressure spring 45 is fixedly connected to the top surface of the reset piston 44, a control device 5 is fixedly connected to the top end of the pressure spring 45, a pressure applying column 46 is fixedly connected to the bottom surface of the reset piston 44, the bottom end of the pressure applying column 46 penetrates through the reset spring 43 and is fixedly connected with a conical pressure applying head 47, the pressure applying column 46 and the conical pressure applying head 47 are both matched with the through hole 42, the conical pressure applying head 47 is matched with a conical groove 22 on the other transfer block 21, a lower limit, an upper limiting retainer ring 49 positioned above the reset piston 44 is fixedly connected to the inner wall of the upper locking cylinder 41, the lower limiting retainer ring 48 and the upper limiting retainer ring 49 are matched with the reset piston 44, and a ratchet-shaped groove 40 positioned above the upper limiting retainer ring 49 is formed in the inner wall of the upper locking cylinder 41.
The control device 5 comprises a displacement piston 501, the bottom surface of the displacement piston 501 is fixedly connected with the top end of a pressure spring 45, the side surface of the displacement piston 501 is slidably connected with the inner wall of an upper locking cylinder 41, a buffer cavity 502 is arranged inside the displacement piston 501, two fixed partition plates 503 are fixedly connected with the inner wall of the buffer cavity 502, the side surfaces of the fixed partition plates 503 are in transmission connection with guide pistons 505 through compression springs 504, the other surface of each guide piston 505 is fixedly connected with a ratchet-type clamping connector 506, the other end of each ratchet-type clamping connector 506 extends to the outside of the displacement piston 501 and is in one-way meshing with a ratchet-type groove 40, the ratchet-type clamping connectors 506 are movably inserted on the side surfaces of the displacement piston 501, the number of the guide pistons 505 is two, a linkage rope 507 is fixedly connected between the two guide pistons 505, the linkage rope 507 is movably inserted inside the fixed partition plates 503, a pressure pipe, the top end of the pressing pipe 508 extends to the outside of the upper locking cylinder 41 and is fixedly connected with a pressing cap 509, a guide hole 510 is formed in the side face of the pressing pipe 508, a linkage piston 511 is inserted into the inside of the pressing pipe 508 in a sliding mode, a linkage line 512 is fixedly connected to the bottom face of the linkage piston 511, the other end of the linkage line 512 extends to the inside of the buffer cavity 502 and is fixedly connected to the middle position of the linkage rope 507, a linkage wing plate 513 is fixedly connected to the side face of the linkage piston 511, the other end of the linkage wing plate 513 penetrates through the guide hole 510 and is fixedly connected with a lifting ring 514, and the lifting ring 514 is movably sleeved on the outside of the pressing pipe.
Bearing device 6 includes a curved tube 61, be equipped with release 7 on the medial surface of a curved tube 61, the tip of a curved tube 61 is equipped with reinforcing apparatus 8, the curved displacement hole 62 that is located its left end is seted up on the curved tube 61 on the surface, the location retaining ring 63 that is located curved displacement hole 62 right side has been cup jointed to the external fixation of a curved tube 61, the right side of a curved tube 61 inner chamber is connected with tractive piston 65 through tractive spring 64 transmission, the inner wall sliding connection of tractive piston 65 and a curved tube 61, the fixed connection has tractive pterygoid lamina 66 on the surface of tractive piston 65, the other end of tractive pterygoid lamina 66 passes curved displacement hole 62 and fixedly connected with curved tractive sleeve pipe 67, curved tractive sleeve pipe 67 activity cup joints the outside at a curved tube 61, construction rail 1 is vertical state when curved tractive sleeve pipe 67 is connected with location retaining ring 63 contact, the top surface of curved tractive sleeve pipe 67 and the equal fixed connection in bottom surface of the tip and the warning anchor.
The releasing device 7 comprises an arc panel 701, an arc surface on the arc panel 701 is fixedly connected with the inner side surface of the arc cylinder 61, an arc pulling sleeve 67 is slidably buckled outside the arc panel 701, two cylindrical cavities 702 are arranged inside the arc panel 701, a rotating shaft 703 is movably sleeved on the inner wall of the cylindrical cavity 702, a wire take-up pulley 704 is fixedly sleeved outside the rotating shaft 703, a limiting ratchet 705 is arranged on the wire take-up pulley 704, a torsion spring 706 is movably sleeved outside the rotating shaft 703, one end of the torsion spring 706 is fixedly connected with the inner wall of the cylindrical cavity 702, the other end of the torsion spring 706 is fixedly connected with the wire take-up pulley 704, an oval