CN112651093A - 一种汽轮机阀门蒸汽不平衡力的计算方法 - Google Patents
一种汽轮机阀门蒸汽不平衡力的计算方法 Download PDFInfo
- Publication number
- CN112651093A CN112651093A CN202011630566.4A CN202011630566A CN112651093A CN 112651093 A CN112651093 A CN 112651093A CN 202011630566 A CN202011630566 A CN 202011630566A CN 112651093 A CN112651093 A CN 112651093A
- Authority
- CN
- China
- Prior art keywords
- valve
- calculating
- force
- valve rod
- coefficient
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/17—Mechanical parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/14—Force analysis or force optimisation, e.g. static or dynamic forces
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Control Of Turbines (AREA)
Abstract
一种汽轮机阀门蒸汽不平衡力的计算方法,属于机械工程计算领域,为了解决现有的汽轮机阀门蒸汽不平衡力计算准确性差的问题。本发明包括预启阀不平衡力计算方法和阀杆不平衡力计算方法;预启阀不平衡力计算方法为:确定预启阀压差系数,并根据该预启阀压差系数计算出预启阀压差P1;计算出预启阀受力面积S1;利用预启阀压差P1与预启阀受力面积S1做积,得出预启阀不平衡力F1;阀杆不平衡力计算方法为:确定阀杆压差系数,并根据该阀杆压差系数计算出阀杆压差P2;计算出阀杆受力面积S2;利用阀杆压差P2与阀杆受力面积S2做积,得出阀杆不平衡力F2。有益效果为计算准确。
Description
技术领域
本发明属于机械工程计算领域。
背景技术
汽轮机在设计过程中涉及油动机以及弹簧选型,蒸汽不平衡力的计算为油动机及弹簧选型提供依据,但是由于机型繁多,蒸汽不平衡力的计算都是各个厂内自己摸索,没有统一的标准,计算准确性差;主汽阀在以下状态下经过定期维护有40年的寿命;冷启:经过一段时间的关机,阀门部件的温度为75华氏度;在8到10小时阀门满载;希望40年内这样的循环为200次;温启:经过一个周末55小时的关机,在3到4小时阀门满载;希望40年内这样的循环为1680次;热启:经过一晚8小时的关机,在0.5到1小时阀门满载;希望40年内这样的循环为7520次;因此,在设计时对阀门蒸汽的不平衡力不经过严格计算,容易造成选大油动机阀杆断裂,选小油动机,提不起阀门的情况。
发明内容
本发明的目的是为了解决现有的汽轮机阀门蒸汽不平衡力计算准确性差的问题,提出了一种汽轮机阀门蒸汽不平衡力的计算方法。
本发明所述的一种汽轮机阀门蒸汽不平衡力的计算方法包括预启阀不平衡力计算方法和阀杆不平衡力计算方法;
所述预启阀不平衡力计算方法的具体步骤为:
步骤一、确定预启阀压差系数,并根据该预启阀压差系数计算出预启阀压差P1;
步骤二、计算出预启阀受力面积S1;
步骤三、利用步骤一计算出的预启阀压差P1与步骤二计算出的预启阀受力面积S1做积,得出预启阀不平衡力F1;即F1=P1×S1;
所述阀杆不平衡力计算方法的具体步骤为:
步骤Ⅰ、确定阀杆压差系数,并根据该阀杆压差系数计算出阀杆压差P2;
步骤Ⅱ、计算出阀杆受力面积S2;
步骤Ⅲ、利用步骤Ⅰ计算出的阀杆压差P2与步骤Ⅱ计算出的阀杆受力面积S2做积,得出阀杆不平衡力F2;即F2=P2×S2。
本发明的有益效果是将汽轮机常见阀门进行归类,分不同种类选取不同压差系数,对原有公式进行修订,使得计算更加准确,做到了计算方法的传承性。
附图说明
图1为具体实施方式一中预启阀不平衡力计算方法流程图;
图2为具体实施方式一中阀杆不平衡力计算方法流程图。
具体实施方式
具体实施方式一:结合图1和图2说明本实施方式,本实施方式所述的一种汽轮机阀门蒸汽不平衡力的计算方法包括预启阀不平衡力计算方法和阀杆不平衡力计算方法;
所述预启阀不平衡力计算方法的具体步骤为:
步骤一、确定预启阀压差系数,并根据该预启阀压差系数计算出预启阀压差P1;
步骤二、计算出预启阀受力面积S1;
步骤三、利用步骤一计算出的预启阀压差P1与步骤二计算出的预启阀受力面积S1做积,得出预启阀不平衡力F1;即F1=P1×S1;
所述阀杆不平衡力计算方法的具体步骤为:
步骤Ⅰ、确定阀杆压差系数,并根据该阀杆压差系数计算出阀杆压差P2;
步骤Ⅱ、计算出阀杆受力面积S2;
步骤Ⅲ、利用步骤Ⅰ计算出的阀杆压差P2与步骤Ⅱ计算出的阀杆受力面积S2做积,得出阀杆不平衡力F2;即F2=P2×S2。
在本实施方式中,阀门设计时关注以下几方面内容:
油缸力必须大于1.2倍的预启阀蒸汽不平衡力与1.2倍的关机位置最大弹簧力以及1.2倍的开状态摩擦力;即
油缸力≥1.2×(F1+关机位置最大弹簧力+开状态摩擦力)
其中,预启阀不平衡力为作用在预启阀上的最大蒸汽不平衡力;
假设油缸上所有的力都作用在油动机活塞上,摩擦力为作用在活塞上力的10%;则:油缸力≥1.2×(F1+最大弹簧力-阀杆力+开状态摩擦力)
活塞最小压强≥0.2×1800=360;
为了保证阀门关闭时主阀和预启阀都在阀座上,最小弹簧力必须大于或等于2倍的阀塞和阀杆重量产生的摩擦力与2倍的套筒产生的摩擦力之和;(由阀塞及连接套筒重量产生的,摩擦系数取0.4);即
Fspg,min≥2(Ff-wt+Ff-bsg)
其中,Ff-wt为阀塞和阀杆重量产生的摩擦力,Ff-bsg为套筒产生的摩擦力,Fspg,min为最小弹簧力;
测试主汽阀时,两个调节阀关闭,因此额定蒸汽压力作用在阀杆上,这会对阀杆产生蒸汽不平衡力;为了避免关闭状态下阀塞离开阀座,则:最小弹簧力必须大于或等于1.2倍的阀杆不平衡力F2即
Fspg,min≥1.2×F2;其中,F2=P2×S2,此时阀杆压差P2为额定压力;
关机弹簧力必须大于或等于1.3倍的阀杆不平衡力F2与1.3倍的摩擦力之和;即:
Fspg≥1.3(F2+Ff,max)
其中:Fspg为关机弹簧力,Ff,max为摩擦力;F2=1.05×P2×S2,此时阀杆压差P2为额定压力,并且额定压力为2400;
油动机里克服蒸汽不平衡力提起主阀离开阀座,在开状态,巨大蒸汽不平衡力不再存在,相应的油动力也不再需要;由于油动机力在1000华氏度下长时间作用在阀杆上,对阀杆产生损坏;设计垫圈降低对阀杆的损坏。
具体实施方式二:本实施方式是对具体实施方式一所述的一种汽轮机阀门蒸汽不平衡力的计算方法进一步限定,在本实施方式中,在步骤一中预启阀压差系数的具体分类以及对应具体值为:
对于35WM汽轮机预启阀压差系数为0.15;
对于小机组汽轮机预启阀压差系数为0;
对于不常见机组预启阀压差系数为0.35。
在本实施方式中,经过对压差系数调整和确定,使得计算结果更加准确。
具体实施方式三:本实施方式是对具体实施方式一所述的一种汽轮机阀门蒸汽不平衡力的计算方法进一步限定,在本实施方式中,在步骤Ⅰ中阀杆压差系数的具体分类以及对应具体值为:
对于35WM汽轮机预启阀压差系数为0.15;
对于小机组汽轮机预启阀压差系数为1;
对于不常见机组预启阀压差系数为0.35。
在本实施方式中,经过对压差系数调整和确定,使得计算结果更加准确。
Claims (3)
1.一种汽轮机阀门蒸汽不平衡力的计算方法,其特征在于,该蒸汽不平衡力的计算方法包括预启阀不平衡力计算方法和阀杆不平衡力计算方法;
所述预启阀不平衡力计算方法的具体步骤为:
步骤一、确定预启阀压差系数,并根据该预启阀压差系数计算出预启阀压差P1;
步骤二、计算出预启阀受力面积S1;
步骤三、利用步骤一计算出的预启阀压差P1与步骤二计算出的预启阀受力面积S1做积,得出预启阀不平衡力F1;即F1=P1×S1;
所述阀杆不平衡力计算方法的具体步骤为:
步骤Ⅰ、确定阀杆压差系数,并根据该阀杆压差系数计算出阀杆压差P2;
步骤Ⅱ、计算出阀杆受力面积S2;
步骤Ⅲ、利用步骤Ⅰ计算出的阀杆压差P2与步骤Ⅱ计算出的阀杆受力面积S2做积,得出阀杆不平衡力F2;即F2=P2×S2。
2.根据权利要求1所述的一种汽轮机阀门蒸汽不平衡力的计算方法,其特征在于,在步骤一中预启阀压差系数的具体分类以及对应具体值为:
对于35WM汽轮机预启阀压差系数为0.15;
对于小机组汽轮机预启阀压差系数为0;
对于不常见机组预启阀压差系数为0.35。
3.根据权利要求1所述的一种汽轮机阀门蒸汽不平衡力的计算方法,其特征在于,在步骤Ⅰ中阀杆压差系数的具体分类以及对应具体值为:
对于35WM汽轮机预启阀压差系数为0.15;
对于小机组汽轮机预启阀压差系数为1;
对于不常见机组预启阀压差系数为0.35。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011630566.4A CN112651093B (zh) | 2020-12-30 | 2020-12-30 | 一种汽轮机阀门蒸汽不平衡力的计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011630566.4A CN112651093B (zh) | 2020-12-30 | 2020-12-30 | 一种汽轮机阀门蒸汽不平衡力的计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112651093A true CN112651093A (zh) | 2021-04-13 |
CN112651093B CN112651093B (zh) | 2023-04-21 |
Family
ID=75368050
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011630566.4A Active CN112651093B (zh) | 2020-12-30 | 2020-12-30 | 一种汽轮机阀门蒸汽不平衡力的计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112651093B (zh) |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1202597B (de) * | 1960-01-21 | 1965-10-07 | Gen Electric | Steuerungsventil fuer Dampfturbinen |
JP2000065236A (ja) * | 1998-08-18 | 2000-03-03 | Mitsubishi Heavy Ind Ltd | 排油弁及びこれを具備した蒸気タービン |
CN101581208A (zh) * | 2009-06-01 | 2009-11-18 | 青岛理工大学 | 一种油田井下流量自动平衡注水器 |
CN201884074U (zh) * | 2010-12-03 | 2011-06-29 | 北京全三维动力工程有限公司 | 高压调节阀 |
US20110240128A1 (en) * | 2010-04-02 | 2011-10-06 | Tyco Valves & Controls Lp | Method and apparatus for monitoring operation of a pilot-controlled pressure relief valve |
CN204267969U (zh) * | 2014-11-13 | 2015-04-15 | 甘肃酒钢集团宏兴钢铁股份有限公司 | 一种调节阀的节流减压装置 |
CN105179708A (zh) * | 2015-10-14 | 2015-12-23 | 四川华林自控科技有限公司 | 一种节能平衡高压阀及设计方法 |
CN105631232A (zh) * | 2016-02-03 | 2016-06-01 | 江苏神通阀门股份有限公司 | 高精度的气体介质调节阀选型计算方法 |
CN105757057A (zh) * | 2016-04-27 | 2016-07-13 | 中广核核电运营有限公司 | 汽轮机电液控制系统定位器稳定性试验控制方法 |
CN206017941U (zh) * | 2016-08-16 | 2017-03-15 | 江苏沃慧达工业科技集团有限公司 | 一种智慧型压差调节阀 |
CN109611587A (zh) * | 2018-11-22 | 2019-04-12 | 河北金桥平衡阀门有限公司 | 阀门启闭机构的补偿装置 |
CN208900737U (zh) * | 2018-09-12 | 2019-05-24 | 武汉深能环保新沟垃圾发电有限公司 | 一种汽轮发电机的调节汽阀结构 |
CN110132455A (zh) * | 2019-05-17 | 2019-08-16 | 浙江大学 | 一种圆形阀芯底面不平衡力矩测量装置及测量方法 |
CN110390163A (zh) * | 2019-07-23 | 2019-10-29 | 哈尔滨汽轮机厂有限责任公司 | 一种用于汽轮机阀门快关动态冲击载荷计算方法 |
CN110778507A (zh) * | 2019-09-18 | 2020-02-11 | 新疆昌吉特变能源有限责任公司 | 汽动给水泵进汽调阀非线性补偿控制方法 |
CN111473156A (zh) * | 2020-05-29 | 2020-07-31 | 亿川科技(成都)有限责任公司 | 一种小流量大压差调节阀 |
CN111767663A (zh) * | 2020-05-29 | 2020-10-13 | 江苏神通阀门股份有限公司 | 一种基于cfd仿真的阀门流量系数便捷计算方法 |
-
2020
- 2020-12-30 CN CN202011630566.4A patent/CN112651093B/zh active Active
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1202597B (de) * | 1960-01-21 | 1965-10-07 | Gen Electric | Steuerungsventil fuer Dampfturbinen |
JP2000065236A (ja) * | 1998-08-18 | 2000-03-03 | Mitsubishi Heavy Ind Ltd | 排油弁及びこれを具備した蒸気タービン |
CN101581208A (zh) * | 2009-06-01 | 2009-11-18 | 青岛理工大学 | 一种油田井下流量自动平衡注水器 |
US20110240128A1 (en) * | 2010-04-02 | 2011-10-06 | Tyco Valves & Controls Lp | Method and apparatus for monitoring operation of a pilot-controlled pressure relief valve |
CN201884074U (zh) * | 2010-12-03 | 2011-06-29 | 北京全三维动力工程有限公司 | 高压调节阀 |
CN204267969U (zh) * | 2014-11-13 | 2015-04-15 | 甘肃酒钢集团宏兴钢铁股份有限公司 | 一种调节阀的节流减压装置 |
CN105179708A (zh) * | 2015-10-14 | 2015-12-23 | 四川华林自控科技有限公司 | 一种节能平衡高压阀及设计方法 |
CN105631232A (zh) * | 2016-02-03 | 2016-06-01 | 江苏神通阀门股份有限公司 | 高精度的气体介质调节阀选型计算方法 |
CN105757057A (zh) * | 2016-04-27 | 2016-07-13 | 中广核核电运营有限公司 | 汽轮机电液控制系统定位器稳定性试验控制方法 |
CN206017941U (zh) * | 2016-08-16 | 2017-03-15 | 江苏沃慧达工业科技集团有限公司 | 一种智慧型压差调节阀 |
CN208900737U (zh) * | 2018-09-12 | 2019-05-24 | 武汉深能环保新沟垃圾发电有限公司 | 一种汽轮发电机的调节汽阀结构 |
CN109611587A (zh) * | 2018-11-22 | 2019-04-12 | 河北金桥平衡阀门有限公司 | 阀门启闭机构的补偿装置 |
CN110132455A (zh) * | 2019-05-17 | 2019-08-16 | 浙江大学 | 一种圆形阀芯底面不平衡力矩测量装置及测量方法 |
CN110390163A (zh) * | 2019-07-23 | 2019-10-29 | 哈尔滨汽轮机厂有限责任公司 | 一种用于汽轮机阀门快关动态冲击载荷计算方法 |
CN110778507A (zh) * | 2019-09-18 | 2020-02-11 | 新疆昌吉特变能源有限责任公司 | 汽动给水泵进汽调阀非线性补偿控制方法 |
CN111473156A (zh) * | 2020-05-29 | 2020-07-31 | 亿川科技(成都)有限责任公司 | 一种小流量大压差调节阀 |
CN111767663A (zh) * | 2020-05-29 | 2020-10-13 | 江苏神通阀门股份有限公司 | 一种基于cfd仿真的阀门流量系数便捷计算方法 |
Non-Patent Citations (4)
Title |
---|
FLOYD D.JURY: "fundamentals of gas pressure regulation", 《TECHNICAL MONOGRAPH》 * |
吴斌等: "R290压缩机内排气管路气流脉动与模态分析", 《日用电器》 * |
周灵锋: "预启式调节阀的静态和动态特性研究", 《中国优秀硕士学位论文全文数据库信息科技辑》 * |
王文强等: "600 MW超临界汽轮机配汽不平衡力影响及配汽方案优化", 《电力大数据》 * |
Also Published As
Publication number | Publication date |
---|---|
CN112651093B (zh) | 2023-04-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Mikalsen et al. | Predictive piston motion control in a free-piston internal combustion engine | |
CN110717219B (zh) | 航空发动机整机状态下压气机进口流量的获取方法及装置 | |
Chladny et al. | Flatness-based tracking of an electromechanical variable valve timing actuator with disturbance observer feedforward compensation | |
EP2256320B1 (en) | Systems and methods for controlling fuel flow to a turbine component | |
CN108227518B (zh) | 一种汽轮机仿真模型的修正方法及装置 | |
CN103092149A (zh) | 基于模型的发电量需求控制 | |
CN103850726A (zh) | 一种快速确定汽轮机定滑压优化曲线的方法 | |
Shalan et al. | Parameter estimation and dynamic simulation of gas turbine model in combined cycle power plants based on actual operational data | |
Mehrpanahi et al. | Dynamic modeling of an industrial gas turbine in loading and unloading conditions using a gray box method | |
Mehrpanahi et al. | A novel dynamic modeling of an industrial gas turbine using condition monitoring data | |
CN104200121A (zh) | 基于机组运行数据的阀门流量函数优化方法 | |
Pondini et al. | Models of control valve and actuation system for dynamics analysis of steam turbines | |
Najjar et al. | Degradation analysis of a heavy‐duty gas turbine engine under full and part load conditions | |
CN113107623A (zh) | 一种双低压缸汽轮机低负荷运行时提升供热抽汽参数的装置及方法 | |
CN111400876B (zh) | 一种基于不同约束条件下的金属构件热机械疲劳寿命预测方法 | |
CN112651093A (zh) | 一种汽轮机阀门蒸汽不平衡力的计算方法 | |
CN110646193B (zh) | 一种获取汽轮机高压调门流量特性的试验方法 | |
Tsoutsanis et al. | Performance assessment of classical and fractional controllers for transient operation of gas turbine engines | |
CN103233787A (zh) | 节流调节型汽轮机转子热应力预估方法 | |
CN113836642B (zh) | 一种航空发动机部件低转速特性扩展方法 | |
CN116257943A (zh) | 一种核电汽轮机压力参数仿真方法 | |
Tai et al. | Adaptive nonlinear feedforward control of an electrohydraulic camless valvetrain | |
Bize et al. | Frequency control considerations for modern steam and combustion turbines | |
Pleshanov et al. | Calculating the dynamic characteristics of a boiler-utilizer at the Novogor’kovskaya heat and electric power plant | |
US9574462B2 (en) | Method for operating a power plant installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |