CN112633704A - Engineering construction site quality management system and method - Google Patents
Engineering construction site quality management system and method Download PDFInfo
- Publication number
- CN112633704A CN112633704A CN202011559190.2A CN202011559190A CN112633704A CN 112633704 A CN112633704 A CN 112633704A CN 202011559190 A CN202011559190 A CN 202011559190A CN 112633704 A CN112633704 A CN 112633704A
- Authority
- CN
- China
- Prior art keywords
- module
- construction
- terminal
- data acquisition
- engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 94
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000003326 Quality management system Methods 0.000 title claims abstract description 13
- 238000004891 communication Methods 0.000 claims abstract description 16
- 238000007726 management method Methods 0.000 claims description 35
- 238000013024 troubleshooting Methods 0.000 claims description 7
- 238000012502 risk assessment Methods 0.000 claims description 6
- 230000008520 organization Effects 0.000 claims description 4
- 238000007619 statistical method Methods 0.000 claims description 4
- 238000011835 investigation Methods 0.000 abstract description 2
- 230000007547 defect Effects 0.000 description 2
- 238000003908 quality control method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a quality management system and a method for an engineering construction site, which comprises a system management terminal and a data acquisition terminal, wherein the data acquisition terminal comprises a communication module, a positioning module and a camera, the system management terminal comprises an expected construction information generation module and a construction information real-time acquisition module, and the construction information real-time acquisition module comprises a problem investigation module and a problem recording module.
Description
Technical Field
The invention relates to the field of engineering construction related products, in particular to a system and a method for managing the quality of an engineering construction site.
Background
The construction of project engineering is staged and belongs to a dynamic process, a plurality of uncertain factors can inevitably occur in the process of advancing, a construction unit must control and master the real-time condition of the engineering construction, must master the latest condition of the construction, finds problems in time and solves the problems. In a management system of a building project, the quality supervision of the building project is a key core work, which runs through the whole construction process, and for the reinforcement of the supervision and management of the project site, corresponding measures are needed to be taken to improve the construction quality and ensure the smooth progress of the project construction, thereby realizing corresponding economic benefits and social benefits.
However, the construction quality control level of the current construction engineering is low, the backward mode of manual paper recording quality problems is still generally adopted in construction site quality control, and the defect is caused.
Disclosure of Invention
The invention aims to provide a system and a method for managing the quality of an engineering construction site, which aim to solve the problem of a laggard mode that the existing construction engineering construction quality management and control level is low and the quality of the construction site is still generally recorded by manual paper.
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides an engineering construction site quality management system, includes system management terminal and data acquisition terminal, data acquisition terminal include communication module, orientation module and camera, system management terminal is including anticipating construction information generation module and construction information real-time collection module, construction information real-time collection module includes problem investigation module and problem record module.
Preferably, the system management terminal further comprises a risk assessment module and a reminding module.
Preferably, the camera is used for collecting field images, the positioning module is used for collecting position information of a construction field, and the communication module is used for being connected with the system management terminal.
Preferably, the data acquisition terminal further comprises a construction drawing module, and a drawing database is stored in the construction drawing module.
Preferably, the data acquisition terminal is one of a mobile phone terminal or an IPAD.
Preferably, the system management terminal further comprises a statistical analysis module.
A quality management method for engineering construction site comprises the following steps,
the method comprises the following steps: the system management terminal and the data acquisition terminal are connected through the communication module to carry out real-time communication;
the method comprises the following steps: a camera on the data acquisition terminal shoots and records site construction and sends shot and recorded information to the system management terminal;
the method comprises the following steps: the system management terminal carries out real-time positioning on the site position through the positioning module, stores the construction site problems in the problem troubleshooting module and finally uploads the problems to the problem recording module;
the method comprises the following steps: and establishing an engineering construction model through the expected construction information generation module, and simulating an engineering construction organization scheme and main construction procedures to obtain expected construction information of the engineering and compare the expected construction information with the construction problems.
Compared with the prior art, the invention has the beneficial effects that:
the project construction site quality management system and the method thereof are characterized in that a system management terminal and a data acquisition terminal are connected through a communication module for real-time communication, a camera on the data acquisition terminal shoots the site construction and sends the shot information to the system management terminal, the system management terminal locates the site position through a locating module in real time, the construction site problems are stored in a problem troubleshooting module and are finally uploaded to a problem recording module, an engineering construction model is established through an expected construction information generation module, an engineering construction organization scheme and main construction procedures are simulated, the method and the device have the advantages that the expected construction information of the project is obtained and compared with the construction problem, the defects of long quality problem rectification period, uneven data and the like in the traditional project construction quality management are overcome, the time consumption of intermediate links can be reduced, and the construction information is convenient to transmit.
Drawings
FIG. 1 is a system structure diagram of the quality management system and method of the seed engineering construction site of the present invention
The system comprises a system management terminal 1, a data acquisition terminal 2, a communication module 3, a positioning module 4, a camera 5, an expected construction information generation module 6, a construction information real-time acquisition module 7, a problem troubleshooting module 8, a problem recording module 9, a risk assessment module 10, a reminding module 11, a construction drawing module 12 and a statistical analysis module 13.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings of the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1, an embodiment of the present invention is provided: a project construction site quality management system comprises a system management terminal 1 and a data acquisition terminal 2, wherein the data acquisition terminal 2 comprises a communication module 3, a positioning module 4 and a camera 5, the system management terminal 1 comprises an expected construction information generation module 6 and a construction information real-time acquisition module 7, and the construction information real-time acquisition module 7 comprises a problem troubleshooting module 8 and a problem recording module 9.
Further, the system management terminal 1 further comprises a risk assessment module 10 and a reminding module 11, wherein the risk assessment module 10 is used for carrying out automatic risk assessment on the found abnormity and reasons, automatically issuing early warning, and intelligently adjusting expected construction information; and the reminding module 11 is used for sending the expected construction information to the supervisor terminal and reminding the supervisor when the expected construction information is updated.
Furthermore, the camera 5 is used for on-site image acquisition, the positioning module 4 is used for acquiring the position information of the construction site, and the communication module 3 is used for being connected with the system management terminal.
Further, the data acquisition terminal 2 further comprises a construction drawing module 12, wherein a drawing database is stored in the construction drawing module, and various drawings can be called at any time.
Further, the data acquisition terminal 2 is one of a mobile phone terminal or an IPAD.
Further, the system management terminal 1 further includes a statistical analysis module 13 capable of generating a statistical chart for the number of problems occurring every day.
The working principle is as follows: firstly, a system management terminal 1 and a data acquisition terminal 2 are connected through a communication module 3 for real-time communication, a camera 5 on the data acquisition terminal 2 shoots and records site construction and sends shot and recorded information to the system management terminal 1, the system management terminal 1 positions a site position in real time through a positioning module 4, a construction site problem is stored in a problem troubleshooting module 8 and finally uploaded to a problem recording module 9, an engineering construction model is established through an expected construction information generating module 6, and an engineering construction organization scheme and a main construction process are simulated to obtain expected construction information of an engineering and compare the expected construction information with the construction problem.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Claims (7)
1. The utility model provides an engineering job site quality management system, includes system management terminal (1) and data acquisition terminal (2), its characterized in that: the system comprises a data acquisition terminal (2) and a system management terminal (1), wherein the data acquisition terminal comprises a communication module (3), a positioning module (4) and a camera (5), the system management terminal comprises an expected construction information generation module (6) and a construction information real-time acquisition module (7), and the construction information real-time acquisition module (7) comprises a problem troubleshooting module (8) and a problem recording module (9).
2. The engineering construction site quality management system according to claim 1, wherein: the system management terminal (1) further comprises a risk assessment module (10) and a reminding module (11).
3. The engineering construction site quality management system according to claim 1, wherein: the camera (5) is used for collecting field images, the positioning module (4) is used for collecting position information of a construction site, and the communication module (3) is used for being connected with a system management terminal.
4. The engineering construction site quality management system according to claim 1, wherein: the data acquisition terminal (2) further comprises a construction drawing module (12), and a drawing database is stored in the construction drawing module (12).
5. The engineering construction site quality management system according to claim 1, wherein: the data acquisition terminal (2) is one of a mobile phone terminal or an IPAD.
6. The engineering construction site quality management system according to claim 1, wherein: the system management terminal (1) further comprises a statistical analysis module (13).
7. A quality management method for an engineering construction site is characterized by comprising the following steps: comprises the following steps of (a) carrying out,
step 1: the system management terminal (1) and the data acquisition terminal (2) are connected through the communication module (3) to carry out real-time communication;
step 2: a camera (5) on the data acquisition terminal (2) shoots and records site construction and sends shot and recorded information to the system management terminal (1);
and step 3: the system management terminal (1) carries out real-time positioning on the site position through the positioning module (4), stores the construction site problems in the problem troubleshooting module (8), and finally uploads the problems to the problem recording module (9);
and 4, step 4: and establishing an engineering construction model through an expected construction information generation module (6), and simulating an engineering construction organization scheme and main construction procedures to obtain expected construction information of the engineering and compare the expected construction information with construction problems.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011559190.2A CN112633704A (en) | 2020-12-25 | 2020-12-25 | Engineering construction site quality management system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011559190.2A CN112633704A (en) | 2020-12-25 | 2020-12-25 | Engineering construction site quality management system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112633704A true CN112633704A (en) | 2021-04-09 |
Family
ID=75325429
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011559190.2A Pending CN112633704A (en) | 2020-12-25 | 2020-12-25 | Engineering construction site quality management system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112633704A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116050942A (en) * | 2023-03-20 | 2023-05-02 | 国艺天成建设工程技术有限公司 | Fine use management system and management method for engineering construction materials |
-
2020
- 2020-12-25 CN CN202011559190.2A patent/CN112633704A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116050942A (en) * | 2023-03-20 | 2023-05-02 | 国艺天成建设工程技术有限公司 | Fine use management system and management method for engineering construction materials |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106056695B (en) | A kind of intelligent mobile inspection terminal based on Internet of Things | |
CN110728443A (en) | Motor full life cycle management and control system | |
CN107862392B (en) | Equipment account management and control method based on power distribution network intelligent operation and maintenance management and control platform | |
CN112202242A (en) | Tower comprehensive monitoring and intelligent early warning platform and early warning method | |
CN104680612A (en) | Automatic IT equipment inspection method | |
CN111369220A (en) | Teacher's cloud platform is built to wisdom | |
CN112633704A (en) | Engineering construction site quality management system and method | |
CN110523782A (en) | A kind of rail rolling production line real-time monitoring system and method | |
CN115047841A (en) | Wind turbine generator system remote fault diagnosis system based on cloud platform | |
CN116307664A (en) | Intelligent manufacturing flow management system based on big data | |
CN111125235A (en) | Production control method | |
CN116468419A (en) | Rail transit big data operation and maintenance decision analysis method, device and storage medium | |
WO2022242420A1 (en) | Apparatus and method for recording number of times, duration and cause of training interruption of analog machine | |
CN111369217A (en) | Old city transformation project engineering construction management system | |
CN111130009B (en) | Method for determining running state of visual image equipment of power transmission line channel | |
CN114118468A (en) | Intelligent inspection management system and method for wind power plant | |
CN114552781A (en) | Monitoring system for installation quality of transformer substation equipment | |
CN114023134A (en) | Digital information electric power simulation training system | |
CN202755005U (en) | Iron making blast furnace production monitoring alarm system | |
CN115313659B (en) | Energy equipment capacity optimal configuration method based on industrial Internet | |
CN114815974B (en) | Construction engineering progress data input device and working method thereof | |
CN113887758B (en) | Visual inspection system and method for nuclear power station equipment | |
CN204228193U (en) | Equipment information collection instrument | |
CN202424777U (en) | Water conservancy supervising device | |
CN216437270U (en) | Application system for visual data in industrial production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20210409 |
|
WD01 | Invention patent application deemed withdrawn after publication |