CN112651720A - Multi-user collaborative editing method and device of railway BIM system based on web real-time modeling - Google Patents
Multi-user collaborative editing method and device of railway BIM system based on web real-time modeling Download PDFInfo
- Publication number
- CN112651720A CN112651720A CN202110004943.1A CN202110004943A CN112651720A CN 112651720 A CN112651720 A CN 112651720A CN 202110004943 A CN202110004943 A CN 202110004943A CN 112651720 A CN112651720 A CN 112651720A
- Authority
- CN
- China
- Prior art keywords
- user
- users
- server
- feature
- edit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 42
- 238000004590 computer program Methods 0.000 claims description 3
- 238000012545 processing Methods 0.000 description 7
- 238000010276 construction Methods 0.000 description 6
- 230000006870 function Effects 0.000 description 6
- 230000008569 process Effects 0.000 description 6
- 238000013461 design Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/604—Tools and structures for managing or administering access control systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Engineering & Computer Science (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Software Systems (AREA)
- Operations Research (AREA)
- Bioethics (AREA)
- Data Mining & Analysis (AREA)
- Computer Hardware Design (AREA)
- Computer Security & Cryptography (AREA)
- Automation & Control Theory (AREA)
- Quality & Reliability (AREA)
- Artificial Intelligence (AREA)
- Audiology, Speech & Language Pathology (AREA)
- Computational Linguistics (AREA)
- Primary Health Care (AREA)
- Information Transfer Between Computers (AREA)
Abstract
The invention provides a multi-user collaborative editing method and a device of a railway BIM system based on web real-time modeling, wherein the method comprises the following steps: a server of the system creates a project based on a project creating request of a user and generates a sharing link of the project; the server creates or opens a component model contained in the project based on a component creating or opening request of a user, and enters an editing state for the component model; the server judges the number of users who have requested to edit the feature based on the identity ID information of the users and the feature ID information of the feature of the component model; if the same characteristic is edited by more than two users, the server automatically and dynamically locks the characteristic and gives the users meeting the set conditions the editing right, and the other users cannot edit the characteristic; if the same feature is requested to be edited by a user within the range, the server automatically and dynamically unlocks the feature, and the user can edit the feature.
Description
Technical Field
The invention relates to the field of railway building information models, in particular to a multi-user collaborative editing method and device of a railway BIM system based on web real-time modeling.
Background
The BIM (building Information modeling) technology is firstly proposed by Autodesk company in 2002, has been widely recognized in the world, can help to realize the integration of building Information, and all kinds of Information are always integrated in a three-dimensional model Information database from the design, construction and operation of a building to the end of the whole life cycle of the building, and personnel of design teams, construction units, facility operation departments, owners and the like can perform cooperative work based on the BIM, thereby effectively improving the working efficiency, saving resources, reducing the cost and realizing sustainable development.
Building Information Modeling (BIM) technology is actively applied to traffic construction projects by owners, design houses, construction units and the like, but some problems are gradually revealed in the application process, such as: the modeling efficiency is low; the built model does not meet the application requirements; the cooperativity is poor and the same model cannot be edited simultaneously.
Particularly in the aspect of railway engineering, the establishment and the use of a railway BIM model are facilitated due to the standardized establishment of a large number of standard components. In the early modeling stage, the standard components are mainly established and selected; how to realize modeling and cooperative processing in the same system is also a problem to be solved.
Disclosure of Invention
In view of this, embodiments of the present invention provide a multi-user collaborative editing method and apparatus for a railway BIM system based on web real-time modeling, so as to eliminate or improve one or more defects in the prior art.
The technical scheme of the invention is as follows:
according to an aspect of the invention, a multi-user collaborative editing method of a railway BIM system based on web real-time modeling is provided, and the method comprises the following steps:
a server of the system creates a project based on a project creating request of a user and generates a sharing link of the project;
the server creates or opens a component model contained in the project based on a component creating or opening request of a user, and enters an editing state for the component model;
the server judges the number of users who have requested to edit the feature based on the identity ID information of the users and the feature ID information of the feature of the component model;
if the characteristic is requested to be edited by more than two users, the server automatically and dynamically locks the characteristic, and gives the users meeting the set conditions the editing right, and the other users cannot edit the characteristic;
if the feature is requested to be edited by a user within the range, the server automatically and dynamically unlocks the feature, and the user can edit the feature.
In some embodiments, the setting condition is based on chronological order, and the server gives the user who first enters the editing state the editing right.
In some embodiments, the setting condition is based on the authority levels of users, the server stores authority level information of the users, the server compares the authority levels of the users who edit the same feature of the same component at the same time, and the server gives editing rights to the users with higher authority levels.
In some embodiments, where two or more users edit the same feature of the same component, the server sends a prompt to the user who cannot edit the feature.
In some embodiments, the server displays the edited component model to other users after the features edited by one user are completed.
In some embodiments, the server gives different users the ability to edit different features of the same component model at the same time based on requests from different users to edit different features.
In some embodiments, the user side has a manual lock command icon and a manual unlock command icon on the operation interface to prevent other users from editing and modifying arbitrarily after one feature is edited.
In some embodiments, the component model of the item is stored on the server, the component model is transmitted over a network and displayed at a user end; the terminal of the user side is a computer, a mobile phone or a tablet computer.
According to another aspect of the present invention, there is also provided a multi-user collaborative editing apparatus for a web-based real-time modeling railway BIM system, the apparatus comprising a processor and a memory, the memory having stored therein computer instructions, the processor being configured to execute the computer instructions stored in the memory, and the apparatus implementing the steps of any one of the above methods when the computer instructions are executed by the processor.
According to another aspect of the invention, there is also provided a computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the steps of the method according to any one of the preceding claims.
According to the multi-user collaborative editing method and device of the railway BIM system based on the real-time web modeling, the beneficial effects at least comprise that:
the method can edit the same component model, increases the cooperativity when editing the component model, and is suitable for multiple people to collaboratively process databases containing a large number of components in different domains.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention. The objectives and other advantages of the invention will be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
It will be appreciated by those skilled in the art that the objects and advantages that can be achieved with the present invention are not limited to the specific details set forth above, and that these and other objects that can be achieved with the present invention will be more clearly understood from the detailed description that follows.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention. The components in the figures are not necessarily to scale, emphasis instead being placed upon illustrating the principles of the invention. For purposes of illustrating and describing some portions of the present invention, corresponding parts of the drawings may be exaggerated, i.e., may be larger, relative to other components in an exemplary apparatus actually manufactured according to the present invention. In the drawings:
fig. 1 is a schematic step diagram of a multi-user collaborative editing method of a railway BIM system based on web real-time modeling in an embodiment of the present invention.
Fig. 2 is a flowchart of a multi-user collaborative editing method of a railway BIM system based on web real-time modeling according to an embodiment of the present invention.
Fig. 3 is a schematic structural diagram of a railway BIM system based on web real-time modeling according to an embodiment of the present invention.
FIG. 4 is a diagram of a component model and assembly features according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the following embodiments and accompanying drawings. The exemplary embodiments and descriptions of the present invention are provided to explain the present invention, but not to limit the present invention.
It should be noted that, in order to avoid obscuring the present invention with unnecessary details, only the structures and/or processing steps closely related to the scheme according to the present invention are shown in the drawings, and other details not so relevant to the present invention are omitted.
It should be emphasized that the term "comprises/comprising" when used herein, is taken to specify the presence of stated features, elements, steps or components, but does not preclude the presence or addition of one or more other features, elements, steps or components.
It is also noted herein that the term "coupled," if not specifically stated, may refer herein to not only a direct connection, but also an indirect connection in which an intermediate is present.
Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. In the drawings, the same reference numerals denote the same or similar parts, or the same or similar steps.
According to one aspect of the invention, a multi-user collaborative editing method of a web-based railway BIM system is provided, so that the cooperativity of editing the same component model by multiple users is improved, and the collaborative editing efficiency is improved.
In some embodiments, as shown in fig. 3, the system includes a server and a web-based client, and users 1, 2, 3, etc. using the system can use the system via a web browser of a terminal across regions, and can run on various terminals, such as a computer, a mobile phone, a tablet computer, etc.
In some embodiments, as shown in fig. 1 and 2, a method comprises:
step S10: a server of the system creates a project based on a project creating request of a user and generates a sharing link of the project;
in the embodiment, one of the users can log in the system by using an account, create a project to be collaboratively edited, generate a sharing link of the project and/or select at least one collaboratively edited user; the sharing link is used for being sent to other users, so that the other users can join in the project to be collaboratively edited, and the selected user can join in the project collaboratively edited after logging in the system. In other embodiments, the sharing link may also be used to directly link to the component model to be collaboratively edited, that is, the component model to be collaboratively edited may be opened by clicking the link.
Step S20: the server creates or opens a component model contained in the project based on a component creating or opening request of a user, and enters an editing state for the component model;
in this embodiment, any user who opens the component model can visually display the model, and any user can send an editing request to the server, that is, on the server, the component model is in an editing state, but specifically, which user can edit the component model, and further determination is needed.
Step S30: the server determines the number of users who have requested to edit the feature based on the ID information of the user and the feature ID information of the feature of the component model, and the following situations may occur:
step S40 a: if the same characteristic is edited by more than two users, the server automatically and dynamically locks the characteristic and gives the users meeting the set conditions the editing right, and the other users cannot edit the characteristic;
step S40 b: if the same feature is requested to be edited by a user within the range, the server automatically and dynamically unlocks the feature, and the user can edit the feature.
In the above embodiment, each user logs in the railway BIM system by using the account, the user side used by the user only plays a role in sending a request command and displaying, and the server is used for calculating and storing. The user side sends a request command to the server and simultaneously carries the ID information of the user side, and the server receives the command request and the carried ID information so as to judge and process.
In the above embodiment, the component model stored in the server includes a plurality of features, each feature includes feature ID information, and the server determines the number of users requesting to edit based on the identity ID information of the user requesting to edit a certain feature, thereby avoiding a conflict and an error when more than two users edit the same feature.
According to the multi-user collaborative editing method of the railway BIM system based on the web real-time modeling, the same component model can be edited, the cooperativity in the process of editing the component model is increased, and the method is suitable for multi-person heterogeneous collaborative processing of a database containing a large number of components.
In the above embodiments, a project to be collaboratively edited may be created by any one user, and the project described herein may be a member set. While creating the project, other user members can be selected to become users of the collaborative editing; links can also be generated and made users of collaborative editing by letting other users enter the way in which links actively join.
In the above embodiments, the component model refers to a three-dimensional model of a component in a railway BIM system, and the component is an integral part of the engineering subject, or is independent or combined with other parts to complete at least one main function of the engineering subject. The most widespread period of component use is early in the project to determine the physical, operational, and aesthetic characteristics of the project. The component is defined according to the functional characteristics, irrespective of its technical implementation, construction method and material composition. Such as a stone pad, pallet/tie-beam, pedestal, pier/column/platform, arch ring, cable tower, stay cable, etc.
The component model described herein is a solid model or a surface model, and may be composed of at least one feature. The solid model records not only all geometrical information but also all point, line, plane and volume information.
In the building process of the component model, a complex entity is constructed by utilizing the geometric element construction function and the relation operation function of the railway BIM system and performing operation on the simple entity sets from top to bottom to obtain intersection, union and difference. The geometric element structure function can also be called as a two-dimensional sketch, and mainly comprises the steps of drawing points, lines, surfaces and the like in a plane; the relational operation function may also be referred to as a command, for example, the command may be stretch, cut, rotate, array, and the like.
In the embodiment, the invention provides a multi-user collaborative editing method of a railway BIM system based on web real-time modeling, all calculation and storage of a BIM model are put on a server for processing and storing, a user side only plays a role in sending and displaying commands, the requirement for heavy BIM software calculation can be finished by any intelligent terminal in any place with a network, the requirement for any equipment to operate BIM software in any place and any time is met, and the problems of high performance requirement, high purchasing cost, complex installation and the like of the BIM modeling software of the traditional user side on a computer are solved.
In some embodiments, when multiple users edit the same feature of the same component, the server determines the number of users who enter the editing state for the feature of the component model at the same time; if the feature is edited by more than two users, the feature is automatically and dynamically locked by the server, the users meeting the set conditions have editing rights, and the other users cannot edit the feature. For example, the setting conditions may be set to a chronological order of entering the editing state or according to the authority level of the user.
In the above-described embodiment, the number of users who the server determines that the feature enters the edit state is determined based on the feature ID information that each feature has and the identity ID information of each user.
In an embodiment, the setting condition is based on a chronological order, and the server gives an editing right to a user who enters an editing state first. In the case where two or more users edit the same feature of the same component, the server gives the user who first enters the editing state the editing right. The user that has lagged behind the edit status can continue editing until the user that previously edited the feature exits the edit status.
In another embodiment, the setting condition is based on the authority levels of users, the server stores authority level information of each user, the server compares the authority levels of the users who edit the same feature of the same component at the same time, and the server gives the users with higher authority levels to edit.
Under the condition that more than two users edit the same feature of the same component, a command for editing the component model by operating the user side by the user carries identity ID information and is transmitted to the server; the server stores the authority levels of all the users, and the server gives the users with higher authority levels the editing right.
The embodiment of the invention discloses two priority editing right modes, which have better fairness according to the time sequence and are suitable for most scenes; according to the authority level of the user, the method has better practicability and is convenient for the user cooperative processing of designers in different levels.
For example, as shown in fig. 4, the component model is shown to be formed by combining two features, wherein the feature 1 is a cuboid, the feature 2 is a cylinder, and the feature 2 is established on the basis of the feature 1. Assuming that user 1 and user 2 edit feature 1 simultaneously, they can edit the rectangle length, width and position of the plan sketch, and can also edit the commanded stretch height.
Firstly, according to a time-sequence setting mode, the server automatically and dynamically locks the editing right of the characteristic, and if the user 1 firstly enters an editing state, the user 1 has the editing right; the user 2 enters the edit state, but cannot edit the feature 1, and this state may be referred to as a pseudo-edit state.
And secondly, according to the setting mode of the user authority, assuming that the user 1 and the user 2 enter an editing state, and the server automatically and dynamically locks the editing right of the characteristic. The server compares the authority levels of the user 1 and the user 2, the user 2 has higher authority registration, and the server gives the user 2 the editing right; although the user 1 enters the edit state, the feature 1 cannot be edited, and the state of the user 1 may be referred to as a pseudo-edit state.
In the above embodiment, two or more users edit the same feature of the same component, and the server sends a prompt to a user who cannot edit the feature. The prompt displayed at the user end can be a popup prompt, such as "temporarily unable to edit", "please later", etc.
In some embodiments, different users can edit different features of the same component model at the same time. The editing rights for the feature are automatically and dynamically locked by the server. For example, while user 1 is editing feature 1, user 2 may edit feature 2.
In some embodiments, after one user finishes editing a feature, the server displays the edited component model to other users. For example, the user terminal may have more than two display areas on the display screen at the same time to display the component models edited by other users.
In some embodiments, the user side has a manual lock command icon and a manual unlock command icon on the operation interface to prevent other users from editing and modifying arbitrarily after one feature is edited.
In some embodiments, the component models of the items are stored on a server, and the component models are transmitted over a network and displayed at each user end.
In some embodiments, the server may store records of feature edits made by various users, so as to query their edit history, and at a later stage, to ascertain which users the component model was edited and modified by.
In some embodiments, while creating a project, it may be set that the export authority of a component model is determined according to the user authority level, preventing anyone from exporting the component model.
In some embodiments, the building and collaborative processing of the component models in embodiments of the present invention may be implemented in a web-based railway BIM system without the need for separate collaborative editing software or plug-ins.
According to another aspect of the present invention, there is also provided a multi-user collaborative editing apparatus for a web-based real-time modeling railway BIM system, the apparatus comprising a processor and a memory, the memory having stored therein computer instructions, the processor being configured to execute the computer instructions stored in the memory, and the apparatus implementing the steps of any one of the above methods when the computer instructions are executed by the processor.
According to another aspect of the present invention, there is also provided a computer readable storage medium, having stored thereon a computer program, which when executed by a processor, performs the steps of any of the methods described above.
The embodiment of the invention provides a multi-user collaborative editing method and a device of a railway BIM system based on a web, all calculations and storage of a BIM model are put on a server for processing and storing, a user side only plays a role in sending and displaying commands, the requirement for heavy BIM software calculation can be finished by any intelligent terminal in any place with a network, the requirement for operating BIM software in any place and any time by any equipment is met, and the problems of high performance requirement, high purchasing cost, complex installation and the like of the BIM modeling software of the traditional user side on a computer are solved.
According to the multi-user collaborative editing method of the railway BIM system based on the real-time web modeling, the beneficial effects at least comprise that:
the method can edit the same component model, increases the cooperativity when editing the component model, and is suitable for multiple people to collaboratively process databases containing a large number of components in different domains.
Those of ordinary skill in the art will appreciate that the various illustrative components, systems, and methods described in connection with the embodiments disclosed herein may be implemented as hardware, software, or combinations of both. Whether this is done in hardware or software depends upon the particular application and design constraints imposed on the solution. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present invention. When implemented in hardware, it may be, for example, an electronic circuit, an Application Specific Integrated Circuit (ASIC), suitable firmware, plug-in, function card, or the like. When implemented in software, the elements of the invention are the programs or code segments used to perform the required tasks. The program or code segments may be stored in a machine-readable medium or transmitted by a data signal carried in a carrier wave over a transmission medium or a communication link. A "machine-readable medium" may include any medium that can store or transfer information. Examples of a machine-readable medium include electronic circuits, semiconductor memory devices, ROM, flash memory, Erasable ROM (EROM), floppy disks, CD-ROMs, optical disks, hard disks, fiber optic media, Radio Frequency (RF) links, and so forth. The code segments may be downloaded via computer networks such as the internet, intranet, etc.
It should also be noted that the exemplary embodiments mentioned in this patent describe some methods or systems based on a series of steps or devices. However, the present invention is not limited to the order of the above-described steps, that is, the steps may be performed in the order mentioned in the embodiments, may be performed in an order different from the order in the embodiments, or may be performed simultaneously.
The software may be disposed in Random Access Memory (RAM), memory, Read Only Memory (ROM), electrically programmable ROM, electrically erasable programmable ROM, registers, hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art.
Features that are described and/or illustrated with respect to one embodiment may be used in the same way or in a similar way in one or more other embodiments and/or in combination with or instead of the features of the other embodiments in the present invention.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes may be made to the embodiment of the present invention by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (10)
1. A multi-user collaborative editing method of a railway BIM system based on web real-time modeling is characterized by comprising the following steps:
a server of the system creates a project based on a project creating request of a user and generates a sharing link of the project;
the server creates or opens a component model contained in the project based on a component creating or opening request of a user, and enters an editing state for the component model;
the server judges the number of users who have requested to edit the feature based on the identity ID information of the users and the feature ID information of the feature of the component model;
if the same characteristic is edited by more than two users, the server automatically and dynamically locks the characteristic and gives the users meeting the set conditions the editing right, and the other users cannot edit the characteristic;
if the same feature is requested to be edited by a user within the range, the server automatically and dynamically unlocks the feature, and the user can edit the feature.
2. The multi-user collaborative editing method of the web-based real-time modeling railway BIM system according to claim 1, wherein the setting condition is based on a chronological order, and the server gives an editing right to a user who first enters an editing state.
3. The multi-user collaborative editing method of the web-based real-time modeling railway BIM system according to claim 2, wherein the setting condition is based on authority levels of users, the server stores authority level information of each user, the server compares authority levels of users who edit the same feature of the same member at the same time, and the server gives editing rights to users with higher authority levels.
4. The multi-user collaborative editing method of the web-based real-time modeling railway BIM system according to claim 2 or 3, wherein in a case where two or more users edit the same feature of the same member, the server sends a prompt to a user who cannot edit the feature.
5. The multi-user collaborative editing method of the web-based real-time modeling railway BIM system according to claim 4, wherein the server displays the edited component model to other users after the characteristics edited by one user are completed.
6. The multi-user collaborative editing method of the web-based real-time modeling railway BIM system according to claim 1, wherein the server gives different users editing rights to edit different features of the same component model at the same time based on requests of different users to edit different features.
7. The multi-user collaborative editing method of the web-based real-time modeling railway BIM system according to claim 1, wherein a manual locking command icon and a manual unlocking command icon are provided on an operation interface of the user side to prevent other users from editing and modifying arbitrarily after one feature is edited.
8. The multi-user collaborative editing method of the web-based real-time modeling railway BIM system according to claim 1, wherein the component models of the project are stored on the server, and the component models are transmitted through a network and displayed at a user terminal; the terminal of the user side is a computer, a mobile phone or a tablet computer.
9. A multi-user collaborative editing apparatus of a web-based real-time modeling railway BIM system, the apparatus comprising a processor and a memory, wherein the memory stores computer instructions, the processor is configured to execute the computer instructions stored in the memory, and when the computer instructions are executed by the processor, the apparatus implements the steps of any one of claims 1-8.
10. A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the steps of the method according to any one of claims 1 to 8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110004943.1A CN112651720A (en) | 2021-01-04 | 2021-01-04 | Multi-user collaborative editing method and device of railway BIM system based on web real-time modeling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110004943.1A CN112651720A (en) | 2021-01-04 | 2021-01-04 | Multi-user collaborative editing method and device of railway BIM system based on web real-time modeling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112651720A true CN112651720A (en) | 2021-04-13 |
Family
ID=75367254
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110004943.1A Pending CN112651720A (en) | 2021-01-04 | 2021-01-04 | Multi-user collaborative editing method and device of railway BIM system based on web real-time modeling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112651720A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113342402A (en) * | 2021-08-05 | 2021-09-03 | 北京蔚领时代科技有限公司 | Multi-player cooperative game editing method, system and device |
CN113722694A (en) * | 2021-09-14 | 2021-11-30 | 中国银行股份有限公司 | Data editing processing method and system based on permission level |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070063038A1 (en) * | 2005-09-19 | 2007-03-22 | Silverbrook Research Pty Ltd | Printing a health report using a mobile device |
US20170132567A1 (en) * | 2015-11-06 | 2017-05-11 | Benjamin F. GLUNZ | Method and system for native object collaboration, revision and analytics for bim and other design platforms |
CN107515997A (en) * | 2017-09-27 | 2017-12-26 | 深圳拎得清软件有限公司 | The multi-specialized collaborative design methods of BIM and its system based on webpage |
CN109087057A (en) * | 2018-06-25 | 2018-12-25 | 中建三局智能技术有限公司 | Collaborative Design method and system based on BIM cloud collaborative platform |
CN110795252A (en) * | 2019-09-20 | 2020-02-14 | 北京浪潮数据技术有限公司 | Method, device, equipment and storage medium for multi-user serial editing of file |
CN111080270A (en) * | 2019-12-31 | 2020-04-28 | 杨剑峰 | Collaborative system application design method, system, device, server and storage medium |
CN111190742A (en) * | 2019-10-16 | 2020-05-22 | 腾讯科技(深圳)有限公司 | Resource cooperation method and device, computer equipment and storage medium |
CN111277905A (en) * | 2020-03-09 | 2020-06-12 | 新华智云科技有限公司 | Online collaborative video editing method and device |
CN111563727A (en) * | 2020-05-06 | 2020-08-21 | 厦门知本家科技有限公司 | Method and system for multi-person online collaborative editing of 3D house type data |
CN111831260A (en) * | 2020-07-13 | 2020-10-27 | 重庆大学 | Data synchronization method, system and related device based on web modeling |
CN111985191A (en) * | 2020-08-05 | 2020-11-24 | 北京同创永益科技发展有限公司 | Multi-person collaborative online document editing method and device |
-
2021
- 2021-01-04 CN CN202110004943.1A patent/CN112651720A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070063038A1 (en) * | 2005-09-19 | 2007-03-22 | Silverbrook Research Pty Ltd | Printing a health report using a mobile device |
US20170132567A1 (en) * | 2015-11-06 | 2017-05-11 | Benjamin F. GLUNZ | Method and system for native object collaboration, revision and analytics for bim and other design platforms |
CN107515997A (en) * | 2017-09-27 | 2017-12-26 | 深圳拎得清软件有限公司 | The multi-specialized collaborative design methods of BIM and its system based on webpage |
CN109087057A (en) * | 2018-06-25 | 2018-12-25 | 中建三局智能技术有限公司 | Collaborative Design method and system based on BIM cloud collaborative platform |
CN110795252A (en) * | 2019-09-20 | 2020-02-14 | 北京浪潮数据技术有限公司 | Method, device, equipment and storage medium for multi-user serial editing of file |
CN111190742A (en) * | 2019-10-16 | 2020-05-22 | 腾讯科技(深圳)有限公司 | Resource cooperation method and device, computer equipment and storage medium |
CN111080270A (en) * | 2019-12-31 | 2020-04-28 | 杨剑峰 | Collaborative system application design method, system, device, server and storage medium |
CN111277905A (en) * | 2020-03-09 | 2020-06-12 | 新华智云科技有限公司 | Online collaborative video editing method and device |
CN111563727A (en) * | 2020-05-06 | 2020-08-21 | 厦门知本家科技有限公司 | Method and system for multi-person online collaborative editing of 3D house type data |
CN111831260A (en) * | 2020-07-13 | 2020-10-27 | 重庆大学 | Data synchronization method, system and related device based on web modeling |
CN111985191A (en) * | 2020-08-05 | 2020-11-24 | 北京同创永益科技发展有限公司 | Multi-person collaborative online document editing method and device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113342402A (en) * | 2021-08-05 | 2021-09-03 | 北京蔚领时代科技有限公司 | Multi-player cooperative game editing method, system and device |
CN113342402B (en) * | 2021-08-05 | 2021-11-12 | 北京蔚领时代科技有限公司 | Multi-player cooperative game editing method, system and device |
CN113722694A (en) * | 2021-09-14 | 2021-11-30 | 中国银行股份有限公司 | Data editing processing method and system based on permission level |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105893593B (en) | A kind of method of data fusion | |
US9082091B2 (en) | Unified user login for co-location facilities | |
CN106850666A (en) | The shared cloud platform of Forestry Information and monitoring operation system | |
CN112651720A (en) | Multi-user collaborative editing method and device of railway BIM system based on web real-time modeling | |
CN109685452A (en) | A kind of power supply company's item data management platform | |
CN114186984B (en) | Two-dimensional and three-dimensional integrated collaborative design system for architectural design enterprise | |
CN109658053A (en) | A kind of power supply company's item data management system | |
CN109462736B (en) | Road and bridge engineering construction video conference management method and system based on BIM + GIS modeling | |
CN110580148A (en) | Integration-oriented EPC project management platform | |
CN102254053A (en) | Parameterization design method and system based on assembly assembling | |
CN109151030A (en) | A kind of Internet of Things object distributed interactive system, method | |
CN111970113A (en) | Enterprise WeChat processing management big data platform framework | |
CN115033380A (en) | Building engineering intelligent integrated cloud platform based on BIM technology | |
Julia et al. | Challenges in Integrating Product-IT into Enterprise Architecture–a case study | |
CN111784192A (en) | Industrial park emergency plan executable system based on dynamic evolution | |
CN114925048A (en) | Natural resource full life cycle management method based on natural resource code and storage medium | |
CN113191733A (en) | Project multi-party collaborative management system and method based on Internet | |
CN203301527U (en) | Cloud server-based building information modeling (BIM) collaborative design device | |
Zhang | [Retracted] Application of Landscape Architecture 3D Visualization Design System Based on AI Technology | |
Zhang et al. | Engineering Methodology of E-Wisdom Enterprise Service Hub Intelligent Information System & Platform | |
Zeng et al. | Application of “Internet+ BIM” Technology in Intelligent Construction of Prefabricated Buildings | |
CN106780158A (en) | Photo localization method and system | |
KR100362382B1 (en) | Network-centric feature-based modeling method in a distributed design environment | |
Zhao et al. | Design and Implementation of SOA-based Signaling Maintenance Assistant Platform for Highspeed Railway | |
CN112529455A (en) | IPD management platform for whole construction process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210413 |