cavity 707 between the two cylindrical cavities 702 is arranged inside the arc panel 701, a partition bar 708 is fixedly connected on the inner wall of the oval cavity 707, a fixed cavity 709 is arranged inside the partition bar 708, a fixed displacement hole 710 fixedly communicated with the fixed cavity 709 is arranged on the surface of, two displacement blocks 711 are cup jointed in the inside slip of fixed cavity 709, fixedly connected with driving rope 712 between two displacement blocks 711, the middle part fixedly connected with of driving rope 712 draws rope 713, the other end of drawing rope 713 extends to the outside of cambered plate 701 and fixedly connected with draws ring 714, equal one-way joint 715 of fixedly connected with on two sides that two displacement blocks 711 kept away from each other, the other end of one-way joint 715 extends to the inside of columnar cavity 702 and with spacing ratchet 705 one-way meshing, the inside slip of fixed displacement hole 710 is pegged graft there is elastic steel ring 716, two equal activity of displacement block 711 cup joint in elastic steel ring 716's outside.
The reinforcing device 8 comprises a reinforcing flat pipe 81, the end face of an arc-shaped cylinder 61 is fixedly connected to the top face of the reinforcing flat pipe 81, the bottom face of an arc-shaped panel 701 is fixedly connected to the top face of the reinforcing flat pipe 81, an expansion strip 82 is movably inserted into the reinforcing flat pipe 81, an installation cavity 83 is formed in the expansion strip 82, the inner wall of the installation cavity 83 is in transmission connection with a piston column 85 through a spreading spring 84, the piston column 85 is in sliding connection with the inner wall of the installation cavity 83, a limiting pipe 86 is fixedly connected to the other face of the piston column 85, the other end of the limiting pipe 86 extends to the outside of the expansion strip 82 and is fixedly connected with a fixing plate 87, the bottom end of the fixing plate 87 is fixedly connected to the bottom face of the inner cavity of the reinforcing flat pipe 81, a guide wheel 88 is fixedly connected to the top end of the side face of the fixing plate 87, spacing pipe 86, fixed plate 87 is followed and is walked around wire wheel 88 and extend to the inside of cylindrical cavity 702 and twine in the outside of take-up pulley 704, spring 84 struts, piston post 85, spacing pipe 86, fixed plate 87 activity cup joints the outside at spacing line 89, directly push extension strip 82 into consolidate flat pipe 81, take-up pulley 704 can rotate under the effect of torsion spring 706 torsion, make spacing line 89 twine to the outside of take-up pulley 704, restrict extension strip 82, the one-way meshing effect of one-way joint 715 and spacing ratchet 705 is mated again, make extension strip 82 reset.
The working principle is as follows:
firstly, a construction fence is placed on the ground around a construction site, then a pulling rope 713 is pulled through a pulling ring 714, then a driving rope 712 is pulled through the pulling rope 713, then the driving rope 712 bends and deforms and pulls two displacement blocks 711 to approach each other, meanwhile, the two displacement blocks 711 do work on an elastic steel ring 716, the elastic steel ring 716 gradually becomes elliptical and elastic potential energy is increased, then the displacement blocks 711 drive the one-way clamping joints 715 to be far away from the take-up wheel 704, then the one-way clamping joints 715 are separated from the limiting ratchets 705, then the take-up wheel 704 is released, then the expansion strips 82 are ejected out from the interior of the reinforcing flat tubes 81 under the action of elastic repulsion force of the expanding springs 84, then the right end face of the piston column 85 is in contact with the right side face of the inner cavity of the installation cavity 83, at the moment, the expansion strips 82 are displaced to the dead point position relative to, then the elastic steel ring 716 pushes the displacement block 711 to move and reset in the process of elastic recovery, then the displacement block 711 drives the one-way clamping joint 715 to reset and engage with the limit ratchet 705 in one way, then a second construction fence is taken and placed on the side surface of the first construction fence, then the downward conical groove 22 on the second construction fence is sleeved on the conical jacking head 35 on the first construction fence, then the upward conical groove 22 on the second construction fence is aligned with the through hole 42 on the first construction fence, then the operating device 5 on the first construction fence is pressed until the bottom surface of the displacement piston 501 is in contact connection with the top surface of the upper limit retainer ring 49, then the guide piston 505 drives the ratchet-type clamping joint 506 to move outwards under the action of the elastic repulsion force of the compression spring 504, and then the ratchet-type clamping joint 506 is in one-way engagement with the ratchet-type groove 40, fixing the operating device 5, in the process, the operating device 5 applies work to the pressure spring 45, then the pressure spring 45 elastically compresses, the elastic potential energy is increased, then the pressure of the pressure spring 45 on the reset piston 44 is increased, then the pressure of the reset piston 44 on the reset spring 43 is increased, then the reset spring 43 elastically compresses, then the reset piston 44 carries the conical pressure applying head 47 to move downwards through the pressure applying column 46, then the conical pressure applying head 47 and the pressure applying column 46 sequentially pass through the through hole 42, then the conical pressure applying head 47 is inserted into the corresponding conical groove 22, then the bottom surface of the reset piston 44 is in contact connection with the top surface of the lower limit retainer ring 48, at the moment, the two construction fences are movably connected together through the matching of the socket device 2, the lower locking device 3, the upper locking device 4 and the operating device 5, then the pulling ring 714 on the second construction fence 1 is pulled, and the corresponding expansion strip 82 is ejected, the installation is repeated as above until the construction fence movably connected can enclose the construction site, the installation process is completed, when the construction fence is subjected to a large enough external force in the use process, a large enough shearing force exists between the construction fence directly stressed and the adjacent construction fence, the shearing force is generated due to the inertia force of the construction fence, then the inner wall of the conical groove 22 exerts pressure on the conical jacking head 35 and the conical pressure applying head 47 under the action of the shearing force, then the pressure exerts downward pressure on the conical jacking head 35 under the matching action of the inner wall of the conical groove 22 and the surface of the conical jacking head 35, then the conical jacking head 35 moves downward and applies work on the jacking spring 32 through the jacking column 34 and the jacking piston plate 33, then the elastic potential energy of the jacking spring 32 is increased, and meanwhile the pressure exerts upward thrust on the conical pressure applying head 47 under the matching action of the inner wall of the conical groove 22 and the surface of the conical pressure applying head 47, then the conical pressure applying head 47 moves upwards, then the conical pressure applying head 47 applies work to the return spring 43 and the pressure applying spring 45 through the pressure applying column 46 and the return piston 44, then the return spring 43 elastically extends, the elastic potential energy is reduced, meanwhile, the pressure applying spring 45 further elastically compresses, the elastic potential energy is increased, then the conical jacking head 35 and the conical pressure applying head 47 both slide out from the inner part of the conical groove 22, so that the construction fence directly stressed is separated from the adjacent construction fence, then the construction fence 1 directly stressed drives the arc-shaped traction sleeve 67 to turn over along the arc-shaped cylinder 61 anticlockwise, then the arc-shaped traction sleeve 67 pulls the traction spring 64 through the traction wing plate 66 and the traction piston 65, the elastic potential energy of the traction spring 64 is increased, the purposes of elastic buffering and energy absorption are achieved, the construction fence 1 is protected, and then after the external force applied to the construction fence 1 is removed artificially, the drawing piston 65 drives the construction fence 1 to turn clockwise through the drawing wing plate 66 and the arc-shaped drawing sleeve 67 under the action of elastic tension of the drawing spring 64, then the two socket devices 2 respectively apply thrust to the conical jacking head 35 and the conical pressure applying head 47 to enable the conical pressure applying head 47 to move towards the inside of the upper locking barrel 41, the conical jacking head 35 moves towards the inside of the lower locking barrel 31 until the arc-shaped drawing sleeve 67 is in contact with the positioning retainer ring 63, at the moment, the construction fence 1 is in a vertical state, then the conical jacking head 35 is inserted into the corresponding conical groove 22 again under the action of the elastic force of the jacking spring 32, meanwhile, the conical pressure applying head 47 is inserted into the corresponding conical groove 22 again under the action of the elastic force of the pressure applying spring 45, and then the construction fence 1 directly stressed is reset.
The above; but are merely preferred embodiments of the invention; the scope of the invention is not limited thereto; any person skilled in the art is within the technical scope of the present disclosure; the technical scheme and the improved concept of the invention are equally replaced or changed; are intended to be covered by the scope of the present invention.

Claims (9)

1. The utility model provides a be used for public road bridge roof beam construction to use rail, includes construction rail (1), its characterized in that: and a socket device (2) is arranged on the right side surface of the construction fence (1).
2. The fence for road and bridge construction as claimed in claim 1, wherein: construction rail (1) is including U type warning frame (11), be equipped with down locking device (3) and go up locking device (4) on the left surface of U type warning frame (11), the tip of U type warning frame (11) is equipped with bears device (6), fixedly connected with is located warning horizontal pole (12) at its top on the inner wall of U type warning frame (11), fixedly connected with warning montant (13) between the top surface of warning horizontal pole (12) and U type warning frame (11) inner chamber, fixedly connected with is located warning anchor strut (14) of its bottom on the inner wall of U type warning frame (11), fixedly connected with warning board (15) between warning anchor strut (14) and warning horizontal pole (12), the tip of warning board (15) and the inner wall fixed connection of U type warning frame (11), the spraying has slope reflective tape (16) on the surface of warning board (15), warning board (15) fixed pasting has warning poster subsides (17) on the surface.
3. The fence for road and bridge construction as claimed in claim 1, wherein: socket joint device (2) are including switching piece (21), the left end face of switching piece (21) and the right flank fixed connection of U type warning frame (11), and the quantity of switching piece (21) is two, has all seted up tapered groove (22) on two faces that two switching pieces (21) kept away from each other, and the contained angle between the inner wall of tapered groove (22) and the horizontal plane is forty-five degrees.
4. A fence for road and bridge construction as claimed in claim 2, wherein: locking device (3) are including locking a section of thick bamboo (31) down, the right flank and the U type of locking a section of thick bamboo (31) left surface fixed connection down, the bottom surface of locking a section of thick bamboo (31) inner chamber is connected with jacking piston plate (33) through jacking spring (32) transmission down, the inner wall sliding connection of jacking piston plate (33) and locking a section of thick bamboo (31) down, fixedly connected with jacking post (34) on the top surface of jacking piston plate (33), jacking post (34) activity is pegged graft on the top surface of locking a section of thick bamboo (31) down, the top of jacking post (34) extends to the outside and the fixedly connected with toper jacking head (35) of locking a section of thick bamboo (31) down, toper jacking head (35) and one change cone groove (22) looks adaptation on connecing piece (21).
5. A fence for road and bridge construction as claimed in claim 2, wherein: the upper locking device (4) comprises an upper locking barrel (41), the right side surface of the upper locking barrel (41) is fixedly connected to the left side surface of the U-shaped warning frame (11), the upper locking barrel (41) is positioned above the lower locking barrel (31), a through hole (42) is formed in the bottom surface of the upper locking barrel (41), the bottom surface of the inner cavity of the upper locking barrel (41) is in transmission connection with a reset piston (44) through a reset spring (43), the reset piston (44) is in sliding connection with the inner wall of the upper locking barrel (41), a pressing spring (45) is fixedly connected to the top surface of the reset piston (44), a control device (5) is fixedly connected to the top end of the pressing spring (45), a pressing column (46) is fixedly connected to the bottom surface of the reset piston (44), the bottom end of the pressing column (46) penetrates through the reset spring (43) and is fixedly connected with a conical pressing head (47), and both the pressing column (46) and the conical pressing head (47) are matched with the, the conical pressing head (47) is matched with a conical groove (22) on the other adapter block (21), a lower limiting check ring (48) which is positioned below the reset piston (44) is fixedly connected to the inner wall of the upper locking cylinder (41), an upper limiting check ring (49) which is positioned above the reset piston (44) is fixedly connected to the inner wall of the upper locking cylinder (41), the lower limiting check ring (48) and the upper limiting check ring (49) are matched with the reset piston (44), and a ratchet type groove (40) which is positioned above the upper limiting check ring (49) is formed in the inner wall of the upper locking cylinder (41).
6. A fence for road and bridge construction as claimed in claim 5, wherein: the control device (5) comprises a displacement piston (501), the bottom surface of the displacement piston (501) is fixedly connected with the top end of a pressure spring (45), the side surface of the displacement piston (501) is in sliding connection with the inner wall of an upper locking cylinder (41), a buffer cavity (502) is formed in the displacement piston (501), two fixed partition plates (503) are fixedly connected on the inner wall of the buffer cavity (502), the side surfaces of the fixed partition plates (503) are connected with a guide piston (505) through a compression spring (504) in a transmission manner, a ratchet type clamping head (506) is fixedly connected on the other surface of the guide piston (505), the other end of the ratchet type clamping head (506) extends to the outer part of the displacement piston (501) and is in one-way engagement with a ratchet type groove (40), the ratchet type clamping head (506) is movably inserted on the side surface of the displacement piston (501), the number of the guide pistons (505) is two, and a linkage rope (507) is fixedly connected between the, the linkage rope (507) is movably inserted in the fixed partition plate (503), a pressing pipe (508) is fixedly connected to the top surface of the displacement piston (501), the top end of the pressing pipe (508) extends to the outside of the upper locking cylinder (41) and is fixedly connected with a pressing cap (509), a guide hole (510) is formed in the side surface of the pressing pipe (508), a linkage piston (511) is inserted in the inside of the pressing pipe (508) in a sliding mode, a linkage line (512) is fixedly connected to the bottom surface of the linkage piston (511), the other end of the linkage line (512) extends to the inside of the buffer cavity (502) and is fixedly connected to the middle position of the linkage rope (507), a linkage wing plate (513) is fixedly connected to the side surface of the linkage piston (511), the other end of the linkage wing plate (513) penetrates through the guide hole (510) and is fixedly connected with a lifting ring (514), and the lifting ring (514) is movably sleeved on the outside of.
7. A fence for road and bridge construction as claimed in claim 2, wherein: the bearing device (6) comprises an arc-shaped cylinder (61), a release device (7) is arranged on the inner side surface of the arc-shaped cylinder (61), a reinforcing device (8) is arranged at the end part of the arc-shaped cylinder (61), an arc-shaped displacement hole (62) positioned at the left end of the arc-shaped cylinder (61) is formed in the surface of the arc-shaped cylinder, a positioning retainer ring (63) positioned on the right side of the arc-shaped displacement hole (62) is fixedly sleeved on the outer part of the arc-shaped cylinder (61), the right side surface of the inner cavity of the arc-shaped cylinder (61) is connected with a traction piston (65) in a transmission mode through a traction spring (64), the traction piston (65) is in sliding connection with the inner wall of the arc-shaped cylinder (61), a traction wing plate (66) is fixedly connected on the surface of the traction piston (65), the other end of the traction wing plate (66) penetrates through the, the arc-shaped traction sleeve (67) is in contact connection with the positioning retainer ring (63), and the top surface of the arc-shaped traction sleeve (67) is fixedly connected with the end part of the U-shaped warning frame (11) and the bottom surface of the warning reinforcing rod (14).
8. The fence for road and bridge construction as claimed in claim 7, wherein: the release device (7) comprises an arc panel (701), an arc surface on the arc panel (701) is fixedly connected with the inner side surface of an arc cylinder (61), an arc traction sleeve (67) is slidably buckled outside the arc panel (701), two cylindrical cavities (702) are formed inside the arc panel (701), a rotating shaft (703) is movably sleeved on the inner wall of each cylindrical cavity (702), a take-up pulley (704) is fixedly sleeved outside the rotating shaft (703), a limiting ratchet (705) is formed on the take-up pulley (704), a torsion spring (706) is movably sleeved outside the rotating shaft (703), one end of the torsion spring (706) is fixedly connected with the inner wall of each cylindrical cavity (702), the other end of the torsion spring (706) is fixedly connected with the take-up pulley (704), an oval cavity (707) between the two cylindrical cavities (702) is formed inside the arc panel (701), a partition strip (708) is fixedly connected on the inner wall of the oval cavity (707), fixed cavity (709) have been seted up to the inside of wall strip (708), set up on the surface of wall strip (708) with fixed cavity (709) fixed displacement hole (710) of fixed intercommunication, two displacement blocks (711) have been cup jointed in the inside slip of fixed cavity (709), fixedly connected with driving rope (712) between two displacement blocks (711), the middle part fixedly connected with pulling rope (713) of driving rope (712), the other end of pulling rope (713) extends to the outside of cambered plate (701) and fixedly connected with pulling ring (714), equal fixedly connected with one-way joint head (715) on two sides that two displacement blocks (711) kept away from each other, the other end of one-way joint head (715) extends to the inside of cylindrical cavity (702) and with spacing ratchet (705) one-way meshing, the inside slip grafting of fixed displacement hole (710) has elastic steel ring (716), two displacement blocks (711) all activity cup joint in the outside of elastic steel ring (716).
9. The fence for road and bridge construction as claimed in claim 7, wherein: the reinforcing device (8) comprises a reinforcing flat pipe (81), the end face of an arc-shaped cylinder (61) is fixedly connected to the top face of the reinforcing flat pipe (81), the bottom face of an arc-shaped panel (701) is fixedly connected to the top face of the reinforcing flat pipe (81), an expansion strip (82) is movably inserted into the interior of the reinforcing flat pipe (81), an installation cavity (83) is formed in the expansion strip (82), the inner wall of the installation cavity (83) is connected with a piston column (85) through a spreading spring (84) in a transmission mode, the piston column (85) is connected with the inner wall of the installation cavity (83) in a sliding mode, a limiting pipe (86) is fixedly connected to the other side of the piston column (85), the other end of the limiting pipe (86) extends to the outer portion of the expansion strip (82) and is fixedly connected with a fixing plate (87), the bottom end of the fixing plate (87) is fixedly connected to the bottom face of the inner cavity of, the inner wall fixedly connected with spacing line (89) of installation cavity (83), the other end of spacing line (89) passes and struts spring (84), piston post (85), spacing pipe (86), fixed plate (87) after walk around wire wheel (88) and extend to the inside of cylindricality chamber (702) and twine in the outside of take-up pulley (704), strut spring (84), piston post (85), spacing pipe (86), fixed plate (87) activity cup joints the outside at spacing line (89).
CN202110223543.XA 2021-03-01 2021-03-01 Be used for public road bridge roof beam construction to use rail Active CN112664054B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110223543.XA CN112664054B (en) 2021-03-01 2021-03-01 Be used for public road bridge roof beam construction to use rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110223543.XA CN112664054B (en) 2021-03-01 2021-03-01 Be used for public road bridge roof beam construction to use rail

Publications (2)

Publication Number Publication Date
CN112664054A true CN112664054A (en) 2021-04-16
CN112664054B CN112664054B (en) 2022-01-07

Family

ID=75399521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110223543.XA Active CN112664054B (en) 2021-03-01 2021-03-01 Be used for public road bridge roof beam construction to use rail

Country Status (1)

Country Link
CN (1) CN112664054B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135155A (en) * 2022-01-04 2022-03-04 烟台品茗科技发展有限公司 Municipal works construction safety control guardrail
CN114135151A (en) * 2021-11-23 2022-03-04 浙江省一建建设集团有限公司 Protector for building safety engineering

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2067629A (en) * 1980-01-16 1981-07-30 Myers F Fence structures
CN206785112U (en) * 2017-06-09 2017-12-22 青岛安装建设股份有限公司 A kind of construction fence
CN208010049U (en) * 2018-03-14 2018-10-26 湖北领驭建设有限公司 A kind of safe fence for road construction
CN109236029A (en) * 2018-10-18 2019-01-18 中国建筑第八工程局有限公司 Construction site anticollision barrier
CN110016879A (en) * 2019-03-15 2019-07-16 浙江大学宁波理工学院 A kind of assembled anticollision barrier with runback bit function
CN209469089U (en) * 2019-08-15 2019-10-08 南宁市全宇电力设计有限责任公司 A kind of electric fence that do not fall
CN209909460U (en) * 2019-05-09 2020-01-07 邵阳职业技术学院 Prevent computer display who emptys
CN111058393A (en) * 2020-02-28 2020-04-24 郑州市交通规划勘察设计研究院 Noise reduction barrier for municipal road bridge construction
CN210483254U (en) * 2019-08-23 2020-05-08 张昆 Safety protection rail for traffic construction

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2067629A (en) * 1980-01-16 1981-07-30 Myers F Fence structures
CN206785112U (en) * 2017-06-09 2017-12-22 青岛安装建设股份有限公司 A kind of construction fence
CN208010049U (en) * 2018-03-14 2018-10-26 湖北领驭建设有限公司 A kind of safe fence for road construction
CN109236029A (en) * 2018-10-18 2019-01-18 中国建筑第八工程局有限公司 Construction site anticollision barrier
CN110016879A (en) * 2019-03-15 2019-07-16 浙江大学宁波理工学院 A kind of assembled anticollision barrier with runback bit function
CN209909460U (en) * 2019-05-09 2020-01-07 邵阳职业技术学院 Prevent computer display who emptys
CN209469089U (en) * 2019-08-15 2019-10-08 南宁市全宇电力设计有限责任公司 A kind of electric fence that do not fall
CN210483254U (en) * 2019-08-23 2020-05-08 张昆 Safety protection rail for traffic construction
CN111058393A (en) * 2020-02-28 2020-04-24 郑州市交通规划勘察设计研究院 Noise reduction barrier for municipal road bridge construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135151A (en) * 2021-11-23 2022-03-04 浙江省一建建设集团有限公司 Protector for building safety engineering
CN114135151B (en) * 2021-11-23 2023-02-21 浙江省一建建设集团有限公司 Protector for building safety engineering
CN114135155A (en) * 2022-01-04 2022-03-04 烟台品茗科技发展有限公司 Municipal works construction safety control guardrail

Also Published As

Publication number Publication date
CN112664054B (en) 2022-01-07

Similar Documents

Publication Publication Date Title
CN112664054B (en) Be used for public road bridge roof beam construction to use rail
CN113250476B (en) Strutting arrangement is used in building engineering construction
CN110907288A (en) Building engineering reinforcing bar intensity detection device
CN210947655U (en) Intelligent combined mounting frame for building
CN204849643U (en) Security isolation fence
CN111172922A (en) Safety barrier is used in highway construction
CN114135155A (en) Municipal works construction safety control guardrail
CN114000450A (en) Road guardrail mounting structure for municipal construction
CN113529596B (en) Highway slope protection structure and construction method
CN204825724U (en) Modular security isolation fence
CN218596802U (en) Roadway pavement hardening traveling platform
CN108454738B (en) Passive mechanical bicycle parking pile
CN108018805B (en) A kind of intelligent mobile guardrail of solar energy
CN216339217U (en) Road guardrail mounting structure for municipal construction
CN110453966B (en) Sectional type combined concrete wire pole
CN213389875U (en) Division fence for town road
CN209908085U (en) Construction rail convenient to install and remove
CN213539969U (en) Fence for indoor construction
CN219908417U (en) Roadbed edge protection equipment during pavement construction
CN215978837U (en) Road bridge tunnel construction rail guard
CN113914338B (en) Reinforcing device for improving stability of highway embankment
CN220059039U (en) Simple stair device for crossing obstacle on construction site
CN217735069U (en) Municipal afforestation central authorities rail guard
CN216304510U (en) Special anticollision barrier equipment of mountain area tourism highway
CN219260825U (en) Anti-crossing guardrail

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant